HomeMy WebLinkAboutWPO202100056 VSMP - SWPPP 2022-01-31Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Waverly Residence
Opposite 7085 Batesville Road
Afton, VA 22920
Prepared by:
Line and Grade, LLC
Prepared for:
Cyrena Sparkman
SWPPP Preparation Date:
January 31, 2022
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
CONTENTS:
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
A. Corrective Action Log
B. SWPPP Amendment Log
C. Grading and Stabilization Activities Log
Section 1. Registration statement
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT #:
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM PLAN/ID #:
CONSTRUCTION ACTIVITIES (VAR10) TECHNICAL CRITERIA: IIB ❑ IIC ❑
REGISTRATION STATEMENT Z019
Application type. 2 NEW PERMIT ISSUANCE
(CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE
❑ MODIFICATION WITHOUT ACREAGE INCREASE
❑ EXISTING PERMIT RE -ISSUANCE
Section 1. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section V. (per Part Ill. K. of the VAR10 Permit).
Operator Name:
Cyrena Sparkman, Property Owner (Contractor TBD)
Contact person:
C rena Sparkman, Property Owner Contractor TBD
Address:
41 Wicket Way; POB 2304
City, State and Zip Code:
Cashiers, NC 28717
Phone Number:
703-200-1947
Primary and CC Email:
cy@sparkman.net; charles.lee.sparkman@gmail.com
B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES
and include a valid email. May we transmit correspondence electronically? YES 0 NO ❑
Section II. Construction Activity Information.
A.
Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site.
B.
Project site location information.
Construction Activity Name:
Waverly Residence
Address:
Near 7085 Batesville Road
City and/or County and Zip Code:
Afton, VA 22920
Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
37.995005,-78.743951
Latitude and Longitude
(6-digit, decimal degrees format):
37.995650,-78.743861
C.
Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest
one -hundredth of an acre.
Total land area of development (include entire area to be
disturbed as approved in the Stormwater Management Plan):
55.45 ac
Primary estimated area to be disturbed (include portions with
Erosion and Sediment Control Plan approval only):
3.26 ac
Off -site estimated area to be disturbed (if applicable):
D.
Property Owner Status:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE 2
E.
Nature of the Construction Activity Description (i.e. commercial,
industrial, residential, agricultural, environmental, utility):
Residential / Agricultural
F.
Municipal Separate Storm Sewer System (MS4) name(s) (if the
site is discharging to a MS4):
G.
Estimated Project Dates (MM/DD/YYYY).
Start Date:
03/01/2022
Completion Date:
09/01/2023
H.
Is this construction activity part of a larger common plan of
development or sale?
YES ❑ NO Qr
Rev 11/2020 PAGE 1 1 6
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
I. 6' Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page.
HUC
NAME(S) OF RECEIVING WATERBODY
020802040101
Stockton Creek - Mechums River
Section III. Off -site Support Activity Location Information.
List all off -site support activities and excavated material disposal areas being utilized forthis project. Include additional
areas on a separate page.
Off -site Activity Name:
Address:
City or County:
Off -site Activity Entrance Location (description, street
address and/or latitude/longitude in decimal degrees):
Latitude and Longitude (6-digit, decimal degrees format):
Is this off -site activity an excavated material disposal
area?
YES ❑ NO ❑
If this off -site activity is an excavated material disposal
area, list the contents of the excavated fill material:
Will a separate VPDES permit cover this off -site activity?
YES ❑ NO ❑
Section IV. Other Information.
A.
A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submittingthe
Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been
prepared.
B.
Has an Erosion and Sediment Control Plan been
submitted to the VESC Authority for review?
YES 2 NO ❑
Erosion and Sediment Control Plan Approval Date (for
the estimated area to be disturbed MM/DD/YYYY):
C.
Has land -disturbance commenced?
YES ❑ NOV
D.
Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications
(AS&S), attached the completed AS&S Entity Form.
AS&S Entity Name (if different from the Operator
identified in Section I
E.
Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Billing Name:
Contact Name:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
Rev 1112020 PAGE 2 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated M54 system.
9VAC25-880-70. Part III. K Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information forstate permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively, or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in Ink(:
Date Signed:
Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please
send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP
Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority. please send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp@deg.virpinia.goy
Rev 11/2020
PAGE 3 16
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section
C.) (DEQ coverage letter to be provided when obtained)
Section 3. Nature of activity
Project Description:
This project consists of the construction of a single family residence and associated access. The existing site is
55.45 acres of vacant wooded land bordered to the north by Stockton Mill Creek and to the south by Batesville
Road.
Erosion and Sediment Control Sequencing:
1. CONTRACTOR SHALL CONDUCT A PRE -CONSTRUCTION MEETING WITH THE PLAN APPROVING AUTHORITY
PRIOR TO ANY LAND DISTURBANCE OR E&S CONTROL INSTALLATIONS.
2. INSTALL CONSTRUCTION ENTRANCE, SEDIMENT TRAP, AND PERIMETER CONTROLS PRIOR TO ANY
DISTURBANCE.
3. ONCE INITIAL MEASURES ARE IN PLACE, REQUEST AN INSPECTION OF THE INITIAL EROSION AND SEDIMENT
CONTROL MEASURES FROM THE COUNTY OF ALBERMARLE E&S INSPECTOR. CALL 24-HOURS IN ADVANCE
OF INSPECTION.
4. PROTECT PERMANENT VEGETATION FOR THE DURATION OF THE PROJECT.
5. COMMENCE DEMOLITION NECESSARY TO PERFORM PROPOSED WORK ONLY (INCLUDING EXCAVATION
WORK).
6. CONTRACTOR TO LEAVE EXISTING STABILIZED AREAS IN A NON -EROSIVE CONDITION UNTIL NECESSARY
TO INSTALL PROPOSED IMPROVEMENTS. DISTURBED AREAS NOT IMPROVED SHALL BE SEEDED WITHIN 14
DAYS OF DISTURBANCE.
7. CONSTRUCT STORM STRUCTURES, IF APPLICABLE, STARTING AT THE DOWNSTREAM TERMINUS OR TIE-IN.
BACKFILL ALL EXCAVATIONS AND TRENCH AREAS.
8. COMMENCE CONSTRUCTION OF PROPOSED PAVING AND SITE ELEMENTS, WITH THE EXCEPTION OF ANY
PROPOSED BMPS.
9. FOR GRASSY AREAS: INSTALL PERMANENT SEEDING AND MULCH. STABILIZE ALL DISTURBED AREAS.
10. FOR GRAVEL AREAS: RESTORE GRAVEL AFTER TRENCHING AND EXCAVATION OPERATIONS ARE
COMPLETE.
13. REPAIR ANY EROSION AND REMOVE ANY SEDIMENT.
15. DRESS AND OVER -SEED ALL DISTURBED AREAS AS NECESSARY TO AFFECT PERMANENT VEGETATIVE
COVER. STABILIZE ALL REMAINING DISTURBED AREAS WITH TOPSOIL, SEED, AND MULCH ONCE WORK IS
COMPLETE.
16. REMOVE SEDIMENT TRAP AND ASSOCIATED DIVERSION DIKES ONCE PERMANENT VEGETATIVE COVER HAS
BEEN ESTABLISHED ON SITE.
17. BEGIN INSTALLATION OF ANY PROPOSED BMPS ONCE ALL CONTRIBUTING AREAS ARE STABILIZED AND
FREE OF DEBRIS. REFER TO INSTALLATION CHECKLIST AND INSPECTION MILESTONES FOR CONSTRUCTION
MILESTONES. INSTALL PERMANENT CONVEYANCE CHANNELS TO BMPS AT THIS TIME, STABILIZING
IMMEDIATELY WITH EC-2 TYPE 1 MATTING.
18. AFTER FINAL SITE STABILIZATION AND APPROVAL FROM THE APPROPRIATE EROSION AND SEDIMENT
CONTROL AUTHORITY, THE SILT FENCE, INLET PROTECTION AND OTHER STABILIZATION MEASURES SHALL
BE REMOVED.
Section 4. Erosion and Sediment Control Plan.
EROSION & SEDIMENT CONTROL NARRATIVE: EROSION AND SEDIMENT CONTROL MEASURES: MAINTENANCE:
PROJECT DESCRIPTION:
THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A SINGLE FAMILY RESIDENCE AND ASSOCIATED ACCESS. THE DISTURBANCE AREA ASSOCIATED WITH
THIS PROIELTIS 1:326AC L142.013 SR. IT IS ANTIUPAMDTWITTHE WORK WILLUAK IN FEBRUMYMD VST J2 MONTHS.
E4STING SITE CONDITIONS:
THE SITE CONSISTS OF VACANT WOODED LAND BORDERED TO THE REM BY STCCKTON MILL CHEM. ME SLOPES WITHIN THE PROJECT AREA RANGE
FROM3TO3OPERCE1W.
ADJACFMAREAS:
THE PROPOSED PROJECT IS BORDERED BY SINGLE FAMILY RESIDENCES ON ALL BIDS, BY STO KTON MILL CREED( TO THE NORTH, AND BY BATESVILLE
CORD OTHEWIJ H.
OFIESITEAREAS:
T IS NOT ANTICIPATED THAT ANY OFFSITE FIBERS WILL BE DISTURBED DURING CONSTRUCTION. UNSUITABLE MATERIALS RESULTING FROM THE
OMMUSED WVRKSHALL BE HW LED FROM THESTEAND DISPOSED OFATAN APPROVED DISPOSALSM PERMITTED SEPARATELY FROM THIS PROJECT.
SOILS:
SEETHE USDASOUS DELINEATION MAPBHEETC3.0.
COMMLAREAS:
THISSITE W15NOCRITICALMR lNTIIEIMMEDATEVICINMOFTIIEMOPOSEDMWTRUMON.HOWEVER,PROWRERMONMWROLMEASURESAS
SHOWM ON THE PLANS SHALLBE PDT IN PACETO PREVENTSHT FROM LEAVING THE PROJECTAIM AND ENTERING MESTREAM BUFFER MMHRL
EROSION as SEDIMENT CONTROL MEASURES:
MERE TO THIS SHEETFLTRA UST OFALL PROPOSED EROSION AND SEDIMENT CONTROL MEASURES TO BE USED ON SIZE.
RERNMENTSTABILIZATION:
THE SIZE WILL BE STABIU]ED THROUGH THE USE OF PERMANENT SEEDING, STONE AND RIPUP, LWDSCAPNG, AND PAVEMENT. SEEDING INFORMATION,
DATES AND AMENDMENTS ME INCLUDED ON THE PANS. SOIL TESTING SHALL P BE COMPLETED THE CONTRACTOR TO DETERMINE THE SUITABILITY OF
FASTING SOILS AND THE NEED FOR MY SOIL AMENDMENTS TO ENSURE THAT PERMANENT SEEDING WILL GROW EFFECTIVELY.
STORM WATER RUNOFF CONSIDERATIONS:
6TORMWATER RUNOFF DURING CONSTRUCTION WILL BE DIRECTED THROUGH APPROPRIATE EROSION AND SEDIMENT CONTROLS TO CLEAN WATER
BEFORE DISCHARGING TO AN ADEQUATE OUTI PROTECTED FROM EROSION AND SEDIMENT AS SHOWM ON THE PLANS.
MAINTENANCE:
ALL FIVE MEASURES SHALL BE INSPECTED REGULARLY AS REQUIRED BY STATE STANDARDS AND MAINTANED IN GOOD WORMNG ORDER. REQUIRED
REPAIRS SHALL BE MADE I MMEDATELY. SEE THE MAINTEMANCE NARRATIVE ON THIS SHEET FOR SPECIPC hW NTENANCE ITEMS AND INSPECTION TIMES.
ALBEMARLE COUNTY EROSION & SEDIMENT CONTROL NOTES:
General mnstruedon notes for Erosion and Sediment Control plans
I. The plan approving authority ..it be notified one week prior to th"it-oaswetion
onf venee, one week prior to the commencement of land disturbing Activity, said one week
,nor .,he final inspection.
All erosion and sediment control measures will be comtmcad and maintained according to
arminnitim naaidards and specifications Offlm Virgin Erosion and Sediment Control
Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control
Regulations.
3. All erosion indictment mewl measures Are to be Placed Prior to or as the first step in
-luring.
4. A copy ofre approved erasion and sediment control plan dell be maintained As Use site at
All fime .
5. Prior m conmmcing land disturbing activities in areas other than indicated On these plans
lincluding, but not limited m, off -site borrow or waste area), the contractor shell submit a
supplementary erosion control plan to the owner for review and appraisal by the plan
approving aaftHt,
6. The mnnomar is respoulble for im it tim ofany addidwal mminn canwl meawres
necessary to pmrmn erosion and sdimentation As determined by the plan approving
authority.
- All disturbed anus arc to drain to approved sediment mntmi nleasmes at all times during
land disturbing asouUses and consist site dcvebpment until Goal slaMlivtim is achieved.
8. During dewsecong opernims. water all be pumped into an approved filtering device.
9. The comet air still ti peatall mossion control meavms wriest lly and after each CHI
producing RioSH cv iiY ��aca�Y. cmi. a w cIF.... A w...a... t.R. tRF cRccnvcaeas of
the ressi control deuces shall be de immediately,
M All fill material W be alkali from m approved, designated bowwaret,
11. All waste materials shall be rakm m an approved waste area. Earth fill shall be ireN
materials only, free ofaion, stump; wood, mbbish, and ores debris.
12. Boww as waste areas are to be reclaimed within] days of completion per Zoning
Ordinance section 5.1.28.
13. All i.eo materials shall be transtomd in mmplimca win, somen 13-301 of the Cade of
Almonds,
14. Botrow, fill or waste activity involving industnal-type powm saimpmem shall be limited to
the hours of 1 Ooam m 9:OUym.
15. BAww, fill or waste activity shall be conducted in a air manner thm maintains lateral
mpllmr, or order to minimize my havrd ro tenons, Physical damage to adjacent land and
commitments, and damage to my public street bemuse it slides, malicong, or collatm.
16. The developer shall reserve the right to install, maintim, remove Or waived W pemuinent
stonmwater maangemut facilities where applicable all erosion control measures required
by this plan regardless ofthe sale olmy, [or, unit, building or other proton ofthe property.
IT Temporary smbdvatim shall be micaryrery, mad, and mulching. Seeding is m be ALL 75
1 harsere, and in the months Of September to February to crosiat a 50150 mu of Amua1
Ryeareas and Cereal Winter Rye, of in March and April to consist of Annual Rye, or May
Ilaough Augum m consist ofGermn Millet. Straw mulch n to be appliedat 8016v10Ust.
Alternatives are subject To.pprovd by the County erosion mnral inspector.
,S. Pcommint stabilisation shell be lime and Gardiner, pemuaiem seeding, And mulch.
Agrimlmml guide lion eAlail be applied at 90NMIOXUC inmryomted into the Lisp 4-6
inchesofmil. Feldilinershall be aglied at lIl(glbGacre mdcOtvsirt Ofa 10-20.10 nutriem
nuis, Pewmeait seding shall Iw tplied At 180ficam a and consist oF95%Kenmdry 31 m
Tall Fescue and 0-5% Peremiai Ryrgmss or Kentucky Blueg , S. mulch is 0 be
andiiedat IHIRM/100I AlteoativesaowbjWtoapmvtdbyre COmtyeemsionem I
insectemer.
19, Malaiaeaiann: All a msuree are m be inspecad wetkly and after each mint.]]. Anydamage
or clogging ro swctuml measures is to be repair immenmly. Silt traps ere ro be cleaned
when 50%of the wet storage Volume is fined with sdimut. AIL seeded areas am m be
eweded when necessary to mhiwea good staid Of gross. Silt frnceanddiversiondykes
which are mllening sedimem ro half their height most be deand and repaired
mmdpeoner
20. ALI fLmi si prom it roti nsindn, wh s merit onwl omsu need a subjw d win, l by a of
Cousite comenrmtion, whm measures are no lmgmmeded, eubjmt to approval byn,e
County erosion control inspector,
UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MNNTMNED IN ACCORDANCE WITH THE
MINIMUM STANDARDS AND SFFCIRCATIONS OF THE LATEST EDITION OF ME VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS AND VESC
HANDBOOK OR COUNTY OF ALBERMARLE STANDARDS, WHICHEVER ARE MORE STRINGENT.
A STAB UZED STONE PAD WITH A FILTER FABRIC UNDERLINER LOCATED AT POINTS OFVEHICUW! INGRESS AND EGRESS ON ACONSTRULTON SITE
SILT FENCE-3.05
A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC ALTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND
ENTRENCHED.
ASEDIMENTFlLTER LOCAMDATTHE IMETTO STORM SENNM CULVERTS.
A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED ATTIRE TOP OR RASE OFASLOPLNG DISTURBEDAREA
ATEMMRARY PONDINGAREA FORMED BY CONSTRUCTING AN MORRIS EMBANKMENT WITH ASTONE OIRIET.
OUTIET POTECTON-3.1G
A PERMANENT ODREF PROTECTION MEASURE THAT CONSISTS OF STRUCTURALLY TUNED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES
PLACED AT THE OUTLETS OF ALL PIPES OR PAYED CHANNEL SECTIONS.
TEMPORARY SEEDI NG - 3.31
THE ESTABLISHMENT OFATEMPORARY VEGETATIVE COVER ON DISTURBED AREA$ THAT WILL NOT BE BROUGHT TO ANAL GRADE FOR PERIODS OF SO DAYS
TOONE YEAR BY SEEDING WITH APPROPRIATE RAPOLYGROWING ANNUAL PIANI
PERMNUENTSEEDING-332
THEESTABLSHMENT OF PERENNIALVEGETATIVE COVER BY PLANTING SEED ON FOUGHGRMLED AREAS R-ol NOT BE BROUGHTTO ANAL GRADE FORA
YEAR OR MORE OR WHERE PERMANENT VEGUATNE COVER IS NEEDED ON ANEGRADED AREAS IN ACCORDANCE WOH EROSION AND SEDIMENT CONTROL
TECHNICAL BULLETIN NO.4: NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES.
MULCHING-3.35
APPLICATION OF PANT RESIDUES OR OTHER SUITABLE MATERIALS TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE OVERIAND FLOW
VELOCITIES. FOSTERS PLANT GROWTH BY INCREASING AMMILABLE MOISTURE AND PROVIDING INSULATION AGAINST EXTREME HEAT OR COLD. SHOULD BE
APPLIED TO ALL SEEDING OPERATION, GR EG PUNT MATERIALS WHICH CO NOT PROVIDE ADEQUATE SOIL PROTECTION BY THEMSELVES, AND RARE MGM
WHICH CANNOT BE SODDED DUE TO THE SEASON BUT WHICH STILL NEED PROTECTION TO PREVENT SOIL LOSS.
THE INSTALLATION OF PROTECTIVE COVERING (BLANKED OR A SOIL STAMUZARON MAT ON A PREPARED PLANTING AREA OF A STIES SLOPE CHANNEL, OR
SHORELINE.
DUST CONTROL-3.39
REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMJUTION, AND CONSTRUCTION ACTIVITIES.
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
ES3: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACIICFS WILL BE CONSTRUCTED AND
hW NTAINED ACCORDING TO MINIMUM STANDARDS AND $MORMONS OF THE MRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND
VIRGINA REGULATIONS VR 62502G] EROSION AND SEDIMENT CONTROL REGULATIONS (4VACSD30).
MR : THE PIANAFPROMNG AUTHORITY MUST ED NOTIFIED ONE WED PRIOR TO THE PREmNSTRUCIION CONFERENCE, ONE WEEK PRIOR TO THE
COMMENCEMENT OF LAND DISTURBING ACrl AND ONE WEEK PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND
DISTURBER MUST BE PROVIDED TO THE PL INMPRMNG AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE L NDDISTURBING ACTMW SHOWN
ON THE APPROVED PLW.IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE LANDDISTURBING ACTIVITY, THE PLANS APPROVAL WILL BE
REVOKED.
M3: All EROSION AND SEDIMENT CONTROL MEASURES ME TO BE PLACED PRIOR TO OR AS SOON AS THE FIRST$MR IN CLEARING.
ES-: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN 8.1 BE hWNTAINED ON THE SITE ATALLTIMES.
MR: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN MGM GREG THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF
SITE BORROW OR WASTED MEAS, THE CONTRACTOR SHALL SUBMIT A SUPPIEMENTMY EROSION CONTROL PLAN TO THE OWNER MR REVIEW
AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
ESG: THE CONTRACTOR IS RESPONSBIE FOR INSTALATON OF MY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
ES]: ALL DISTURBED AEA$ ME TO GRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTWTES AND
DURING SITE DEVELOPMENT UNTIL FINAL $TMILIUTION IS ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLA MPROMNG AUTHORITY, THE
CONTROLS SHALL BE REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF TEMPORARY
MEASURES SHALLBE PERMANENTYSTMIUZEDTO PREVENT FURTHER EROSION AND SEDIMENTATION.
ESB: DURINGDEWATERING OWMnONS,WAMRWILLBEWMPMIWOMMF M RLTERINGDEVICE
Ma: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND IMMEDIATELY AFTER FACH
RUNOFF£RODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO hW NTAIN THE EFFECTVENESS OF THE EROSION CONTROL
DEVICES SHALL BE MADE IMMEDIATELY.
ES30: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT WAS BEEN TRMSPORTED ONTO A PAYED OR PUBLIC ROAD
SURFACE
STILL: SEEDING OPERATIONS SHALL BE INLMTED WITHIN ] Dan AFTER REACHING FINAL GRACE OR UPON SUSPENSION OF GRADING OPERATIONS FOR
M ANTICIPATED DURATION OF GREATER THAN 14 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR ASPECIFIC All
ES32: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND MR MOVEMENT OF DUST FROM EXPOSED Was WHICH MAY PRESENT
HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR FROM ANIMAL OR PUNT UFE.
M13: A VSMP IS REQUIRED FOR FROJECS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED CHEMPEAKE AY PRESMVATON AREA
(CHIRAL OR ONE ACRE OR GREATER OUTSIDE THE CBPA FOR MORE INFORMATION VISIT ME VIRGINA STORMWATER MANAGEMENT PROGRAM
PERMITTING Will RAREST: LRtaJ/wwx.Try.eirginia.gw/ROgmms/V/aNr/SHormwateRAata�memasm
Fkr; I FGFNn
Sal FENCE
SF SILT FENCE
®TREE MOTE ON
�® LIMITS OF DISIMMNCE
® DIVERSION DIKE
IP IMF PROTECTION
OP ODRETPROTECDON
CULVERT IMF PROTECTION
CD CHECK DAM
CE CONSTRUCTION ENTRANCE
SOS TEMPORARY/PERMANENTSEEDING
AND MULCHING
REMOVE TREE
SAW WIT
® DEMOLISH PAVEMENT
MANNED STEEP SLOPES
FROM COUNTY GIs
t�� I WATEROTECIION ORDINANCE
BUFFSw SOYYEAR FL00DPWN
IN GENERAL. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED GAILY AND AFTER EACH RAINFALL EVENT GREATER THAN 025
INCHES. MEASURES SHOULD BE CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULEANDTHE VIRGINN EROSION AND SEDIMENT CONTROL
HANDBOOK. THE FOLLOWING WILL BE CHECKED IN PARTICULAR
1- THE CONSTRUCTION ENTRANCES AND CONSTRUCTION ROAD $TPBILIUTION AREAS SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHISOFWAY THROUGH PERIODIC TOP DRESSING WITH ADDITIONAL STONE AND/OR WASHING AND
REWORKING OF DURING STONE.
2. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SILT FENCE AFTER EACH MNFALL. UNDER NO CIRCUMSTANCES SHALL DEPOSITS BE ALLOWED TO
ACCUMULATE ABOVE WllF ME HEIGHT OF ME FENCE. DAMAGED OR UNDERCUT SILT FENCE SHALL BE REPAIRED IMMEDIATELY. SHOULD SILT FIERCE
BECOME INEFFECOVE OR REACH THE END OF THE EXPECTED USEABLE LIFE FABRIC SHALL BE REPLACED IMMEDIATELY. ORION SILT FENCE REM_
DRESS MY SEDIMENT DEPOSITS TO CONFORM WITH EXISTING GRADE AND SEED.
3. INLET PROTECTION SHALL BE CHECKED REGULARLY FOR SEDIMENT. IF EXCESSIVE SEDIMENT IS PRESENT, OR IF SOMME PONDING OCCURS AFTER
RAINFALL, THE MINE SHALL BE PULLED AWAY AND CLEANED OR REPLACED.
4. STONE USED IN CULVERT INLET PROTECTION SHALL BE INSPECTED REGULARLY FOR CLOGGING AND REPLACED AS NEEDED TO MAINTAIN FULL
FUNMONALITY. UNDER NO CIRCUMSTANCES SHALL SEDIMENT BE ALLOWED TO ACOUMUTATE ABOVE ONEHNF OF THE HEGHT OF THE INLET
PROTECTION. ACCUMULATED SEDIMENT SHALL BE REMOVED AND UPOREAM MGM PERMW EARLY STABILIZED BEFORE THIS CONTROL IS REMOVED.
5. CHECK DAMS SHALL BE INSPECTED REGULARLY TO ENSURE THE CENTER OF THE DAM IS LOWER TWOS THE EDGES. SEDIMENT SHALL BE REMOVED
WHEN IT REACHES ONE HALF THE HEGHT OF THE DAM.
6. MY MIL WITHIN TREE PROTECTION ARM THAT IS INaDVER1ENTLY COMPACTED SHAH BE AERATED WITH AN IRON RAR EVERY M INCHES TO A DEPTH
OF 32INCHES. PHYSICAL DAMAGE TO TREES SHAH a REPAIRED AS OUTLINED IN THE VIRGINA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION
3.38, TREES THAT ME STRESSED OR DAMAGED SHALL RECEIVE AN APPROPRATE APPLICATION OF FERTILIZER TO AID RELYIVERY.
]. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREA$ SHOULD BE FERTILIZED AND RESEEDED AS
NEEDED.
S. ALL TEMPORARY EROSION AND SEDIMENT MEASURES SHALL BE DISPOSED OF WITHIN THIRTY(SOL DAYS AFTER ANAL SITE STABILIZATION IS ACHIEVED
AND VEGETATION IS ESTABLISHED. FINAL SIZE STABILIZATION SHAH BE APPROVED BY THE OWNER AFTER THE INSPECTOR HAS DETERMINED THAT ME
SITE IS STABILIZED.
MANAGEMENT STRATEGIES:
THE FOLLOWING SEQUENCE OF DENTS AND EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE CONSTRUCTION SCHEDULE MR THIS
PROTECT AND SHALL APPLY TO ALL CONSTRUCTION ACINTIES WITHIN PROJECT LIMITS.
1. CONSTRUCTION WILL BE SEQUENCED SO THAT TRENCHING AND EXCAVATION OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBIF.
2. SOIL STOCKIPLES WILLED PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES. STOCKPILES REMAINING FOR MORE THAN 14 DAYS SHALL
BETEMPORAMLYSEEDED.
3. THE CONTRACTOR SHALL ME APPROPRIATE CONSTRUCTION METHODS TO MINIMIZE DISTURBANCE ALONG MMMED SLOPS AND EXISTING STEEP
SLOPS WHERE EROSION HAZARD IS HIGH.
A ALL STORM SEWER INUM THAT ARE MADE OPEMBIE DURING CONSTRUCTION SHALL BE PROTECTED WITH INLET PROTECOON SO THAT
SENMENTU MWATERGNNOTE ME EMMV MCESYSTEM.
5. PREVIOUSLY GRASSED AREASSHALL BESEEDED AND STRAW MULCHED IMMEDIATELYARER TRENCHING OPERATION.
6. ALLTHEEROSION AND SEDMENTCONTROL MEASURESSHALLBE INSPECTED46 HOURSMTER EVERY RAIN DENT GRDTEfl THAN 0.251NCHESAND
EVERY 5 DAVS EVEN IFA RAIN EVEMDOES NOTOCW R. REQUIRED REPAIRS SHALL BE MADEAS NEEDEDTO MMNTAIN DESIGNEDSTANDARD.
]. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVERED IS ACHIEVED THAT IB UNIFORM, MATURE ENOUGH TO
SURVIVE AND WILL INHIBIT EROSION.
6, THE CONTRACTOR SHALL SE RESPONSIBLE FOR ALL THE INSTALLATION AND MAINTENANCE OF All EROSION AND SEDIMENT CONTROL PRACTICES.
MINIMUM STANDARD COMPLIANCE:
MSl HAVE TEMPI AND PERMANENT STABWZATION BEEN ADDRESSED IN THE NARRATIVE? HAVE ME PROPOSED PRACTICES BEEN SHOWN ON
THE PUN] YES
SEEDSPECIRCKRON YES MULCHING YES GRAVEL YES
MS2 WAS STABILIZATION OF SOIL STOCKPILES BEEN ADDRESSED IN THE NARRATIVE? YES.
IS SEDIMENTTRPPPNG MEASURES PROVIDED? YES.
MS3 W15MMIN CEOFPMR ENTSTABIUZATIONBMNADDRESSEDMREXPOSEDMEM?YES.
MS4 MESMIMEMTRAFPINGFACIUnBTOBEMNSTRUCTEDMARRSrS lNIDA?YES
MS5 HAS STABILIZATION OF EARTHEN STRUCTURES BEEN ADDRESSED? YES.
MSG ME SEDIMENT WINS REQUIRED WHERE NEEDED?EJA
MS] HAS STABILIZATION OF COTANDFlLL SIDFFS BEEN MEQUATFLY ADDRESSED?YES.
MSS ME PAVED FLUMES, CHANNELS OR SLOPED DRAJNB REQUIRED WHERE NECESSARV?L
MS9 HAS STABILIZATION THROUGH SURFACE ROUGHENING OR OIRIFT PROTECTION BEEN ADDRESSED? YES.
MGM IS ADEQUATE INLET PROTECTION REQUIRED ON ALL OPERATIONAL STORM BEFRR IMF"] YES.
Ml HAS MMNT VICE OF PERMAENT STABILIZATION BEEN ADDRESSED FOR CONVDMCE AND RECEIVING CHANNELS? YES.
Ml MEINSTREAM CONSTRUCTION MEASURES REQUIRED $O THAT CHARNEL DAMAGE IS MINIMIMD?WA,
MS33 ME TEMPORARY STREAM CROSSINGS OF NON£RODIBIE MATERIAL REQUIRED WHERE APPLICABI£I NLA.
MS34 THIS REGUUTION REQUIRES THAT ALL MPLJG9LE FEDERAL.STATE AND LOCAL REGULATIONS PEMANING TO WORKING IN OR CROSSING LIVE
WATERCOURSES BE FOLLOWED. L
MS35 HAS RESTMILIZATION OF MGM SUBJECT TO INSTREAM CONSTRUCTION BEEN ADEQUATELY ADDRESSEW NlA
MS36 IS STABILIZATION OF UOUTY TRENCHES ADDRESSED? YES.
Ml ISTHETRMSPORT OFSOILAND MUD ONTO PUBLIC ROADWAYS PROPERLY CONTROLLED? U.E CONSTRUCTION ENTRANCES, WASH RACKS,
GAILY CURNNING OF MADWAYS, TRANSPORT OF SEDIMENT TO ATRAPPLNG FACILTY) YES.
MSSS HMTIREREMOVALOFMMMWYPRAL SSaNAWRMM?YES.
HMM NNT NCEOFPRAC SBEENMDRMM?(I.EREPAIROFSIRUCTIJRESMDRE"J OFAMUMU"MDMDIMEMLYES.
MS39 ME FROPERRESAND WATERWAYS DOWNSTREAM FROM DEVELOFMENTAOEQATELYPROTECTED FROM EROSION AND SEDIMENT DEPASIIION
DUETOINCR EMINPMKSTORMWATERRUNOFF?YES.
EROSION AND SEDIMENT CONTROL SEQUENCING:
L WNmACFORSHA WNDUUAMEJDINSTRUCFIONMEEPNGWOHTHEP APPRWINGAU RO MIORTOAWY DDISWRWNCEORMWMROL
INSTALLMONO
2. INSTALL WNSTRUMON ENT WWCE, SMIMENTTAP,MD PEAIMETEx WNFROLS PRIORTOANY DLSNRBWCE.
3. ONCE INIPAL MFASURMME IN PACE. RMUMM INSPECTION OFTHE INIBALEROSIONMOSEDIMEM CONTROL MEASURES EWMTHE WUNTYOF
ALBERMMLE EM INSPECTOR. CALL 24HOURS IN AOVMCEOF INSPECTION.
A MOTELTPAMM WGPATONMRMEDURMONOFTHEMWEU.
5. WMMMCEDEMOUPONNECESSARYTOP MRMMOMSEDWORKONL (INCWDINGDfAVAPONWORK).
6. WNTRM.TORRILEAVEMX NG9T lULI MFASINANONEMASNECONDIPONUNnLNECF.SSARYTOINST4 MOPASEDIMMMEMEMT DI6URBM
MEASNUIMPROVEDSHAIIMSEEDWWITHIN14AYSOFD6 R& CE.
]. WNSMUMMORMSTRUMR6,IFAWLICALE,BTARTINGAT EWWNCTBFAMTEAMINUSORTIHN.RACNPLLALLIXGVATOMSMDTRENCHMFAS.
S. COMMENCE CONSTRUCTION OF PROPOSED PAVING AND SIZE ELEMENTS, WITH THE ANCEPTION OFANY PROP ED MM.
9. FOR GRASSYMFAS: INSTALL PERMANENT SEEDING AND MULCH. STMILIZEALL DISTURBED MRS.
an. FOR GRAVELMEAS: RESTORE GRAVEL AFTER TRENCHING AND MGVAPON OPERATIONS ARE COMPETE.
13. REPAW ANY EROSION AND REMOVE ANY SEDIMENT.
15. DRESS AND OYERSEED ALL DISTURBED MOM AS NECESyWY TO AFFECT PEAMW ENT YEGE WCOVER. STAIN LIZE ALL REM Ni NO D6NRBED MOM
WITH TOMMIL, SEED, AND MULCH ONCE WORK IS COMPERE.
16. REMOVE SEDIMENT MAP AND ASSOCIATED DIVERSION DINES ONCE PEAMWENT VEGETATIVE ROVER HAS BEEN ESTABLISHED ON SITE.
v. BEGIN INSTALGnoN OF MY MR EO BMPS ONCE ALL WMOIBLTTING AREAS ME WMIUZW AND FREE OF DEBRIS. REAR TO I NSTALIACON CH CONTROL
AND INSPECTION an DEALINGS FOR CONSTRUCTION M ILESTON M. INSTALL PERMAN ENT CONVEYMCE CHAIN NETS TO BM M AT TO B TIME, STAUNUMING
IMMEDATELY WRH EG2 TYPE I MALLI
M AFTER PNALSITE STABI LIUTION AND APPROVAL FROM THE APPROMCOTE MOSION AND SMIM ENT CONTROL AUTHORITY, THE SILT FENCE, IN LET PROTECTION
AND OTHER STABILIZATION MEASURES SHALL BE HEMMED.
W
Z
J
w
U
z DO
LU OO
0 In 0
CA
LI-I O
X N
} 2a
v
LU Ga
Q C
liJ
cr
cr
Q
Z
J
O
cr
h
z
O
U
I-
z
LLJJ
G
Oil
U)
Z
Q
Z
O
U)
O
X
LU
G
APPROVED DCH
SUBMISSION NO. 4
T H E W 0 R H O F
L I N E + G R A D E
C! .0
LLI v
z
/
u=irs or swverea rroroce4vrar _ — — — — \ \ � ` \ — � � // / // % / / / / / / / / � >
LU
SO 1420"SF / / / / ,__________—
SILT
DRAIMGEMFA 0.93 AC
D ADDANFq NO V A A I I L / _ / / / / / I I — ♦ / / A
\ G\INGING PROPOSED
Ho
A�� ! ( ��
23SS4 Bomm07MO 1 / J
\ \ WNSIRUCIION STAGINGAND PMWNG I \ \ w � O
MR DETWORAGE]30.1G' ® \ DO \ \ 36L\ \ I MP Dnvs]oRAGE ]3163' \ \ \ \ Q ) \ / / U ,n z cr
A\ — STOP EMRANNMEM ]32.63'� \ ��\ \V 1 AI \V 9F 136 LF �A L / \� LU 0'o Z
v v A v V A — — A I I sro Ka oanoN V N o Z
>q, T� I I ` 9EOIMEMTRAP \ \ —i
T.M. 85-/0 TRACT Z I I \ \\ — — — \ — -- — — — . \ \ \ I I I I DRUNaGEARFAe.aoAc \ 1 , LLI a w �
55.45 ACRES — \ \ \ �'7�/ \ I / SO Q
SO
CYRENA W. SPARfMAN I \ \ / — — —
D.B. 5439-/79 D.B. 5433-/35 8 1,36 PLAT ALDIIONALPARHINGIFNEEDD) I \
\ _ \ \ \I
ZONED RA _
SF ]OIF
USE RES/DENTIAL 1 / / ' _ — — — — \ \ \ \ \ 1\ / \\ \ '� ` r \ / / 0
co
Lu
1 I / /
\ , I
ALB. CD ,r PAVE6 Cl WITH WASH FIkM.
V A\ IV 1 I I I II A V / / / / /// 1 I I I I I I 1 A 1 A A\ \\\ V A V PPOVIOEONJ N4GEi0 SILT FENCEfI
do
a ET4rr�,r
lHTSI N w APPROVED DCH
SUBMISSION NO. 4
PROJECT 2107007
THE WORK OF
/ LINE + GRADE
// /' / /
z, ;1 EROSION AND SEDIMENT AN MENT CONTROL PLPH 1 C2.1
1-30:0
G
\ —
///J// — — — — — — — — —
carers or swverea rrorocRavrar — — — /
DOWN.TYPE SINSTPIIFDFOA ER
DOWNHILLOF LEVEL SPREADER
Dlazov3
\
\ IASTAFFR SITE IssrAsmzEo
\ /omnre//
ON SLOPES
3:1 OR STEEPER
coven
•oN SLOPES as on sTEEaEx-SEE
I\ ( I I � • • • • Nsr / / / � / \ \ \ c Rucnory srAcwc �'�' \ /
AN P Nc /
\ V ` D1azbIasF
36
\ \ V A \ \Y VI I 'I I\ I � I � I �I I �• jD
MAmNG
�YDDI
T.M. 85-I0TRACT2
55.45 ACRES
CYRENA W. SPARIfMAN
3TVEIIN—S\TB`FOR 50' SEDIMENTIRAP AD0110NLLPARKING DRANAGEAREAAC
ZONED RA sFwL,r FNEEDED
USE RESDENTIAL \
\1 / 1
`` /, \
PERMWENT STONE OR AT EACH CULVERTCMIN. DIMENSION MDSMlrF . -' / ,� I
RE UF
EC3TYPESEE SHEET 3INSTILLING WIND DOWNHLLOFSTONEOP./1 I \
NOTE LEVEL SPREADlift
ER
\ V A \ I I 1 1 / I / / / /� C AA V A IASTAF1Efl s11E 199TPBW]ED A A I
/
I
LLI
Li
s
u
W
Z
J
\\
/w
U
W o
/
00
\
(%! CA
�o
/
} a
/
W a
N
d
z
d
J
O
cr
F
Z
O
U
z
w
Lu
uJ
Z
Q
Z
0
U)
0
X
Lu
w&co Nry vnveo cEWirXWaSHwCI,
RErTr
/,PPONDE DRW N4GEi061LTC(E
1� l RA YMQ ANO R ISEY
I SIGN 14 ���
�31A
useRFSIp vnn[ / APPROVED DCH
SUBMISSION NO. 4
PROJECT 2107007
THE WORK OF
L I N E + G R A D E
z, ;1 EROSION AND SEDIMENT CONTROL PLAN PH 2 C2 •2
1-30:0
G
C0i^s unTWq
]i M p4.fr[M
a'YN ]iA aGViEGIE RaY
SIOXE PpOFILEu.
SCECSIRUCTION a IISPIyyT vMEo
IrIJ Wg3NnOLX
MNG
Ili ,1' NIN• 1F PAVEMENT
5! WEND NLL SHM �:I i 75rtIVE He".1
ESS Ntl EG EIIRLx RESS TRO➢cING DEVICE
PLAN
�—IPMIX. POSOr2MO�XAGf
�HERFPING DEVICE.
X TM SECTION A —A
Anm t 1, of1 Had, —1I IWM ava 1' hInti-Ek
Aalaff TENS SHWIlon,Sh hio. Seli S dlamd r1_'—AuNI to, odeam.
cmoNV -TTL 1 10 ,ry hfr tl h to wl
1Ner edeXdu1 e edu a �I NxLaE Ue VramlM ha,
seam, Lew dnvla, caTh. orxticco,ua-.
PAVED WASH RACK
Gut
CONSTRUCTION ENTRANCE WITH WASHRACK
PIPE OUTLET CONDITIONS
�F1N.�7•�No DURING)
y •��%Z�-1
Aye
Amory+.
1p�Aijl•�i a��.7� J1
�' �' tiiS7=111111
Source: Va. DSWC Flag, 3.18.1
OUTLET PROTECTION - MINIMUM DIMENSIONS
PIPE
OIY'XARGE
APRON
APRON WIOM
APRON WIOTX
REQOIREO
BTR.A
TNLWATFA
TMCWROIN
SPAR
EG
IEXGiX
OPSIRFAM
DOWNSTREAM
RIP MP
(�1
UNN
(BOO)
(W)
dp
IN IS
IHLXEB
LFB
FEET
FEET
FEET
FFEr
FEET
Al
1
12
0.42
6
3
T
OS
o.TO
A2
2
12
1.01
6
3
sa
0.5
o.T.
n 3.18-1 OUTLET PROTECTION
\_J
CONSTRUCTION OF A SILT FENCE
(WITHOUT WIRE SUPPORT)
1. SET THE 2MN12. 2. EXCAVATE A CX 4- TRENCH
UpEEOVE ALONG THE DNE OP
STAKES
rWa
III .
3. STAPLE FILTER MATERIAL 4. BJCEPIIL ART CO UIP ET
TO SPREES AND EXTEND THE EXCAVATED SOIL.
IT INTO THE THENCR.
III �=
�1 9 �� ,
III
SHEET FLOW INSTALLITION
(PERSPECr1VE WEN)
I I
I I
—
/�� II
POINTS A EHDULD RE WERIER THAN POINT E.
Source: Adapted from Installation ofS raw W Fahne Filter
Barriam for Sediment Control Sherwood aM Wyant Plate 3.05-2
O 3.05-2 SILT FENCE
TABLE 3316
,IMSEDJUNE2 H
TEMPoRPRYSEEDING SPECIFICATIONS
OUICN REFERENCE FOR EJ L REGIONS
>FX1Gnax
I SPECIES
I PF11r
AGONMlES
FERTILIZER & LIME
rwl.,eearea ,mev
TER"'
3.32D
(REVISED TUNE SEES)
PFRVANFNTSFFOINO SPFtlFlCJTONS FOR PIEDMONT AREA
SEED
VNO DRE
EMSES
A CUONNX.FEEPCEE
�q e�
INEET
&DIME
ri..e�y,�•FERTILIZER
��oa
SEDIMENT TRAP VOLUME COMPUTATIONS
ST-1
I Drainage Area Ro,)l RaquIre115mre0e Elevetlona
1
caxrouR
Iar.
mcr.
cum.
+aa 1gz cr
L
W
Area
Vol.
Vol.
Vol.
el Yrzpe r30.16
flewtlan
IFY(
IFY(
ISFI
ICFI
(C1T
("0
RE Dry SHITTe 731.0
rID.03
39
ii
Sr6
0
0
0
Tia4 T31 63
r30.W
K
31
1446
21W
85
8S
WET DRY a nNvlkmenl
]31.0]
60
33
I 11E6 I
SoSS
131
116
TEMPORARY DIVERSION DIKE
Compacted son
f arm
PION
_ IIII ulll
I
Source: V. DSWC Plate 3.09-1
O 3.09-1 DIVERSION DIKE
SILT FENCE CULVERT INLET
PROTECTION
ael—
nn a ma,ao naawma '""
OPTIONAL STONE COMBINATION**
Source: Adapted farm VDOT Standard
Sheets aed V. DSWC
O SEEDING SCHEDULE -PIEDMONT O 3.08-1 CULVERT INLET PROTECTION
Plate 3.06-1
TEMPORARY SEDIMENT TRAP
N Ii
ar w m/TINE
CROSS SECTION OF OUTLET
EW. PEEL
@ INETEPTH
OOSS �
1 --.RES OaR WR S LL BE VOOT AA. am, OR i5
OUTLET (PERSPECTIVE VIEW)
Source: Va. DSWC Plate 3.13-2
O 3.13-2 SEDIMENT TRAP (STONE OUTLET)
TYPICAL TREATMENT — i
(SOIL STABILIZATION BLANKET)
INSTALLATION CRITERIA
s
So
rr r s PLAN VIEW
STAPLING DIAGRAM
°r sr:NE Fan w mi auwNa.4iw°r"eW", m
rmlr�rmm �`� XFIE
T T
Source: VDOT Road and BERRIES Standards
O 3.36-2 EC-2 INSTALLATION
W
Z
J
J
F
W
J
O
cr
F-
z
0
F—
z
w
w
z
a
z
O
v/
O
Ir
Lu
G
APPROVED DCX
SUBMISSION NO. 4
Plate 3362 T H E W 0 R K O F
I N E GRADE
C2.3
Section 5. Stormwater Management Plan
LEGEND uj v
GLENN. z
000000o FOREsreDAREA \� -
0 0 o s
z
TME OF CONCENTRATION PATH
LIMITSrswvera rroeavar >
DRAINAGE DIVIDE u
`L, SURFACEFLOW ARROW
WATER PxalEcnary o9olrvANCE uj
— — I BUFFERYSOaYEARFLOODPIAm
MANAGED STEEP SLOPES 7
FROMWUNTYG6
/-----
i
IT
SHEET HnwAREe
LLJ
IT
LLJ
-- �-
z
\
Z
\ \ ` SHEET FLOW AREAC \- L1J 0 Q
� � —� 036 AC Z�Z
GREET FTow AREA
v G A 11v
1.91 AC
V A T A V
o
�N
I < K
T. M. 85-I0 TRACT ZGO
I \ — — — w O
D.5439-179 D.B. 5433-/35 8 I36 PLAT V '-- ' w� Lu
/ -vvv �) v�- 1� �
B. / Q � a � CYRENA W. SPARIfMAN
55.45 CRES \
Lu
RESv A
ZONE9 RA
USE.' /DENTIAL II \ \ \ / � / / � � � � L0� 1620]3sFV � � � \I � � O
W
Lu
Lu
It
IT
IT-
1l l I // / v I I A v ` v v v• C' ���IS
2x o]P
EI
STORM WATELY TAER MANAGEMEC E142IM3 SF) OF THIS SITE ME OBE NARRBEDD FORTHE CONSMUCIDON OFASINGLE FAMILY "Ew°s"svER
RESIDENCE PLEASE NOTE TWIT AT THIS TIME, TREES WETHIN ME DISTURBANCE AREA HAVE ALREADY BEEN CLEARED. FOR
SrOflMWATFRMANAGEMMTMRMSE,TXESREMCONSIDEREDTOBEFORBMDINIMMnNGCONNTIONS.ADDmONLLLY,
/THESITE ATO BE USED FOR AGRICULTURAL PURPOSES (ORCHARD +HpY OPERATIONS THEREEOREAREAS NOT DIRECTLY
ASELRESEWTI THE CONSTRUCTION OF THE SINGLE FAMILY RESIDENCE ARE NOT INCLUDED ON THIS PLANE 'FYOHAt DWI
EXISTINGDWUNAGEPATTERNS ARE LARGELY PRESERVED, WITH ALLMAIOR DRNNAGEPREAS RELESEDAS SHEET FLOW FROM ME
APPROVED DCH
SKEIN POSr-0ENELOPMENT CONDITIONS.TENSE SPREADERS ACE LOCATED AT ALL CONCENTRATED OUTFAUSTO RETURN
CHANNELIZED WATER FROM THE SIZE TO SHEETFIGARM CONFORM WUH WAC258]066(D), SINCE NOALTERNATIVE FLOWPAM
IX /RTS FORSTORMS LARGER THAN THEWATER QUALEf DESIGN STORM, THE LEIELSFREADERS GAVE BEEN DESIGNED U$ING FEAR SUBMISSION NO. 4
FLOWS FROM THE 10YFPA DESIGN STORM. THIS ENSUflES THAT 9VAC2587066(D)APFLES FOR THE IDYEAR DESIGN STORM. AT PROJECT 2107007
INDI IDUAL DOWNSPoUIS NOT DIRECTED MAN ENGINEERED LEVELSPREPDEO FLOW WILL BE DISSAPATED WIM CUSTOM, LARGE
SPLASH BLOCNS(SEE ARCHITECTURAL%ANE FOR DETAILS).THISENSURES PSREMMLECOUNTY5 SrORMNATER MANAGEMENT T H E W 0 R x 0 F
AGREEMENTFORSINGLEFPMILYRESIDENCESISADHEREDTO. LINE + GRAD E
SINCETHEENCTINGGRADESDOWNHILL OF MELP/EL SPflEPDERS RANGE FROM IW25%, PARTICULAR CARE HAS BEEN TAKEN IN
/./ ' / / / / / / // / /-'THE DESIGN OF ME SPREADERS. DOWNHILL ALLOWABLE MELOCmES HAVE BEEN DETERMINED, AND LEVEL SPREADERS HAVE BEEN
DESIGNED SUCH THATTHE VELOCITY OVER THE WEIR IS LESSTWW n% OFTHEALLOWABLEVELOCITY.THIS ENS )RESTWIT, AS
PREDEVELOPMENT STORMWATER MANAGEMENT PLAN RUNOFIY HASBENUSE.00wnxlLL,ALLowAONSHETC5.2.MM +E NOT ExcEEceD.IN ADOmoN,nconsERMATIME RunFALL C5.0
�1 jC INTENSITY CO BEEN USED. SEE CALaLAL OW ALLOWABLE
%(FlOC 5.2.
1'-W: o so Go
LEGEND
ujv
sNEARFA z
i\\ / // // / // / / IMPEflvIDUS AflEa
O0 0O�O FDflF51EDAREA \� —
0 0 0 =
umIrs GF DIsruRSANCE
TIME OF CONCENTRATION PAM
carers werFa ro�OGrrGver >
NOTEPREA OFSHEFIFLOWDOWNHILLOFIEVELSFAEAOEfl6 MU5T 9E /
WMR£IELY siABN2EO AND VEGETATED PflI0R i0 RElFASE DFROND3. DRAINAGE DIVIDE U
DA=OARAC� / / / / / �SDRFACE FLOW ARflOW
oD 1AzovisF\ , c=o.w �'`'� / ' 1 1
TC=S MIN. —gig0 W / / WATER REELECTION IENRFLORDINANCE
BUFFER/106YEM FLWOPIAIN
— FflOM WUNttG6 —
TOTUOAa.D3 Ac
INCLUDES _ /
i
SFRFADFA) / ` / / �♦ / / / / NomC0145GARAGE,GMVELFOOTPAT. AND V'OUS RO ERO DRNETORE
/ % /
/ ♦� NSIRUCIEDATA FURIRETIME.IMPERVIOUS PREAS FROM TIESE FURIRE
1__ _____ ____ /__ / / / // / J/ `\, / IMPROVEMENTS MUSTCNFORMTIED NRIN XYDROLWIC DESIGN.FUIIIRE
/ I 11 I T -� � -/ / / // ' / / \�Z IMPROVEMENTS MUST CONFORM ttI DRAINAGE PATTERN$SHOWNHEAEIN.
1� I107
l
1 \
' : • sH\EFr�owAxuc `♦
\ \ \ 1
\\ \V II A A \ V / TOTAL DA=o.35AC♦ A e
135E _ t 1 1
vDA A6
TC IN
DULVERTAI
\\ \\ \\ \\ \ \ SXEET FLOW AflEAA \ 5MIN
\ \ \ \ \ \ \ I \ \ \ 1 TOTAL DA=389AC N (IN DEC LEVEL RED
� U
3PRFADFOR) I \ / 1ry`k`l; % >W
v v T. M. 85 0 TR4T 2 V v Y w a F
\ \ EEVEES4AC Al \ ♦ I Itl G
\ \ \5545 1CRES \ — — \ c=CAD
\ \ CYRENA W. S�JR J N I \ \ / — — ` — \ \ '� (INCLUDES MIIM AREA cuE ER A11
D543�/79 0.� �433tt/35�� 116,
4A� \ / — — \ \ \ \ I y�-') ` `` ( y\ \ ` f
v v\ vvZONERA I1v_vvv A\
/ LEV-0S44ANEfl
\\ \USERF\SD�N`AL\ --- — \ \ \ `�`� \w=O.AAAc
_TOEMiio cuE ER E) C-5
TC=SMIN
.,
2110p
p
doI
av m¢va T 1 ee�rv,vmr✓ev �IoxAs ¢YjO
OB395S5TTY
Z�Eo RA
cF rzSOE",,v
APPROVED
H SUBMISSION A
PROJECT 2107007
LINE +O LNE GRADE
/
z, ;1 POSTDEVELOPMENT STORMWATER MANAGEMENT PLAN C5.1
1'=30:0 SO 50
DENMAN
10 YR HIM
LINING
'MIN. CLEAR
V ABER WNDUIT
CROSSING 735
WC ELEC CONDUIT
DRIVEWAY
EX
GF )OE
MOE,
OUREFPROTECTION I `3'WCETECC01
(SEESHEEFC2.3FOR CROSSING
MIN. DIMENSIONS)
...,..... L5'HOPEIPS DR11
OCULVERT Al PROFILE O CULVERT A2 PROFILE
H: 1•=30:0 60 H: P-30:0
30 60
V. P-31:0 3 6 V: 1'-31:0
3 6
COVER TO BE ONWMPACIED
TOFSO11/1UflFUNLEBSOTHERAMSE
SPECIFIED ON PLANS
6'a6' PRESSURE TREATED TIMBERS
YCUVER-
LENGTH EST PLOP
'FRENCH DRAIN'
ON FABRIC
oZ
p
TN
(ORRPPEREP PLAIN)
6
8w
3-
BE
24:1 SLOPE UP TO
LEVEL SPREADER
WASHED, ANGULAR
-
VDOT NE7 STONE
-
LINE SPILLING
WIN
-
WITHEG3LINING.
I
I I I
_
GEOTEXTIIE FABRICWNRNUOUSLV
UNING TO BE CONTINUOUS WITH CULVEAi OUREf
'BUERITOWBAFPEO' AROUND STONE
0 W SCHEDULE 40 PERFOPATED WCTO 25i0NE (MIN. 1' OVERLAP ON TON
PROTECTION UNING WHEN CULVERT I6 PBE6EHIT.
DALIGHTATLOCATION SHOWN ON BANS BELOW
NONWOVEN GEOIIXTIlEFlL1ER FABRIC
p
(PIPESURST TURONS SHOSLBE APPROVED
UNDER EC3 UNING, MIN 2' OVEBIM
B
BYENGINEER)
NOTES
PPE
L CONTAINOR
TO PROOPEON
2. iOPWVIOECLEANREDONUPSTREAM END OF55TEMAND Ai ALL B00F LEADER TIHN6
AND ALL OTHER ROWS.
PNDALLOTHER LOCATION SO
AIFlEDON
MAINTAIN
3. PPESSHALL NTEDSHAUL TO MMNT WIT OF FEE.
NOTES:
ROWPERFORATIONS 110GP PERBE OR
FABRIC VENWEHAFLOW RAPE OF 110 GPM PER SFOR GREATER, AND
ATE
A PUNCTURE
PUNCTURE STRENGTH OF 50 LBSOR
DRAIN
L LEVEL 6PRFADERUPSHALL BE COMP£IELY LEVE�ONGMnREINIMUM
STD.
WINESTBENGTO THE FRENCH BECOMPLETELY
S. PSIWNNELTONS iTTHEFREN
PREVE
2. ENDS SHALLBEMEYER INTO PDNCEM6LOFEAMMMBEREN'TO PREVENi$WUBING/6HORi CIRW111NG MOUND ENDS.
OF WIT)
SOIL INRLTMON IWO NEAROUDCONNECTINNON-WOVEN
GEOTIMINOFABRIC TOPREVENT AROUND CONNECTION MINT.
3. RFBNSHOLBE%ACEDNOMORETHW]R'FRONMM RENDS.
RODENT SCREEN AVIRGITED HE
6. WNTIUCTOfl TO PROVIDE PODENi$CREEN ON ALL DAtt1GH1FD PPEB.
A WNTIUCfOfl 6HALL NOT WMPACf$TIWNG BASIN AREA Ofl ALLOW HEAVY EQUIPMENT IN THE$TILLING BASIN VICINItt TO AI
O FRENCH DRAIN
O LEVEL SPREADER
-1:0 1 2
N ZTi aW1UN 711DAMWl•IMIaLCIr nncti-lm:uii
IEL G •DESIGN BFORM TOTALAREATO TOTAL DOWNSLOPE WWNSLOPE MINIMUM LENGTH PRWIDED LENGTH aNWNBLOPE RIGID LIP
NOEN INTENSITY LEVEL BPREMER FLOW ALIAWAE'
(IN/UPI LAC) OF B.I. LIP OF RIGID LIP VELOCITY BELOW L3
OMBEP FACTOR (CF8) GROUNWOVER VELOCITY (FPS) (FI) (FT) IFPBI MATERIAL
Al BAB 7,03 Du 124 ARMS, 4.00 10 16 383 OmBFv
q2 036 703 0A4 1.11 GRA44 4.00 LS 16 38S TIMBER
B 050 703 0. I.fi9 GRASS 4.00 22 24 386 TIMBER
ME RA'NFN.L WTENSRY UYD HEPE9 THEN.GH AND OF THE CO.WNFIOEfA'I MRERVAL AS BERA 1EOBVTHENOM ATLAS U WEA'!IE THIS QAVYw4TNE V4LVEgiIPAP151. ALWUNTFOR
CHANGES M WUTXFR MTRAMS n1ATMAY COOBNOVER THE ORIGN LIFICEME PROJECT, TNE10VM RENRN BEFOR HAS BEEN LBEOSWCENOrLL]SiNATNE FLOWPAIX IS PRESENT
2THE 0THE GROG Y OFTNESNALLOW SWOWDERED FLOW THAT WILL. DOWSPAL W THE LEVEL SPREADER AFTER iNEEFFECRYE L9TAYQCFSNEETFLOW IS TEA.
CULVERT DATA TABLE
Elw(11)
T40N
SEE LAN WfgPE %PNS FOR
SPLASH BLCCH MATERIAL
3B�
2%MAX. FOR SO' TO EX. GggpE
EEP HOLES. PRILLEp 18"0.C. 739D3
CULVERT NAME
CULVERT06CRIPTION
HYDROLOGY
TDTAL
FLOW
Q
FLOW PER
BARREL
0/N (4Ta)
HOMMO
TERCALWLATIONS
EIEVAiNIX
WRET
Itt
)
TAILWATER
VELOCITY
Npaj
LOW POINT
FIEVATION
FRE I-)RD
IR)
MaleNa1311apeS M
C
Tc
(min)
I
IIN10)
MCAa
(AclINe)
LENGTH
INLET CONTROL
OUTLET CONTROL
XWU
O
MWI
FALL
Et01
MWo
Oa
H.
ka
X
ELIo
INVO
INVIO
MATERIAL
OM (in)
gil10YRBNPMI
112"HOPE
1 ]3385
]3300
NL£E
]1
037
5
703
038$
012
042
036
036
519
]3896
000
O2]
02]
050
695
]33]88
H
R60
]3950
058
P1125NRSi0RMl
1.12"HOPE
1173365
73860
XKE
12
037
5
793
T.
Od]
OA]
03]
03]
532
]389]
OCO
O2B
028
050
695
]33)04
352
]3950
053
g2110NR3TOF.)
1-12"HOPE
11743 ]0
]4450
XL£E
12
CM
5
703
060LOT
101
O80
O80
110
]4510000
042
042
050
O30
]44013
3281-12
OWE
3 ]63 ]0
i1150
XL£E
12
038
5
T93
O60
116
114
085
0.
LA5
]4515
000
065
06fi
050
O30
746029
346
]dB11
ISB
DESIGN CHANNEL CROSS SECTION ANALYSIS
LeOel C---.-IOn I En -min I Channel _I--t SIOOB
T30M
Behan
Depth OR)
SAO
ON
BAR
41.10
OF FUNDED RUNOFF BEHIND IEVELSFRFADFR. ]38'0] HIM
o t z 3 a 5 e ] e 9
ODITCH TO Al CROSS SECTION
Elw (III Behan DOI IF)
T46N 1.50
T45M
IMAM
1m
am
BAD
NN HIG`
0 1 2 3 A 5 e ] B 9
O DITCH TO A2 CROSS SECTION
U)
J
F—
LLI
0
LLI F
Z00 L6i
Lu > W
LLI 0 Z <
ir N o
o U Z
d AT < [C
LLLI Q-
% p Lu
� a Q
O
H
G
APPROVED DCH
SUBMISSION NO. 4
PROJECT 2107007
T H E W 0 R H O F
L I N E R- G R A D E
C5.2
Section 6. Pollution Prevention Plan.
(reference State Regulation 9VAC25-880-70 part II section AA)
D. Plan showing pollution activities and prevention practices
/
NOiE:AflEA0F5HEEF FLOW DOWNHILLOF LEVEL SPBBADFR5
COMPIETELYUMIUNDANDY GEFATEDPRIORTORELFASE
DOWNHILL OF LEVELSPflEPDER
AL
BE
SPREADER TO BE INSTMIED / / /
/ /
/
�:•' ' ' ' ' ]46
LOWMP-AT .ICE GROUNDCWER
SON BLOFE53:SNSFORFER-SEE / L
" / IANDSGPEPIPNS FORSEFD MIX
I'--
qq • • s a
ANDP �
� MATFx41SrAGINGARFA / \
V Iv % \
EG2 TYPE I MATTING TO LEVEL \ \ MATTING
\ \ \ TT \ \ \ 4'' BPRFAOER ONCE iflAP IS REMOVED _ /� STOCKNIE
v v v Aa V A V I \\ v vGO
ST
� 1 T. M. 85-/D TRACT Z
55.45ACRES
OA17K/
CYRENAW S/M A/V G3 TYPE 11NBTll DFOR Sp \I
D.B. 5439-/79 D. BA.�C5433-/35 r� 136 PLAT _/ / \ -DOWNHIILOFLEVELSPREADER. \ I _ \ SEDIMENTTRAI
ZO/VED RA AI / -` \_ \\ A I 1��1 9F �Lf I ADDIDONAL PNEEDED DMINAGEMFA 1
USE RESIDENTIALI�'�.I�
FERMANENi STONEOPAi EACH CULYERTOUTFALL \\SEE SHEET C2.3 FOR MIN. DIMENSIONSPND STONESI2E. I 1 \ \ �� I j SF ]BIFC
EC3TPESINSTILLINABASINDOWNHILL�
OFSTOEOP./
\ \ NOTE LEVELSPflEPDER TO BE IN$LALLFD \ \
SWIP MMLB]%W/RkINGAUGE
W
Z
_.j
\
w
Cl O a
a
\
z o K
Lu 0
0
/
z
\ /
\ /
W O z
w cN=
i
W
/
>-ow
/
-j
a
� a
z
/
W a w
O
j rn
F—
> >
J
a
ALRCCDNTYRAVED CEWITH WASH RACK
PROVIDE DRNNAGE TO SILT FENCES
dD
IRK J95 h` 06RG/G
l RSio Rri APPROVED
CH SUBMISSION
PROJECT umoo]
T H E W 0 R K 0 F
LINE + GRADE
NOTE: CONTRACTOR TO MARK UP PLANS WITH ANY CHANGES IN THE FIELD
z, ;1 POLLUTION PREVENTION PLAN — X1.0
1'-W: 0 3D Go
E. Sources of Pollutants, locations, and prevention practices
Pollutant, or Pollutant Prevention Practices,
Generating Activity Location on site Control Measures
F. Sources of Pollutants, continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and on-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip
Paving operations
Roads and driveways
pans and absorbentloil dry for all paving
machines to limit leaks ands ills
Direct concrete wash water into a leak -
Concrete washout
Current location and detail shown
proof container or leak -proof settling
and cement waste
on plan
basin that is designed so that no overflows
can occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting, and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing compounds.
Water shall be filtered, settled or similarly
Dewatering operations
Dewatering sites shown on plan
treated prior to discharge as shown on
plan.
Designated areas for material delivery
Material delivery and storage
Designated area shown on plan
and storage. Placed near construction
entrances, away from waterways and
drainage paths
Material use during building process
Building areas
Follow manufacturer's instructions.
MSDS's attached.
waste collection area will not receive a
substantial amount of runoff from upland
Solid waste disposal
Current designated container areas
areas and does not drain directly to a
on plan
waterway. Containers have lids covered
before periods of rain, or are in a covered
area Scheduled collection to prevent
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
overfilling. MATERIALS NOT TO BE
BURIED ON -SITE
Convenient and well -maintained
portable sanitary facilities will be
Sanitary waste
Current locations shown on plan
provided, and located away from
waterways or inlets. Such facilities shall
be regularly maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and
not during rainfall events
To be treated in a sediment basin or
Wash Waters
Wash areas shown on plan
better control as specified on plan.
Minimize the discharge of pollutants
from equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials
present on the site to precipitation and to stormwater.
G. Non-stormwater discharges (9VAC25-880-70-E)
Discharge
Pollutants or Pollutant
Constituents
Location on Site
Vehicle washout
Sediment, paints, oils
See pollution prevention plans
Dust control spray
Adhesives, sediment
See ESC plans
Pavement and building wash
Soaps, detergents, residual material
See ESC plans
Landscape irrigation
Fertilizers, sediments
See landscape and ESC plans
Concrete washout
Lime, concrete admixtures
See pollution prevention plans
Paint/masonry washout
Paint, oils, construction materials
See pollution prevention plans
K Persons responsible for pollution prevention practices
Name: Owner, Cyrena Sparkman (until contractor is selected)
Address: 41 Wicket Way; POB 2304 Cashiers, NC 28717
Email: cy@sparkman.net
Phone Number: (703) 200-1947
I. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical
spill and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows,
All spills will be cleaned up immediately upon discovery. Spent absorbent materials and rags will be hauled off -
site immediately after the spill is cleaned up for disposal at the nearest landfill.
Report all spills, leaks and discharges as follows,
Spills large enough to discharge to surface water will be reported to the National Response Center at 1-800-424-8802.
J. Pollution Prevention Awareness
All employees will be trained via biweekly tailgate sessions. The sessions will address the
following topics: Erosion and Sediment Control Practices, Non-Stormwater Pollution Prevent
Practices, Waste Management and Materials Storage Practices, and Emergency Procedures
specific to the construction site.
Formal training will be provided for staff with specific stormwater responsibilities, such as
installing and maintaining BMPs. The formal training will cover all design and construction
specifications, and will occur before any BMPs are installed on the site.
Section 7. Discharges to impaired waters, surface waters within an applicable TNML
wasteload allocation, and exceptional waters.
Runoff from this site discharges to I UC 020802040101 Stockton Creek — Mechums River, which is listed as impaired on
the DEQ Integrated List of All Waters in Virginia. Causes of impairment are Benthic Macroinvertebrates Bioassessments.
Section 8. Qualified personnel
The following personnel are responsible for inspections;
Name: Daniel Hyer, PE (until another consultant is selected)
Address: 113 4 h St NE STE 100 Charlottesville, VA 22902
Email: dhyer@line-grade.com
Phone Number: (434)262-0163
Section 9. Signed Certification
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering
the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
Operator Name: Daniel C. Hyer
Company: Line and Grade Civil Engineering
Title
Signature:
Date: January 315t, 2022
Section 10. Delegation of authority.
Delegation of Authority
I, (name), hereby designate the person or specifically described position below to be a duly authorized
representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit,
at the construction site. The designee is authorized to sign any reports, stormwater
pollution prevention plans and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction
General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Section 11. General permit copy
To be included with final SWPPP.
Section 12. Inspection logs
Section 12a. Corrective Action Log
Project Name: Waverly Residence
SWPPP Contact:
Inspection
Date
Inspector
Name(s)
Description of Deficiency
Corrective Action Needed (including planned
date/responsible person)
Date Action
Taken/Responsible
person
Section 12b. SWPPP Amendment Log
Project Name: Waverly Residence
SWPPP Contact:
Amendment No.
Description of the Amendment
Date of Amendment
Amendment Prepared by
Names and Title
Section 12c. Grading and Stabilization Activities Log
Project Name: Waverly Farm
SWPPP Contact:
Date
Grading
Activity
Initiated
Description of Grading Activity
Date Grading
Activity Ceased
(Indicate
Temporary or
Permanent)
Date When
Stabilization
Measures are
Initiated
Description of Stabilization Measure and
Location