Loading...
HomeMy WebLinkAboutSP200700053 Correspondence 2008-06-10 •s•S• � • ! TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS To: Juandiego Wade (Albemarle County) From: W. Scott Dunn, AICP Re: STAB Middle School Relocation—Road Improvement Contribution Calculation Date: June 10, 2008 Copy: Judy Wiegand (Albemarle County), Glenn Brooks (Albemarle County), Joel Denunzio (VDOT), Michael Waylett(STAB), Kurt Gloeckner(Gloeckner Engineering) Per your request, Timmons Group has calculated the pro-rata share of the requested road o, improvements associated with the relocation of St Anne's-Belfield's (STAB) Middle School to the Lower Campus located on Faulconer Drive. As indicated in the report, and agreed upon by the County and VDOT, the following > intersections/road improvements are associated with the relocation of the Middle School: 0 0 > Southbound right turn lane on Faulconer Drive (exiting the Lower Campus) at the s E 00 ,f) Faulconer Drive/Southbound US 29 off ramp intersection; and ➢ Westbound right turn taper on Old Ivy Road at the Old Ivy Road/Faulconer Drive —• N intersection. • M O l- M O co The estimate provided by Joel Denunzio (VDOT) for the southbound right turn lane on Faulconer x Drive indicated a cost of $71,000. Timmons Group calculated a cost for the requested LL westbound right turn taper on Old Ivy Road based on the aforementioned estimate. The y estimated cost for westbound right turn taper on Old Ivy Road is$40,000. v • 0 The pro-rata share was determined using (1) the site-generated traffic estimate for the Middle School and (2) the projected 2010 total traffic volumes. The "impact percentage"was calculated Ni using the total number of site-generated trips compared against the total number of entering o trips at each of the subject intersections. The calculations are summarized in the table below: `" 00 eel H Intersection Faulconer Drive at US 29 Ramp Faulconer Drive at Old Ivy Road Time Period AM Peak PM Peak AM Peak PM Peak Site Traffic 155 112 100 69 E 2010 Total Traffic 1,046 916 1,071 789 0 Impact Percentage 14.8% 12.2% 9.3% 8.7% Average 13.5% 9.0% E Proposed Improvement SB Right Turn Lane WB Right Turn Taper — E Estimated Cost $71,000 $40,000 a Pro-rata Share $9,601 $3,616 Total Contribution $13,218 Based on this information, STAB will be required to contribute $13,218 toward those intersection improvements cited in the traffic study for the proposed Middle School. If you have any questions regarding this information, please contact me at (804) 200-6955. E v 0 d 0 V Page 1 of 3 Judith Wiegand From: Scott Dunn [scott.dunn@timmons.com] Sent: Tuesday, June 10, 2008 2:31 PM To: Juandiego Wade; Judith Wiegand; Glenn Brooks; joel.denunzio@vdot.virginia.gov Cc: mwaylett@stab.org; gloecknerterry@embarqmail.com Subject: STAB -Cost Sharing Estimates for Improvements Follow Up Flag: Follow up Flag Status: Red Attachments: STAB Road Improvement Contribution 061008.pdf Juan— Per your request, I am forwarding the cost estimates to Judy, Glenn, and Joel (see attached). Judy, Glenn, Joel— Please review the attached memo at your earliest convenience. If you need additional information or have any questions, feel free to contact me directly. Scott TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. W. Scott Dunn, Transportation Planner 117 S. 14th Street, Suite 303 Richmond, VA 23219 Tel: 804.200.6955 Mobile: 804.402.0830 Fax: 804.225.8551 E-mail: scott.dunn@ itimmons.com www.timmons.com From: Juandiego Wade [mailto:JWADE@albemarle.org] Sent: Thursday, June 05, 2008 5:27 AM To: Scott Dunn Cc: Judith Wiegand; Glenn Brooks; joel.denunzio@vdot.virginia.gov Subject: RE: Response to request for additional traffic data Hello Scott: Hope all is well. I wanted to let you know that I will be on vacation June 5-13. Please forward your cost estimates to Judy, Glenn and Joel. They will review while I am away. Thank you very much.Juan From: Juandiego Wade Sent: Thursday, May 29, 2008 11:09 AM To: 'Scott Dunn' Subject: RE: Response to request for additional traffic data Thank you Scott. I have discussed with staff and recommend for the Timmons Group to develop the cost estimate for your impact. This will avoid any confusion. Thank you.Juan From: Scott Dunn [mailto:scott.dunn@timmons.com] 6/11/2008 Page 2 of 3 Sent: Wednesday, May 28, 2008 2:23 PM To: Juandiego Wade Subject: RE: Response to request for additional traffic data Juan, So I can disregard the left turn lane prices provided, given that the TIA did not indicate left turn lanes at Intersection 4 or 5? Also, should I proceed using the $71,000 cost estimate for the right turn lane on Faulconer Drive at the ramp? Lastly, there is no cost estimate provided for a right turn taper(as identified in the study). What cost should be used? I assume a left turn taper would be less expensive than a full width right turn lane. Scott From: Juandiego Wade [mailto:JWADE@albemarle.org] Sent: Wednesday, May 28, 2008 2:10 PM To: Scott Dunn Subject: RE: Response to request for additional traffic data Hello Scott: I checked with VDOT and the cost estimates they sent me were for intersections 4 and 5, which the TIA identified as being most impacted by the project. Thank you.Juan From: Scott Dunn [mailto:scott.dunn@timmons.com] Sent: Thursday, May 22, 2008 11:11 AM To: Juandiego Wade; Denunzio, Joel D., P.E. Cc: mwaylett@stab.org; gloecknerterry@embarqmail.com Subject: RE: Response to request for additional traffic data Juan: Thanks for the information. Just to clarify, the study cited 2 school related improvements ➢ On Faulconer Drive as it approaches the SB off ramp from Route 29 a 100' right lane was indicated (the taper was warranted under background conditions) ➢ On Old Ivy Rd (WB) as it approaches Faulconer Drive a right turn taper was indicated. The information you provided below shows prices for(1) a left turn lane at Faulconer/Ramp intersection and (2) a left turn lane at Faulconer/Old Ivy. Neither of these corresponds with the school related improvements cited in the submitted study. My experience in the past, and shown below, is that left turn lanes are more expensive to install given the transitions. I see you included the cost for a right turn lane but no explanation was associated with that line item. Any explanation you can provide will be appreciated. Scott 804.402.0830 From: Juandiego Wade [mailto:JWADE@albemarle.org] Sent: Wednesday, May 21, 2008 4:05 PM To: Scott Dunn Subject: FW: Response to request for additional traffic data 6/11/2008 Page 3 of 3 Hello Scott: Please find below the cost estimates provided by VDOT. Please verify STAB percentage of impact at these locations. Thank you and please contact me if you have any questions.Juan Wade From: Denunzio, Joel D., P.E. [mailto:Joel.Denunzio@VDOT.virginia.gov] Sent: Thursday, May 15, 2008 3:02 PM To: Juandiego Wade; Judith Wiegand; Glenn Brooks Subject: RE: Response to request for additional traffic data Juan, I ran the estimates for the improvements to route 855 and route 601 as we discussed at our meeting last week I used PCES (Project Cost Estimating System)to generate these estimates. PCES takes historical data from advertised VDOT projects and generates a database according to the type of facility and features of the road. I used a functional classification of urban local street with a shoulder design which is in line with the current road. also generated the estimate assuming the project would fall under rolling terrain. Please also note that these estimates do not include any type of right of way or utility costs. If you have any questions, please contact me and I will try and answer any questions. Thanks, Joel Route 29 southbound ramp at intersection of route 855, Faulconer Dr. —install left turn lane -$150,000 Route 855 intersection with Old Ivy Road —install left turn lane - $150,000 Estimate on right turn lane -$71,000 Joel DeNunzio, P.E. Staff Engineer 434-293-0011 Ext. 120 joel.denunzio@vdot.virginia.gov 6/11/2008