HomeMy WebLinkAboutSP200700053 Study Traffic Study 2008-02-22 6?e ; S 053 ST ANNE'S- BELFIELD SCHOOL MIDDLE SCHOOL RELOCATION ALBEMARLE COUNTY, VA TRAFFIC IMPACT ANALYSIS i FEBRUARY 22, 2008 i i 1 I PREPARED FOR; GLOECKNER ENGINEERING m [----------- Contact. W. Scott Dunn, AICP ', TIMMONS GROUP YOUR VISION �cwa�v�rs THROUGH OURS. • STAB-Middle School TIA Table of Contents Table of Contents i Introduction 1 Study Limits 2 Existing Roadways and Background Traffic Volumes 5 Trip Generation and Traffic Distribution 12 Left and Right Turn Lane Analysis 19 Capacity Analysis 22 2008 Existing Traffic Volume Capacity Analysis (without the Middle School) 24 2010 Background Traffic Volume Capacity Analysis (without the Middle School) 27 2010 Total Traffic Volume Capacity Analysis(with the Middle School) 30 Conclusions 33 2010 Background Improvements(without the Middle School) 33 2010 Middle School Improvements 34 Appendix A-Traffic Count Data Appendix B-Turn Lane Nomographs Appendix C- 2008 SYNCHRO Output Sheets Appendix D - 2010 Background SYNCHRO Output Sheets Appendix E - 2010 Total SYNCHRO Output Sheets i STAB-Middle School 77A Tables Table 1 — 2010 Trip Generation Summary 12 Table 2 — Level of Service Definitions 22 Table 3 — Level of Service Criteria 23 Table 4— Level of Service and Delay Summary 2008 Existing Traffic 24 Table 5 — 95th Percentile Queue Length Summary 2008 Existing Traffic 26 Table 6— Level of Service and Delay Summary 2010 Background Traffic 27 Table 7— 95th Percentile Queue Length Summary 2010 Background Traffic 29 Table 8 — Level of Service and Delay Summary 2010 Total Traffic 30 Table 9 — 95th Percentile Queue Length Summary 2010 Total Traffic 32 Figures Figure 1 —Vicinity Map 3 Figure 2 — Preliminary Site Layout 4 Figure 3 — 2008 Existing Geometry 6 Figure 4 — Study Area Intersections 7 Figures 5A and 5P — 2008 Existing Traffic Volumes 8-9 Figures 6A and 6P — 2010 Background Traffic Volumes 10-11 Figures 7A and 7B— Site Traffic Distribution Percentages 13-14 Figures 8A and 8P — 2010 Site Traffic Volumes 15-16 Figures 9A and 9P — 2010 Total Traffic Volumes 17-18 Figure 10 — 2010 Background Roadway Geometrics 20 Figure 11 — 2010 Total Roadway Geometrics 21 Figure 12 — 2008 Background Level of Service 25 Figure 13 — 2010 Background Level of Service 28 Figure 14 — 2010 Total Level of Service 31 u STAB-Middle School TIA INTRODUCTION This report presents the findings of the traffic impact analysis for the proposed 250-student Middle School to be located on St. Anne's-Belfield's (STAB) Lower Campus. The proposed school will be an addition to the existing elementary school and campus facilities that already exist on Faulconer Drive in Albemarle County, Virginia. The proposed Middle School is scheduled to open in the fall of 2010. The following steps were taken to determine the potential traffic impacts associated with the proposed Middle School: 1. Background Data — Background AM (8:00 a.m. — 9:00 a.m.) and PM (3:30 p.m. — 4:30 p.m.) peak hour turning movement counts were obtained at the following five (5) locations: 1. Route 250 and Old Ivy Road 2. Route 250 and Canterbury Road/Route 601 3. Route 601 and Old Garth Road/Old Ivy Road 4. Old Ivy Road and Faulconer Drive 5. Faulconer Drive and Route 601/Route 250 Off-ramp These time periods were established in conjunction with school officials, Albemarle County and the Virginia Department of Transportation (VDOT) and coincide with the anticipated start and dismissal times of the proposed Middle School. se& ( �'�glt;y3t 2. Background Traffic Projections — Background traffic volumes were projected ahead through 2010, the build out year for the Middle School, using a 2% annual growth rate. This growth rate was specified by Albemarle County and approved by VDOT. 3. Trip Generation — Traffic generated by the Middle School was estimated using the 7th edition of the Institute of Transportation Engineer's Trip Generation Handbook. Trip _ _ d generation was calculated using the number of students as the independent variable. A NAG 30% reduction to the estimated trip generation was applied based on information #(.5 provided by STAB officials pertaining to families with siblings attending both the Lower and Middle Schools 4. Traffic Distribution and Projections — The distribution of school-generated traffic was estimated based on the distribution of the student population. STAB representatives provided a breakdown of student residences in relation to the proposed Middle School. u)k"h0 1Jt; 5. Left and Right Turn Lane Analyses —Turn lane analyses were conducted using the Virginia Department of Transportation's (VDOT) Road Design Manual. 1 STAB-Middle School TIA 6. Traffic Capacity Analysis — Level of service calculations for the intersections within the study area were performed using SYNCHRO Version 6 (Build 614). This computer program calculates delay based on techniques outlined in the 2000 Highway Capacity Manual. The following intersections were analyzed: 1. Route 250 and Old Ivy Road 2. Route 250 and Canterbury Road/Route 601 3. Route 601 and Old Garth Road/Old Ivy Road 4. Old Ivy Road and Faulconer Drive 5. Faulconer Drive and Route 601/Route 250 Off-ramp 7. Review of Proposed Improvements — Proposed roadway improvements required to accommodate projected background and site-generated traffic were evaluated relative to VDOT standards. STUDY LIMITS The planned 250-student Middle School is proposed to be built on the existing STAB Lower Campus in Albemarle County, Virginia (see Figure 1). Access to the Lower Campus will remain as it exists today; Faulconer Drive will serve as the sole point of ingress and egress. A preliminary site plan depicting the Middle School is shown in Figure 2. Given the traffic associated with the proposed development, it, distribution, and the existing traffic volumes along the roadway corridors adjacent to the site, Albemarle County and VDOT have indicated that the traffic study shall be limited to the unsignalized intersection adjacent to the Faulconer Road/Route 601 intersection and two signalized intersections on the US Route 250 (Ivy Road) corridor at Canterbury Road/Route 601 and Old Ivy Road. ochA445) vo,d,412--todeil 19(1/WL4(1._ fopet. td oPi °' ci(¢$1.' , 64)161)tjlr 111 87/) liAfrpt0A, VP- 00);(01 ,,,,ic-)fr.t-e-) ,/ 'ef&-j tiv 4I o t" Wit;" 611 cLt ✓a"�" ^ n� t 2 LEGEND: f Existing Road 0_ Railroad � — Proposed Site _ SITE29 c)„,ry / `fs . n •***t t; Rte 601 , .... c'fi, / 250 a °c IVY Rd ��P / �)C %. �� Faulconer Dr , 9r L.....1 o4 c�e / a ID '•. O Ydt R / j d w a , / / BIRDWOOCOUNTRYYCCLUB � ✓ Rry•• ••CS�'T.a;SP07at 0ia // M v on r, , iss. a „p d O ,,•y..� City of Charlottesville aci ---- i,,,,,p,a -..... •:S,4 /' •• l'T .•nspo • 2501. NOT TO SCALE i S. .. we Surrounding Roadway Network Figure TIMMONS GROUP and Site Location 1 0 O y a T rl 11 trl1y W`---z ..,.--// r 1/ , . fr, . ®4e. -, t tom'.`' sv._„? --. / ,•itt ' I' // t .‘ _IA,...(-1-)___:--1„, ',';/,101f.' 4 ',., : .‘ _,/ ,..fri/ - '''''"-.------ rik7 j° b) t , \ \ ; S Ltytt tt� ""ic d �:e / f"jjy�`fa\ ,�'''' _! }y i , . ,:::00? 111‘ \''\\ l\11" 7 1-�"-.-y 4t LA,mil ' ,��/ 'CAS y '��,�}+� t� olir is ,0�41`� =s / ., t / � � � ��� iIA \i..t�� i N- r V, z 0. Y ,, i tipl" ,, �' i (�Y >> t J j1Y 1vI �� ': PROPOSED r r �'�, / SITE PLAN ��`- '<q ,- " St.Anne's Belfield School lat //(/ 7. '" LowerlMidd[e School awe CMawr Ar,WV. /�/ .. NOT TO SCALE i/ �!!t _.,_.J— . _._.. ^ ` p:p I e• Preliminary Site Layout Figure TIMMONS GROUP 2 VOux,,,VYY rcwt1.ty �r;aeODUH OVIB O ya STAB-Middle School TIA EXISTING ROADWAYS AND BACKGROUND TRAFFIC VOLUMES Timmons Group conducted a review of the adjacent roadways that will be most impacted by site- generated traffic. The existing intersection geometry within the study area is summarized on Figure 3. Background turning movement counts were obtained at the following five intersections: 1. Route 250 and Old Ivy Road 2. Route 250 and Canterbury Road/Route 601 3. Route 601 and Old Garth Road/Old Ivy Road 4. Old Ivy Road and Faulconer Drive 5. Faulconer Drive and Route 601/Route 250 Off-ramp These locations are shown graphically on Figure 4. This data was collected between January 22nd and January 24th, 2008 during both AM and PM peak hours. AM data was collected from 8:00 to 9:00 am and PM data was collected from 3:30 to 4:30 pm. These hours coincide with the anticipated start (8:40am) and dismissal (4:10pm) times of the proposed 250-student Middle School. The 2008 AM and PM peak hour directional turning movement counts are summarized on Figures 5A and 5P. The complete traffic data can be found in Appendix A. Background through traffic was projected ahead 2.0% annually through 2010 (opening year of the Middle School). Background traffic volume projections for 2010 are shown on Figures 6A and 6P. 5 LEGEND: T.�35 - Existing Road ill- 5-90 Signalized Intersection 'i 'T Unsignalized Intersection / r- Lane Configuration I29 I , Channelized Turn \%/ S Storage Length(in feet) fy es T Taper Length(in feet) `, 0/ d/ulconer c �Rdoo Dr Fc?' 74, ir A ONN ,,, • 44 4Ner _ y 9p 1-* Cn v-t. / .,)4 T-200'$_35p,___.......:S-'200,ti 1 r=120,Tcg0, s, u cn c #ft 250 o/a./., ivy kd • to NOT TO SCALE 3 a `' • Elb 2008 Existing Geometry Figure TIMMONS GROUP 3 0 YOUR VISION ACHIEVED THROUGH OURS C) LEGEND: f Existing Road wn.— Railroad Proposed Site Q Intersection to be Analyzed SITE / 6 csz .CS-Y Tr f d'a *??fic, Rte 601.... 6, 1 i ., o / boo o, 250 d f % �, Ivy Rd '•, -Po- /air / -.7,,,, s,q Faulconer Dr / 6'' '114 / _ -.. .i/ /al, / L___Th 64°' / #....),..;.......... BIRDWOOD •♦ CSr�R • T? / COUNTRY CLUB F a XPOrtat;� Oa / Ma `c • h �/ sie Ra a la % / •y City of •'••.• Charlottesville ISI iT / •.hspo / ••..&iph to y 250 • '•• NOT TO SCALE - •, StudyArea Intersections Figure TIMMONS GROUP 4 l o YOUR VISION ACHIEVED THROUGH OURS QI I i s y 7 :40...'"..-. „ CS:7N cA K.5***. ./N.e.. \ c. re' Rte 601 SITE \or.' -.4. ...(ect 4°Ce co. .-17:::7 o c • L cd'> CU U. Faulconer Dr qee 1 I �`J/ Icy Rd 5 ©� / Faulconer Dr tj 266 35 4_ 2 ��I j 134 w 475 .I j 114 .0- a 3 41111111 Route 601 548 #, .1 t G 1113 FD 100 t 1.7 O/ va ij a4j, }j 548 tj 278 21 4_ Ivy Rd j 548 0 9 . ao . j 178 0 29 0 co .) 4 1. 29 4 $ .1 4 I. o r 1 NOT TO SCALE R. 767 v R. $ : m 1 3 j N �Iw } 4 j o 0 0 CO 110 — 38 p '1 r J 79 ..1 t ( $ W 87 v 623 t $ g - 604 a 0 t -a 47 1,150 t4 r—7 23 29 t j t4 1,150 169 4_— t4 358 71 4_ ' 4 5277W 477 N 4 225 w 152 •— [4o.) j t. 9 N J 4•L. o r- - 740 a m 0 -4 867 za t 2 j o a o o } 1 j o a 953 222tg _.4 430 .1 t (J 48 ..) t (t. S $ -. 654 74 t 646 0 80 t -4 7 105 t4 �..-' 0 80 tj 1 1 1. Canterbury Rd Old ivy Rd 3 .«-'•"�Ott 2008 Existing Traffic Volumes Figurero TIMMONS GROUP AM Peak Hour 5-A o YOUR VISION ACHIEVED THROUGH OURS 0 y SITE Rte 601 0 6- �6 0 29 6 114- Li- Fa j i.� IVY Rd _ 5 1 Faulconer Dr t4 245 29 t— 2'-3 CV 4. 128 .': 441 .0- u i . V 79 T 3 Route 601 � I • 8 O/Cr 246 t✓, T rL`'P a ti, 508 14 246 52 t IVY Rd 508 031 4 'r.' m 4. 149 v85 4- ~uo 1 .) 1. 61 r .1 w L. 2 NOT TO SCALE N - 404 493 V s .+ .'�i o 1 3 j e N f 44 0 1 �I � iN 91 � 92 � o 0 1 I. -J 45 •1 t P a 29$ 394 t $ 354 c 0 t -•-• 32 954 tt r 7 5 10 1'1 14 954 85 t 14 576 265 4- 4 560 ' 445 e 253 N 653 ) L. 19 f E J4 L W 0 I - 619 726 g ~— G P t 1 W 0 8 t 1 l _____.3 937 815 ti e. .! 300 *1 t f `'~Y ~y 27 .1 t 1 0 -+ 31 t .-544 t„ a 499 0 167 t r 711 76 14. 7 0 167 14 (/) • y Canted/DV Rd Old Ivy Rd 3 •.' •' it 2008 Existing Traffic Volumes Figure rio TIMMONS GROUP PM Peak Hour BUR VISION ACHIEVED THROUGH OURS -� a O ti a Rte 601 SITE o acd g V a F1 I Ivy Rd ©4114 , Faulconer Dr 1.4 2n 36 © 139 w 494 •- E q, .1 : : , o I 601 ° o .N I 570 '1 t U io4 t W 0�0 289 } � a t4 570 tl 289 22 Ivy Rd j 570 ' 9 4 185 8 30 1 .1 4 1. 30 f .1 + 1, 0 N o NOT TO SCALE N o - 735 798 s • ,o „ t 3 j w N t 44 o 0 0 "' — 2 o .—� ua a 40 r 82 *) t r n w 91 648 t I' w 628 0 0 t • —-4 49 1,196 t$ r —.7 24 30 tr t4 1,196 176 4- t/ 372 74 4_r 548 m 496 � F a 4 234 w 158 1' p J 4 1. 9 i- .1 1. 0 i- - 776 u, 902 w E ~—a 1�\ I •N m } i V .. o } 14 r., N OA 992 4- 231~ 3 • .J 447 41 t r N r 50 '1 t r v -. 680 N n t 672 0 83 t v. -4 I7 109 t4 r—7 I0 83 t1 V) UJ Canterbury Rd Old Ivy Rd ae' 2010 Background Traffic Volumes Figure TIMMONS GROUP AM Peak Hour 6-A o ,OUR VISION ACHIEVED THROUGH OUR!, O y a SITE Rte 601 a` IS 14 T MI To. LL Faulconer D Ivy Rd ©iir FaulconerDr t4 255 30 4_.— 24Y4 14. ", 459 411111111:1 % J ~ ez r � aRoute 601 S 2 t 5 'O ° J *N . ,529 0�, 101 t aU6 N 256 t4 t�y� a t. 529 14 256 54 t.- IVY Rd 1 529 0 32 '$, IA155 0 88 ,, r L. 63 4-- e' J 4 l 2 � >, 1 NOT TO SCALE n 420 513 ti 0 t $ w * t 4 �, ci� 95 . V 96 4- j • ') r 47 �I t f T. 30 u 410 t ' c 368 0• 0 t r— 4 33 993 t4 +7 5 10 tj ,--- t4 993 88 t• tj 599 276 4_ 4 583 1 463 4- r c 4, 263 it 679 ,,,1L. 20 4- t, J 1 0 r IA E. 644 755 w 11 975 •- 848 . tIl - •• J 312 1 t l ly 28 *I t f E -. 566 t 32 t -,'E519 0 174 t f-4(7 11 79 t4 r—7 0 174 tj (n 1 1 Canterbury Rd Old Ivy Rd ..01IC0. Q •° 2010 Background Traffic Volumes Figure TIMMONS GROUP PM Peak Hour 6-P VISION ACHIEVED THROUGH OURS 1. STAB-Middle School TIA TRIP GENERATION AND DISTRIBUTION The site-generated traffic volumes for 2010 are shown in Table 1. These estimates are based on trip generation information provided in the 7th edition of the Institute of Transportation Engineer's (ITE's) Trip Generation Handbook. Trip generation was calculated using the number of students as the independent variable. ortf Table 1 2010 Trip Generation Summary ` a WEEKDAY ITE AM PEAK HOUR PM PEAK HOUR LAND USE CODE AMOUNT UNITS ADT IN %OUT TOTAL IN OUT TOTAL Private School(K-8) 534 250 STUDENTS 121 /I 99 220 75 84 159 Adjusted Trip Generation assuming 30% reduction 85 69 154 53 59 111 due to combined upper/middle drop off SOURCE: 'Trip Generation Handbook, 7th ed;" Institute of Transportation Engineers I' The table above reflects a 30% reduction to the estimated trip generation based on information provided by STAB officials pertaining to families with siblings attending both the Lower and Middle Schools. Data provided by the school indicated that 30% of the students who attend the Middle School have a sibling that attends the Lower School; parents will be permitted to drop off both students at the earlier Lower School start time, thus reducing the traffic impacts associated with the Middle School The distribution of school-generated traffic w. estima -8 eased on the distribution of the student G � �. population. STAB representatives provided a breakdown of student residences in relation to the proposed Middle School. The estimated 2010 site traffic distributions are shown on Figures 7A i/r-) Gu'`9' and 7B. The 2010 peak hour volumes from Table 1 were multiplied by the percentages from Figures 7A and 7B to generate the 2010 site traffic volumes shown on Figures 8A and 8P. The 2010 background traffic volumes from Figures 6A and 6P were added to the 2010 site traffic volumes from Figures 8A and 8P to generate the projected 2010 total traffic volumes shown on Figures 9A and 9P. 12 Rte 601 SITE ti o IS 4 oacd�s C a 1LL Faulconer Dr lIvy Rd Sri Faulconer Dr fl 100% 15% t 9 3 CIV/' 0% 0% s 1 IIIIIIIIII Route 601 0 o p ^ , _a' a' t 5 4 o 0% ii 0/ es% t✓ 1 t4. 0% t4 85% 25% c_ Ivy R 4 0% ' 0% . 1 oo 4 0% o% d 1 ,1 4 L. o% i •)1 4 L. 0% , NOT TO SCALE . 0 3 60% o o ~ o0� S ; ; t 4 ^ ',a t 4 4 a' 0• 0% — 0°/a _ coz—� '1 r oN c J 60% "1 t r -. 0%a 60%t a' ; -. 0%; 0% t r—O 0% 60% tl .71.— 0% 0% t4 t4 60% 20% t 4- tl 25% 25% �- 1 0% i0% 4- ; ti 4 0% "' 5% f F., o "i J 4 L. 0% 6 E -. 0% —. 0% '2.3 l ,1 2 4 a: � r---..�1 ; z ,t 1 4 a a 0% — 5% S J 40% .1 t r J 0% -.1 t r 1 -. 0%; 0% t 0% 0% t ;L. 0% 0% t4 r-7 0% 0% tl 1 1 Canterbury Rd Old Ivy Rd I 3 .• 2010 Private School Figure rb TIMMONS GROUP Entering Site Trip Distribution Percentages 7A o YOUR VISION ACHIEVED THROUGH OURS Q y Rte 601 SITE C O a` • Ica _8` 1- a Faulconer Or l/ IIVy Rd �y Faulconer Dr % 0%t� 100 t_4-: © © ya 100% 0% 1 J 1 0% t-- ' Cr Route 601 g g ,a' a' t - l a .g , 60% 4 a •1 t C o 0% t c'Y OL 83 40% t�' allt aj�Y tl 60% • ~ U 40% 0% l_ iv Rd j 60% ' 0% Y 4 40% $ 0% .— a J 4 1. 0% 4- ' J t I. 0% 1 NOT TO SCALE l - 0% —. 40% E a t 34 g . 0 . Y t a � a Z • • 0% 0% a, , r 0% -1 t r y -. 0% , 0% t * _. 0%a 0% t -. 0% 60% tl 0% 0% 14 14 60% 0% k tl 25% 0% 4 460% a `i 0% 4- ti 425% 0% 4- y ~ J 4 1. 0% r- J 4, L. 0% y _ - 20% % V ti — 30% 7R t 2 4 a% :F $ * t 1 . a" y'� , irj 40% $ 1 0% 1 t P J 0% 1 t 1 ,P ya - 0%y 0% t 's — 5%y 0% t ,_-. s 0% 0% t4, —-4 II0% 0% t4 (n 1 y tti Canterbury Rd Old Ivy Rd I 3 . to ftett 4` • 2010 Private School Figure rb TIMMONS GROUP Exiting Site Trip Distribution Percentages 7B o TOUR VISION ACHIEVED THROUGH OUTT Q y SITE Rte 601 6 a, I a% o R LL 0.\Faulconer Dr 11 Ih'Rd 5pi Faulconer Dr 11 154 13 L r © 3 ay// 1 69 Eg 0 cr 11111111 ��,��;� Route 601 4' ft 1‘ Tit m T 5 4 o idJ , 42 .-- -O t tii I� 1 t C 72 t °° V. C Oio 100 ti R a 11 42 11 10o z1 L�.71. IVYRa 4 42 0 0 1 28 N 0 4— N J 4 1 `0 J 4 0 I- e 1 NOT TO SCALE si _ ze R 0 it .- e o } 3 1 0 m t a 1 0 0 c 0 n 1 r .- _! 51 41 t (' 0 — 0,t, 51 t .. —. 0 0 0 t 7 0 92 11 r—.7 0 0 U 11 92 17 L 1'1 39 21 L.—r 4 42 0 V 4 17 ."'. 4 m .14 1. 0 � " J 4 1. 0 4 Z ff -. 04 -+ 21 IOI it0i '., a 0 0 o T w -. 3 0 0 .._-.7 0 0 t1 () l ' 1 Canterbury Rd Old Ivy Rd 1 3 .•` , 2010 Private School Site Traffic Volumes Figurerb TIMMONS GROUP AM Peak Hour A ,OUR VISION ACHIEVED THROUGH OURS O ti SITE Rte 601 14- ory�d�j� 0 29 a LL Faulconer Or I 5 I�YRd _ li Faulconer Dr 14 11i 8 k_.-� 2ro-i--- ~3 414 59 w 0 .- m I Route 601 U 35 + 0 v'; #-, '1 t s 45 t 047/,, r.,", 68 tl AIR 42.. tl 35 r tl 68 13 - I1'YRd 1 35 0 0 "- 0 4 24 it, 0 w` ..11 L 0 M 1 � 1. 0 NOT TO SCALE T\ 32 204 R. o �n o f 3 + 0 ti a ? 4 j o 6CT) s0 00 '1 (' -, 32 .1 t r 0 0 -4 O mot, 32 t NJ -. 0 o 0 t ▪ -.7 0 67 11 -.Z 0 0 11 • t4 67 11 4-•--�- t4 28 13 L"- 4 35 rt., 0 15 w 3 J (. 0 o .1 4 0 m w g` 12 18 a o t z y o 0 0 r o t i kn > 24 0 3 � �•l~ 21 t r wly a } r 0 0 0 } 3 o O t 7 0 0 11 -•7 0 0 141 (n 1 1 Canterbury Rd Old Ivy Rd 3 .` � 'C 2010 Private School Site Traffic Volumes Figure ( TIMMONS GROUP PM Peak Hour 8-P o YOUR VISION ACHIEVED THROUGH OURS Qi y SITE Rte 601 6 0 • Cd'j U. Faulconer Dr Ji IVY Rd ©dFauIconer Dr }l 431 49 t r 2`3 1/I 1 209 494 1111104,, Route 601 } sj w • NfI611 2 tg c1i.I } o, 176} if', ( 389 tt 413 iky }l 612 14 389 43 t r ivy Rd j 612 9 $ m 4 213 i 30 .14 t. 30 r- `" .1 4, 1. 0 f W 2 1 NOT TO SCALE N. 785 826 $ ti . } 3 j ita 2 t 4 j o 0 0 1- 0' V . e 114 40 E~ '1 r' 133 } r n w 91 E 699 } N 628 c 0 } 7 49 1,289 }j —7 24 30 tt }j 1,289 193 t.- tt 411 95 t j 590 $ 496 m 1 251 7, 162 .i .14 1. � 9 � ti J 4 1. 0 `,-4zo -4. 784 -. 923 o zo ti IV, 1,019 .- :2. 235 _ 481 'i t r' ....4 50 't t r' E ;, 6e0 kJ n � �} 676 a 83 } 4_-.-..z 7 109 11 -.z o 83 }l Cn 1 1 Co Canterbury Rd Old Ivy Rd 3 .• 0 2010 Total Traffic Volumes Figure TIMMONS GROUP AM Peak Hour 9A YOUR VISION ACHIEVEO THROUGH OURS -- Q y rite 601 SITE ID/ tu- aG`d u O ti Faultoner Dr JII I} Ivy Rd © Faulconer Dr }j 366 38 4_ 2iyil j 1 01 ' . 4 1 82 !' v To cc- Route 601 } 5 j a -� 564 1111 N IO/ 324 }j "P //44�TTll:ll a t j 564 1.4 324 67 4- .. ly,Rd 4 564 c 32 e m \ 179 a 88 4- 4 o ,3 4 1, 63 ` m ,4.1 4 L a 2 > NOT TO SCALE N. 0 - 452 So36 s N r } 3 j a $ w E } 4 i-' f 95 96 •- - - _-_- - °' 1 r lc - 78 1 } r w 30 m 441 } 368 c 0 } r 7 33 1,059 }j 7 5 10 }j }j 1,059 99 4- }j 627 289 L 4 618 1 463 j 278 $ 682 a r j 1, 20 .1 j L. 0 m 1 . - 656 773 E ,-'2..• o t 2 4 ' a' t 1 j s C 114 998 4- B51e 333 1 } r- ro 28 1 } f� $ ' 566 32 } P. c 522 c 174} �6-4-4 11 79 }1 r-. 0 174 }j (7) 1 Canterbury Rd Old Ivy Rd 3 .IDS. ffi 2010 Total Traffic Volumes Figure n TIMMONS GROUP PM Peak Hour YOUR VISION ACHIEVED THROUGH OURS -� Q STAB-Middle School TIA LEFT AND RIGHT TURN LANE ANALYSES The guidelines for left and right turn lane treatments are found in VDOT's Road Design Manual. These guidelines provide criteria for the installation of left and right turn lanes at unsignalized intersections. Right and left turn lane analyses were completed using the 2010 background traffic volumes shown on Figures 6A and 6P. The location of each warrant analysis along with the findings is shown below: 1. Eastbound right turn lane at Old Garth Road/Old Ivy Road — no right turn lane required 2. Westbound left turn lane at Old Ivy Road/Old Garth Road — no left turn lane required 3. Southbound left turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft left turn lane with 100 ft taper required 4. Southbound right turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft right turn lane with 100 ft taper required 5. Northbound left turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft left turn lane with 100 ft taper required 6. Eastbound left turn lane at Old Ivy Road/Faulconer Drive— 100 ft left turn lane with 100 ft taper required 7. Westbound right turn lane at Old Ivy Road/Faulconer Drive— no right turn lane required 8. Southbound right turn lane at Faulconer Drive/Ramp from SB US Route 29 — 100 ft rig turn taper required 9. Northbound left turn lane at Faulconer Drive/Ramp from SB US Route 29— no left turn lane required Right and left turn lane analyses were also completed using the 2010 total traffic volumes shown on Figures 9A and 9P. The location of each warrant analysis along with the findings is shown below: 1. Eastbound right turn lane at Old Garth Road/Old Ivy Road — no right turn lane required 2. Westbound left turn lane at Old Ivy Road/Old Garth Road — no left turn lane required 3. Southbound left turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft left turn lane with 100 ft taper required 4. Southbound right turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft right turn lane with 100 ft taper required 5. Northbound left turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft left turn lane with 100 ft taper required 6. Eastbound left turn lane at Old Ivy Road/Faulconer Drive — 100 ft left turn lane with 100 ft taper required 7. Westbound right turn lane at Old Ivy Road/Faulconer Drive — 100 ft right turn taper p required 8. Southbound right turn lane at Faulconer Drive/Ramp from SB US Route 29 — 100 ft right 4, turn lane with 100 ft taper required 9. Northbound left turn lane at Faulconer Drive/Ramp from SB US Route 29 — no left turn lane required The turn lane warrant analyses are summarized graphically on Figures 10 and 11. The turn lane nomographs are included Appendix B. 19 LEGEND b 135 - Existing Road L 5-90�j� Signalized Intersection O+ Unsignahzed Intersection ti°° Lane Configuration Er °o °o �,ti �,ti / I� 29 O Unfunded Background Improvement ©�,N°° Channelized Turn o S Storage Length(in feet) A v \� T Taper Length(in feet) A Dip iIv/Rd �a Gp1 Faulconer Toodila!" S�I00. ' T'` NJ , "J'i,. 1-t- / 71'100, 90, ► T_100'S_200'� 5, 0'T_ , s, 200'5=350 F1290 j ! 7S. in 2 P o sC N U #ft 250 �.al` ,R a IVy Rd • y NOT TO SCALE I 3 .,w .4e 2010 Background Geometry Figure with Unfunded Improvements TIMMONS GROUP 10 0 =TOR',3.,It)N,=„,:.Jr:�,.,fiS3tJ!= OUP', Based on VDOT Turn Lane Warrants 1. \ LEGEND. \\` Existing Road no T>135' Signalized Intersection u t5>9o' UnsignahzedIntersection tioo O+ 'j r Lane Configuration S tioo �, d / j29 O Unfunded Background Improvement loo I 0 Unfunded Total Improvement \f�S h. Channehzed Turn '�'4 S Storage Length(m feet) \ 0 = T Taper Length(in feet) 7715. lip iy /q0 ._ goo S �,4 Ivy Rd ?a 601 • Faulconer Dr • 2 ,; yhh • -7 / T,I00' `y n. L y �\�S,S,90,-Jo0© O 7 `20 ...................... dr ....7 T 100' s' 2' cc s,z00'1 0r_g0' s,T=200's,3s0 ~ Yf+ � . s- a 11 C U 6 #ft °/a 250 ii,j, /kJ Rd • y NOT TO SCALE tO I �.* 2010 Total Geometry Figure a `. ' ' with Unfunded Improvements g TIMMONS GROUP n YOUR, ,.),,,t_t.,t, =, r itOUG,,Otj.,s Based on VDOT Turn Lane Warrants 11 0 0 STAB-Middle School T7A ROADWAY CAPACITY ANALYSIS Capacity analysis allows traffic engineers to determine the impacts of traffic on the surrounding roadway network. The Highway Capacity Manual methodologies govern how the capacity analyses are conducted and how the results are interpreted. Levels of service (LOS) are determined for each part of the roadway network, with LOS A through C representing acceptable results and LOS D through F representing marginal to unacceptable results. Table 2 shows in detail how each of these levels of service are interpreted. Table 2 LEVEL OF SERVICE DEFINITIONS ROADWAY SEGMENTS OR CONTROLLED ACCESS L.O.S. HIGHWAYS INTERSECTIONS Free flow, low No vehicle waits �� 4,71 A traffic density. longer than one signal 4? indication. B Delay is not unreasonable, On a rare occasion stable traffic flow. motorists wait through more than one signal indication. Stable condition, movements Intermittently drivers C somewhat restricted due to wait through more than higher volumes, but not one signal indication, ! objectionable for motorists. and occasionally backups ' may develop behind left `1! turning vehicles, traffic 4P ',�� flow still stable and ��. acceptable. Movements more restricted, Delays at intersections queues and delays may occur may become extensive during short peaks, but with some, especially D lower demands occur often left-turning vehicles enough to permit clearing, waiting two or more .0> thus preventing excessive signal indications,but i/ P backups. enough cycles with lower '1%,� �� ��� demand occur to permit 1% �� 4); periodic clearance, thus preventing excessive �l 1� back-ups. `��� �y� Actual capacity of the Very long queues may 4, E roadway involves delay create lengthy delays, to all motorists due to especially for left congestion. turning vehicles. Forced flow with demand Backups from locations F volumes greater than downstream restrict or O', F capacity resulting in prevent movement of �� . complete congestion. vehicles out of approach 4'�"� ������� Volumes drop to zero in creating a storage area '�� 4�. `OF' extreme cases. during part or all of 00. 4� an hour. �j ��, �',�.* SOURCE: A Policy on Design of Design of Urban Highways andP �j Arterial Streets-AASHTO, 1973 based upon material published in Highway Capacity Manual, National Academy of Sciences, 1965. 22 STAB-Middle School TIA For both unsignalized and signalized intersections, level of service is defined in terms of delay, a measure of driver discomfort, frustration, fuel consumption and lost travel time. Table 3 summarizes the delay associated with each LOS category: Table 3 Level of Service Criteria Unsignalized Intersections Signalized Intersections Level of Delay per Level of Delay per Service Vehicle (sec) Service Vehicle (sec) A <10.0 A < 10.0 B >10.0 to <15.0 B >10. to <20.0 C >15.0 to <25.0 C >20.1 to <35.0 D >25.0 to <35.0 D >35.1 to <55.0 E >35.0 to <50.0 E >55.1 to <80.0 F >50.0 F > 80.1 Five intersections were analyzed for the 2008 and 2010 scenarios. These intersections, both signalized and unsignalized, were analyzed using SYNCHRO Version 6 (Build 614) based on 2000 Highway Capacity Manual (HCM) methodologies with the following assumptions: • Level terrain; • 12 foot lane widths; ? • No parking activity or bus stops; � • No pedestrians, and b`r�a • Signal timings provided by VDOT. 23 STAB-Middle School TIA 2008 Capacity Analysis-Existing Traffic Table 4 summarizes the 2008 existing LOS based on the 2008 existing volumes shown on Figures 5A and 5P and the existing geometry shown on Figure 3. The 2008 AM and PM background LOS is shown on Figure 12 and the corresponding SYNCHRO worksheets are included in Appendix C. Table 4 �,Q Level of Service and Delay Summary 2008 Existing Traffic 001/4. ‘ .", Eastbound Westbound Northbound Southbound Intersection Number and Type of LaneAM PM AM PM AM PM AM PM - Overall Descnption Control Group Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay'LOS Delay LOS-AM PM �. 1 Ivy Road Left 83 5 F 274.3 F 442.2 F 54.9 D Delay Delay at Old Ivy Road Through 52.4 D 45 2 D 16 2 B 25 3 C 197 9 69.6 Signal Right 15 0 B 14 9 B 45 2 D 43.4 D LOS LOS ''''' Approach 52.4 D 45 2 D 15 9 B 22 2 C 75 6 E, 238.9 F 442 2. F 54 9 D F E Q 2 Ivy Road Left 214.9 F 20 3 C 13 8 B 12.4 B Delay Delay at Canterbury Rd/ SignalThrough 14.9 B 13 4 B 36 1 D 27.6 C 48.8 D 42.0 D 44.2 D 36 3 D 64 8 25 0 Route 601 Right 8.5 A 8 8 A 45.2 B 40.5 D 43.9 D 35 5 D LOS LOS Approach 95.2 F 15.8 B 35 8 D 26.9 C 47 3 D 41.3 D 43.9 ,D 35 6 D E C L� 3 Old Garth Road/ Left 8.9 A 8.8 A Delay Delay fq / Old Ivy Road Two- way Through 286 6 F 26 0 D ** F 47.8 E 1.7 A 14 A - - \ �V at Route 601 Right t t t t - LOS LOS •_y\�// Approach 286.E F 26 0 D ** F 47.8 E - - Stop 4 Old Ivy Road Left Delay Delay at Faukoner Dr Two- Way Through 2 6 A 13 A 0.0 A 0.2 A 0 0 A 0 0 A 238 5 F 30 7 D Stop Right t t t t 17.0 C 10.3 B LOS LOS Approach - - -- 0 0 A 0.0 A 211.3 F 28.7 D - - 5 Route 601/ Left Delay Delay (�/ Route 29 Exit Ramp Wa Through 2 4 A 1 7 A 98 6 F 25 1 D 36 0 E 21 5 C - - 'V1T at Faukoner Dr Sto Right t t t t LOS LOS 1 '�///�\) Approach - - - - 98.6 F 251 D 36.0 E 21.5 C - - \ ;V t SYNCHRO does not provide level of service or delay for movements with no conflicting volumes. ill **Delay greater than 9999 99 seconds cannot be calculated by SYNCHRO Each of the two signalized intersections that were analyzed show unacceptable levels of service during the AM and/or PM peak periods. In addition, the remaining three unsignalized VYi,\, , intersections also show unacceptable levels of service. 11 II • 1 I: 24 (:\ i 29 6- Q, c c --..' 0/ 2 Q>, Ivy n ,N d ' 4) o, „,,.\,:op% Ili, Faulconer Dr 2/..........,:-.6 • • • .iwai , .1,. X............ dr .._ o iv , :) -1:3 Lyi cc 0/ c c., 250 a ii, LEGEND. • B AM Peak Hour LOS (r) (B) PM Peak Hour LOS ---1 ). — Existing Road Cr3 NOT TO SCALE 1 ..,... Ilk *O.. . it 2008 Existing Volume Figure (I.- . ft, • (i) TIMMONS GROUP Level of Service 12 o YOUR',MOP,ACffit,THROU,,i,.,OURS C) ZI1 STAB-Middle School T7A Table 5 summarizes the 95th percentile queue lengths for the 2008 existing volumes shown on Figures 5A and 5P. The corresponding SYNCHRO worksheets are included in Appendix C. Table 5 95th Percentile Queue Length Summary 2008 Existing Traffic Eastbound Westbound Northbound Southbound Intersection Number and Type of Lane AM PM AM PM AM PM AM PM Description Control Group Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) 1 Ivy Road Left 67 175 190 263 at Old Ivy Road Signal Through #718 #673 108 599 Right 24 58 0 0 2 Ivy Road Left #682 #402 11 15 at Canterbury Rd/ Signal Through #711 452 #892 #581 61 36 85 99 Route 601 Right 3 8 15 14 126 98 3 Old Garth Road/ Two- Left 3 5 Old Ivy Road Way Through 370 39 ** 88 5 4 at Route 601 Stop Right 0 0 4 Old Ivy Road Two- Left 322 99 at Faulconer Dr Way Through 9 3 0 0 0 0 7 3 Stop Right 0 0 5 Route 601/ Two- Left Route 29 Exit Ramp Way Through 7 5 261 54 155 67 at Faulconer Dr Stop Right 0 0 #-95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cydes. **Delay greater than 9999.99 seconds,queue not calculated by SYNCHRO. 26 STAB-Middle School TIA 2010 Capacity Analysis-Background Traffic(without Middle School) Table 6 summarizes the 2010 background LOS based on the 2010 background volumes shown on Figures 6A and 6P and the existing geometry shown on Figure 3. The 2010 AM and PM background LOS is shown on Figure 13 and the corresponding SYNCHRO worksheets are included in Appendix D. Table 6 Level of Service and Delay Summary 2010 Background Traffic Eastbound Westbound Northbound Southbound Intersection Number and Type of Lane Overall Description Control Group AM PM AM _ PM AM PM AM PM Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS AM _ PM 1 Ivy Road Left 215.0 F 119.4 F 188.6 F 123 6 E Delay Delay at Old Ivy Road Through 147 7 F 88.5 F 24.3 C 29.4 C 152.6 69.3 Signal Right 22.2 C 16.9 B 52.9 D 42.5 D _ LOS LOS Approach 147 7 F 88 5 F 23.7 C 25.7 C 181.2 F 107 6 F 188 6 F 119 3 E F E 2 Ivy Road Left 294 9 F 22.7 C 14 5 B 14 0 B Delay Delay at Canterbury Rd/ Through 16.2 B 11.4 B 43.5 D 30 7 C 49 2 D 45 1 D 44.1 D 40 7 D 82 1 _ 26.8 _ Route 601 Signal Right 8.8 A .7.4 A 45.5 D 43.3 D 46.1 D 39.1 D LOS LOS Approach 128.3 F 15.4 B 43.0 D 29.8 C 47.7 D 44.3 D 45.8 D 39.4 D F C 3 Old Garth Road/ Left _ Delay Delay Ivy Road Two- Old Through 371 7 F 28.7 D "' F 60 2 F 9 0 A 8 9 A 1 8 A 14 A - - at Route 601 Sto Right t t t t LOS LOS Approach 371 7 F 28.7 D ** F 60 2 F 4 Old Ivy Road Left _ Delay Delay o- at Faulconer Dr w Through 2 7 A 1.3 A 0 0 A 0.2 A 0 0 A 0 0 A 308 9 F 35 4 E -- _ - StopWay Right t t t t 17 8 C 10 4 B LOS LOS Approach 0.0 A 0.0 A 274.5 F 33.0 D -- - 5 Route 601/ Left Delay Delay 29 Exit Ramp Two- Route Through 2 4 A 1 8 A 132 0 F 27 5 D 44 1 E 23 3 C -- - at Faulconer Dr Stop Right t t t t _ LOS LOS Approach -- - - - 132.0 F 27.5 D 44 1 E 23 3 C -- - t SYNCHRO does not provide level of service or delay for movements with no conflicting volumes. **Delay greater than 9999 99 seconds cannot be calculated by SYNCHRO Again, it is noted that each of the two signalized intersections show unacceptable levels of service during the AM and/or PM peak periods and the remaining three unsignalized intersections also show unacceptable levels of service. 27 : P`Pl / � (.1 80 114 iQJ P`P \PP c v 0, cashi, ICY Rd ,Pa 601 Faulconer Dr tie • • ��il (q)q a (q) a 0 (B) (C) NJ \� alF C(C) o a c g #ft 04a 250 I_, Ra Ivy Rd LEGEND B AM Peak Hour LOS (B) PM Peak Hour LOS Cr) 1. — Existing Road NOT TO SCALE W I 3 a Q. r ; •t 2010 Background Volume 1 Figure TIMMONS GROUP Level of Service 13 a YOUR YIS1ON ACHEEVEO THROUGH OURS C) STAB-Middle School TIA Table 7 summarizes the 95th percentile queue lengths for the 2010 background volumes shown on Figures 6A and 6P. The corresponding SYNCHRO worksheets are included in Appendix D. Table 7 95th Percentile Queue Length Summary 2010 Background Traffic Eastbound Westbound Northbound Southbound Intersection Number and Type of Lane AM PM AM PM AM PM AM PM Descnption Control Group - Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) 1 Ivy Road Left _ 175 #366 0 0 at Old Ivy Road Signal Through #992 #756 143 655 Right 29 70 78 181 2 Ivy Road Left #720 #312 11 12 at Canterbury Rd/ Signal Through #763 364 #951 563 64 37 88 118 Route 601 Right 3 6 15 14 164 117 3 Old Garth Road/ Two- Left _ 3 6 Old Ivy Road Way Through 428 45 ** 106 6 4 at Route 601 Stop _ Right - 0 0 4 Old Ivy Road Two- Left 372 116 at Faulconer Dr Way Through 9 3 0 0 0 0 8 3 Stop Right 0 0 5 Route 601/ Two- Left Route 29 Exit Ramp Way Through _ 8 5 310 62 186 77 at Faulconer Dr Stop Right 0 0 #-95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. **Delay greater than 9999.99 seconds;queue not calculated by SYNCHRO. • 29 STAB-Middle School 77A 2010 Capacity Analysis- Total Traffic(with the Middle School) Table 8 summarizes the 2010 total LOS based on the 2010 total volumes shown on Figures 9A and 9P and the existing geometry shown on Figure 3. The 2010 AM and PM total traffic LOS is summarized on Figure 14 and the corresponding SYNCHRO worksheets are included in Appendix E. As with the 2010 background volumes, it is noted that each of the two signalized intersections show unacceptable levels of service during the AM and/or PM peak periods and the remaining three unsignalized intersections also show unacceptable levels of service under 2010 total conditions. Table 8 Level of Service and Delay Summary 2010 Total Traffic Eastbound Westbound Northbound Southbound / Intersection Number and Type of Lane Overall A \Q Description Control Group AM PM AM PM AM PM AM PM \V Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay 'LOS Delay I LOS AM PM 1 Ivy Road Let _ 210 5 F `119 4 F 220 1 F 145.5 F Delay Delay at Old Ivy Road Signal Through 167 3 F 94 0 F 23 7 C 29 6 C _ 171.1 74 0 Right 217 C 170 B 49 0 D 425 D LOS LOS Approach 167.3 F 94.0 F 23.0 C 25.8 C 176 8 F 107.6 F 220.1 _F 145.5 F F E 2 Ivy Road Left 104.1 F 26.9 C 16.1 A 14.6 B _ Delay Delay at Canterbury Rd/ Signal Through 10.9 B 11.1 B 65.0 E 33.2 C 54.6 D 47.3 D 136.6 F 45.1 D 63.4 29.2 Route 601 Right 6 2 A 7.3 A 50.4 D 45.4 D 77.8 E 41.8 D LOS LOS Approach 50 0 D 17.0 B 64 3 E 32 2 C 52 9 D 46 4 D 89 4 F 42 5 D E C 3 Old Garth Road/ Left Delay Delay Old Ivy Road Two- Through 491 7 F 32.6 D *e F 74 4 F 9 2 A 9 1 A 19 A 1 5 A - - Wayat Route 601 stop Right t t t t LOS LOS Approach 4917 F 32.6 D ** F 744 F • - 4 Old Ivy Road Left _ Delay Delay at Faukoner Dr Way Through 4.2 A 2.1 A 0 0 A 0 2 A 0 0 A 0 0 A 857 1 F 72.9 F - - Stop Right t t t t 241 A 10.7 B LOS LOS Approach, 00 A 00 A 770 7. F 67 7 F - - 5 Route 601/ Left Delay Delay Route 29 Exit Ramp Two- Way Through- 2 4 A 1 8 A 488 9 F 42 7 E 144 2 F 35 1 E - - at Faukoner Dr Right t t t t LOS LOS Stop Approach - - - - 488 9 F 42.7 E 144 2 I F 35 1 E - - t SYNCHRO does not provide level of service or delay for movements with no conflicting volumes **Delay greater than 9999.99 seconds cannot be calculated by SYNCHRO 30 :-., / GI iT P� ro P� O. 6J v (� P L, \�� �L� " c.flL ��i+ O/a : cd ,e4 Ivy Rd "Pa G0> at,, Faulconer Dr i tie /..„......., eN • III ,....;,7 ,. (4.)71. .,,,., '...N .,' a 0 w o ~ o a #fre) ce- C° „ ;‘,& 02 250 4, a Ivy Rd I LEGEND • B AM Peak Hour LOS (B) PM Peak Hour LOS y ttl - Existing Road NOT TO SCALE I 3 a ... "' ` • 2010 Total Volume Figure TIMMONS GROUP Level of Service 14 0 YOUR VISION SCHlFY£O THROUGH OURS a STAB-Middle School TIA Table 9 summarizes the 95th percentile queue lengths for the 2010 total volumes shown on Figures 9A and 9P. The corresponding SYNCHRO worksheets are included in Appendix E. Table 9 95th Percentile Queue Length Summary 2010 Total Traffic Eastbound Westbound Northbound Southbound Intersecbon Number and Type of 4 Lane AM PM AM PM AM PM AM PM Description Control f Group Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) Queue(ft) 1 Ivy Road Left 174 #399 0 0 at Old Ivy Road Signal Through #954 #764 141 660 Right 33 73 73 181 2 Ivy Road Left #627 #359 7 12 at Canterbury Rd/ Signal Through 478 355 #954 #624 65 37 #139 132 Route 601 Right 2 6 15 14 #259 #175 3 Old Garth Road/ Two- Left 3 6 Old Ivy Road Way Through 477 51 ** 122 6 5 at Route 601 Stop Right 0 0 4 Old Ivy Road Two- Left 608 213 at Faulconer Dr Way Through 17 6 0 0 0 0 12 3 Stop Right 0 0 _ 5 Route 601/ Two- Left Route 29 Exit Ramp Way Through 8 5 885 125 494 154 at Faulconer Dr Stop Right 0 0 #-95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cydes. **Delay greater than 9999.99 seconds;queue not calculated by SYNCHRO. 32 STAB-Middle School TIA Conclusions The conclusions reflect the necessary roadway improvements that are needed in two distinct phases. The first phase includes the improvements that are necessary due to overall traffic growth in the area based on the 2010 background traffic volumes. The second phase consists of the improvements that are required due to traffic generated by the proposed Middle School in 2010. 2010 Background(without Middle School) Each of the five intersections that were analyzed showed unacceptable levels of service under 2010 background conditions. With respect to the signalized intersection on the US Route 250 corridor, it appears that additional through lanes are necessary to handle projected traffic volumes. While the additional through lanes would significantly improve east/west traffic movement along the corridor, the minor approaches at both Route 601 and Old Ivy Road are less than desirable and somewhat limiting with respect to efficient overall traffic flow. The remaining three unsignalized intersections do not warrant the installation of traffic signals; furthermore their locations and geometrics are not suited for such an improvement. That being said, the turn lane analyses indicate that the following auxiliary lanes are warranted: • Southbound left turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft left turn lane with 100 ft taper required • Southbound right turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft right turn lane with 100 ft taper required • Northbound left turn lane at Route 601/Old Garth Road/Old Ivy Road — 100 ft left turn lane with 100 ft taper required • Eastbound left turn lane at Old Ivy Road/Faulconer Drive — 100 ft left turn lane with 100 ft taper required • Southbound right turn lane at Faulconer Drive/Ramp from SB US Route 29 — 100 ft right turn taper required It is recommended that the above listed turn lane improvement be considered by the County; again, these are improvements warranted by projected background traffic. 33 STAB-Middle School TIA 2010 Middle School Improvements The addition of the Middle School in 2010 is estimated to add approximately 154 total AM peak trips (85 enter, 69 exit) and 112 PM peak trips (53 enter, 59 exit). Provided the trip distribution and surrounding road network, the additional traffic will be most evident at two locations — Faulconer Drive/Old Ivy Road and Faulconer Drive/SB US 29 Off ramp. Under 2010 total traffic conditions, each of these intersections were noted as satisfying the following turn lane warrants: • Westbound right turn lane at Old Ivy Road/Faulconer Drive— 100 ft right turn taper • Southbound right turn lane at Faulconer Drive/Ramp from SB US Route 29 — 100 ft right turn lane with 100 ft taper The westbound right turn taper at Old Ivy Road/Faulconer Drive was not warranted under 2010 background conditions. With respect to the Faulconer Drive/Ramp from southbound US Route 29 intersection, a similar intersection improvement was noted under 2010 background conditions (i.e. a right turn taper). Given the fact that a right turn treatment was warranted under 2010 background conditions at the Faulconer Drive/Ramp from southbound US Route 29 intersection it is not recommended that the proposed Middle School be held responsible for this improvement. With respect to the westbound right turn taper at Old Ivy Road/Faulconer Drive, it is not recommended that the Middle School be responsible for the installation. Estimates indicate the proposed middle school will add approximately 20 vehicles to this specific movement; a volume of this magnitude in this setting should not require installation of an auxiliary taper. 34 STAB-Middle School TIA Appendix A Traffic Count Data STAB-Middle School 77A PAGE INTENTIONALLY BLANK STAB-Middle School 774 Table A-1 Turning Movement Counts St.Annes Belfield Development-Charlottesville,Virginia Start Date 1/24/2008 Start Time 7:00 AM Street Name Old Ivy Rd--Northbound Old Ivy Rd--Southbound Ivy Rd--Eastbound Ivy Rd--Westbound Start Time Left Thru Right Total Left Thru Right Total Left Thru Right Total Left Thru Right Total Total 8:00 AM 45 13 15 73 80 0 9 89 7 115 0 122 0 64 32 96 380 8:15 AM 5 1 1 7 41 0 3 44 14 201 0 215 0 88 39 127 393 8:30 AM 2 0 1 3 30 0 5 35 18 157 0 175 0 72 37 109 322 8:45 AM 3 0 0 3 54 0 3 57 9 173 0 182 0 66 30 96 338 Peak Hour Left _Thru Right Total Left Thru Right Total Left Thru Right Total Left Thru Right Total Total 8:00-9:00 55 14 17 86 205 0 20 225 - 48 646 0 694 0 290 138 _ 428 1433 PHF 0.31 " 0.27 0.28 0.29 0.64 • 0 0.56 0.63 0.67 0.80 0 0.81 0 0.82 0.88 0.84 0.91 Start Date 1/24/2008 Start Time 4.00 PM Street Name Old Ivy Rd--Northbound Old Ivy Rd--Southbound Ivy Rd--Eastbound I Rd--Westbound Start Time Left Thru Right Total Left Thru Right Total Left Thru Right Total Left Thru Right Total Total 3.30 PM 71 18 16 105 55 0 11 66 9 98 0 107 0 155 66 221 499 345 PM 20 4 5 29 70 0 15 85 5 149 0 154 0 188 79 • 267 535 4.00 PM 18 6 0 24 40 0 10 50 8 115 0 123 0 158 64 • 222 419 4.15 PM 4 3 2 9 39 0 13 52 5 137 0 142 0 152 56 208 411 Peak Hour Left Thru Right Total Left Thru Right Total Left Thru Right Total Left Thru Right Total Total 3.30-4.30 113 31 23 167 204 0 49 253 27 • 499 0 526 0 653 265 918 1864 PHF 0.40 0.43 0.36 0.40 0.73 0 0.82 0.74 0.75 • 0.84 0 0.85 0 0 87 0.84 0.86 0.87 Table A-2 Turning Movement Counts St.Annes Belfield Development-Charlottesville,Virginia Start Date 1/23/2008 Start Time 8:00 AM Street Name Canterbury Rd--Northbound Canterbury--Southbound Ivy Rd--Eastbound I Rd--Westbound Start Time Left Thru Right Total Left Thru Right Total Left Thru Right Total Left Thru Right Total Total 8:00 AM 5 5 1 11 22 5 119 146 106 179 4 289 2 111 64 _ 177 623 8:15 AM 7 1 10 18 12 6 115 133 102 161 3 266 3 120 48 171 588 8:30 AM 4 8 12 24 12 1 114 127 98 155 0 253 2 127 26 • 155 559 8:45 AM 4 10 7 ' 21 10 3 108 121 124 ▪ 159 0 283 2 119 31 152 577 Peak Hour - Left Thru Right Total Left Thru Right . Total Left Thru Right Total Left Thru Right Total Total ,8:00-9:00 20 24 30 74 56 15 456 527 430 654 7 1091 9 477 169 655 2347 PHF 0.71 0.60 0.63 0.77 0.64 0.63 0.96 0.90 0.87 0.91 0.44 0.94 0.75 0.94 0.66 0.93 0.94 Start Date 1/23/2008 Start Time 3:30 PM Street Name Canterbury Rd--Northbound Canterbury--Southbound Ivy Rd--Eastbound Ivy Rd--Westbound Start Time Left Thru Right Total Left _Thru Right Total Left Thru Right Total Left Thru Right Total Total 4:00 PM 3 3 3 9 16 5 129 150 71 145 2 218 2 123 29 154 531 4:15 PM - 2 3 3 8 11 2 112 125 84 125 3 212 8 125 27 160 505 4:30 PM 2 2 2 6 23 5 115 143 82 145 2 229 7 101 16 124 502 4:45 PM 2 1 5 8 12 ▪ 3 127 142 63 129 4 196 2 96 13 111 457 Peak Hour Left Thru Right Total Left Thru Right _ Total Left Thru Right Total Left Thru Right Total Total 3:30-4:30 9 9 13 31 62 15 483 560 300 544 11 855 19 445 85 549 1995 PHF 0.75 0.75 0.65 0.86 0.67 0.75 0.94 0.93 0.89 0.94 0.69 0.93 0.59 0.89 0.73 0.86 0.94 11 W -0 AAAA (n (n WC/) 1p Co 1p Co Co Co CA (/) O) (n Cn 1pW 13 AAA A (n CO n(n 13CA13 CO Co Co CA (/) (J) (A(/) 2CJO A W op/ W W mC0 ACa - o w " m m 2GJm ACA Opt - w m 3:OO A W -+ o p1 ET W -7Ox CJ7 OCn o � 0 � p. TOx cn OCi0 � 2 as TOE. CA O Cnoam as TO W cn CD O � a) p. O 3 z 30 o Z 3 A o K K K K 3 z 3 w (O o z 3 w o -, m 3 m m oo $ co 3 m m o -, CD 3 m m o0 5 m 3 m m m m CD CD CO Cp CO -• pp I- N W N cor co O N W N (O Cn Co1 0 w N W O (O V (O V O O N x OA x OA_ Ut Cp =, V x ?7 OW Cb Nx = 31 O co � N DN V 0 73N CO 0 DN 1 1 3 o 1 1 co 1 1 cm m 0 1 1 m 3 o OO , O0007• co 007 OOOO ?. p 2 2 c 2 c c 2 2 73 73 7) 7) p 31 1 7) p o s 0 C 65 (O CD o(O l (O CO 0 t0 CO .7- .�. 3 7- CD al .7' s w w co 7 P. -4 C� O CNf1 O N 3 S g g O O 0 O bo 4b. O NCD ONO a NO 0 coCJ1 V a ID W W in up A p1 Op -, U1 W po (OW CD NCO COCn A ca cor NN co CJ7 Cro w OCn CCD NtA AN w D p2m � Ap � m 37 co Cn V -. CD 7) > • Cax NA (11N � C 0) N� AO V � C 7 W Ox U1 � 0 ...4 t0 � V V � 0 7 O O CCD C O CCD Co N W m co p s CJ1 A O N f�D (D CA71 N O O 1 O bp 0 ? s N 7' O (OD Cn 2 2 p o c 2 0 a, p (n2 rnrnrn V 2 (p cn2 ? (D aoc w Co 1 en (n M 1 0 33 3)Cn 0 3) (n aC p 31 7] o p 71 31O aC is v IO - cr o - Ca O en co 10 W o o W 10 O 0 2 ? NCO W � co A C0 C Cn �10 co A W co(O 0 0 3 Cn � m- C o 3: - C m 7 CO » S S A = » 7• m 7 7' mo " C7 g mp O 1 O 1 1g 0 ... 1 0 C 0 0 W OA1 � 1 j OCA1 � � 1j 15 p Cu O A O N W W CJ7 0 7 V CA O W N T. Cn 0 7 < U 40 CO O co N O co O a co CA O O N A V 0 a < Q O Caw co Opf A W a g CO Np1 AO � W a m C CA W o -+ CO CAW pN W C.n CJ7 CO COO m m m D ? m D o (O p O A CA fT fWJ1 Q 7(') A O O a 0 0 0 O Ord, a O O a 0 0 0 0 = a 0•n CJ U. 0D a w0 w0 _ _ � C s� < 0 m 1 1 0 o m coen J CO (D V o 7 V m 2" co W w QpOo R•„ CD m •CD coN 7 Co CO V _. S S 'CpJ1 v p N (WO CD rn V 2 A A (J1 2 a (p c CIl O N A C a fA 2 c (A c C 7J Co a a -. o 73 3j m 73 71 m m p 31 31 0 31 _ _ _ 31 p1 COO CJ1(7, N O N O CO S A N N9. N L N N S co Ca V A avli N V ? W cn O c0 o C) {0 - a 7 pOpAO pp co O d coO Cn co A W a N OCAO -, -• -, 0 j W p co CO CA0 7 N pO A P1 CA N W Co P) N V Cu 0 V CO W CCmu n f P) O CA A CD N a co A w 0 Cn CO w a o r r r r o r , r O 1- r 6 N m -. -+ 000 O o0 0 0000 V m CD ! N m CO N O CJ7 V CO COO a a a a O co ? Co N 7' N 7' W s 7" 7' S CA Co W V A CD ! CA v CO -' co N CO Ca cop U7 2 (O A c a CD co c 2 a COV 2 0 2 a (JI C C a p 31 _ _ _ 3. 0 33 3) � 7) 31iE 31 3) * ▪ Nri5 V N 8 V,- a, A N a N V , O O S O O O O= O O(3 O O O O 3CI ps1 _ 1a O 1 V � � 1Q � (DO yNW NO p_ � w0 0 � � a C,. ✓ co O CDN V it 6g5 OCT Co - V N NC - A (b Wm O -• �7 A CO W w c0 w W A w Co rn W co O Co1Q 0 CA1 A - N1 OCp1 IVCO1 0 1 NNN CO 1 •0 (71 CO NW Al COO OD0 O V VO» CO V o0 CD(000 V CA Cn o0 Cp v1O o co NO COCJ) IDW W 0) 10 - coCJ1 O ofW CA O C Cy J7 w C) co P1 CD N O W a 1< O m 00 O - W1 00 0 .d N O N a0 wi N LU O O co (0 T (A O co a) 0 N- -5 Ca O H co N H CO O H N N ' H r O C rV^ is a0 N r- n n) a co cd co O N- Q) a7 a0 a v) 17 O UP (D ' V O N O -O O V N co O (n coN C H H O O C H H U) O N D N M N M co N ([l M LU ' g N (D O > O M ` O (D O C) O In Nt >1 D N co co n O N l^Q Q) H r H O Q) H r- O r^ 7 7 1 y _ O O N 1 J N M N M J •- hO cc J O (VV an 0 J O MO t n7 (d 15 H H H H C_ 5 C L L L r Cr a CD a Q E E cc a) 7 7 7 7 a) N H H H H C J (d O U J J J J In C E g O a) E lo ro M c a d 77 WI M 0 (D CO M C) 3• O C. > O N LU CO N O M O tU N M O N • H . 2 $ H H o _ H H o a 0) O O ccN a) O Q (M 0 0 ONt N0, O O`^ M p (D )In D '5D -a u) 2 ' O co Q a O H d a) 0 2 (D 2 u O O V L- O co [p a) L N M N L (D L M O .0 h • N C H I- C) C H H C) a) O 0 C Q M a) C) 0 0 0 a, 0 C) (a a) 0 0 0 0 Q) C) 0 U. J J O. J J 77 (d i O N -O ro _ N (O ,r 8 ~ (M N N O O O O 0, 0, N B H ' H O O .D .D L L t L L t L L O O:O O O O O' O 0 O)O O O O DSO O Z eE ii Z 1 z 2 r M L N ._ r M 0 ._ V CO (n O O n O C I- (D N � Q) O a0 C � M N N .- � Q) O c, 0 00 O U U M C) C el) N 0 0 (D M CO M O (a a) N CO V O 0 O U0 N O lL J J O N M LL J J O OD .- M -- a) a) O a) E a) '3 O a (i) E a) O z oZaaa .o FQ Q = Q f a_ s s x 1,1 w m m N N o (n (0) V to o LL N N d ro 0 (A O (n Y O LL _ _ ro (n 65 U) (n 65 W 6600 da0d (n (/) (n CnV 4 4 4 L1 Md STAB-Middle School TIA PAGE INTENTIONALLY BLANK STAB-Middle School 77A Appendix B Turn Lane Nomographs STAB-Middle School 77A PAGE INTENTIONALLY BLANK 0 c° a) rl v 01 m .. _ o LL Q 1..._ I T I_..__1 1 1 ::::— .1 I If` i o h 8 • .:a i° j Cin W 0, W U) 0 U =W w � W -o (U L. ce c _ -a I__ R O I—� = u - O ce CD o � � W = CO o a N w 0 oGU • Cr ' o =• oC W Cr o a a cc 0 a tr w u y a° 0a. z ¢ D J 0 m ...:'}:,.,:s'....':S': ..:•(',tea. ._i___ 1 I 1 1 I w ai : + 7 `..' .... ... ... .... ..... O L. o $ o o rn o m a s • N r CO t0 cr V rn N 2 O z a E 8f10H dad S310IH3/1'SNdfll 1NJId ANd STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.7 VDOT ROAD DESIGN MANUAL 800 ■• ■_ _. { ' ■ iilli, 1Igt Grads. tl£.tt Tl izsd Intorsset&ons 1. L t Loft Turns in VA 700 11111 IIIIIllkb1IkiIi111 6 • 4Oi Phi f;IPsr•t ioo Dsa•V0 .rifieed, * 600 II 1111"IiiiiiiinEltiliiiiit. . ' r II ill 0 500 :::::_::,70 1 1'!IIIIi!ili!IIIIII1III ' 4001111H1111111INIPPlikilli iili1i1111ii1i z ■■■■■■//■I ■■■/ ■■► . ■■. ii►.■■..■.. 471 1111111111111111111s;111 �iis11:ll:11114111111i 300 // ■.■■■/11■■/■■/■ ■=/■ ■► ■ ►0■■s11/►t■/401■,ram! a ■■■■■/■■■■t\■■■■/■■■■■■N/■■■\ /■►\■■I•\■►14/■■►\_�� NI a ■■■a a=mc ■t■/■■/MINSIS■I■■■�g■■■OI■■►\■L�■■■► "'O o * // ■ ■■■■■//_`1■■ . /.w■ ■ , o. 0 200 No llon_e urn Nouns ,' ■■■►0■ ,r ►■ ,t' _• ! ski Sr. Nj ■■U■M ‘` \� .� . ,f'� o•`I ,? > 139 ;;7 _La e q u r e d��tiaoall o. :ran; ,`),J`.�,. /`r0.a. l S. ?04•,SO, 10 0■i/NM■■■■■ 'B■■■■ ■■■■■►1 .. UU ►M 63 11' ':/ �.�� IL-.••��\�■:■■■%r�.■■■■■■■■■■■■■■/■ I ( ( r t � 0040 % 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) LEGEND — AM Peak Hour NO LEFT TURN LANE REQUIRED __- PM Peak I-bur Left-Turn Lane Warrant es 2010 Background Volume Figure TIMMONS GROUP WB Old Ivy Rd at B-2 Old Garth Rd STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.2 VDOT ROAD DESIGN MANUAL 800' - - Grade, Un.LQn.11t.d Intersection. L - % Lett Turn in v - 100 ' - , , ~. - I ' - 8 - etor.p. Length Required 7 _; V. - 40 .ph (op.r.tln0/O..lgn Speed) 648 ' , L . Sa 410 f � i.". 0 400� ley,.. .. � ;_ t^ 300 i - S=100r I o _ i yy a_ No Left-Turn Lune Requite I+ O 200 ' �. o 0 200 400 529600 800 1000 VA ADVANCING VOLUME (VPH) 570 LEGEND — AMPeakHour 100 FT LEFT TURN LANE REQUIRED __- PM Peak I-bur Left-Turn Lane Warrant • •. 2010 Background Volume Figure TIMMONS GROUP SB Route 601 at B-3 Old Garth Rd/Old Ivy Rd °o a) CA CO CIJ Q ' I ' N. LE h m h p LU a co IY RI 0 n3 H IQ �a g a hce c 2 :: 1 O D = c� IY L CO CO n3 ce ~ _ I 0 U I— fp ' ' U.) U 0 , . I M a0 = 0 O 1— p ;w :• ••• ¢ �Q 0 _ � ¢ Iw a N �-1 • J : 0 • a U : ¢ : 15 .o = O : a Icr a a LL D : Q : cn u • I aw o w Icc f I o •: t Q o 0 H I = _ • 1 1 I i.i . ' tn r 'a o $ 0nCD 0 NCo v CV o c • 0 z `L a E 811OH 83d S3131H3A'SNuf111H018 AHd WI1 F- STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.2 VDOT ROAD DESIGN MANUAL Boo ; ■■r' artarra■ar■■ara■ ■w . r■■airrrr3Ya1\iaria■iii�i� ,a...., un•i tn.:rend Int.re•et t.ne a r� r1Ati0ii■*■ ■■■raar ■r NON OONOa ar■r■ra I. . t L.rt T..r..e en r /00 s ois—s� mina miAtrr emmeersa■a■s i - Le.�th A.inlied t- s■ etmamrpaeasrrr eleaa■■■rr r- 40 .en io.. o.ni�n A0.nd1 aarara n ruurasaar L- st us■ ■k ■■riaaaraaa.a ui- 600 ■ t1�t*1r11mMU■■saairass■aa■aara■■ �■w■M■rr■ar■■ 570 ua.a■s..r. ■■uasirasw■aaaiaai s rasa►• ■uueeI■s■tasa�sr■■■a■ - 500 �� � iaraa. ■rrii�issss�■■■■ar■ p Ill ■■aa■sa■a•• ■r■■Mrsa■aa■ar■■aa■ arrra■rrsarsaa■ar ■ria.■■mmumm■■aaa■ • -1■s�r■■■aaaaai■aat. ■■■M■rts■ r 40o area i■sa■ ■■r■t■sr! ■■sNiaw■■r.s■■■■■ p • ■uaemasseq■aatlii ■r■rrs■rr■aa■■■■rrr AM Peale Hour z ! iiaraus■aa�rriraaEN - ■■is■suur■uuusu■t.ar■i■r■rr S=10O' 300 r■sa■i■ra .vs a■� 0 rrl■rraus eimmase■a®■�a! raa■■■ra■ _ — rmi■wai■■■i n. No Left-1vrr, Lurie Required"- aiiiii1ir■■■■r■ir O 200 t"IBMIMarua■Um i • ,img,, ■r�■■urns■a! a�iauiiii iral • 100 r IW uu•U•UNUaNauM u is im■ sMr■i 1101MEMe aM■aar■■■■s■■■■s■■■imam u■sws■i■aa■■■■u moonu0 ■assa■ ■■■a ■■■■■r mememirsausememe ewsui 0 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) BOO` j ) ) Af ( dial..,‘ ial.. uneann.lef.d 3 • 700, ] ' : ii 74 - —1r.-r-r-r-rlliniti k. b.. uii I , p▪ 500aasa. s s,�■■aa►•ss■■issss■■u �' nwm u■aiipu U111111111111101'1110111'w11111 O 400ia aali11: 1: %igi��1rf;iin at■agni�lsaasi_uuU PM Peak Hour z ssommemaqgar.ummom■■a --raiirarmmesa-. i meMoMMmem `^ r■■ aa■7 waiaaaaiaaiaaaa■aa►sa►`i■iai■ o 300 .Su )1 ra■sa■■■r�■■Os■, ■►�ya_■i■ d phi_ _as44_ n raraumeemi�'ammi'RIS s� i� p No Le fr-Turn u■I■uais■ PPM. ig-a� 11-_ 0 200��a■r,■rafno 'equiredrsrusi►IrOMMUMUM SUaii . .w.■;`U• �in ' 100Mias�t®aaiirrr rs „■iiiit��iii�■ r �a~~■ai�a I- mo` s■ss■su ,y {� a■■■■r■aatasar�aaaii■■■iskass r■im■ra■■ ;,.• if7lmmactr■imota oram aaaaiaaa■iaui 0 I . t , ; { - _)__:: , ) ri • .1: ' f i 0 200 4c?0 600 800 1000 V, ADVANCING VOLUME (VPH) 410 LEGEND — AM Peak Hour 100 FT LEFT TURN LANE REQUIRED ___ PM Peak Hour Left-Turn Lane Warrant •r. 2010 Background Volume Figure TIMMONS GROUP NB Route 601 at B-5 Old Garth Rd/Old Ivy Rd STAB-Middle School TL4 WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.4 VDOT ROAD DESIGN MANUAL 800 ■waassmaini • _ = i �� 2 Orsds, Yanlgaasd Intersect/ono Willi j �: ��=-�I�� L i Left Turns In WA' N1111111111111i1111111111 \.111L s - Storage L.npth Rsigair.d _ I i ! ii V. - 40 .ph 4Opsrstinq/WsiIa Spssd) 4 0 01 1 MIN r c - )St . 0 500■ _ „ ®ao , . \ - - '4 y II 'I f �1� i .. Z 400 i. - 00. 30n i I' i ?- , 0 No Left-Turn r �i- ;�,\\ sue. c 200■8!l Lone Required. ' 1-,r 2 �0.. �S, `tO. ., > ■s i ( _ , . • 145 galia6Yaig� T�eu�4 100 1 '. f , { 1 L 1 ' 1 . 52 { , iI 00 200 ' J '401 6d 4tO0 ' 1000 VA AD2VANCING VOLUME (VPH) 735 LEGEND — AM Peak Hour 100 FT LEFT TURN LANE REQUIRED ___ PM Peak Hxx Left-Turn Lane Warrant ol `a"` 2010 Background Volume Figure •0 TIMMONS GROUP EB Old Ivy Rd at B-6 vy,.F r.a.t.to hen>>(vt G fth(J l^4.r.UUN1 Faulconer Dr _ -I in PHV RIGHT TURNS,VEHICLES PER HOUR : 3 ' m i3 � bz ]C N NJ A C i O C •�Ns O • K ' ON OA O OZ T } E • • CCN w : I^l •+ C C Ln I NJ —I • rtezIO _ c� n I — nrn� o CT4 - - - D - nZ = o a em F IL _O 0 m °°V p 7 v ° —I O L D 0w •° i 0 C —1 -n co o Li —I I 0o — � z n cQ 70 a 5 D rn o ,_, o r Z r o— • Z 0 > < < c m -- -1 cD �C = c m F �G� � sy O -1 rn m o I E: _ 3 N cD r-r rC 33 o m C rn �' g D = o g� 8 ca oo • > 3 CO Cp _Ls, n m 0 o •. 1 I M PHV RIGHT TURNS,VEHICLES PER HOUR m . z 3Eo Co g ro rn C I-, o Q Hrn w 0 * O _ $— c m LI CU C -i -0 v) p = —I j wo ° _I _ 0C v z 0 —I Dz rn n� ` S�> A 0 >v_) oar - o- -I= > m I p -1Qrn n N rnCr) w 0 11-1 o � C m D � � O CD 70 _ro a- -u ; �DvC � r0 m ( • 1n C(D rt C c D rn 1. 00 o. i _ .... .....i _�. D Q Dv ca n CO -1 (D o0 J. STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.2 VDOT ROAD DESIGN MANUAL aoo ; , f rOr.d.. un.trwa:t..e lnt.r..atIon. L - ► Lott Tvrw. /n r = 700 I . - ster.e. L..eth tto0.ir.4 tl. ���� ������ V- 40 woh toMraiw./Gail. 11e.411 7.7. M j. sa 7anYY l Mws/!>l1� L- it mmemen W 600 1, M•- lIiu.iMMrMwsawtMwaMo 500 I a_! i. ■a MwMMs .__ • oM■ '%� ° ._ q 111011111111111111110111111 o 1IllhIIIIII • AM Peak Hour z• a o 0 { I' O 300 INN 111111111111 M:1o1sOiO1em1sM.iiion1sct ,21.E O 200 No Left Turn Lane Required ■ 11 ' I i -L I IIIIIM i ■■i_wuu:uu-— > 139 s.w■ s■....■■■■s■ _7 o o 1i iI' af= i Il1llI 0 104 20G 400 600 800 1000 VA ADVANCING VOLUME (VPH) 800 ) III II- Or.oe. ua.alw.tlled I000000viler* _ L - t L.It Turn. In - 700IL s - otor.l. L.natr. tt."nrtr.a y r. 40 .oh (Op.r.ttne/O..tln 9040d1 L - 10t • 600 Mittu F NIt ' �l 334■MM P 1 O SOOes■ ■wNsta.- • a 1awwlwsigintimil o 1■■=uu__•1/1111 WAIN.==/ 11111 O 400M �i lliiei®sMre\!s■ ■wi wm �it� N wq wwwwN■ PM Peak Hour z �i ■wMsssNwsssw somanumeu m lamas numnieumemoweemosimml, IILL enamel sim O Mu_,. -- -Ass.- ■•ft sisu.auU �Nssommoun S 'NA►i.'g�MMNo Lo!-Turn Min& MWMOMMMMs • ■■■■M■ ■ ? 200Ms a Aws ne Require•wNNSwe 00000 mom etws■► io S N. > 133 RSNlMUMswasU URN �iiiiiiiiiiiisiii ilaiils ,Goi1MIMM . - �e j niE1ii111Ii1111t111sfif1li1i 0 101 200 VA ADVANCING VOLUME O(VPH)1000 LEGEND — AM Peak Hour NO LEFT TURN LANE REQUIRED ___ PM Peak HJur Left-Turn Lane Warrant 'j.. % 2010 Background Volume Figure TIMMONS GROUP NB Faulconer Dr at B-9 Ramp from SB US Route 29 L PHV RIGHT TURNS,VEHICLES PER HOUR I C) 3 o o C o $ p rn xi S^ o crnn xi 0 m .• M rn 7D Z = o_ 53 � ' C n m v C O op 72 n g• ` _' Q 70 0� OO ,� �I 70 rn 7C� rr 1— z •= rrl I4 Ec al 0 w rno ut CD Xi m $ ill 3 N = rQ = E O C aI ]° _ �gl ao o a' ; 1 , 1 ► I a CA 7 o ED 1 CO n C) (p o 0 STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.7 VDOT ROAD DESIGN MANUAL 800..::::1 au.-11111n► ,..►.1. _ i Grade. Onalgneliz.d tntaraaetiona L • t Lott Turns In VA y 700 l ,` 3 Storage Length Raqulrad 4- \ P . 40 .ph (Aparatinp/DasiOn Spa•dl M _;r; I. z 400 �i� ., . - . ..... "pia , _ , ° 3001 ' ' 4114‘.. 11111"1111111 a rlf•\'�a. IMMO lannbanasienih sr ► .�0 0 200,No_Left-Turn , l -`-'-s \ ,r , o Lane `, J`' .l;� , .T %, 139 Required �. �" r'�O��.S, ?0�.SO- 100 040 200 400 600 800 1000 96 VA ADVANCING VOLUME (VPH) LEGEND — AM Peak Hour NO LEFT TURN LANE REQUIRED --- PMPeak Fbur Left-Turn Lane Warrant ••'•. Figure • • •. 2010 Total Volume 9 TIMMONS GROUP WB Old Ivy Rd at B-11 Old Garth Rd STAB-Middle School TIA WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.2 VDOT ROAD DESIGN MANUAL 800.1 . . _ - mf_ e'�' Grad.. Un.tan.11s.d 1nt.r..etlon. 1.. . _ . ... L - 1 Lott Turn. In V 2 76pp -" � SNIOM 1 - Otor.a. L.nath n.$ulr.d tl. zJ3 ■ / tit{! _ i,.�.r, V - {0 ■ah (Op•r.t1n0/o..len [tir.•d) • 5 0 0 11 111".:° 1 . . _ , _, , _ , > 441 �ia11»��10asw�. sr.ali`ii ar"ii dimi .i t^ 30 0 II11 111=i11I1t ' _ S=10 0 o U»UR^ IIIIIaOMP111111tiat>r a.a. No Left-Turn j Lune Re uir d � " O 200 -41- . 1 , , - 0 i t- "' i . r tr.- _IV.- 'ti . ___ 0 200 400 564600 800 1000 VA ADVANCING VOLUME (VPH) 612 LEGEND — AM Peak Hour 100 FT LEFT TURN LANE REQUIRED ___ PM Peak Hour Left-Turn Lane Warrant ''••`•• 2010 Total Volume Figure TIMMONS GROUP SB Route 601 at B-12 Old Garth Rd/Old Ivy Rd STAB-Middle School TIA GUIDELINES FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) FIGURE C-1-8 VDOT ROAD DESIGN MANUAL 120. 1 1 1 1 I I . .... .... _ 100 I::: . > •='•:: FULL-WIDTH TURN LANE AND TAPER REQUIRED� — cn U72 _' .. W 60 TAPER REQUIRED —' z cc I- H C7 40 • :: a 20 RADIUS REQUIRED I I 10.0 200 300 400 500 564 600 700 612 PHV APPROACH TOTAL,VEHICLES PER HOUR LEGEND — AM Peak Hour RIGHT TURN LANE REQUIRED --- PM Peak Hour Right-Turn Lane Warrant 2010 Total Volume Figure TIMMONS GROUP SB Route 601 at B-13 "'"' Old Garth Rd/Old Ivy Rd STAB-Middle School TIA WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.2 VDOT ROAD DESIGN MANUAL 800SONSEE ,- t■ art■SEE SEEM ■p� • r®cinewi EMu airUEERMEEt Gr.l.. Un.tan.lt.oa 1 ton. _ ./h E tr■i �■rEErMEEtr. I. - . wtt to r a ! .IMVeNiitlulr.IEUEMErU.■ a - L..qI Rom mired o. 700I $ glQSarM ■MErarrrrrrr r- 40 .on (0e.......fliwalini ao..41 > ■ rarl■ ■raraMMaEtr• L - s• > 612 ratans i ■rrMEEMrraEa ,., 600PW MaCE=MEca ■arraaaaaw W .Errrr mil WRWu..urr■ lSl 1111/11Hluui1♦11i:uiiii♦1 50011 NEr ■EEEEMEEEEEsrEtEErsr.sEENEE ° ■'�♦♦♦♦E.UE!!E' !!!!i!!i!!1!!!!!1!1!!!ii!!! . l AM Peak Hour z• a■1�ixiEEEaiEUESEttrrrrE�.EtaEaaeu■ ........ — Straus■ r•E.SrWWEEW\• Er.E ■E■■ 5=100' _ O 300.m u.isot minommots 1uaa.umii%ui■EEMa�■ O 200 Nc Tuft Tern lane Rv9u�r itiitiill!liiilli i o aril l II.irognii IrEa•Erii=iii: ri=r } 10 o i ii ETIi1iiiiifiuiOIIihIl I 0 200 4C0 600 699 800 1000 VA ADVANCING VOLUME (VPH) 800 # ' r . _ �. ) t Gm.a.. Un..q..tia.a to - 700 ! ! 1 1 1 L - % Lott Turn. to I I 4 - 'tone. L.nntn R.GUtr.4 V. ao mphIGv.r.ttM/O.614. a...a1 I i L - 104 f 600 { II - j o SOOil 1 , I i11111°- „ , a 0 PM Peak Hour z• :: ; • �! 4 t ��� _ [ _ re; O gEtNo Leh-Turn h12. --•!?J; 200EM, tine Required ' ili 100 4-1 Etta :1 . ' :.-J I O ± : t 1 0 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) 441 LEGEND — AM Peak Hour 100 FT LEFT TURN LANE REQUIRED __- PM Peak Hour Left-Turn Lane Warrant 2010 Total Volume Figure TIMMONS GROUP NB Route 601 at B-14 Old Garth Rd/Old Ivy Rd STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.5 VDOT ROAD DESIGN MANUAL 800 . .j 1 ` . ji`'f _ Grid*, unslgnallzaQ Zat.rzzetioaa j , . rr. L . = Ortt TYrf• t d 7 0 0 s - sc ora4O Lsnat)b laqu trod +, -. rL 20- 40?sph (Operating/ONig5 $paadl 500- z �p T +. 7�. , 1 O 400 -' . ti `^ 30f1 " 1 _ " _ , 0_ :No Left-Turn r,-'_�� \ !? .5%,. JIBS O 200.,_-ane Required_. �0. s, 0 158 '1� 000!:-- 1001 \ , -: ' ' A rL) r 0 200 400452 600 800 1000 + VA ADVANCING VOLUME (VPH) 785 LEGEND — AM Peak Hour 100 FT LEFT TURN LANE REQUIRED ___ PM Peak Hour Left-Turn Lane Warrant .. �''. 2010 Total Volume Figure TIMMONS GROUP EB Old Ivy Rd at B-15 YOUR VISfOM ACMEVIO tMROUGM OURS Fa u Icone r Dr o = ,-( j _m azi L o .L co = ce u_iJ — 0~� 0 QCr Cr W z Z _ `' Z o COu)C3 IL Ct (t E tU H a w D > o 0 W Q 1a a z C O I 0 ' Z ~ o m_ a0 :'w : a _ tui C= O o a aS • CO W LL W Z ::I:: Cr $ .......•:;• r n o o • M 154 .... ... ... .. .... O 0 8 a a CM 0 w co Ri o Q a z • E LcY I ; f 8fl0H 83d S313IH3A'SNtifll 1HOIU Mid J f- - IPHV RIGHT TURNS,VEHICLES PER HOUR m " 3 _ O A co W �O+ F+ N n O • N • 3 O O O C pig A O ° ••''• S = , '�•• I--I ° N Ts 0 I-1 col C C)co T 'v i.y x 0 it o m �- rn 7v = NO- .p - - " n 7v v C 0 z H 3 n c r A v� c O _ o STAB-Middle School 77A WARRANT FOR LEFT-TURN STORAGE LANES ON TWO-LANE HIGHWAYS (40 MPH) FIGURE C-1-1.2 VDOT ROAD DESIGN MANUAL Boo ' f ., . r MM ■ it �1�11,wl11'��,�,M, ar.a., un.lt..u..a R s.n. ■ Talk II! t - t c.rt r rr. sn . �� •U_U ■■■■U V . iter N. S.+Mah Rw�.lrea T. 7000 ■. Qffi!a a ■ ■■/w/. V . ao .oh sao.r.ttna/a«site io.N1 > i.^i. a II/■■/awa//.. L - 64 6001 . r, -t ig;11Nmommim!!t/.www. ///ww■wwwww 1= 111111111111111'111111111111 500 1.. Y w, ■aaw■..aa//../■/aaa■■aa p d1!!�'!"""'. !!!!!!!!!!1!!!!!!!!!!!!!1!! AP.I Peak Hour z 4.o 0 s!1■11111 ./L�111111111111111111111111IH N ssaw■///"rr/w/wa/aaw/wa■■aaawai/ii 5=100 ■i/wis/ 3oo/ ir:a/ww■aa/■.awaww ►�■ ■/w ■ ■a�■ o a.MUmpliw ./..a■//aas/m i 111 " 1 ' Mmassi■ c. .. a. ■n. 209 • - -Turn Lome ftuquired II (I 1111I11 0 2oD..io "iru.Rauua•■u■ /■t■u ems saaw■w aj r■u ■■ {{rung. 400 600 800 1000 176 VA ADVANCING VOLUME (VPH) BOO .: 1 _ f . ' ' , LL t an. ore.a In nt.r..ntlen. 0. 700 1 A f II - 3tor.a. i..n.tT. Rp.l rwd ( f ,` I. IOt•rh (QI»rwR 11q/O..f On SO.bI 600 ; 1 { i1_ ■ O 500 f *•.j ' 11i°- - > ::: t 1 . PM Peak Hour Z 400 -1 .Y.. 1 1 . . 02 300 a - '12 - atequircd 9 P r jI • _.._ 100 . Y i - a 0 146200 400 600 800 1000 VA ADVANCING VOLUME (VPH) LEGEND — AM Peak Hour NO LEFT TURN LANE REQUIRED ___ PM Peak Hour Left-Turn Lane Warrant as 2010 Total Volume Figure TIMMONS GROUP NB Faulconer Dr at B-18 Ramp from SB US Route 29 _ STAB-Middle School 77A Appendix C 2008 SYNCHRO Output Sheets (on CD) STAB-Middle School 77A PAGE INTENTIONALLY BLANK STAB-Middle School 77A Appendix D 2010 Background SYNCHRO Output Sheets (on CD) STAB-Middle School 77A PAGE INTENTIONALLY BLANK STAB-Middle School TIA Appendix E 2010 Background SYNCHRO Output Sheets (on CD) STAB-Middle School TIA PAGE INTENTIONALLY BLANK RECEIVE r) FEB 26 NOB COMMUNITY DEVELOPMEN