Loading...
HomeMy WebLinkAboutSDP202100065 Correspondence 2022-01-31 (9)SHIMP ENGINEERING, P.C. Design Focused Engineering January 31, 2022 Doug McAvoy Jr. Virginia Department of Transportation 701 Vdot Way Charlottesville, VA 22911 RE: Response Letter #2 for SDP2021-00065 Albemarle Business Campus: Block 1 Dear Doug, Thank you for your review of the final site plan for Albemarle Business Campus: Block 1. This letter contains responses to VDOT comments dated December 3, 2021. Our responses are as follows: 1. Provide a vertical profile for the entrance. a. Response: A vertical profile is provided on C 13. b. Follow-up: Sheet C 13 contains sight -line profiles, and no others. Provide a vertical profile of the ground along the center -line of the proposed entrance. RESPONSE: Vertical entrance profile now added to C13. 2. Since you appear to be replacing the existing ditch on the north side of Country Green Road (Rte 875) with curb and gutter, you will need to add drop inlets and storm sewers to handle the storm water run off from the road. a. Response: Comment received. Please see the revised stormwater plan. b. Follow-up: Provide hydraulic calculations and drainage map. RESPONSE: The VSMP plan Sheet C20 showing inlet and pipe drainage map and calculations has been sent to you with this submittal. This can also be found on county view under planning application WPO201800044 — VSMP plan. If you have any questions or concerns about these revisions, please feel free to contact me at Keane@shimp-en ing eering com or by phone at 434-227-5140. Regards, Keane Rucker, EIT 912 E. High Sr. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com