HomeMy WebLinkAboutSDP201900045 Correspondence Minor Amendment 2020-05-20Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, May 20, 2020 4:08 PM
To:
Randy Ralston
Cc:
Tim Miller
Subject:
RE: Final site plan documents
Yup, they are open from 8:30 AM — 4 PM, MWF.
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, May 20, 2020 3:42 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Tim Miller <tmiller@meridianwbe.com>
Subject: Re: Final site plan documents
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thanks Cameron, Tim Miller ad I were just talking about the site plan!!!
Offices/Front desk are open MWF for pickup?
Thanks again, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(alralstonpc.com
1
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, May 20, 2020 3:38 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: Final site plan documents
Randy,
The minor amendment has been signed and approved and a copy of the plan is at the front desk of the CDD office ready
for pick-up. Please let me know if you have any questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Friday, May 15, 2020 2:00 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Final site plan documents
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron, Tim Miller dropped off the final site plan documents by your office this morning. I forgot to email you, as I
was watching new traffic patterns at the Starbucks..... not pretty
Have a great weekend. Thanks againFor your help
Randy
Get Outlook for iOS
Cameron Langille
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, May 20, 2020 3:42 PM
To: Cameron Langille
Cc: Tim Miller
Subject: Re: Final site plan documents
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thanks Cameron, Tim Miller ad I were just talking about the site plan!!!
Offices/Front desk are open MWF for pickup?
Thanks again, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, May 20, 2020 3:38 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: Final site plan documents
Randy,
The minor amendment has been signed and approved and a copy of the plan is at the front desk of the CDD office ready
for pick-up. Please let me know if you have any questions. Thanks,
Cameron
9
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Friday, May 15, 2020 2:00 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Final site plan documents
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron, Tim Miller dropped off the final site plan documents by your office this morning. I forgot to email you, as I
was watching new traffic patterns at the Starbucks..... not pretty
Have a great weekend. Thanks againFor your help
Randy
Get Outlook for iOS
Cameron Langille
From: Cameron Langille
Sent: Wednesday, May 20, 2020 3:39 PM
To: Randy Ralston
Subject: RE: Final site plan documents
Randy,
The minor amendment has been signed and approved and a copy of the plan is at the front desk of the CDD office ready
for pick-up. Please let me know if you have any questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Friday, May 15, 2020 2:00 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Final site plan documents
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron, Tim Miller dropped off the final site plan documents by your office this morning. I forgot to email you , as I
was watching new traffic patterns at the Starbucks..... not pretty
Have a great weekend. Thanks againFor your help
Randy
Get Outlook for iOS
Cameron Langille
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Friday, May 15, 2020 2:00 PM
To: Cameron Langille
Subject: Final site plan documents
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron, Tim Miller dropped off the final site plan documents by your office this morning. I forgot to email you, as I
was watching new traffic patterns at the Starbucks..... not pretty
Have a great weekend. Thanks againFor your help
Randy
Get Outlook for iOS
Cameron Langille
From: Cameron Langille
Sent: Wednesday, May 6, 2020 11:14 AM
To: Ana Kilmer
Subject: RE: Site plan for 5th street development - starbucks
Hi Ana,
It's nearing approval. I expect it to be ready for signatures within the next 2 weeks. There is no site re -design necessary
at this point, they are just waiting on getting their new easements recorded and then updating the site plan with the
deed book and page number of the recorded plat.
From: Ana Kilmer <akilmer@albemarle.org>
Sent: Wednesday, May 6, 2020 9:52 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: Site plan for 5th street development - starbucks
Hi Cameron:
hope that you are well. I need to work on the site bond for this project and I was wondering about the status
of this site plan.
Thankyou
Ana D. Kilmer
Management Analyst II
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville, VA 22902
akilmer@albemarle.ore
Cameron Langille
From:
Ana Kilmer
Sent:
Wednesday, May 6, 2020 9:52 AM
To:
Cameron Langille
Subject:
Site plan for 5th street development - starbucks
Hi Cameron:
I hope that you are well. I need to work on the site bond for this project and I was wondering about the status
of this site plan.
Thankyou
Ana D. Kilmer
Management Analyst II
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville, VA 22902
akilmer@albemarle.org
Cameron Langille
From: Jeffrey Baker
Sent: Thursday, April 30, 2020 11:27 AM
To: Cameron Langille
Cc: Chris LeBlanc
Subject: RE: 5th St. Station SDP2019-45
Hey Cam,
I believe what I circled below — found on the third sheet of the new, pending site plan. Including Chris for confirmation:
SDP201900045 Plan - Approved Minor Amendment 2019-11-18
+. 3 / 16 PDF ® Q +
Jeff P. Baker
Zoning Permit Planner
E
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 x3024
jbaker@albemarle.org
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, April 30, 2020 11:21 AM
To: Jeffrey Baker <jbaker@albemarle.org>
Subject: RE: 5th St. Station SDP2019-45
I don't think they're even showing a sign on the minor amendment, but I don't have a copy in front of me. Check CV to
see if they show one on the unapproved version of the minor.
From: Jeffrey Baker <jbaker@albemarle.ora>
Sent: Thursday, April 30, 2020 10:19 AM
To: Cameron Langille <blanRille@albemarle.orR>
Subject: 5th St. Station SDP2019-45
Hey man,
I see there's a pending SDP Amendment for 5`h St:
Find ResulU 26 records found (Thursday, April 30. 20201006 AM)
Apprcatron
Number
7 SEP201S00025
B SDP20IM27
9 SDP201900045
10 SP200700004
11 SP200700063
12 SP200900032
17t)EYl':rj[ri_i_i_rl<7
Project Nome TMP
5TH STREET STATION - OVERALL PH II - MINOR 07WI000000200
VERIZON- FRYS SPRING TIER II t5TH STREET STATION) 076M1000000200
Sth Street Development - Minor 07600000005SAO
51h Street ; Avon Center 076PA 10000002AO
5th Street Development 07600000005SAO
51h Street Plaza 076000000055AO
Sth Street - Avon Center - Parking Structure
currentstatts
Approved
Approved
Linder Review
Approved
Approved
Withdrawn
r d r PPi r'i r 7 r • .. .
I've got the sign permit in with the monument sign proposed just south of what was labeled as the approximate location
on the approved site plan. Don't guess this small shift is a problem, but wanted to run by you:
10
�� vRaPDscD 4— i ..
CONCIiEiESIOEwALK
IXISTING LEFT TURN LANE PR OPOSEDEHEER
OP'TAPER. TAPER tOExISTINGNNG ` -) PPOPOSEp VDOT T
,e STORAGET' _\\ r ./ ). S. CGrt ETYP)
\ O Sf RRR]( AVERRIEPPIN4
x STONEPFDEE T ,< 7
j APPROXIMATE LOCATION 6 A - T(�. �! p �PA1�Ay�TS O O
SIZE OF (PROPOSED SIGN--. /f Yi '!L',.
)SED MIL_B OVERLAY tpSP YF'Sj y y PROPOSEDPEOESTF
E
PER WP-]DETAIL ON 5" •LLSOV-O` � F,� ' `�CROSSINGMARKINGS
SHEETg(TYP.1 S 9� .t0>/ _`.
T t i
�' E-
1 .Lo G+ .. �p"�6'� •4 /\ L.PeoPosEovoor
`` 6'f�LE� _ . „ M t "6 !y \ . rp STD. CbatTYP �, 1 i��•
PROPOSEDGRASS fL.-- r, '!'• / .i. Y \,J. ,
MEDIANATENTRANCE :< \O� k ORIYE-TMRU
PLRVDU$PAV[RS a; + ~ WINDOW
PROPOSEOCGT"�J 'Y.IP �. ("P3 \(QRUMPOUn ,
MOUN)MLE CURB ;�! .. SL6RAOSME(
0`' S - :' 0'J 1•CP �4. WWSIOEWA
PROPOSEORA A.. °f},( PROPOSEDCONC.\ ANDDRNETI
MEDIAN ��c- RUMPERRLOCKS LANE
PROPOSEDSTRHET — \ ^ (TYP-) YELLOI
SIGN ( ? VDOT STD. VDOPTOySSEDWCONC. >. cum FO
--IXISTINGRIGHT %L' fiaR RVFJ• + STO.CGvVYPJ PRO
TURN LANE raj ,rt 4V �) - ''y 3LILAN,: A
(ypP'TAPER,;LP' .pa FFE=392.67 \R�
STORAGE LENGTH / z 7�, 4 L PROPOSED U
PERYTOUSPAVERS (9.500ET) p\ca\�
(TYP,) BNRDINGATOHAVLAZERO
.,s ENTRYSDEWALK SLOPING
]NTRACTORSHALL--z/ ��._—� 1 K N4 VELLOWPAINTED AWAY FROM THE MALOING
ROVE THE ENTRANCE - - — R ` CURB FOR FIRE LANE
)HOLDAYINN.17HE
STACKING
'OSEDDEVELOPME- M
TAYNGCARSTACKIM �.
f
PROPOSED STOP
/ BAR 0SIGNIlk
Z
PROPO%DVOOT>
STO.CG-F - `• �ji - Y� -� ,
/.
J"1_
SETRACKVARURLEWD \\ _ ,J�/ ,•�;
ACCESS ESMT.
08_P4-- PEDESTTINN ,
VARMRLEWEDTH _ \ CROSS RlG Lf
PRO
ACCESSESM'. S MMONGSw1CGnR ,
Let me know and thanks!
Jeff P. Baker
Zoning Permit Planner
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 x3024
i ba kerCDTa Ibema rle.ore
11
Cameron Langille
From: Chris LeBlanc <chris@nolabuilds.com>
Sent: Sunday, April 26, 2020 11:33 AM
To: Keith Bradshaw; Frank Pohl; Kauppila, Joel; Rebecca Ragsdale; Cameron Langille; Randy
Ralston; tmiller@meridianwbe.com; Alex Morrison
Subject: 5th St Landing CO
Attachments: 76M 1-1-SPA-C-201.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hello all,
I hope everyone is enjoying their weekend. I followed up with everyone after our 3:00 meeting and I think I got some
good answers. Thank you all again for helping us through the tail end of this process. I hope that we can satisfy
everyone's final requirements. We have some of you meeting us at 5th St Landing starting around 9:00 AM Monday
morning. We should have Diggs meeting with Joel and I believe the trail contractor will be out there as well. Please be
aware that we'll have paving going on and the Holiday Inn has sensitivities to life.
Randy is working this weekend to have the amended easement prepared for Cameron. This should be the final piece of
his puzzle to get the minor amendment approved. I have included a markup of the site plan outlining which areas are
being held up and what items will be in progress. I've color coded the sections for reference.
The main hold up is the orange area that consists of the bike lane, curbing and sidewalk. This is the section that is being
held up by the shop drawings for a VDOT approved D-Box (not going to pretend to have this structure figured out
completely in my head). Joel and Diggs will be meeting on site regarding this Monday morning. Hopefully, I can better
address the timeline of the other items after this meeting. Per Diggs, construction on the taper lane (green) will
commence this week.
In talking to Joel about their approval for vehicular safety, it was his thought that we are at a "punch list" stage once the
entrance (purple) is complete (feel free to correct me if I misstate this). The bike lane (orange), taper lane (green), and
curbing would not be items that would hold up his approval for CO. Hopefully we are far enough through with the taper
lane in the next couple weeks and the northbound improvements are all that remains. The right turn in/right turn out
and entry paving (purple) are all that is required in order to open the site. Joel, I'd be happy to walk through additional
items that you need to see complete while we are on site.
The contractor for the internal trail (blue) will hopefully begin Tuesday/Wednesday and wrap up at the end of this
week/beginning of next. Asphalt should complete at the end of this week and striping will happen at the start of next
week. The path (red) connecting the sidewalk to the internal path will be the absolute last thing to be complete in that
portion of the site work. Keith, Ashley, and I will be walking the site to check the boxes one more time for things they'd
like to see in regards to phasing and safety.
Please let me know if we can work through bonding on the remaining items or if anyone has any items left for their list
so we can address them ASAP. I should be able to have close valuations on work remaining after the 9:00
meetings. Again, I want to thank all of you for your help with this process.
Chris LeBlanc
NOLA Build and Design
12
1304 East Market St, Suite P
Charlottesville, VA 22902
434-284-1711
chris@NOLAbuilds.com
www.NOLAbuilds.com
13
Cameron Langille
From: Moore, Adam <adam.moore@vdot.virginia.gov>
Sent: Wednesday, April 22, 2020 3:06 PM
To: Rebecca Ragsdale
Cc: Cameron Langille; Keith Bradshaw; Frank Pohl; Emily Cox; Bedsaul, Willis C. (VDOT);
Kauppila, Joel
Subject: Re: 5th Street Landing aka 5th Street Commercial Road improvements
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
I may not be able to attend at this time. I know there were some changes along the way on this. I'm
not sure that we have any plans that the county doesn't have as well. I will ask my guys.
Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use
VDOT - Charlottesville Residency
701 %'1)0 f NVm I Charlottcsvillc I VA
main 434.422.9782
On Wed, Apr 22, 2020 at 2:12 PM Rebecca Ragsdale <ragsdale@albemarle.ore> wrote:
We'd like to discus the status of road improvements for 51" Street Commercial and the attached email.
Does VDOT have the latest set of plans that seem to be referenced below? The final site plan that was approved
showed the 5`h Street improvements. The minor (SDP201900045) under review with Cameron as the lead doesn't show
changes.
The big item that is still up in the air is the 5th St bike lane, sidewalk and taper lane adjustment. Due
to a substantial number of utilities (some in places not originally thought), involvement of multiple
agencies (VDOT, ACSA, Albemarle County, City of Charlottesville, Dominion etc), and a significant
reconfiguration, this item has kicked back and forth for some time without resolution. It now seems like
we have a solution that will work for everyone, however, the solution (an offset D box) has a 3-week
lead time for manufacture (once it receives final approval) and then still needs to be coordinated for
install and completion. This could push us out another couple months, which will be unacceptable for
Starbucks.
14
Join Microsoft Teams Meeting
Learn more about Teams I Meeting options
15
Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, April 22, 2020 1:55 PM
To:
Rebecca Ragsdale
Cc:
Keith Bradshaw
Subject:
RE: ZMA201200007 5th Street Commercial
And sorry, I didn't answer your questions. Definitely include Adam & Willis. Also include Frank and Emily Cox.
From: Cameron Langille
Sent: Wednesday, April 22, 2020 1:53 PM
To: Rebecca Ragsdale <ragsdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Hi Rebecca & Keith,
Thanks for sending me this. I regret to say that I was not aware that they are trying to not do the 51h Street road
improvements. I saw the "It now seems like we have a solution that will work for everyone" part and that makes me a
little anxious. No plans have been sent to me since the last review, and those plans were dated November or
December.
I am going to send you both a teams chat in a moment. Thanks,
Cameron
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Wednesday, April 22, 2020 12:32 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Cameron,
Are you aware of these issues described in the attached email? Should this be an update to the site plan you have under
review. I'd like to coordinate a meeting that includes all the necessary people from VDOT. Adam and Willis? Should we
include Frank?
Rebecca
The big item that is still up in the air is the 5th St bike lane, sidewalk, and taper lane adjustment. Due to
a substantial number of utilities (some in places not originally thought), involvement of multiple
agencies ([DOT, ACSA, Albemarle County, City of Charlottesville, Dominion etc), and a significant
reconfiguration, this item has kicked back and forth for some time without resolution. It now seems like
we have a solution that will work for everyone, however, the solution (an offset D box) has a 3-week
lead time for manufacture (once it receives final approval) and then still needs to be coordinated for
install and completion. This could push us out another couple months, which will be unacceptable for
Starbucks.
16
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, April 17, 2020 4:38 PM
To: Rebecca Ragsdale <ragsdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
You're welcome!
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 4:02 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Excellent! I knew you had it all covered.
I will talk to Keith about the buffer some more.
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, April 17, 2020 3:55 PM
To: Rebecca Ragsdale <ragsdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Hi team,
Here's some info:
Bike lanes were shown on the approved final site plan. The file is too large to send the whole thing, so I
extracted two drawings where you can see it (attached). It's hard to see on sheet 3, but it's clearer in the
exhibits on Sheet 13.
Proffer 5a: yes, that's the buffer. With their minor amendment that's currently under review (SDP201900045), I
had commented telling them that all of the buffer landscaping needed to be installed as part of phase 1. See my
attached comment letter, comment #15. 1 was erring on the side of caution and just made a judgement call that
they would need it all installed at the beginning as part of phase 1. Based on my comment letter, it looks like
they revised the minor amendment so that all the buffer landscaping was proposed in phase 1. As I mentioned
to Keith earlier, that minor has not been approved. They haven't resubmitted since my comments went out in
January.
Let me know if you need anything else.
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 20201:48 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: ZMA201200007 5th Street Commercial
Hi Cameron,
17
Keith and I were reviewing the proffers for 5`h Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
7. TU O ncr "I ttenvuk few bc)ck wm• w the PnKcett hS meta n.f tw)ck 1n in
its impwarincnU w the f vwteW of So St The h. k lent. JW I be akiun .n the f tV final utc Ptee
tort invtwlkd M the 0%nn in c ntuncnan wuh thr nmfm..<mcMa .h vn un the fem frcW utc 14=
t,ppeoced foe dcveloftntait of the Pnv�,.
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
18
5. fly Deed of Dtdi—im and Fasmtan and Bill ofSak dead April 1, 2009. mordnt in the
Ckrk's 011ice of the Ckcuk Caen of Ammtarle County, VnSieis in Deed &vk 1590. pogo J97-505
1-f A mcni 1.Owner yarned an Easement to the Carty of Albcmrle pnividing sccem over Re
Proleny to the County's Grxnatwq• Trail.
In addition it, the screening mquircomMf of tle AlEarurle Count)Amlitkcttfral
Rcvic% ldturd and Section 32.7,9 of the Adaanrfb Canty /oninp tdndtnantce. the
thin" dill ptofidc a stgeudird buffer for the purposes of scrccrting the
dcirlopm i from the Grevtwvy Trail sho%n on fhe C'om-clawl Plan Ihti
vegctated hull" shall he linmded m a manner consist"n %nth Section 12. ) 9 of the
Alhcmuic /fining (hdinm,;v and the landscaping shall be ihn%non the fuel alit
plan us1 inaullod w pan of any conslttetiim %het%n on the firwl silt plan Im
dcscbgimait of aK Iknpm)
the fl%m Dull conwrucl a whiculu aid peskslnan trawl %vy (-I rasr1 Wa)'I
Iron the ptorwowd puking uea to de edge at the futon%aY frail, in de
approximate Itxahtm. ahaain in the Ctincclitwl Plan. Ile Iravcl Way shall br
canitructcd to moat C'lau A (low matntcnaricc multrux'shaml uw pathi srartdards
in accotida %ith the C'ouniN's Design Standards Manual The Travel %'a) shall
he %ho%n an the fIr31 (anal Put plan and 1nsWk-d by the ()%Mr in c on)umijon %lth
the tmpwitvwnu shown on the first frrtsl site plan approved for %k%clopmcrtt of tle
Propm). The 7raiel Way shall be maintained tithe (him
C. to the extent the Mwum rat de Travel Us) on the Conr{uwl Ilan is uxonugmf
with the 1,xaions slur%n at the basement. the lhiner shall, at itt stik expcnw.
prepae and execute an eawmuv and ao txnr tYiag eawm t plat if noces . in a
fount scceleahk to the ('north of Alhomuk, to canes the Ideation of the lasnnent.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.org
19
Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, April 22, 2020 1:53 PM
To:
Rebecca Ragsdale
Cc:
Keith Bradshaw
Subject:
RE: ZMA201200007 5th Street Commercial
Hi Rebecca & Keith,
Thanks for sending me this. I regret to say that I was not aware that they are trying to not do the 5th Street road
improvements. I saw the "It now seems like we have a solution that will work for everyone" part and that makes me a
little anxious. No plans have been sent to me since the last review, and those plans were dated November or
December.
I am going to send you both a teams chat in a moment. Thanks,
Cameron
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Wednesday, April 22, 202012:32 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Cameron,
Are you aware of these issues described in the attached email? Should this be an update to the site plan you have under
review. I'd like to coordinate a meeting that includes all the necessary people from VDOT. Adam and Willis? Should we
include Frank?
Rebecca
The big item that is still up in the air is the 5th St bike lane, sidewalk and taper lane adjustment. Due to
a substantial number of utilities (some in places not originally thought), involvement of multiple
agencies (VDOT, ACSA, Albemarle County, City of Charlottesville, Dominion etc), and a significant
reconfiguration, this item has kicked back and forth for some time without resolution. It now seems like
we have a solution that will work for everyone, however, the solution (an offset D box) has a 3-week
lead time for manufacture (once it receives final approval) and then still needs to be coordinated for
install and completion. This could push us out another couple months, which will be unacceptable for
Starbucks.
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, April 17, 2020 4:38 PM
To: Rebecca Ragsdale <rraesdale@albemarle.ore>
Cc: Keith Bradshaw <kbradshaw@albemarle.ore>
Subject: RE: ZMA201200007 5th Street Commercial
You're welcome!
20
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 4:02 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Excellent! I knew you had it all covered.
I will talk to Keith about the buffer some more.
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, April 17, 2020 3:55 PM
To: Rebecca Ragsdale <ragsdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Hi team,
Here's some info:
• Bike lanes were shown on the approved final site plan. The file is too large to send the whole thing, so I
extracted two drawings where you can see it (attached). It's hard to see on sheet 3, but its clearer in the
exhibits on Sheet 13.
Proffer 5a: yes, that's the buffer. With their minor amendment that's currently under review (SDP201900045), I
had commented telling them that all of the buffer landscaping needed to be installed as part of phase 1. See my
attached comment letter, comment #15. 1 was erring on the side of caution and just made a judgement call that
they would need it all installed at the beginning as part of phase 1. Based on my comment letter, it looks like
they revised the minor amendment so that all the buffer landscaping was proposed in phase 1. As I mentioned
to Keith earlier, that minor has not been approved. They haven't resubmitted since my comments went out in
January.
Let me know if you need anything else.
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 1:48 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: ZMA201200007 5th Street Commercial
Hi Cameron,
Keith and I were reviewing the proffers for 5' Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
7. The (hvwr shall ptovi k foe hsc)ok samv at the Pnqwnf bN imiumon of tic lc Wses in
its inq+ovem moi to the (ontW of S' \t 1 he h.)c k lance "I be thtwn am the firm final wit plan
nut insWled by the Owner in cmuncbon with the tmpn.vem M% ah.n.n �v the ftrt find site plan
ttpptostd foe devebptttnn of the Pmpert).
21
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
OWN - llf- 7t7
22
5. fly Deed of Dediwdm and Fasmtan and Bill of Sakdowd April 1, 2009. mordnt in the
Ckrk's 011ice of the Ckcuk Caen of Albmtrle County, VnSieis in Deed &vk 3590. pogo J97-505
1-f A mcni 1.Owner yarned an Easement to the Carty of Albcmrle pntviding sccem over Re
Property to the County's Grxnatwq• Trail.
In addition to the screening mquircomMf of tie AlEarurle Count)Amlittoctt[ral
Rcvic% ld.urd and Section 32.7,9 of the AlbowAYU Canty /oninp tdndtnantce. the
thin" dill ptofidc a stgeudird darner for the purposes of scrccrting the
dcirlopm i from the Grevtwvy Trail sho%n on fhe Com-clew) Plan Ihti
vegctated hull" shall he linmded m a manner consist"n %nth Section 12. ) 9 of the
Alhcmuic Mining (hdinm,;v and the landscaping shall be ihn%non the fuel atic
plan us1 inaullod w pan of any conslttetitm shct%n on the firwl silt plan Im
dcscbprnatl of aK Iknitcrt)
the fl%m Dull conwrucl a whiculu aid peskslnan trawl %vy (-I rasr1 Wa)'I
front the ptolx.wd puking uea its de edge at the Green%aY frail, in de
approximate 6. iatj'm. ahnain un thC e onccptwl Plan. Ile Iravcl Way shall br
conitructcd to moat C'lau A (low matntcnartcc multrux'shaml uw pathi srartdards
in acconda %ith the C'ouniN's Design Standards Manual The Travel %'a) shall
he %ho%n an the fIr31 (anal Put plan and InsWk-d by the ()%Mr In c on)umijon %llh
the tmpwitvwnu shown on the first frrtsl site plan approved for %k%clopmcrtl of 0e
Propm), The 7raiel Way shall be maintained tithe (him
C. to the exrenl the Mwum rat de Travel Us) on the Conrlewl Ilan it uxonugmf
with the 1,xaions slur%n at the basement. the 0,,wr shall, at ttt s.tk cxpcnw.
prepae and execute an eawmuv and ao txnr tYiag eawm t plat if noces . in a
form scceptahk to the ('north of Alhomuk, to careen the location of the lasnnent.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.org
23
Cameron Langille
From: Rebecca Ragsdale
Sent: Wednesday, April 22, 2020 12:32 PM
To: Cameron Langille
Cc: Keith Bradshaw
Subject: RE: ZMA201200007 5th Street Commercial
Attachments: FW: 5th Street Landing
Cameron,
Are you aware of these issues described in the attached email? Should this be an update to the site plan you have under
review. I'd like to coordinate a meeting that includes all the necessary people from VDOT. Adam and Willis? Should we
include Frank?
Rebecca
The big item that is still up in the air is the 51h St bike lane, sidewalk, and taper lane adjustment. Due to
a substantial number of utilities (some in places not originally thought), involvement of multiple
agencies ([DOT, ACSA, Albemarle County, City of Charlottesville, Dominion etc), and a significant
reconfiguration, this item has kicked back and forth for some time without resolution. It now seems like
we have a solution that will work for everyone, however, the solution (an offset D box) has a 3-week
lead time for manufacture (once it receives final approval) and then still needs to be coordinated for
install and completion. This could push us out another couple months, which will be unacceptable for
Starbucks.
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, April 17, 2020 4:38 PM
To: Rebecca Ragsdale <rragsdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
You're welcome!
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 4:02 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Excellent! I knew you had it all covered.
I will talk to Keith about the buffer some more.
From: Cameron Langille <blaneille@albemarle.org>
Sent: Friday, April 17, 2020 3:55 PM
To: Rebecca Ragsdale <ragsdale@albemarle.org>
24
Cc: Keith Bradshaw <kbradshaw(c@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Hi team,
Here's some info:
• Bike lanes were shown on the approved final site plan. The file is too large to send the whole thing, so I
extracted two drawings where you can see it (attached). It's hard to see on sheet 3, but it's clearer in the
exhibits on Sheet 13.
Proffer 5a: yes, that's the buffer. With their minor amendment that's currently under review (SDP201900045), I
had commented telling them that all of the buffer landscaping needed to be installed as part of phase 1. See my
attached comment letter, comment #15. 1 was erring on the side of caution and just made a judgement call that
they would need it all installed at the beginning as part of phase 1. Based on my comment letter, it looks like
they revised the minor amendment so that all the buffer landscaping was proposed in phase 1. As I mentioned
to Keith earlier, that minor has not been approved. They haven't resubmitted since my comments went out in
January.
Let me know if you need anything else.
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 1:48 PM
To: Cameron Langille <blaneille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: ZMA201200007 5th Street Commercial
Hi Cameron,
Keith and I were reviewing the proffers for 5' Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
7. In* (1•rttec drill pmvwk for tKj<k iii.rex b the Pn4vrt5 M utchu of track Irtev in
its ingwon to u to the InwUMc of 5" tit the h" k Win "I be Owun on the f rY ruW utc p4e
and inW!W by the 0%nn in conjunction .nth the impnnrnunti dtwn on the rvr ruW Yk plm
spf o rd for dcvclopnrnt of the Pnj c ,
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
25
=%I
�, u L . .4 1
Lp=
4
atK=l
Immu'r'-w(lif IF V k tWvi
er
26
5. fly Deed of Dediwdm and Fasmtan and Bill of Sakdowd April 1, 2009. mordnt in the
Ckrk's 011ice of the Ckcuk Caen of Albmtrle County, VnSieis in Deed &vk 3590. pogo J97-505
1-f A mcni 1.Owner yarned an Easement to the Carty of Albcmrle pntviding sccem over Re
Property to the County's Grxnatwq• Trail.
In addition to the screening mquircomMf of tie AlEarurle Count)Amlittoctt[ral
Rcvic% ld.urd and Section 32.7,9 of the AlbowAYU Canty /oninp tdndtnantce. the
thin" dill ptofidc a stgeudird darner for the purposes of scrccrting the
dcirlopm i from the Grevtwvy Trail sho%n on fhe Com-clew) Plan Ihti
vegctated hull" shall he linmded m a manner consist"n %nth Section 12. ) 9 of the
Alhcmuic Mining (hdinm,;v and the landscaping shall be ihn%non the fuel atic
plan us1 inaullod w pan of any conslttetitm shct%n on the firwl silt plan Im
dcscbprnatl of aK Iknitcrt)
the fl%m Dull conwrucl a whiculu aid peskslnan trawl %vy (-I rasr1 Wa)'I
front the ptolx.wd puking uea its de edge at the Green%aY frail, in de
approximate 6. iatj'm. ahnain un thC e onccptwl Plan. Ile Iravcl Way shall br
conitructcd to moat C'lau A (low matntcnartcc multrux'shaml uw pathi srartdards
in acconda %ith the C'ouniN's Design Standards Manual The Travel %'a) shall
he %ho%n an the fIr31 (anal Put plan and InsWk-d by the ()%Mr In c on)umijon %llh
the tmpwitvwnu shown on the first frrtsl site plan approved for %k%clopmcrtl of 0e
Propm), The 7raiel Way shall be maintained tithe (him
C. to the exrenl the Mwum rat de Travel Us) on the Conrlewl Ilan it uxonugmf
with the 1,xaions slur%n at the basement. the 0,,wr shall, at ttt s.tk cxpcnw.
prepae and execute an eawmuv and ao txnr tYiag eawm t plat if noces . in a
form scceptahk to the ('north of Alhomuk, to careen the location of the lasnnent.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.org
27
Cameron Langille
From: Cameron Langille
Sent: Friday, April 17, 2020 4:38 PM
To: Rebecca Ragsdale
Cc: Keith Bradshaw
Subject: RE: ZMA201200007 5th Street Commercial
You're welcome!
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 4:02 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Excellent! I knew you had it all covered.
I will talk to Keith about the buffer some more.
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Friday, April 17, 2020 3:55 PM
To: Rebecca Ragsdale <rraesdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.orx>
Subject: RE: ZMA201200007 5th Street Commercial
Hi team,
Here's some info:
• Bike lanes were shown on the approved final site plan. The file is too large to send the whole thing, so I
extracted two drawings where you can see it (attached). It's hard to see on sheet 3, but it's clearer in the
exhibits on Sheet 13.
• Proffer 5a: yes, that's the buffer. With their minor amendment that's currently under review (SDP201900045), I
had commented telling them that all of the buffer landscaping needed to be installed as part of phase 1. See my
attached comment letter, comment #15. 1 was erring on the side of caution and just made a judgement call that
they would need it all installed at the beginning as part of phase 1. Based on my comment letter, it looks like
they revised the minor amendment so that all the buffer landscaping was proposed in phase 1. As I mentioned
to Keith earlier, that minor has not been approved. They haven't resubmitted since my comments went out in
January.
Let me know if you need anything else.
From: Rebecca Ragsdale <rraRsdale@albemarle.orR>
Sent: Friday, April 17, 2020 1:48 PM
To: Cameron Langille <blaneille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.orR>
Subject: ZMA201200007 5th Street Commercial
28
Hi Cameron,
Keith and I were reviewing the proffers for 5' Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
7. the (hsner shell prosidc for hic)cle we hr the Pon") ly in iuswnt of twcycic Inns in
iu impmvemenu to the frontage of Sa Stthe hicyck hates shall tv sltuwn on the fi t lint site Plan
and insW W by the fluner in cort)un[t" with the irnRntTmcnu sM,%n on the ftnt final stic plan
sppro vd for development of tlto Property.
2
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
casrwr uua '�
_—
�.
.,yt,� � y is r• �.,
v
G
29
5. By Deed of Dedication and rasemcnt and Bill of Sale dated April 1. 2008. recorded in the
Clerk's Office of the Circuit Court of Albemarle County, Virginia in Deed Book 3580. pages 497-505
("Fi cm-). Owner granted an rasement to the County of Albemarle providing access over the
Property to the county's Greenway I mil.
A. In addition to the screening requirementsof the .Albemarle County Architectural
Rcvicw Board and Section 32.7.9 of fhc Albemarle County Zoning Ordinance, the
Owner shall provide a ycgetated buffer for the purposes of screening the
development from the Greenway Trail shown on the Conceptual Plan. This
vegetated ImITter shall be provided in a manner consistent with Section 32.7.9 of tM
Albemwle Zoning Ordinance and the landscaping shall be shown on the final site
plan and installed as pan of any construction shown on the final site plan for
devclopmcnl of fhc Property.
The Owner shall construct a vehicular and pedestrian travel way (" I ravel W'ay"1
from the proposed parking area to the edge of the Greenw'ay Trail, in the
approximate locations shown tin the Conceptual flan. The "(ravel Way shall be
constructed to meet Class A flow maintenance multi-use/shared use path) standards
in accordance with the County's Design Standards Manual. The Travel Way shall
be shown on the first final site plan and installed by the Owner in conjunction with
the improvements shown on the first final site plan approved for dcvclopmcm of the
Property. 'Ihc Travel Way shall be maintained by the Owner.
C. 'I o the extent the Location of thc'I-ravel Way tin the Conceptual flan is inconsisYcm
with the locations shown on the Fascment, the Owner shall, at its sole expense,
prcparc and execute an casement and accompanying casrment plat, if necessary. in a
form acceptable to the Count' of Albemarle, to correct the location of the lasement.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.org
30
Cameron Langille
From: Rebecca Ragsdale
Sent: Friday, April 17, 2020 4:02 PM
To: Cameron Langille
Cc: Keith Bradshaw
Subject: RE: ZMA201200007 5th Street Commercial
Excellent! I knew you had it all covered.
I will talk to Keith about the buffer some more.
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, April 17, 2020 3:55 PM
To: Rebecca Ragsdale <ragsdale@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: RE: ZMA201200007 5th Street Commercial
Hi team,
Here's some info:
Bike lanes were shown on the approved final site plan. The file is too large to send the whole thing, so I
extracted two drawings where you can see it (attached). It's hard to see on sheet 3, but it's clearer in the
exhibits on Sheet 13.
Proffer 5a: yes, that's the buffer. With their minor amendment that's currently under review (SDP201900045), I
had commented telling them that all of the buffer landscaping needed to be installed as part of phase 1. See my
attached comment letter, comment #15. 1 was erring on the side of caution and just made a judgement call that
they would need it all installed at the beginning as part of phase 1. Based on my comment letter, it looks like
they revised the minor amendment so that all the buffer landscaping was proposed in phase 1. As I mentioned
to Keith earlier, that minor has not been approved. They haven't resubmitted since my comments went out in
January.
Let me know if you need anything else.
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 20201:48 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: ZMA201200007 Sth Street Commercial
Hi Cameron,
Keith and I were reviewing the proffers for 51' Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
31
7. the OAs shall pro%idc for Mc%cic wco% to the Prupr ty bt inclusam of N%c Vic lure% In
rb imixo%c rnu to the Imntage of 5" titthe hi.ycic lane shall be s6nwn on the tint liwl lire plan
mind Installed M the l lwner Inn+nluncuon with the oriMo menis sM,An rm the tint lirul %itc plan
approccd fur deselopmont of the Propm)
2
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
f R A
_
sile sBae�m "•%c$
rr try
X
to
32
5. By Deed of Dedication and Easement and Bill of Sale dated April 1. 2008. recorded in the
Clerk's Office of the Circuit Court of Albemarle County, Virginia in Deed Book 3580. pages 497-505
("Fasemcm-). Owner granted an Easement to the County of Albemarle providing access over the
Property to dre County s (ireenway I mil.
A. In addition to the screening requirements of the .Albemarle County Architectural
Rcvicw M,ard and Section 32.7.9 of the Albemarle County Zoning Ordinance, the
Owner shall provide a ycgetated buffer for the purposes of screening the
development from the Greenway Trail shown on the Conceptual Plan. This
vegetated butTcr shall he provided in a manner consistent with Section 32.7.9 of the
Albemarle Zoning Ordinance and the landscaping shall be shown on the final site
plan and installed as pan of any construction shown on the final site plan for
devclopmcnl of the Property.
The Owner shall construct a vehicular and pedestrian trawl way ("I ravel W'ay"1
from the proposed parking area to the edge of the Greenway Trail, in the
approximate locations shown on the Conceptual flan. Ilte Travel W'a) shall be
constructed to meet Class A (low maintenance multi-use.'shi red use path) standards
in accordance with the county's Design Standards Manuel. The Travel Way shall
be shown on the first final site plan and installed by the Owner in conjunction with
the improvements shown on the first final site plan approved for development of the
Property. the I mvcl Way shall he maintained by the Owner.
C. 'lo the extent the Location of thc'I-ravel Way on the Conceptual flan is inconsistent
w ifh the locations shown on the Fasemcm, the Owner shall, at its sole expense,
prepare and execute an casement and accompanying casement plat, if necessary. in a
form acceptable to the County of Albemarle, to correct the location of the Basement.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.org
33
Cameron Langille
From: Cameron Langille
Sent: Friday, April 17, 2020 3:55 PM
To: Rebecca Ragsdale
Cc: Keith Bradshaw
Subject: RE: ZMA201200007 5th Street Commercial
Attachments: SDP201700012 SHeet 13.pdf, SDP201700012 SHeet 3.pdf, SDP201900045 4th Review
Comments.pdf
Hi team,
Here's some info:
Bike lanes were shown on the approved final site plan. The file is too large to send the whole thing, so I
extracted two drawings where you can see it (attached). It's hard to see on sheet 3, but it's clearer in the
exhibits on Sheet 13.
Proffer 5a: yes, that's the buffer. With their minor amendment that's currently under review (SDP201900045), I
had commented telling them that all of the buffer landscaping needed to be installed as part of phase 1. See my
attached comment letter, comment #15. 1 was erring on the side of caution and just made a judgement call that
they would need it all installed at the beginning as part of phase 1. Based on my comment letter, it looks like
they revised the minor amendment so that all the buffer landscaping was proposed in phase 1. As I mentioned
to Keith earlier, that minor has not been approved. They haven't resubmitted since my comments went out in
January.
Let me know if you need anything else.
From: Rebecca Ragsdale <ragsdale@albemarle.org>
Sent: Friday, April 17, 2020 1:48 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Keith Bradshaw <kbradshaw@albemarle.org>
Subject: ZMA201200007 5th Street Commercial
Hi Cameron,
Keith and I were reviewing the proffers for 5" Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
7. 'fhe (hsner shall pmside for bicycle, ■csxrs m the Pruperty tw inclusion of hicycle Iw¢s in
in impo rcni to the frontage of 5a tit. the hicyvlt [me, shall he shown om the tint Anal site plan
and installed by the Owner in conjunction with the improvements shown on the lint final site plan
approved for developmrnt of the Ptoppty.
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
34
35
5. By Deed of Dedication and Basement and Dill of Sale dated April 1.2008. recorded in the
Clerk's Office of the Circuit Court of Albemarle County. Virginia in Deed Book 3580. pages 497-505
f`Fr cnt'). Owner granted an F,ascmcnt to the County of Albemurlc Providing access over the
Pmpcny to the County s Grcenway Tmil.
A. In addition to the screening requirements of the .Albemarle County Architectural
Rcvicw Board and Section 32.7.9 of the Albemarle County Zoning Ordinance, the
Owner shall provide a ycgetated buffer for the purposes of screening the
development from the Grecnway Trail shown on the Conceptual Plan. This
vegetated butcr shall he Provided in a manner consistent with Section 32.7.9 of the
Albemarle Zoning Ordinance and the landscaping shall be shown on the fiml site
plan and installed as pan of any construction shown on the final site plan for
development ofthe Property.
The Owner shall construct a vehicular and pedestrian travel way ("I ravel K'ay"1
from the proposed parking area to the edge of the Greenway Trail. in ilie
approximate locations shown on the Conceptual flan. Ihe'I ravel Way shall be
constructed to meet Class A flow maintenance multi-useshared use path) standards
in accordance with the County's Design Standards Manual. The Travel Way shall
be shown on the first final site plan and installed by the Owner in conjunction with
the improvements shown on the fast final site plan approved for development of the
Property. the Travel Way shall be maintained by the Owner.
C. l o the extent the loca ion of thc'I-ravel Way on the Conceptual flan is inconsistent
w iih the locations shown on the Fascincm, the Owner shall. at its sole expense.
prepare and execute an casement and accompanying casement plat. if necessary. in a
form acceptable to the Count' of Albemarle, to correct the location of the Basement.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.orq
36
Cameron Langille
From: Rebecca Ragsdale
Sent: Friday, April 17, 2020 1:48 PM
To: Cameron Langille
Cc: Keith Bradshaw
Subject: ZMA201200007 5th Street Commercial
Attachments: ZMA201200007 5th Street Commercial.pdf
Hi Cameron,
Keith and I were reviewing the proffers for 5th Street Station and I have a few questions I thought you might be able to
help with. We can schedule a meeting with you on Teams if that's easier.
I couldn't find in the site plan set where any bike lanes were shown to satisfy proffer 7:
7. the (Tamer shall provide fix bicycle aeons to the Property by inclusion of bicycle lanes in
its improvements to the fnmtage of Si° St. nse bicycle Imes shall be shown on the first final site plan
and installed by the Omner in conjunction with the improvements shown on the first final site plan
approved for development of the Property.
For proffer 5a, did we consider everything in yellow on the landscape plan to be the required buffer area? The proffer
says it shall be shown on the site plan and installed as part of any construction shown on the site plan. I think it may be
OK to phase. I saw notes on the site plan that the primitive trail and greenway trail will be done with Phase I which we
will require prior to CO and not bond. I didn't see where we specified anything for the buffer and think it is OK to phase.
37
7
t!
09VIM: 9CNL
19
.
I
�y
Y
38
5. By Deed of Dedication and Easement and Bill of Sale dated April 1, 2008. recorded in the
Clerk's Office of the Circuit Coun of Albemarle County, Virginia in Deed Book 3580. pages 497-505
("Fasemrnt'). Owner granted an Easement to the County of Albemarle providing access over the
Pmpcny to the C'ounty's Greenway Trail.
A. In addition to the screening requirements of the .Albemarle County Architectural
Rcvicw Board and Section 32.7.9 of the AIhcmarIc County Zoning Ordinance, the
Owner shall provide a ycgetaled butler for the purpnscs of screening the
developmcnt from the Grecnway Trail shown on the Conceptual Plan. This
vegetated buncr shall he provided in a manner consistent with Section 32.7.9 of tM
Albemarle Zoning Ordinance and the landscaping shall be shown on the final site
plan and installed w pan of any construction shown on the final site plan for
dcsclopmcnl of the Progeny.
the Owner shall construct a vehicular and pedestrian trawl way (" 1 ravel W'ay"1
from the proposed parking area to the edge of the Gneenway Trail, in dw
approximate locations shown tin the Conceptual III=.'Ihe Travel Way shall be
constructed to meet Class A (low maintenance multi-use,'shared use path) standards
in accordance with the County's Dvogn Standards Manual. The Travel Way shall
be shown on the first final site plan and installed by the Owner in conjunction with
the tmprovcmenis shown on the first final site plan approved fort development of the
Property. the Tavel Way shall be maintained by the Owner.
C. 'I o the extent the Location ol'thc'I-mvcl W'ey on the Conceptual flan is inconsistent
with the locations shown on the I-asemcnt, the Owner shall, at its sole expense.
prepare and execute an easement and accompanying casement plat, if necessary, in a
form acceptahle to the County of Alhemarle, to correct the location of the Iasement.
Rebecca Ragsdale, Principal Planner
Community Development
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902-4596
434-296-5832 ext. 3226
ragsdale@al bemarl e.orq
39
Cameron Langille
From: Cameron Langille
Sent: Monday, February 24, 2020 11:01 AM
To: tmiller@meridianwbe.com; 'Randy Ralston
Subject: RE: Another question 5th St back Parcel
Probably not; if there is sidewalk like that along both sides of the travelway leading to wherever the new lot line begins,
then no waives are needed. Again, it's hard to answer without knowing where the new lot line is, but as long as there is
sidewalk along both sides of the travelway all the way to the new lot, then that section of the Ordinance has been met.
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, February 21, 2020 2:56 PM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Here is a sketch showing sidewalk and planters back to the new lot. There is a 45' length of sidewalk next to the drive
through lane that does not have enough room for a planter.
Will this need a waiver?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 20, 2020 2:20 PM
To: tmiller@meridianwbe.com; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
Hi Tim,
Private streets serving non-residential uses/lots can be approved administratively by staff. That said, the actual physical
improvements within the private street ROW will need to meet the standards specified in the Subdivision
0
Ordinance. One thing that concerns me with the 51h Street Commercial site is that there are not sidewalks and planting
strips along both sides of the entire travel way length as currently designed leading back to where buildings #2 and #3
are located. Unless sidewalks and planting strips get installed along both sides of the proposed private street ROW all
the way back to the new parcel, waiver request would need to be filed, which would still require approval by the
Planning Commission.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Thursday, February 20, 2020 9:30 AM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Can you tell me what would be required to create a private road to a new parcel around the storage building?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 13, 202010:46 AM
To: Randy Ralston <err@rralston.comcastbiz.net>; Tim Miller <tmiller@meridianwbe.com>
Subject: RE: Another question 5th St back Parcel
Hi Randy,
You're almost to the finish line with the first building, congratulations! Below are my answers to your questions:
Selling off a piece and doing mini -storage: there are some hurdles you would have to go through in order to do a
different use and building layout on your property than what you've been approved for already. The Zoning Map
Amendment (ZMA201200007) had a proffered concept plan tied to it, and development of your site will be held to that
plan unless you go through another rezoning and amend the concept plan. And since rezonings have to go through the
Planning Commission and Board of Supervisors as public hearings, there is no guarantee that it will end up being
approved.
41
Parking requirements for self -storage facilities: the Zoning Ordinance does not specify a standard for this use. What you
would have to do is file a request with the Zoning Administrator to determine what the parking requirements are. You
would provide him with an analysis of what you think you need, and then he'd evaluate it and either approve it or say
that a different calculation is needed.
Retaining % acre for constructing a small building: this is another element that we would need to see drawn up on
plans. It would also require an amendment to the ZMA concept plan. I can't verify whether we would support or not
support a change to the layout without seeing it.
One more consideration, and this is a big one, to keep in mind if you are actually thinking about changing this site, is that
it is in the Entrance Corridor. This means the mini -storage building and all new buildings would have to go back through
the ARB for review. Most mini -storage developers already have a specific building design in mind and often times the EC
guidelines conflict with the more standardized corporate design of national mini -storage companies.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 20201:27 PM
To: Cameron Langille <blaneille@albemarle.ore>; Tim Miller <tmiller@meridianwbe.com>
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!!!
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment - for my back parcel!!!
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
42
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randv@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randv@ralstonpc.com
Subject: SDP201900045 5th Street Commercial MinorAmendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 41h review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
43
m
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Friday, February 21, 2020 2:56 PM
To: Cameron Langille;'Randy Ralston'
Subject: RE: Another question 5th St back Parcel
Attachments: 5th St sidewalks.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Here is a sketch showing sidewalk and planters back to the new lot. There is a 45' length of sidewalk next to the drive
through lane that does not have enough room for a planter.
Will this need a waiver?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
P I a n n i
idian
ng Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 20, 2020 2:20 PM
To: tmiller@meridianwbe.com; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
Hi Tim,
Private streets serving non-residential uses/lots can be approved administratively by staff. That said, the actual physical
improvements within the private street ROW will need to meet the standards specified in the Subdivision
Ordinance. One thing that concerns me with the 51h Street Commercial site is that there are not sidewalks and planting
strips along both sides of the entire travel way length as currently designed leading back to where buildings #2 and #3
are located. Unless sidewalks and planting strips get installed along both sides of the proposed private street ROW all
the way back to the new parcel, waiver request would need to be filed, which would still require approval by the
Planning Commission.
Let me know if you have any follow-up questions. Thanks,
Cameron
45
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Thursday, February 20, 2020 9:30 AM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Can you tell me what would be required to create a private road to a new parcel around the storage building?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
A Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 13, 202010:46 AM
To: Randy Ralston <err@rralston.comcastbiz.net>; Tim Miller <tmiller@meridianwbe.com>
Subject: RE: Another question 5th St back Parcel
Hi Randy,
You're almost to the finish line with the first building, congratulations! Below are my answers to your questions:
Selling off a piece and doing mini -storage: there are some hurdles you would have to go through in order to do a
different use and building layout on your property than what you've been approved for already. The Zoning Map
Amendment (ZMA201200007) had a proffered concept plan tied to it, and development of your site will be held to that
plan unless you go through another rezoning and amend the concept plan. And since rezonings have to go through the
Planning Commission and Board of Supervisors as public hearings, there is no guarantee that it will end up being
approved.
Parking requirements for self -storage facilities: the Zoning Ordinance does not specify a standard for this use. What you
would have to do is file a request with the Zoning Administrator to determine what the parking requirements are. You
would provide him with an analysis of what you think you need, and then he'd evaluate it and either approve it or say
that a different calculation is needed.
Retaining % acre for constructing a small building: this is another element that we would need to see drawn up on
plans. It would also require an amendment to the ZMA concept plan. I can't verify whether we would support or not
support a change to the layout without seeing it.
0
One more consideration, and this is a big one, to keep in mind if you are actually thinking about changing this site, is that
it is in the Entrance Corridor. This means the mini -storage building and all new buildings would have to go back through
the ARB for review. Most mini -storage developers already have a specific building design in mind and often times the EC
guidelines conflict with the more standardized corporate design of national mini -storage companies.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 2020 1:27 PM
To: Cameron Langille <blaneille@albemarle.ors>; Tim Miller <tmiller@meridianwbe.com>
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!!!
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment -for my back parcel) I I I
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
47
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy@ralstonpc.com
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randy@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 4th review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
48
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Friday, February 21, 2020 2:31 PM
To: Cameron Langille;'Randy Ralston'
Subject: RE: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
This is helpful. I will get with the client and get back to you.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
P I a n n i
idian
nq gaup
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 20, 2020 2:20 PM
To: tmiller@meridianwbe.com; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
Hi Tim,
Private streets serving non-residential uses/lots can be approved administratively by staff. That said, the actual physical
improvements within the private street ROW will need to meet the standards specified in the Subdivision
Ordinance. One thing that concerns me with the 51h Street Commercial site is that there are not sidewalks and planting
strips along both sides of the entire travel way length as currently designed leading back to where buildings #2 and #3
are located. Unless sidewalks and planting strips get installed along both sides of the proposed private street ROW all
the way back to the new parcel, waiver request would need to be filed, which would still require approval by the
Planning Commission.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Thursday, February 20, 2020 9:30 AM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
49
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Can you tell me what would be required to create a private road to a new parcel around the storage building?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
a
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 13, 202010:46 AM
To: Randy Ralston <err@rralston.comcastbiz.net>; Tim Miller <tmiller@meridianwbe.com>
Subject: RE: Another question 5th St back Parcel
Hi Randy,
You're almost to the finish line with the first building, congratulations! Below are my answers to your questions:
Selling off a piece and doing mini -storage: there are some hurdles you would have to go through in order to do a
different use and building layout on your property than what you've been approved for already. The Zoning Map
Amendment (ZMA201200007) had a proffered concept plan tied to it, and development of your site will be held to that
plan unless you go through another rezoning and amend the concept plan. And since rezonings have to go through the
Planning Commission and Board of Supervisors as public hearings, there is no guarantee that it will end up being
approved.
Parking requirements for self -storage facilities: the Zoning Ordinance does not specify a standard for this use. What you
would have to do is file a request with the Zoning Administrator to determine what the parking requirements are. You
would provide him with an analysis of what you think you need, and then he'd evaluate it and either approve it or say
that a different calculation is needed.
Retaining % acre for constructing a small building: this is another element that we would need to see drawn up on
plans. It would also require an amendment to the ZMA concept plan. I can't verify whether we would support or not
support a change to the layout without seeing it.
One more consideration, and this is a big one, to keep in mind if you are actually thinking about changing this site, is that
it is in the Entrance Corridor. This means the mini -storage building and all new buildings would have to go back through
the ARB for review. Most mini -storage developers already have a specific building design in mind and often times the EC
guidelines conflict with the more standardized corporate design of national mini -storage companies.
50
Let me know if you have any follow-up questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 20201:27 PM
To: Cameron Langille <blaneille@albemarle.org>; Tim Miller <tmiller@meridianwbe.com>
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!!!
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment - for my back parcel)!!
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
51
Facsimile: 434-220-4894
e-mail: randv@ralstonpc.com
From: Cameron Langille <blaneille@albemarle.org>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randv@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randv@ralstonpc.com
Subject: SDP201900045 5th Street Commercial MinorAmendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 4ch review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.org
(434) 296-5832 ext. 3432
52
Cameron Langille
From: Cameron Langille
Sent: Thursday, February 20, 2020 2:20 PM
To: tmiller@meridianwbe.com; 'Randy Ralston
Subject: RE: Another question 5th St back Parcel
Hi Tim,
Private streets serving non-residential uses/lots can be approved administratively by staff. That said, the actual physical
improvements within the private street ROW will need to meet the standards specified in the Subdivision
Ordinance. One thing that concerns me with the 51h Street Commercial site is that there are not sidewalks and planting
strips along both sides of the entire travel way length as currently designed leading back to where buildings #2 and #3
are located. Unless sidewalks and planting strips get installed along both sides of the proposed private street ROW all
the way back to the new parcel, waiver request would need to be filed, which would still require approval by the
Planning Commission.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Thursday, February 20, 2020 9:30 AM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rraIston.comcastbiz.net>
Subject: RE: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Can you tell me what would be required to create a private road to a new parcel around the storage building?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 13, 202010:46 AM
53
To: Randy Ralston <err@rralston.comcastbiz.net>; Tim Miller <tmiller@meridianwbe.com>
Subject: RE: Another question 5th St back Parcel
Hi Randy,
You're almost to the finish line with the first building, congratulations! Below are my answers to your questions:
Selling off a piece and doing mini -storage: there are some hurdles you would have to go through in order to do a
different use and building layout on your property than what you've been approved for already. The Zoning Map
Amendment (ZMA201200007) had a proffered concept plan tied to it, and development of your site will be held to that
plan unless you go through another rezoning and amend the concept plan. And since rezonings have to go through the
Planning Commission and Board of Supervisors as public hearings, there is no guarantee that it will end up being
approved.
Parking requirements for self -storage facilities: the Zoning Ordinance does not specify a standard for this use. What you
would have to do is file a request with the Zoning Administrator to determine what the parking requirements are. You
would provide him with an analysis of what you think you need, and then he'd evaluate it and either approve it or say
that a different calculation is needed.
Retaining % acre for constructing a small building: this is another element that we would need to see drawn up on
plans. It would also require an amendment to the ZMA concept plan. I can't verify whether we would support or not
support a change to the layout without seeing it.
One more consideration, and this is a big one, to keep in mind if you are actually thinking about changing this site, is that
it is in the Entrance Corridor. This means the mini -storage building and all new buildings would have to go back through
the ARB for review. Most mini -storage developers already have a specific building design in mind and often times the EC
guidelines conflict with the more standardized corporate design of national mini -storage companies.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 20201:27 PM
To: Cameron Langille <blangille@albemarle.org>; Tim Miller <tmiller@meridianwbe.com>
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!1!
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment - for my back parcel!!!
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
54
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Cameron Langille <blanRille@albemarle.orR>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randv@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randv@ralstonpc.com
Subject: SDP201900045 Sth Street Commercial Minor Amendment - 4th Review Comments
W
Good afternoon Tim & Randy,
Attached you will find the 4th review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.org
(434) 296-5832 ext. 3432
56
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Thursday, February 20, 2020 9:30 AM
To: Cameron Langille;'Randy Ralston'
Subject: RE: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Can you tell me what would be required to create a private road to a new parcel around the storage building?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 13, 202010:46 AM
To: Randy Ralston <err@rralston.comcastbiz.net>; Tim Miller <tmiller@meridianwbe.com>
Subject: RE: Another question 5th St back Parcel
Hi Randy,
You're almost to the finish line with the first building, congratulations! Below are my answers to your questions:
Selling off a piece and doing mini -storage: there are some hurdles you would have to go through in order to do a
different use and building layout on your property than what you've been approved for already. The Zoning Map
Amendment (ZMA201200007) had a proffered concept plan tied to it, and development of your site will be held to that
plan unless you go through another rezoning and amend the concept plan. And since rezonings have to go through the
Planning Commission and Board of Supervisors as public hearings, there is no guarantee that it will end up being
approved.
Parking requirements for self -storage facilities: the Zoning Ordinance does not specify a standard for this use. What you
would have to do is file a request with the Zoning Administrator to determine what the parking requirements are. You
would provide him with an analysis of what you think you need, and then he'd evaluate it and either approve it or say
that a different calculation is needed.
57
Retaining % acre for constructing a small building: this is another element that we would need to see drawn up on
plans. It would also require an amendment to the ZMA concept plan. I can't verify whether we would support or not
support a change to the layout without seeing it.
One more consideration, and this is a big one, to keep in mind if you are actually thinking about changing this site, is that
it is in the Entrance Corridor. This means the mini -storage building and all new buildings would have to go back through
the ARB for review. Most mini -storage developers already have a specific building design in mind and often times the EC
guidelines conflict with the more standardized corporate design of national mini -storage companies.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 20201:27 PM
To: Cameron Langille <blangille@albemarle.org>; Tim Miller <tmiller@meridianwbe.com>
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!!!
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment -for my back parcel) I I I
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
58
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randy@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 41h review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
59
Cameron Langille
From:
tmiller@meridianwbe.com
Sent:
Thursday, February 20, 2020 9:27 AM
To:
Cameron Langille
Subject:
RE: 5th st
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Sorry about that. Should have checked before I sent the e-mail.
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, February 20, 2020 9:24 AM
To: tmiller@meridianwbe.com; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: 5th st
Hi Tim,
Yes, I forwarded that to you & Randy a little while ago. See attached email. Let me know if you have any questions or
anything. Thanks,
Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Wednesday, February 19, 2020 3:32 PM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: FW: 5th st
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Have you received the approval from VDOT?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
Planni
idian
ng Group
60
From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov>
Sent: Wednesday, February 19, 2020 3:18 PM
To: tmiller@meridianwbe.com
Cc: Kauppila, Joel <Joel.kauppila@vdot.virginia.gov>; Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: 5th st
Tim,
This review was completed on February 4th, and VDOT finds it acceptable.
Thanks, Willis
On Wed, Feb 19, 2020 at 3:02 PM <tmiller@meridianwbe.com> wrote:
Joel,
Can you tell me the status of the review of the 5" Street plans?
The contractor is asking about the pavement depths for the Bike Lane. I assume it should match the existing pavement
depths, but wanted to check with you before I tell him.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
- Planning Group
61
From: Kauppila, Joel <Joel.kauppila(a@vdot.virginia.eov>
Sent: Tuesday, January 7, 2020 4:27 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: Randy Ralston <err@rralston.comcastbiz.net>; Willis Bedsaul<willis.bedsaul@vdot.virginia.gov>
Subject: Re: 5th st
Tim,
The current standard that needs to be used is the Midwest Guardrail System. GR-MGS2 GR-MGS3 etc. If you refer to
the design standards, keep scrolling past the old standards of GR 9...
http://www.extranet.vdot.state.va.us/LocDes/Electronic Pubs/2016 Road%20and%20Bridge/CS500.pdf
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 V'DOT Wav I Charlot[csvillc I VA
main 434.422.9373
cell 540.827.7876
On Tue, Jan 7, 2020 at 4:21 PM <tmiller@meridianwbe.com> wrote:
Joel,
Will we need to include a GR-9 terminal treatment on the south end of the GR-2?
Thanks,
Timothy Miller, P.E., L.S.
62
Principal
434-882-0121
www.meridianwbe.com
Meridian
planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.aov>
Sent: Tuesday, January 7, 2020 10:01 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: Randy Ralston <err@rralston.comcastbiz.net>; Willis Bedsaul<willis.bedsaul@vdot.virginia.eov>
Subject: Re: 5th st
Tim/Randy,
This will work! Please submit the plan amendment to the County for their review. I've CC'd the VDOT plan reviewer
so he is in the loop.
Thanks,
Joel
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Way II Charlottesyille I VA
main 434.422.9373
cell 540.827.7876
63
On Mon, Jan 6, 2020 at 12:42 PM <tmillerPnneridianwbe.com> wrote:
Joel,
We are able to a 1.5:1 slope with this cross-section.
Let me know if this will work.
Thanks,
Timothy Miller, P.E., L.S.
Principal
!SJ.E:I:Y. I111 A
www.meridianwbe.com
Meridian
Planning Croup
From: Kauppila, Joel <Joel.kauppila@vdot.virsinia.eov>
Sent: Tuesday, December 31, 2019 4:30 PM
To: tmiller@meridianwbe.com
Cc: Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: 5th st
Gentlemen,
Sorry for the delay, I am back in action. Unfortunately, 1:1 slope would warrant a wall.
64
New idea - would CG 3 (without gutter pan) create enough space to achieve at least a 1V1.5H slope? The bike lane
would need to go back to 5' wide. The guardrail pad can be sloped at 1:12 max from the top of curb then 2% ADA
sidewalk. Does that have a chance at 1:1.5 rip rap? Typically, a gutter pan would be required but I believe this would
constitute a special instance.
Thanks and happy new year!
Joel %auppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Way II Chulottesville I VA
main 434.422.9373
cell 540.827.7876
On Fri, Dec 27, 2019 at 2:55 PM tmiller@meridianwbe.com <tmiller@meridianwbe.com> wrote:
Randy,
I will be out of town next week. Once we get joel to sign off I can send to county.
Good luck remembering your resolution.
Still need easement recorded before resubmitting.
Tim
65
Sent from my Sprint Phone.
-------- Original message --------
From: Randy Ralston <err@rralston.comcastbiz.net>
Date: 12/27/19 2:22 PM (GMT-05:00)
To: tmiller@meridianwbe.com, "'Kauppila, Joel"'<joel.kauppila@vdot.vireinia.gov>
Subject: Re: Sth st
Tim, Can you also reach out to the head of County engineering with this as well? Having a senior moment
(ANOTHER ONE!) and can't think of his name at the moment. He will ahve tyo aprove all of this as well.
thanks Randy
PS ... my New Years resolution is to stop having senior moments
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-
mail immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you
that any tax advice contained in this communication, including any attachments, is not
intended or written to be used, and cannot be used, for the purpose of avoiding penalties
under the Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
66
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randV(@ralstonpc.com
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, December 27, 2019 11:12 AM
To:'Kauppila, Joel'<moel.kauppila@vdot.virginia.gov
Cc: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th st
Joel,
We as -built the white stripe and top of headwall. I checked the elevations and they are correct.
Vertical delta on north is 5'
Vertical delta on south is 6'
Can we use concrete slab on the 1:1 slope along the top of the headwall?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: Kauppila, Joel <joel.kauppila@vdot.virginia.gov>
Sent: Monday, December 23, 2019 5:03 PM
To: tmiller@meridianwbe.com
Subject: Re: 5th st
Tim,
1:1 is probably too steep for rip rap. The north set of elevations on .pdf seem different than our field assessment
(tape measure visual). I was expecting a 3-4' fill. That's probably worth double checking. Do you have a recent
elevation on white stripe?
We couldn't access the south part of the box culvert.
67
On Fri, Dec 20, 2019 at 4:16 PM <tmiller@meridianwbe.com> wrote:
Here is what I am getting for elevations along the headwall.
Looks like a 1:1 slope from the sidewalk to the top of headwall.
Let me know if this will work using rip -rap for stabilzation.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: Kauppila, Joel<ioel.kauppila@vdot.vireinia.aov>
Sent: Friday, December 20, 2019 10:57 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Brook Wood <brook@digsinc.com>; Tim Miller <tmiller@meridianwbe.com>
Subject: Re: 5th st
I'd love to discuss this topic more with you in person. In short, when dealing with existing conditions, it's almost
impossible to capture everything on 2D paper. Our responsibility during construction is to ensure everything built
within the public ROW is per VDOT Contract Documents - Standards, Specifications, Road Design Manual, Drainage
Manual, Structures Manual, Code of Virginia, VTMs etc. Everyone has a role in this and unfortunately there will
always be field issues discovered during lay out or construction that must be addressed. Here is the plan note
that's always included;
The big issue for your development is roadway drainage vs. the site plan modifications. The second issue is the
importance of guardrail construction and safety standards that aren't always detailed sufficiently on the
plans. You are permitted to build to your approved plan (which was deemed unconstructable and in the
amendment process). However, we've identified these issues that may make it difficult to build and
stabilize your plan in a way that we can be comfortable releasing the permit. Our comments thus far have
been an effort to head off these problems you may encounter. Additionally the retaining wall would still
need to be approved by our structure and bridge department considering its placement over an
inventoried structure governed by federal inspection guidelines. This is not handled during plan review,
most frequently, because the engineer at the time does not have enough specificity regarding the wall
design. Structure shop drawings are always required for retaining walls supporting critical roadway features. The
shop drawings contain additional details necessary but depend on the VDOT pre approved structure selected by
the Contractors Geotechnical engineer.
Let's meet again next year to discuss further. Happy holidays!
Joel
On Thu, Dec 19, 2019 at 9:47 AM Randy Ralston <err@rralston.comcastbiz.net> wrote:
68
Good morning Joel,
Around 3:00 this morning, I was thinking about my site and our ongoing discussions about changes to
5th st sidewalks, drainage and retaining wall. While I realize removal of the retaining wall should save
considerable money; and the installation of a box culvert and extending the curbing should be more
than an offset in cost savings... but I do have a procedural question.
My site plan was approved almost two years ago. VDOT and the county signed off on the approved
plans. Now were are talking about significant changes. This is my question... since the plan has been
approved, under what authority can VDOT (or the County) impose changes?
Again, I am NOT opposed to looking into these changes; in fact I have asked Tim Miller's office to
investigate. Frankly, even as a layman, your suggested changes make sense. (Rather ironic that none of
the engineers originally involved in the review process did not appreciate the issues you and Brook
Wood raised.)
Take care, Randy
This communication may contain confidential and privileged information. It
is intended to be protected by the Attorney -Client Privilege and the Work
Product Doctrine. If you have received this message in error, please delete
this e-mail immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you
that any tax advice contained in this communication, including any attachments, is not
intended or written to be used, and cannot be used, for the purpose of avoiding
penalties under the Internal Revenue Code or applicable state or local tax —law
provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
Joel %auppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT WayI Charlottesville I VA
main 434.422.9373
cell 540.827.7876
69
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
70
Cameron Langille
From:
Cameron Langille
Sent:
Thursday, February 20, 2020 9:24 AM
To:
tmiller@meridianwbe.com; 'Randy Ralston'
Subject:
RE: 5th st
Attachments:
RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Hi Tim,
Yes, I forwarded that to you & Randy a little while ago. See attached email. Let me know if you have any questions or
anything. Thanks,
Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Wednesday, February 19, 2020 3:32 PM
To: Cameron Langille <blangille@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: FW: 5th st
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Have you received the approval from VDOT?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Bedsaul, Willis<willis.bedsaulCa@vdot.virginia.eov>
Sent: Wednesday, February 19, 2020 3:18 PM
To: tmiller@meridianwbe.com
Cc: Kauppila, Joel <Joel.kauppila@vdot.virginia.eov>; Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: 5th st
Tim,
This review was completed on February 4th, and VDOT finds it acceptable.
71
Thanks, Willis
On Wed, Feb 19, 2020 at 3:02 PM <tmiller@meridianwbe.com> wrote:
Joel,
Can you tell me the status of the review of the 5" Street plans?
The contractor is asking about the pavement depths for the Bike Lane. I assume it should match the existing pavement
depths, but wanted to check with you before I tell him.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
- Planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.aov>
Sent: Tuesday, January 7, 2020 4:27 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: Randy Ralston <err@rralston.comcastbiz.net>; Willis Bedsaul<willis.bedsaul@vdot.vireinia.aov>
Subject: Re: 5th st
Tim,
72
The current standard that needs to be used is the Midwest Guardrail System. GR-MGS2 GR-MGS3 etc. If you refer to
the design standards, keep scrolling past the old standards of GR 9...
http://www.extranet.vdot.state.va.us/LocDes/Electronic Pubs/2016 Road%20and%20Bridge/CS500.pdf
Joel %auppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Way Charlottesville I VA
main 434.422.9373
i MM71! I3arZili
On Tue, Jan 7, 2020 at 4:21 PM <tmiller@meridianwbe.com> wrote:
Joel,
Will we need to include a GR-9 terminal treatment on the south end of the GR-2?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
73
Meridian
Planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.aov>
Sent: Tuesday, January 7, 2020 10:01 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: Randy Ralston <err@rralston.comcastbiz.net>; Willis Bedsaul<willis.bedsaul@vdot.vireinia.aov>
Subject: Re: 5th st
Tim/Randy,
This will work! Please submit the plan amendment to the County for their review. I've CC'd the VDOT plan reviewer
so he is in the loop.
Thanks,
Joel
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Ways Charlottesville I VA
main 434,422,9373
cell 540.827.7876
On Mon, Jan 6, 2020 at 12:42 PM <tmiller@meridianwbe.com> wrote:
Joel,
74
We are able to a 1.5:1 slope with this cross-section.
Let me know if this will work.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.virginia.gov>
Sent: Tuesday, December 31, 2019 4:30 PM
To: tmiller@meridianwbe.com
Cc: Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: 5th st
Gentlemen,
Sorry for the delay, I am back in action. Unfortunately, 1:1 slope would warrant a wall.
New idea - would CG 3 (without gutter pan) create enough space to achieve at least a 1V1.5H slope? The bike lane
would need to go back to 5' wide. The guardrail pad can be sloped at 1:12 max from the top of curb then 2% ADA
sidewalk. Does that have a chance at 1:1.5 rip rap? Typically, a gutter pan would be required but I believe this would
constitute a special instance.
75
Thanks and happy new year!
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Way I Charlottesville I VA
main 434.422.9373
cell 540.827.7876
On Fri, Dec 27, 2019 at 2:55 PM tmiller@meridianwbe.com <tmiller@meridianwbe.com> wrote:
Randy,
I will be out of town next week. Once we get joel to sign off I can send to county.
Good luck remembering your resolution.
Still need easement recorded before resubmitting.
Tim
Sent from my Sprint Phone.
Original message
76
From: Randy Ralston <err@rralston.comcastbiz.net>
Date: 12/27/19 2:22 PM (GMT-05:00)
To: tmiller@meridianwbe.com, "'Kauppila, Joel"'<joel.kauppila@vdot.virginia.gov>
Subject: Re: Sth st
Tim, Can you also reach out to the head of County engineering with this as well? Having a senior moment
(ANOTHER ONE!) and can't think of his name at the moment. He will ahve tyo aprove all of this as well.
thanks Randy
PS ... my New Years resolution is to stop having senior moments
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-
mail immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you
that any tax advice contained in this communication, including any attachments, is not
intended or written to be used, and cannot be used, for the purpose of avoiding penalties
under the Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(aralstonpc.com
77
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, December 27, 2019 11:12 AM
To:'Kauppila, Joel' <loel.kauppila@vdot.virginia.gov>
Cc: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th st
Joel,
We as -built the white stripe and top of headwall. I checked the elevations and they are correct.
Vertical delta on north is 5'
Vertical delta on south is 6'
Can we use concrete slab on the 1:1 slope along the top of the headwall?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: Kauppila, Joel <joel.kauppila@vdot.virginia.gov>
Sent: Monday, December 23, 2019 5:03 PM
To: tmiller@meridianwbe.com
Subject: Re: 5th st
Tim,
1:1 is probably too steep for rip rap. The north set of elevations on .pdf seem different than our field assessment
(tape measure visual). I was expecting a 3-4' fill. That's probably worth double checking. Do you have a recent
elevation on white stripe?
We couldn't access the south part of the box culvert.
On Fri, Dec 20, 2019 at 4:16 PM <tmiller@meridianwbe.com> wrote:
Here is what I am getting for elevations along the headwall.
Looks like a 1:1 slope from the sidewalk to the top of headwall.
Let me know if this will work using rip -rap for stabilzation.
78
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.eov>
Sent: Friday, December 20, 2019 10:57 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Brook Wood <brook@digsinc.com>; Tim Miller <tmiller@meridianwbe.com>
Subject: Re: 5th st
I'd love to discuss this topic more with you in person. In short, when dealing with existing conditions, it's almost
impossible to capture everything on 2D paper. Our responsibility during construction is to ensure everything built
within the public ROW is per VDOT Contract Documents - Standards, Specifications, Road Design Manual, Drainage
Manual, Structures Manual, Code of Virginia, VTMs etc. Everyone has a role in this and unfortunately there will
always be field issues discovered during lay out or construction that must be addressed. Here is the plan note
that's always included;
The big issue for your development is roadway drainage vs. the site plan modifications. The second issue is the
importance of guardrail construction and safety standards that aren't always detailed sufficiently on the
plans. You are permitted to build to your approved plan (which was deemed unconstructable and in the
amendment process). However, we've identified these issues that may make it difficult to build and
stabilize your plan in a way that we can be comfortable releasing the permit. Our comments thus far have
been an effort to head off these problems you may encounter. Additionally the retaining wall would still
need to be approved by our structure and bridge department considering its placement over an
inventoried structure governed by federal inspection guidelines. This is not handled during plan review,
most frequently, because the engineer at the time does not have enough specificity regarding the wall
design. Structure shop drawings are always required for retaining walls supporting critical roadway features. The
shop drawings contain additional details necessary but depend on the VDOT pre approved structure selected by
the Contractors Geotechnical engineer.
Let's meet again next year to discuss further. Happy holidays!
Joel
On Thu, Dec 19, 2019 at 9:47 AM Randy Ralston <err@rralston.comcastbiz.net> wrote:
Good morning Joel,
Around 3:00 this morning, I was thinking about my site and our ongoing discussions about changes to
5th st sidewalks, drainage and retaining wall. While I realize removal of the retaining wall should save
considerable money; and the installation of a box culvert and extending the curbing should be more
than an offset in cost savings... but I do have a procedural question.
79
My site plan was approved almost two years ago. VDOT and the county signed off on the approved
plans. Now were are talking about significant changes. This is my question... since the plan has been
approved, under what authority can VDOT (or the County) impose changes?
Again, I am NOT opposed to looking into these changes; in fact I have asked Tim Miller's office to
investigate. Frankly, even as a layman, your suggested changes make sense. (Rather ironic that none of
the engineers originally involved in the review process did not appreciate the issues you and Brook
Wood raised.)
Take care, Randy
This communication may contain confidential and privileged information. It
is intended to be protected by the Attorney -Client Privilege and the Work
Product Doctrine. If you have received this message in error, please delete
this e-mail immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you
that any tax advice contained in this communication, including any attachments, is not
intended or written to be used, and cannot be used, for the purpose of avoiding
penalties under the Internal Revenue Code or applicable state or local tax —law
provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randypralstonpc.com
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDnT Wgy II Charlottesville I VA
main 434.422.9373
cell 540.827.7876
Willis C. Bedsaul
Land Development Engineer
M
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
81
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Wednesday, February 19, 2020 3:32 PM
To: Cameron Langille; 'Randy Ralston'
Subject: FW: 5th st
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Have you received the approval from VDOT?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
Planni
idian
ng Group
From: Bedsaul, Willis <willis.bedsaul@vdot.virginia.gov>
Sent: Wednesday, February 19, 2020 3:18 PM
To: tmiller@meridianwbe.com
Cc: Kauppila, Joel <joel.kauppila@vdot.virginia.gov>; Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: Sth st
Tim,
This review was completed on February 4th, and VDOT finds it acceptable.
Thanks, Willis
On Wed, Feb 19, 2020 at 3:02 PM <tmiller@meridianwbe.com> wrote:
Joel,
Can you tell me the status of the review of the 5th Street plans?
82
The contractor is asking about the pavement depths for the Bike Lane. I assume it should match the existing pavement
depths, but wanted to check with you before I tell him.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.aov>
Sent: Tuesday, January 7, 2020 4:27 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: Randy Ralston <err@rralston.comcastbiz.net>; Willis Bedsaul<willis.bedsaul@vdot.vireinia.aov>
Subject: Re: 5th st
Tim,
The current standard that needs to be used is the Midwest Guardrail System. GR-MGS2 GR-MGS3 etc. If you refer to
the design standards, keep scrolling past the old standards of GR 9...
http://www.extranet.vdot.state.va.us/LocDes/Electronic Pubs/2016 Road%20and%20Bridae/CS500.pdf
83
Joel %auppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Way Charlottesville i VA
main 434,422.9373
cell 540.827.7876
On Tue, Jan 7, 2020 at 4:21 PM <tmiller@meridianwbe.com> wrote:
Joel,
Will we need to include a GR-9 terminal treatment on the south end of the GR-2?
Thanks,
Timothy Miller, P.E., L.S.
Principal
C1cLS:1:Y��7ifr�il
www.meridianwbe.com
Meridian
Planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.eov>
Sent: Tuesday, January 7, 2020 10:01 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: Randy Ralston <err@rralston.comcastbiz.net>; Willis Bedsaul<willis.bedsaul@vdot.virginia.eov>
Subject: Re: 5th st
84
Tim/Randy,
This will work! Please submit the plan amendment to the County for their review. I've CC'd the VDOT plan reviewer
so he is in the loop.
Thanks,
Joel
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Ways Charlottesville I VA
main 434,422,9373
mLtzLOhi�iArF.Yl1
On Mon, Jan 6, 2020 at 12:42 PM <tmiller@meridianwbe.com> wrote:
Joel,
We are able to a 1.5:1 slope with this cross-section.
Let me know if this will work.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
85
www.meridianwbe.com
I
Meridian
- + - Planning Group
From: Kauppila, Joel <Joel.kauppila@vdot.virsinia.eov>
Sent: Tuesday, December 31, 2019 4:30 PM
To: tmiller@meridianwbe.com
Cc: Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: 5th st
Gentlemen,
Sorry for the delay, I am back in action. Unfortunately, 1:1 slope would warrant a wall.
New idea - would CG 3 (without gutter pan) create enough space to achieve at least a 1V1.5H slope? The bike lane
would need to go back to 5' wide. The guardrail pad can be sloped at 1:12 max from the top of curb then 2% ADA
sidewalk. Does that have a chance at 1:1.5 rip rap? Typically, a gutter pan would be required but I believe this would
constitute a special instance.
Thanks and happy new year!
Joel %auppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Way II Charlottesville I VA
main 434.422.9373
cell 540.827.7876
86
On Fri, Dec 27, 2019 at 2:55 PM tmiller@meridianwbe.com <tmiller@meridianwbe.com> wrote:
Randy,
I will be out of town next week. Once we get joel to sign off I can send to county.
Good luck remembering your resolution.
Still need easement recorded before resubmitting.
Tim
Sent from my Sprint Phone.
-------- Original message --------
From: Randy Ralston <err@rralston.comcastbiz.net>
Date: 12/27/19 2:22 PM (GMT-05:00)
To: tmiller@meridianwbe.com, "'Kauppila, Joel"'<ioel.kauooila@vdot.virginia.eov>
Subject: Re: Sth st
Tim, Can you also reach out to the head of County engineering with this as well? Having a senior moment
(ANOTHER ONE!) and can't think of his name at the moment. He will ahve tyo aprove all of this as well.
87
thanks Randy
PS ... my New Years resolution is to stop having senior moments
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-
mail immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you
that any tax advice contained in this communication, including any attachments, is not
intended or written to be used, and cannot be used, for the purpose of avoiding penalties
under the Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, December 27, 2019 11:12 AM
To:'Kauppila, Joel' <Joel.kauppila@vdot.virRinia.Rov>
Cc: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th st
, Joel,
88
We as -built the white stripe and top of headwall. I checked the elevations and they are correct.
Vertical delta on north is 5'
Vertical delta on south is 6'
Can we use concrete slab on the 1:1 slope along the top of the headwall?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: Kauppila, Joel <Joel.kauppila@vdot.vireinia.gov>
Sent: Monday, December 23, 2019 5:03 PM
To: tmiller@meridianwbe.com
Subject: Re: 5th st
Tim,
1:1 is probably too steep for rip rap. The north set of elevations on .pdf seem different than our field assessment
(tape measure visual). I was expecting a 3-4' fill. That's probably worth double checking. Do you have a recent
elevation on white stripe?
We couldn't access the south part of the box culvert.
On Fri, Dec 20, 2019 at 4:16 PM <tmiller@meridianwbe.com> wrote:
Here is what I am getting for elevations along the headwall.
Looks like a 1:1 slope from the sidewalk to the top of headwall.
Let me know if this will work using rip -rap for stabilzation.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: Kauppila, Joel <joel.kauppila@vdot.virginia.gov>
Sent: Friday, December 20, 2019 10:57 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Brook Wood <brook@diesinc.com>; Tim Miller <tmiller@meridianwbe.com>
Subject: Re: 5th st
89
I'd love to discuss this topic more with you in person. In short, when dealing with existing conditions, it's almost
impossible to capture everything on 2D paper. Our responsibility during construction is to ensure everything built
within the public ROW is per VDOT Contract Documents - Standards, Specifications, Road Design Manual, Drainage
Manual, Structures Manual, Code of Virginia, VTMs etc. Everyone has a role in this and unfortunately there will
always be field issues discovered during lay out or construction that must be addressed. Here is the plan note
that's always included;
The big issue for your development is roadway drainage vs. the site plan modifications. The second issue is the
importance of guardrail construction and safety standards that aren't always detailed sufficiently on the
plans. You are permitted to build to your approved plan (which was deemed unconstructable and in the
amendment process). However, we've identified these issues that may make it difficult to build and
stabilize your plan in a way that we can be comfortable releasing the permit. Our comments thus far have
been an effort to head off these problems you may encounter. Additionally the retaining wall would still
need to be approved by our structure and bridge department considering its placement over an
inventoried structure governed by federal inspection guidelines. This is not handled during plan review,
most frequently, because the engineer at the time does not have enough specificity regarding the wall
design. Structure shop drawings are always required for retaining walls supporting critical roadway features. The
shop drawings contain additional details necessary but depend on the VDOT pre approved structure selected by
the Contractors Geotechnical engineer.
Let's meet again next year to discuss further. Happy holidays!
Joel
On Thu, Dec 19, 2019 at 9:47 AM Randy Ralston <err@rralston.comcastbiz.net> wrote:
Good morning Joel,
Around 3:00 this morning, I was thinking about my site and our ongoing discussions about changes to
5th st sidewalks, drainage and retaining wall. While I realize removal of the retaining wall should save
considerable money; and the installation of a box culvert and extending the curbing should be more
than an offset in cost savings... but I do have a procedural question.
My site plan was approved almost two years ago. VDOT and the county signed off on the approved
plans. Now were are talking about significant changes. This is my question... since the plan has been
approved, under what authority can VDOT (or the County) impose changes?
Again, I am NOT opposed to looking into these changes; in fact I have asked Tim Miller's office to
investigate. Frankly, even as a layman, your suggested changes make sense. (Rather ironic that none of
the engineers originally involved in the review process did not appreciate the issues you and Brook
Wood raised.)
Take care, Randy
90
This communication may contain confidential and privileged information. It
is intended to be protected by the Attorney -Client Privilege and the Work
Product Doctrine. If you have received this message in error, please delete
this e-mail immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you
that any tax advice contained in this communication, including any attachments, is not
intended or written to be used, and cannot be used, for the purpose of avoiding
penalties under the Internal Revenue Code or applicable state or local tax —law
provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(alralstonpc.com
Joel %auppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Wav_,I Charlottesville I VA
main 434,422,9373
cell 540.827.7876
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
91
Cameron Langille
From: Cameron Langille
Sent: Thursday, February 13, 2020 10:46 AM
To: Randy Ralston; Tim Miller
Subject: RE: Another question 5th St back Parcel
Hi Randy,
You're almost to the finish line with the first building, congratulations! Below are my answers to your questions:
Selling off a piece and doing mini -storage: there are some hurdles you would have to go through in order to do a
different use and building layout on your property than what you've been approved for already. The Zoning Map
Amendment (ZMA201200007) had a proffered concept plan tied to it, and development of your site will be held to that
plan unless you go through another rezoning and amend the concept plan. And since rezonings have to go through the
Planning Commission and Board of Supervisors as public hearings, there is no guarantee that it will end up being
approved.
Parking requirements for self -storage facilities: the Zoning Ordinance does not specify a standard for this use. What you
would have to do is file a request with the Zoning Administrator to determine what the parking requirements are. You
would provide him with an analysis of what you think you need, and then he'd evaluate it and either approve it or say
that a different calculation is needed.
Retaining % acre for constructing a small building: this is another element that we would need to see drawn up on
plans. It would also require an amendment to the ZMA concept plan. I can't verify whether we would support or not
support a change to the layout without seeing it.
One more consideration, and this is a big one, to keep in mind if you are actually thinking about changing this site, is that
it is in the Entrance Corridor. This means the mini -storage building and all new buildings would have to go back through
the ARB for review. Most mini -storage developers already have a specific building design in mind and often times the EC
guidelines conflict with the more standardized corporate design of national mini -storage companies.
Let me know if you have any follow-up questions. Thanks,
Cameron
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 20201:27 PM
To: Cameron Langille <blangille@albemarle.org>; Tim Miller <tmiller@meridianwbe.com>
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
92
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!II
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment - for my back parcel!!! I
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
From: Cameron Langille <blaneille@albemarle.orx>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randy@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
93
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randv@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 4`h review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.org
(434) 296-5832 ext. 3432
94
Cameron Langille
From: Kauppila, Joel <joel.kauppila@vdot.virginia.gov>
Sent: Tuesday, February 11, 2020 8:27 AM
To: Randy Ralston
Cc: Cameron Langille; Adam Moore
Subject: Fwd: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan
Amendment
Attachments: Land Use Permit 10-10-2019.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Randy,
I don't see a need for a permit modification since overall scope has not changed and minor changes. We will just attach
the current approved amendments to the packet.
Joel Kauppila PE I Project Engineer
VDOT - Charlottesville Residency
701 VDOT Wav I Chulottesville I VA
main 434,422,9373
cell 540.827.7876
---------- Forwarded message ---------
From: Bedsaul, Willis <willis.bedsaul@vdot.virginia.gov>
Date: Tue, Feb 11, 2020 at 7:23 AM
Subject: Fwd: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
To: Kauppila, Joel<ioel.kauppila@vdot.virginia.gov>
Fyi,
Joel please see below, email concerning commercial entrance.
Thanks, Willis
---------- Forwarded message ---------
From: Randy Ralston <err@rralston.comcastbiz.net>
Date: Mon, Feb 10, 2020 at 10:09 AM
Subject: Re: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
To: Bedsaul, Willis <willis.bedsaul@vdot.virginia.gov>, Cameron Langille <blangille@albemarle.org>
Cc: Adam Moore <adam.moore@vdot.virginia.gov>
Good morning Willis,
Attached please find a Land Use Permit we obtained from VDOT dated October 10, 2019. Is this permit
sufficient for the authorized work, as it addresses improvements along 5th St. ?
95
Please advise.
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(alralstonpc.com
From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov>
Sent: Tuesday, February 4, 2020 9:28 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Adam Moore <adam.moore@vdot.virginia.gov>; Randy Ralston <err@rralston.comcastbiz.net>
Subject: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
Cameron,
Attached you'll find the review letter on the above subject, if you have any questions please let me know.
Regards,
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
96
Ph# 434-422-9866
Cell# 540-219-5492
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
97
Cameron Langille
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Monday, February 10, 2020 10:10 AM
To: Bedsaul, Willis; Cameron Langille
Cc: Adam Moore
Subject: Re: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
Attachments: Land Use Permit 10-10-2019.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Willis,
Attached please find a Land Use Permit we obtained from VDOT dated October 10, 2019. Is this permit
sufficient for the authorized work, as it addresses improvements along 5th St. ?
Please advise.
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov>
Sent: Tuesday, February 4, 2020 9:28 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: Adam Moore <adam.moore@vdot.virginia.gov>; Randy Ralston <err@rralston.comcastbiz.net>
Subject: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
98
Cameron,
Attached you'll find the review letter on the above subject, if you have any questions please let me know.
Regards,
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
M
Cameron Langille
From:
tmiller@meridianwbe.com
Sent: Monday, February 10, 2020 7:23 AM
To: Cameron Langille
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I did address her last comment so just need the easement plat recorded.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
Planni
idan
ng Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, February 7, 2020 4:31 PM
To: tmiller@meridianwbe.com
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Tim,
The only Planning comments left were for the easement plat. However, Emily from Engineering sent you an email with
her last round of comments, and I can't verify if she had anything else outstanding. Have you spoken with her/sent her a
revised PDF to confirm that all of her comments are addressed?
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, February 4, 2020 10:08 AM
To: Cameron Langille <blanaille@albemarle.org>
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
100
Cameron,
I believe that this addresses all of the site plan comments except for the recordation of the easement plat.
Can you confirm this?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randv@ralstonoc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 4`h review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
101
Cameron Langille
From: Cameron Langille
Sent: Friday, February 7, 2020 4:31 PM
To: tmiller@meridianwbe.com
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Tim,
The only Planning comments left were for the easement plat. However, Emily from Engineering sent you an email with
her last round of comments, and I can't verify if she had anything else outstanding. Have you spoken with her/sent her a
revised PDF to confirm that all of her comments are addressed?
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, February 4, 2020 10:08 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I believe that this addresses all of the site plan comments except for the recordation of the easement plat.
Can you confirm this?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blaneilleC@albemarle.ore>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randv@ralstonoc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
102
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 4th review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
103
Cameron Langille
From: Margaret Maliszewski
Sent: Wednesday, February 5, 2020 12:39 PM
To: Randy Ralston
Cc: Cameron Langille
Subject: RE: 5th St - light poles and fixtures
Attachments: ARB2019-127_approval_letter.pdf
Hello, Randy.
I've done a little searching and here's what I found. You can use this link to access the ARB-approved documents for
ARB-2019-127, including the updated lighting. I entered an approval date of 12/18/2019 for that ARB application in
CountyView. I sent an email (copied below) that day indicating that the revisions resolved the outstanding ARB issues,
and that I would attempt to get the ARB approval letter out. Though I have a distinct memory of preparing and sending
that letter, I cannot find a record of it. I have just written an approval letter and it is attached to this message (paper
copies in the mail). I'm very sorry for the delay and any confusion I've caused. If questions remain, please let me know.
Thanks.
Margaret
104
T j Groups I Find
RE: 5th St - sconces and light poles/fixtures
®Margaret Maliszewski
To tmiller@meridianwbe.com; 'Randy Ralston
Cc Cameron Langille
Tim,
I've looked over the revisions and the changes resolve the outstanding ARB issues. I'll try to get the ARB approval le
Margaret
From: Margaret Maliszewski
Sent: Tuesday, December 3, 2019 10:05 AM
To: tmiller@meridianwbe.com: 'Randy Ralston' <err@rralston.comcastbiz.net>
Cc: Cameron Langille <blanaille@albemarle.ore>
Subject: RE: 5th St - sconces and light poles/fixtures
Thanks for sending this over, Tim. I've added it to my review queue and will let you know if anything else is require(
Margaret
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Monday, December 2, 2019 2:09 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.ore>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Cc: Cameron Langille <blangille@albemarle.ore>
Subject: RE: Sth St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or oper
sure the content is safe.
Margaret,
I have added a street tree, changes scarlet oaks to white oaks, and revised the lighting notes.
Can you take a look and see if this will address your comments?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Friday, January 31, 2020 4:16 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Subject: 5th St - light poles and fixtures
105
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Margaret,
Either I am getting too old to operate a computer, or Microsoft has it out for me (or, possibly a little of both).
When Tim Miller submitted a minor amendment to my site plan, we had to change the light poles. As I recall,
the manufacturer we wanted to use did not produce fixtures with the correct lumens. As a consequence, we
needed to change the design and manufacturer of the light poles (all of this happened in November and
December of 2019).
I have found an e-mail from you where you approved the new design; I see where you said a letter from ARB
would be forthcoming; and I have e-mail correspondence from Tim Miller where he is sending me the specs on
the new lights .... but nothing is attached. And I'll be damned if I can find your letter or the specs.
I really hate to bother you, but could you send me any information you have on the light poles that were
approved by ARB? I know the information is on my computer somewhere, but Microsoft has hidden it where
I can't find it (I really dislike Office 365). I'd also appreciate a cop of the approval letter from ARB. Not sure if
that went to me or Tim.
Thank you so much for your help.
Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
106
Cameron Langille
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, February 4, 2020 1:27 PM
To: Cameron Langille; Tim Miller
Subject: Another question 5th St back Parcel
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good afternoon Cameron,
I'can't begin to tell you how much fun I've had obtaining approval on the final site plan for my 5th St property;
which was followed by a minor amendment to that site plan. When my friends tell me that I have aged 20
years over the last 8 years, I remind them that those are not age wrinkles, but rather laugh wrinkles turned
upside down!!!
Not having learned my lesson, I am actually thinking of doing ANOTHER amendment - for my back parcel!!!
have received 5 offers from groups wishing to buy some of my land to construct a multi - level controlled
storage facility. One offer involves a 3 story 120,000 sq ft facility to be located on 1.1 acres.
Couple questions for you: (1) conceptually, would the county entertain such a large facility on one of the back
parcels; (2) what are the parking requirements for a storage facility (I could not locate them in the Code); and
(3) if I retained approx 3/4 of an acre, would the County entertain my constructing a small building on that
remaining parcel?
I realize there are a number of issues that would need to be addressed, but before I start spending money
(again) I'd like to know if the County would be willing to entertain such a development; and if so, what the
parking limitations would be.
Thanks, Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
107
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com <randy@ralstonpc.com>
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 4th review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
108
Cameron Langille
From:
tmiller@meridianwbe.com
Sent: Tuesday, February 4, 2020 10:08 AM
To: Cameron Langille
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I believe that this addresses all of the site plan comments except for the recordation of the easement plat.
Can you confirm this?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
P I a n n i
idian
ng Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonoc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Good afternoon Tim & Randy,
109
Attached you will find the 4th review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
110
Cameron Langille
From: Cameron Langille
Sent: Tuesday, February 4, 2020 9:40 AM
To: Tim Miller
Cc: randy@ralstonpc.com
Subject: RE: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Attachments: SDP201900045 VDOT 4th Review Comments 2-4-2020.pdf
Good morning Tim & Randy,
Attached is the VDOT comment letter. Please let me know if you have any questions. Thanks,
Cameron
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller <tmiller@meridianwbe.com>
Cc: randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial MinorAmendment - 4th Review Comments
Good afternoon Tim & Randy,
Attached you will find the 41h review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
111
Cameron Langille
From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov>
Sent: Tuesday, February 4, 2020 9:28 AM
To: Cameron Langille
Cc: Adam Moore; err@rraIston.comcastbiz.net
Subject: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
Attachments: SDP-2019-00045- 5th Street Commercial Development-R3-Minor Site Plan
Amend ment-02-04-20. pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Attached you'll find the review letter on the above subject, if you have any questions please let me know.
Regards,
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
112
Cameron Langille
From: Cameron Langille
Sent: Friday, January 24, 2020 4:53 PM
To: Tim Miller
Cc: randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment - 4th Review Comments
Attachments: SDP201900045 4th Review Comments.pdf
Good afternoon Tim & Randy,
Attached you will find the 4th review comments for this application. Please note that VDOT has not yet finished their
review or sent me their comments. I will forward those to you when I receive them.
Thanks,
Cameron
Cameron Langille ) Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
113
Cameron Langille
From: Cameron Langille
Sent: Thursday, January 16, 2020 2:37 PM
To: tmiller@meridianwbe.com
Subject: RE: SDP201900045 5th Street Commercial Resubmittal
Okay sounds good. There was only one set in my mailbox so the other must have been routed to VDOT if you dropped
both sets off here at CDD.
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Thursday, January 16, 2020 2:35 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: SDP201900045 5th Street Commercial Resubmittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
These plans address VDOT comments.
I submitted one set for VDOT and One set for you.
If you have one set, then the other must have done to VDOT.
If you have two sets, then one of them should go to VDOT.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
Planni
idian
ng Group
From: Cameron Langille <blaneille(c@albemarle.org>
Sent: Thursday, January 16, 2020 12:55 PM
To: Tim Miller <tmiller@meridianwbe.com>
Subject: SDP201900045 5th Street Commercial Resubmittal
Hi Tim,
114
I received a resubmittal of this site plan from you last week and I noticed today that the comment response letter
(attached) only has responses to VDOT comments. Did you want me to forward this plan to VDOT to review, or did you
want me to review it?
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
115
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Thursday, January 16, 2020 2:35 PM
To: Cameron Langille
Subject: RE: SDP201900045 5th Street Commercial Resubmittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
These plans address VDOT comments.
I submitted one set for VDOT and One set for you.
If you have one set, then the other must have done to VDOT.
If you have two sets, then one of them should go to VDOT.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mer
P I a n n i
idian
ng Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Thursday, January 16, 2020 12:55 PM
To: Tim Miller <tmiller@meridianwbe.com>
Subject: SDP201900045 5th Street Commercial Resubmittal
Hi Tim,
I received a resubmittal of this site plan from you last week and I noticed today that the comment response letter
(attached) only has responses to VDOT comments. Did you want me to forward this plan to VDOT to review, or did you
want me to review it?
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
116
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
117
Cameron Langille
From:
Cameron Langille
Sent:
Thursday, January 16, 2020 12:55 PM
To:
Tim Miller
Subject:
SDP201900045 5th Street Commercial Resubmittal
Attachments:
SDP201900045 Applicant Comment Response 4th Review.pdf
Hi Tim,
I received a resubmittal of this site plan from you last week and I noticed today that the comment response letter
(attached) only has responses to VDOT comments. Did you want me to forward this plan to VDOT to review, or did you
want me to review it?
Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangillePalbemarle.org
(434) 296-5832 ext. 3432
118
Cameron Langille
From:
Sent:
To:
Subject:
Attachments:
BizHubPlanning@albemarle.org
Thursday, January 16, 2020 11:44 AM
Cameron Langille
Message from KM_364e
S K M _3 64 e- P I2 00116114 3 0. p d f
119
Cameron Langille
From:
Sent:
To:
Subject:
Attachments:
BizHubPlanning@albemarle.org
Thursday, January 16, 2020 8:45 AM
Cameron Langille
Message from KM_364e
S K M _3 64 e- P I2 0011608440. p d f
120
Cameron Langille
From: Cameron Langille
Sent: Tuesday, December 31, 2019 4:19 PM
To: Tim Miller, randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Site Plan Amendment - VDOT Comments
Attachments: SDP201900045 VDOT 3rd Review Comments.pdf
Hi Randy & Tim,
Attached you will find the VDOT review comments for SDP201900045. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille ( Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
121
Cameron Langille
From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov>
Sent: Friday, December 27, 2019 2:55 PM
To: Cameron Langille
Cc: Adam Moore
Subject: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Development
Attachments: SDP-2019-00045- 5th Street Commercial Development-R2-Minor Site Plan
Amendment- 12-27-19.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Attached you'll find the review letter on the above subject, if you have any questions please call.
Regards,
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
122
Cameron Langille
From: Margaret Maliszewski
Sent: Wednesday, December 18, 2019 5:43 PM
To: tmiller@meridianwbe.com; 'Randy Ralston'
Cc: Cameron Langille
Subject: RE: 5th St - sconces and light poles/fixtures
Tim,
I've looked over the revisions and the changes resolve the outstanding ARB issues. I'll try to get the ARB approval letter
out this week.
Margaret
From: Margaret Maliszewski
Sent: Tuesday, December 3, 2019 10:05 AM
To: tmiller@meridianwbe.com; 'Randy Ralston' <err@rralston.comcastbiz.net>
Cc: Cameron Langille <blangille@albemarle.org>
Subject: RE: 5th St - sconces and light poles/fixtures
Thanks for sending this over, Tim. I've added it to my review queue and will let you know if anything else is required.
Margaret
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Monday, December 2, 2019 2:09 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Cc: Cameron Langille <blangille@albemarle.org>
Subject: RE: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret,
I have added a street tree, changes scarlet oaks to white oaks, and revised the lighting notes.
Can you take a look and see if this will address your comments?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
123
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent: Thursday, November 21, 2019 9:42 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Tim Miller <tmiller@meridianwbe.com>
Subject: RE: 5th St - sconces and light poles/fixtures
Yes. 3:00 works.
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, November 20, 2019 6:44 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Cc: Tim Miller <tmiller@meridianwbe.com>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Would Friday at 3:00 work? I included Tim in this email exchange,
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent: Wednesday, November 20, 2019 1:05 PM
124
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
The poles are not really the issue — it is the fixtures. The approved plan shows one set of lights, the proposed revision
shows another set of lights, the emailed cut sheets show a third set.
Friday is currently open from 2:30 to 4:00.
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, November 20, 2019 10:16 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret, I apologize for not getting back to you. Been fighting the IRS on behalf of a nonprofit... these
government officials are hell bent on going after the wrong people!
Sorry to act so uninformed - especially on my own project. But the changes in the poles... were different poles
submitted with the site plan amendment (by Meridian Group), or are specs on the poles (which I received
from my contractor and forwarded to you) different than what was approved? Trying to figure out where the
differences occurred.
I sent Tim Miller an e-mail (as I would like for him to attend). Was Friday afternoon still a possibility for
you? If so, what time. I will make it work on my end; but depends on what Tim's schedule is.
thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
125
Facsimile: 434-220-4894
e-mail: randvoralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.ore>
Sent: Wednesday, November 20, 2019 9:09 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Good morning, Randy.
My comments on the recent plan submittal are copied below. I think it would be best if we could meet to go over the
lighting issues. Please let me know a few times when you are available to meet.
Thanks.
Margaret
1. Parking lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent
appearance throughout the development. If lighting changes are proposed in this minor amendment, lighting on the
entire site must be addressed with this amendment. If Phase 2 lighting changes can't be shown on this plan, include
notes on this plan indicating that with this amendment all Phase 2 lighting is eliminated. When you submit your Phase 2
amendment, you can add lighting back that matches Phase 1 approved lighting.
2. Revise the quantity and spacing of the large trees along 5th Street to 35' on center all along the frontage.
From: Margaret Maliszewski
Sent: Monday, November 18, 2019 5:11 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
I've looked over the cut sheets and the recent plan submittal. I think we need to meet to get the lighting straightened
out. Do you have time Wednesday afternoon or Friday afternoon?
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, November 12, 2019 10:00 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.ors>
Cc: Kevin Campbell<KCampbell@harmanconstruction.com>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret, These were the fixtures submitted with the original approved site plan. I know you had several
comments concerning the resubmitted site plan amendment, but I thought those comments related to the
126
lumens and not the color or style of the hardware. Our plans were to use these fixtures as originally
approved, and not a change submitted as part of the amendment. (Hope that make sense).
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.orx>
Sent: Tuesday, November 12, 2019 9:20 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Kevin Campbell <KCampbell@harmanconstruction.com>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
Is this meant to be part of the recently resubmitted site plan amendment?
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Monday, November 11, 2019 11:28 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Cc: Kevin Campbell <KCampbell@harmanconstruction.com>
Subject: 5th St - sconces and light poles/fixtures
CAUTION This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
127
Good morning Margaret,
Attached are spec sheets from my contractor for the Sconces and light poles/fixtures for 5th St. Wanted to
make sure these met with ARB approval.
Thanks Randy
PS I apologize if Mark Kestner reached out to you on this as well. Not trying to double team you. And Mark
should have sent you the identical information.
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
F
128
Cameron Langille
From: Cameron Langille
Sent: Tuesday, December 17, 2019 10:28 AM
To: Moore, Adam; Frank Pohl
Cc: Joel Kauppila (VDOT)
Subject: RE: SDP2019-45 5th St. Station Commercial
Hi Adam,
Thanks for sending this over to us. The owner had mentioned some of this to me but your email paints a fuller
picture. From Planning's standpoint, the most important thing is ensuring that the sidewalk is still kept over the bridge
as originally shown. Addition of curb and gutter and removal of the retaining wall should not be a problem as long as
VDOT and the County Engineer approve of doing so.
Thanks,
Cameron
From: Moore, Adam <adam.moore@vdot.virginia.gov>
Sent: Tuesday, December 17, 2019 9:04 AM
To: Cameron Langille <blangille@albemarle.org>; Frank Pohl <fpohl@albemarle.org>
Cc: Joel Kauppila (VDOT) <joel.kauppila@vdot.virginia.gov>
Subject: SDP2019-45 5th St. Station Commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron/Frank,
We have had discussions in the field with the contractor and developer of the above site about
making modifications to their plans inside the right of way. I know the plan is not yet approved.
The owner seems in agreement that along the road the curb and gutter should be extended and a
drainage inlet installed to address an area that is a frequent washout/erosion issue. Additionally they
would like to potentially remove the retaining wall. This would lead to slopes that are a bit steeper
than we generally like, but paired with a handrail would still be safe for pedestrians.
VDOT concurs with these changes. If the wall remains, approval from our Structure and Bridge
section will be required as it would be located over an existing box culvert. Additionally the wall will
have to be under a maintenance permit with the county. We are not trying to eliminate the sidewalk,
think the curb actually helps the condition of the proposed sidewalk.
The developer mentioned that you all may have some issue with these changes, so I'd like to open
that discussion.
Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use
VDOT - Charlottesville Residency
129
701 VDOT Way I Charlottesville I VA
main 434.422.9782
130
Cameron Langille
From:
Moore, Adam <adam.moore@vdot.virginia.gov>
Sent:
Tuesday, December 17, 2019 9:04 AM
To:
Cameron Langille; Frank Pohl
Cc:
Joel Kauppila (VDOT)
Subject:
SDP2019-45 5th St. Station Commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron/Frank,
We have had discussions in the field with the contractor and developer of the above site about
making modifications to their plans inside the right of way. I know the plan is not yet approved.
The owner seems in agreement that along the road the curb and gutter should be extended and a
drainage inlet installed to address an area that is a frequent washout/erosion issue. Additionally they
would like to potentially remove the retaining wall. This would lead to slopes that are a bit steeper
than we generally like, but paired with a handrail would still be safe for pedestrians.
VDOT concurs with these changes. If the wall remains, approval from our Structure and Bridge
section will be required as it would be located over an existing box culvert. Additionally the wall will
have to be under a maintenance permit with the county. We are not trying to eliminate the sidewalk,
think the curb actually helps the condition of the proposed sidewalk.
The developer mentioned that you all may have some issue with these changes, so I'd like to open
that discussion.
Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use
VDOT - Charlottesville Residency
701 V'DU'1' Wu I Charloacscillc I VA
main 434.422.9782
131
Cameron Langille
From:
Cameron Langille
Sent:
Monday, December 16, 2019 3:52 PM
To:
E. R. Ralston
Subject:
RE: 5th st commercial
Randy,
After hearing what the VDOT field inspector said, I think that this is a questions that Adam Moore (VDOT rep who
reviewed the first site plan) and the County Engineer need to weigh in on. I really don't handle too much when it comes
to retaining walls, or culverts and I wouldn't be the one to make a determination as to whether it's needed or not or can
be removed. I am going to be in a training all day on Wednesday so I'm sorry to say I can't make the site visit.
To answer your second question — removing the retaining wall, changing curb & gutter, and anything related to the
culverts are both VDOT and County issues. Changes to those features would need to be approved by both VDOT and the
County on a site plan.
Let me know if this information helps clear tings up or if you have other questions.
-Cameron
From: E. R. Ralston <errestonfarm.11c@gmail.com>
Sent: Wednesday, December 11, 2019 6:34 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Re: 5th st commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
You are correct, that is not what I wanted to heart! I But is hasn't been the first time and I suspect it won't be the last!
Met with Joel Kauppila (VDOT) on site yesterday. He isn't excited about the retaining wall over Moore's creek. In fact he
would prefer to have that removed from the plan. However (and there is always a "however"), he is concerned about
the sheet flow of water over the sidewalk. He suggested that we look at extending the curb and installing a box culvert
near the primitive walkway with underground piping and rip rap under the primitive pathway. (I apologize if my
description of Joel's comments are inadequate ).
As I understand it, removal of the retaining wall is a VDOT issue and changing the curb and adding a box culvert is a
County issue.
My biggest concerns (besides the additional expenses) are the excessive delays in obtaining County approval for such a
proposed change.
What are your thoughts on this?
Feel free to call me if you want to discuss. Use my cell: 434-882-2355.
132
Also I have a meeting scheduled on site next Wednesday the 18th at 9:00 am with Joel Kauppila, brook wood and Tim
Miller. If you are interested in a road trip, your attendance would be appreciated.
Randy
Get Outlook for iOS
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, December 11, 2019 5:09 PM
To: E. R. Ralston
Subject: RE: 5th st commercial
Hi Randy,
Based on my recollection, yes we did discuss this during the first review. The ZMA approved for the property shows the
sidewalk going all the way to the municipal boundary. What was approved on Scott's plan is consistent with the ZMA
requirements. Scott's plan shows the sidewalk going over the bridge and ending at the culvert wing wall as shown on
Sheet 13 of the Collins Plan.
Based on the exhibit shown on Sheet 13 of Scott's plan, the guardrail isn't going to be an issue for pedestrians to access
the sidewalk. Part of the guardrail is getting removed near the entrance to your site. Closer to the bridge, the road
pavement will be widened to accommodate the sidewalk and other improvements. When the site in the city gets
developed the guardrail will likely be either totally removed or altered in a way so that new sidewalk connecting to the
sidewalk will be accessible with no impediments. This is how sidewalk networks get constructed piecemeal in all
localities.
I know this may not be what you wanted to hear, but that's a required improvement. Please let me know if you have
follow-up questions. Thanks,
Cameron
From: E. R. Ralston <errestonfarm.11c@gmail.com>
Sent: Tuesday, December 10, 2019 10:16 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: 5th st commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
I met with VDOT representatives on my site this morning, and am somewhat perplexed. Their working plans show the
new sidewalk being extended to the City line. My recollection is that we agreed to stop the sidewalk where the primitive
walkway on 5th ended.
Problems with extending the sidewalk... 1. The proposed sidewalk will be located behind the guard rail. Anyone on the
sidewalk heading north will have to crawl over the guardrail in order to exit the sidewalk. An extensive retaining wall
will have to be constructed over Moore's creek to support the sidewalk... which will be inaccessible.
Again my recollection is that the county agreed to modify the length of the sidewalk extension. And I suspect that Scott
collins forgot your remove it from the final site plan .
133
Appreciate your help.
Randy
E. Randall Ralston, P.C.
134
Cameron Langille
From: E. R. Ralston <errestonfarm.11c@gmail.com>
Sent: Wednesday, December 11, 2019 6:34 PM
To: Cameron Langille
Subject: Re: 5th st commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
You are correct, that is not what I wanted to hear!!! But is hasn't been the first time and I suspect it won't be the last!
Met with Joel Kauppila (VDOT) on site yesterday. He isn't excited about the retaining wall over Moore's creek. In fact he
would prefer to have that removed from the plan. However (and there is always a "however"), he is concerned about
the sheet flow of water over the sidewalk. He suggested that we look at extending the curb and installing a box culvert
near the primitive walkway with underground piping and rip rap under the primitive pathway. (I apologize if my
description of Joel's comments are inadequate ).
As I understand it, removal of the retaining wall is a VDOT issue and changing the curb and adding a box culvert is a
County issue.
My biggest concerns (besides the additional expenses) are the excessive delays in obtaining County approval for such a
proposed change.
What are your thoughts on this?
Feel free to call me if you want to discuss. Use my cell: 434-882-2355.
Also I have a meeting scheduled on site next Wednesday the 18th at 9:00 am with Joel Kauppila, brook wood and Tim
Miller. If you are interested in a road trip, your attendance would be appreciated.
Randy
Get Outlook for iOS
From: Cameron Langille <blangille@albemarle.org>
Sent: Wednesday, December 11, 2019 5:09 PM
To: E. R. Ralston
Subject: RE: 5th st commercial
Hi Randy,
Based on my recollection, yes we did discuss this during the first review. The ZMA approved for the property shows the
sidewalk going all the way to the municipal boundary. What was approved on Scott's plan is consistent with the ZMA
requirements. Scott's plan shows the sidewalk going over the bridge and ending at the culvert wing wall as shown on
Sheet 13 of the Collins Plan.
Based on the exhibit shown on Sheet 13 of Scott's plan, the guardrail isn't going to be an issue for pedestrians to access
the sidewalk. Part of the guardrail is getting removed near the entrance to your site. Closer to the bridge, the road
135
pavement will be widened to accommodate the sidewalk and other improvements. When the site in the city gets
developed the guardrail will likely be either totally removed or altered in a way so that new sidewalk connecting to the
sidewalk will be accessible with no impediments. This is how sidewalk networks get constructed piecemeal in all
localities.
I know this may not be what you wanted to hear, but that's a required improvement. Please let me know if you have
follow-up questions. Thanks,
Cameron
From: E. R. Ralston <errestonfarm.11c@gmail.com>
Sent: Tuesday, December 10, 2019 10:16 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: 5th st commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
I met with VDOT representatives on my site this morning, and am somewhat perplexed. Their working plans show the
new sidewalk being extended to the City line. My recollection is that we agreed to stop the sidewalk where the primitive
walkway on 5th ended.
Problems with extending the sidewalk... 1. The proposed sidewalk will be located behind the guard rail. Anyone on the
sidewalk heading north will have to crawl over the guardrail in order to exit the sidewalk. An extensive retaining wall
will have to be constructed over Moore's creek to support the sidewalk... which will be inaccessible.
Again my recollection is that the county agreed to modify the length of the sidewalk extension. And I suspect that Scott
collins forgot your remove it from the final site plan .
Appreciate your help.
Randy
E. Randall Ralston, P.C.
136
Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, December 11, 2019 5:10 PM
To:
E. R. Ralston
Subject:
RE: 5th st commercial
Hi Randy,
Based on my recollection, yes we did discuss this during the first review. The ZMA approved for the property shows the
sidewalk going all the way to the municipal boundary. What was approved on Scott's plan is consistent with the ZMA
requirements. Scott's plan shows the sidewalk going over the bridge and ending at the culvert wing wall as shown on
Sheet 13 of the Collins Plan.
Based on the exhibit shown on Sheet 13 of Scott's plan, the guardrail isn't going to be an issue for pedestrians to access
the sidewalk. Part of the guardrail is getting removed near the entrance to your site. Closer to the bridge, the road
pavement will be widened to accommodate the sidewalk and other improvements. When the site in the city gets
developed the guardrail will likely be either totally removed or altered in a way so that new sidewalk connecting to the
sidewalk will be accessible with no impediments. This is how sidewalk networks get constructed piecemeal in all
localities.
I know this may not be what you wanted to hear, but that's a required improvement. Please let me know if you have
follow-up questions. Thanks,
Cameron
From: E. R. Ralston <errestonfarm.11c@gmail.com>
Sent: Tuesday, December 10, 2019 10:16 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: 5th st commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
I met with VDOT representatives on my site this morning, and am somewhat perplexed. Their working plans show the
new sidewalk being extended to the City line. My recollection is that we agreed to stop the sidewalk where the primitive
walkway on 5th ended.
Problems with extending the sidewalk... 1. The proposed sidewalk will be located behind the guard rail. Anyone on the
sidewalk heading north will have to crawl over the guardrail in order to exit the sidewalk. An extensive retaining wall
will have to be constructed over Moore's creek to support the sidewalk... which will be inaccessible.
Again my recollection is that the county agreed to modify the length of the sidewalk extension. And I suspect that Scott
collins forgot your remove it from the final site plan .
Appreciate your help.
Randy
137
E. Randall Ralston, P.C.
138
Cameron Langille
From: E. R. Ralston <errestonfarm.11c@gmail.com>
Sent: Tuesday, December 10, 2019 10:16 AM
To: Cameron Langille
Subject: 5th st commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Cameron,
I met with VDOT representatives on my site this morning, and am somewhat perplexed. Their working plans show the
new sidewalk being extended to the City line. My recollection is that we agreed to stop the sidewalk where the primitive
walkway on 5th ended.
Problems with extending the sidewalk... 1. The proposed sidewalk will be located behind the guard rail. Anyone on the
sidewalk heading north will have to crawl over the guardrail in order to exit the sidewalk. An extensive retaining wall
will have to be constructed over Moore's creek to support the sidewalk... which will be inaccessible.
Again my recollection is that the county agreed to modify the length of the sidewalk extension. And I suspect that Scott
collins forgot your remove it from the final site plan .
Appreciate your help.
Randy
E. Randall Ralston, P.C.
139
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Monday, December 9, 2019 4:03 PM
To: Emily Cox; Cameron Langille
Subject: FW: SDP201900045 5th Street Commercial Minor Amendment #1 - 3rd Review
Comments
Attachments: SDP201900045 3rd Review Comments.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Emily,
I think it would be best for me to meet with you. I am not able to figure out what it is you are asking for.
Please let me know when you are available.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mgr
P I a n n i
idian
ng Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Monday, December 9, 2019 3:52 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment #1- 3rd Review Comments
Hi Tim & Randy,
Attached are the third review comments for this minor amendment. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blangille@albemarle.org
(434) 296-5832 ext. 3432
140
Cameron Langille
From: Cameron Langille
Sent: Monday, December 9, 2019 3:52 PM
To: Tim Miller, randy@ralstonpc.com
Subject: SDP201900045 5th Street Commercial Minor Amendment #1 - 3rd Review Comments
Attachments: SDP201900045 3rd Review Comments.pdf
Hi Tim & Randy,
Attached are the third review comments for this minor amendment. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille I Senior Planner
Community Development Department
Planning Division
blaneille@albemarle.ore
(434) 296-5832 ext. 3432
141
Cameron Langille
From: Emily Cox
Sent: Tuesday, December 3, 2019 4:16 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor
Attachments: SDP201900045 5th street commercial -minor amend Rev2.doc
The Review for the following application has been completed:
Application Number = SDP201900045
Reviewer= Emily Cox
Review Status = Requested Changes
Completed Date = 12/03/2019
This email was sent from County View Production.
142
Cameron Langille
From: Margaret Maliszewski
Sent: Tuesday, December 3, 2019 10:05 AM
To: tmiller@meridianwbe.com; 'Randy Ralston'
Cc: Cameron Langille
Subject: RE: 5th St - sconces and light poles/fixtures
Thanks for sending this over, Tim. I've added it to my review queue and will let you know if anything else is required.
Margaret
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Monday, December 2, 2019 2:09 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>; 'Randy Ralston' <err@rralston.comcastbiz.net>
Cc: Cameron Langille <blangille@albemarle.org>
Subject: RE: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret,
I have added a street tree, changes scarlet oaks to white oaks, and revised the lighting notes.
Can you take a look and see if this will address your comments?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Margaret Maliszewski <MMaliszewski@albemarle.ore>
Sent: Thursday, November 21, 2019 9:42 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Tim Miller <tmiller@meridianwbe.com>
Subject: RE: 5th St - sconces and light poles/fixtures
Yes. 3:00 works.
143
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, November 20, 2019 6:44 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Cc: Tim Miller <tmiller@meridianwbe.com>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Would Friday at 3:00 work? I included Tim in this email exchange,
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent: Wednesday, November 20, 2019 1:05 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
The poles are not really the issue — it is the fixtures. The approved plan shows one set of lights, the proposed revision
shows another set of lights, the emailed cut sheets show a third set.
Friday is currently open from 2:30 to 4:00.
144
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, November 20, 2019 10:16 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret, I apologize for not getting back to you. Been fighting the IRS on behalf of a nonprofit... these
government officials are hell bent on going after the wrong people!
Sorry to act so uninformed - especially on my own project. But the changes in the poles... were different poles
submitted with the site plan amendment (by Meridian Group), or are specs on the poles (which I received
from my contractor and forwarded to you) different than what was approved? Trying to figure out where the
differences occurred.
I sent Tim Miller an e-mail (as I would like for him to attend). Was Friday afternoon still a possibility for
you? If so, what time. I will make it work on my end; but depends on what Tim's schedule is.
thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
145
From: Margaret Maliszewski <MMaliszewski@albemarle.ore>
Sent: Wednesday, November 20, 2019 9:09 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Good morning, Randy.
My comments on the recent plan submittal are copied below. I think it would be best if we could meet to go over the
lighting issues. Please let me know a few times when you are available to meet.
Thanks.
Margaret
1. Parking lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent
appearance throughout the development. If lighting changes are proposed in this minor amendment, lighting on the
entire site must be addressed with this amendment. If Phase 2 lighting changes can't be shown on this plan, include
notes on this plan indicating that with this amendment all Phase 2 lighting is eliminated. When you submit your Phase 2
amendment, you can add lighting back that matches Phase 1 approved lighting.
2. Revise the quantity and spacing of the large trees along 5th Street to 35' on center all along the frontage.
From: Margaret Maliszewski
Sent: Monday, November 18, 2019 5:11 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
I've looked over the cut sheets and the recent plan submittal. I think we need to meet to get the lighting straightened
out. Do you have time Wednesday afternoon or Friday afternoon?
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, November 12, 2019 10:00 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Cc: Kevin Campbell<KCamobell@harmanconstruction.com>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret, These were the fixtures submitted with the original approved site plan. I know you had several
comments concerning the resubmitted site plan amendment, but I thought those comments related to the
lumens and not the color or style of the hardware. Our plans were to use these fixtures as originally
approved, and not a change submitted as part of the amendment. (Hope that make sense).
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
146
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent: Tuesday, November 12, 2019 9:20 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Kevin Campbell <KCampbell@harmanconstruction.com>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
Is this meant to be part of the recently resubmitted site plan amendment?
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Monday, November 11, 2019 11:28 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Cc: Kevin Campbell <KCampbell@harmanconstruction.com>
Subject: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Margaret,
Attached are spec sheets from my contractor forth e Sconces and light poles/fixtures for 5th St. Wanted to
make sure these met with ARB approval.
Thanks Randy
147
PS I apologize if Mark Kestner reached out to you on this as well. Not trying to double team you. And Mark
should have sent you the identical information.
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
F
148
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Monday, December 2, 2019 2:09 PM
To: Margaret Maliszewski; 'Randy Ralston'
Cc: Cameron Langille
Subject: RE: 5th St - sconces and light poles/fixtures
Attachments: 76M 1-1-SPA-C-204.pdf; 76M 1-1-SPA-C-501.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret,
I have added a street tree, changes scarlet oaks to white oaks, and revised the lighting notes.
Can you take a look and see if this will address your comments?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
M e 1
Planni
idian
ng Group
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent: Thursday, November 21, 2019 9:42 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Tim Miller <tmiller@meridianwbe.com>
Subject: RE: 5th St - sconces and light poles/fixtures
Yes. 3:00 works.
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, November 20, 2019 6:44 PM
To: Margaret Maliszewski <MMaliszewski@albemarle.ore>
Cc: Tim Miller<tmiller@meridianwbe.com>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
149
Would Friday at 3:00 work? I included Tim in this email exchange,
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randylaralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent: Wednesday, November 20, 2019 1:05 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
The poles are not really the issue — it is the fixtures. The approved plan shows one set of lights, the proposed revision
shows another set of lights, the emailed cut sheets show a third set.
Friday is currently open from 2:30 to 4:00.
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Wednesday, November 20, 2019 10:16 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
150
Margaret, I apologize for not getting back to you. Been fighting the IRS on behalf of a nonprofit... these
government officials are hell bent on going after the wrong people!
Sorry to act so uninformed - especially on my own project. But the changes in the poles... were different poles
submitted with the site plan amendment (by Meridian Group), or are specs on the poles (which I received
from my contractor and forwarded to you) different than what was approved? Trying to figure out where the
differences occurred.
I sent Tim Miller an e-mail (as I would like for him to attend). Was Friday afternoon still a possibility for
you? If so, what time. I will make it work on my end; but depends on what Tim's schedule is.
thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(dralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.ore>
Sent: Wednesday, November 20, 2019 9:09 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Good morning, Randy.
My comments on the recent plan submittal are copied below. I think it would be best if we could meet to go over the
lighting issues. Please let me know a few times when you are available to meet.
Thanks.
Margaret
151
1. Parking lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent
appearance throughout the development. If lighting changes are proposed in this minor amendment, lighting on the
entire site must be addressed with this amendment. If Phase 2 lighting changes can't be shown on this plan, include
notes on this plan indicating that with this amendment all Phase 2 lighting is eliminated. When you submit your Phase 2
amendment, you can add lighting back that matches Phase 1 approved lighting.
2. Revise the quantity and spacing of the large trees along 5th Street to 35' on center all along the frontage.
From: Margaret Maliszewski
Sent: Monday, November 18, 2019 5:11 PM
To: Randy Ralston <err@rralston.comcastbiz.net>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
I've looked over the cut sheets and the recent plan submittal. I think we need to meet to get the lighting straightened
out. Do you have time Wednesday afternoon or Friday afternoon?
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Tuesday, November 12, 2019 10:00 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.org>
Cc: Kevin Campbell<KCampbell@harmanconstruction.com>
Subject: Re: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Margaret, These were the fixtures submitted with the original approved site plan. I know you had several
comments concerning the resubmitted site plan amendment, but I thought those comments related to the
lumens and not the color or style of the hardware. Our plans were to use these fixtures as originally
approved, and not a change submitted as part of the amendment. (Hope that make sense).
Thanks Randy
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
152
Facsimile: 434-220-4894
e-mail: randvoralstonpc.com
From: Margaret Maliszewski <MMaliszewski@albemarle.orR>
Sent: Tuesday, November 12, 2019 9:20 AM
To: Randy Ralston <err@rralston.comcastbiz.net>
Cc: Kevin Campbell <KCampbell@harmanconstruction.com>
Subject: RE: 5th St - sconces and light poles/fixtures
Randy,
Is this meant to be part of the recently resubmitted site plan amendment?
Margaret
From: Randy Ralston <err@rralston.comcastbiz.net>
Sent: Monday, November 11, 2019 11:28 AM
To: Margaret Maliszewski <MMaliszewski@albemarle.ors>
Cc: Kevin Campbell <KCampbell@ harmanconstruction.com>
Subject: 5th St - sconces and light poles/fixtures
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Good morning Margaret,
Attached are spec sheets from my contractor for the Sconces and light poles/fixtures for 5th St. Wanted to
make sure these met with ARB approval.
Thanks Randy
PS I apologize if Mark Kestner reached out to you on this as well. Not trying to double team you. And Mark
should have sent you the identical information.
This communication may contain confidential and privileged information. It is
intended to be protected by the Attorney -Client Privilege and the Work Product
Doctrine. If you have received this message in error, please delete this e-mail
immediately and contact the sender at: 434-817-1040
IRS Circular 230 Notice: Under U.S. Treasury Regulations, we are required to inform you that
any tax advice contained in this communication, including any attachments, is not intended or
written to be used, and cannot be used, for the purpose of avoiding penalties under the
Internal Revenue Code or applicable state or local tax law provisions.
153
E. Randall Ralston, Esq.
943 Glenwood Station Lane, Suite 101
Charlottesville, Virginia 22901
Telephone: 434-817-1040
Facsimile: 434-220-4894
e-mail: randy(@ralstonpc.com
154
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Tuesday, November 12, 2019 12:08 PM
To: Cameron Langille
Cc: 'Randy Ralston'
Subject: FW: 5th Street Commercial Development
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Email from ACSA.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Alexander Morrison<amorrison@serviceauthority.org>
Sent: Tuesday, November 5, 2019 1:32 PM
To: tmiller@meridianwbe.com
Subject: 5th Street Commercial Development
Tim,
The amendment has been approved but I will need 2 more copies of the plan submitted (one to stamp approved for
your file and one for my inspector). If you let me know when they will be dropped off I can stamp them and give the
approval package to the person dropping the plans off.
Alexander J. Morrison, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698
6 11rr
155
156
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Tuesday, November 12, 2019 12:05 PM
To: Adam Moore; Cameron Langille
Cc: 'Randy Ralston'
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
I will get plans to the county tomorrow.
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Moore, Adam <adam.moore@vdot.virginia.gov>
Sent: Tuesday, November 12, 2019 11:12 AM
To: Cameron Langille <blangille@albemarle.org>
Cc: tmiller@meridianwbe.com; Randy Ralston <err@rralston.comcastbiz.net>
Subject: Re: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
I do not have it yet.
Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use
VDOT - Charlottesville Residency
701 VDOT Way I Charlottesville i VA
main 434.422.9782
On Tue, Nov 12, 2019 at 10:30 AM Cameron Langille <blaneille(c@albemarle.ora> wrote:
Sorry, I just realized your first email was for Adam.
157
From: Cameron Langille
Sent: Tuesday, November 12, 2019 10:30 AM
To: tmiller@meridianwbe.com; Adam Moore <Adam.Moore @vdot.vireinia.gov>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: SDP201900045 - Sth Street Minor Amendment - 2nd Review Comments
Yes, but it was dropped off with my Intake staff on Friday November 1, 2019 so I've only had it for a week.
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, November 12, 2019 10:16 AM
To: Adam Moore <Adam.Moore@vdot.virginia.eov>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>; Cameron Langille <blaneille@albemarle.ore>
Subject: FW: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Andrew,
Have you received a set of revised plans dated 10/14/19?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
158
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, November 12, 2019 9:52 AM
To: tmiller@meridianwbe.com; randv@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim,
The only thing I have received from VDOT is the attached comment letter dated 8-27-2019. 1 also received a copy of
the AM-E request approval, attached.
ACSA has not sent anything directly to me on this application. I have no emails, comments, approvals, etc.
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille <blangille@albemarle.org>; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
159
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Mendian
Planning Group
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
160
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blangille@albemarle.ore
161
Cameron Langille
From:
Moore, Adam <adam.moore@vdot.virginia.gov>
Sent:
Tuesday, November 12, 2019 11:12 AM
To:
Cameron Langille
Cc:
tmiller@meridianwbe.com; Randy Ralston
Subject:
Re: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
I do not have it yet.
Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use
VDOT - Charlottesville Residency
701 VDOT Way I Charlottesville I VA
main 434.422.9782
On Tue, Nov 12, 2019 at 10:30 AM Cameron Langille <blangille@albemarle.org> wrote:
Sorry, I just realized your first email was for Adam.
From: Cameron Langille
Sent: Tuesday, November 12, 2019 10:30 AM
To: tmiller@meridianwbe.com; Adam Moore <Adam.Moore @vdot.virginia.gov>
Cc: 'Randy Ralston' <err@malston.comcastbiz.net>
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Yes, but it was dropped off with my Intake staff on Friday November 1, 2019 so I've only had it for a week.
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, November 12, 2019 10:16 AM
To: Adam Moore <Adam.Moore@vdot.virginia.gov>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>; Cameron Langille <blangille@albemarle.org>
Subject: FW: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
162
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Andrew,
Have you received a set of revised plans dated 10/14/19?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Cameron Langille <blaneille@albemarle.org>
Sent: Tuesday, November 12, 2019 9:52 AM
To: tmiller@meridianwbe.com; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim,
The only thing I have received from VDOT is the attached comment letter dated 8-27-2019. 1 also received a copy of
the AM-E request approval, attached.
163
ACSA has not sent anything directly to me on this application. I have no emails, comments, approvals, etc.
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille <blangille@albemarle.org>; randy@ralstonpc.com
Subject: RE: SDP201900045 - Sth Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
164
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blaneille@albemarle.ore
165
Cameron Langille
From:
Cameron Langille
Sent: Tuesday, November 12, 2019 10:31 AM
To: tmiller@meridianwbe.com; Adam Moore
Cc: 'Randy Ralston'
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Sorry, I just realized your first email was for Adam
From: Cameron Langille
Sent: Tuesday, November 12, 2019 10:30 AM
To: tmiller@meridianwbe.com; Adam Moore <Adam.Moore@vdot.virginia.gov>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Yes, but it was dropped off with my Intake staff on Friday November 1, 2019 so I've only had it for a week.
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, November 12, 2019 10:16 AM
To: Adam Moore <Adam.Moore @vdot.virginia.gov>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>; Cameron Langille <blangille@albemarle.org>
Subject: FW: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Andrew,
Have you received a set of revised plans dated 10/14/19?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
MG!
Planni
idian
ng Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, November 12, 2019 9:52 AM
166
To: tmiller@meridianwbe.com; randv@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim,
The only thing I have received from VDOT is the attached comment letter dated 8-27-2019. 1 also received a copy of the
AM-E request approval, attached.
ACSA has not sent anything directly to me on this application. I have no emails, comments, approvals, etc.
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille <blangille@albemarle.org>; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
167
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blaneille@albemarle.org
168
Cameron Langille
From:
Cameron Langille
Sent:
Tuesday, November 12, 2019 10:30 AM
To:
tmiller@meridianwbe.com; Adam Moore
Cc:
'Randy Ralston'
Subject:
RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Yes, but it was dropped off with my Intake staff on Friday November 1, 2019 so I've only had it for a week
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, November 12, 2019 10:16 AM
To: Adam Moore <Adam.Moore@vdot.virginia.gov>
Cc:'Randy Ralston' <err@rralston.comcastbiz.net>; Cameron Langille <blangille@albemarle.org>
Subject: FW: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Andrew,
Have you received a set of revised plans dated 10/14/19?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, November 12, 2019 9:52 AM
To: tmiller@meridianwbe.com; randv@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim,
The only thing I have received from VDOT is the attached comment letter dated 8-27-2019. 1 also received a copy of the
AM-E request approval, attached.
ACSA has not sent anything directly to me on this application. I have no emails, comments, approvals, etc.
169
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille <blangille@albemarle.org>; randy@ralstonpc.com
Subject: RE: SDP20190004S - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: 5DP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
170
blangille@albemarle.or¢
171
Cameron Langille
From:
tmiller@meridianwbe.com
Sent: Tuesday, November 12, 2019 10:16 AM
To: Adam Moore
Cc: 'Randy Ralston'; Cameron Langille
Subject: FW: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Attachments: SDP201900045 VDOT First Review Comment Letter.pdf; SDP201900045 VDOT AM-E
Approval 1-6-2017.pdf
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Andrew,
Have you received a set of revised plans dated 10/14/19?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, November 12, 2019 9:52 AM
To: tmiller@meridianwbe.com; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim,
The only thing I have received from VDOT is the attached comment letter dated 8-27-2019. 1 also received a copy of the
AM-E request approval, attached.
ACSA has not sent anything directly to me on this application. I have no emails, comments, approvals, etc.
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille <blaneille@albemarle.org>; randv@ralstonoc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
172
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller(@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blangille@albemarle.org
173
Cameron Langille
From: Cameron Langille
Sent: Tuesday, November 12, 2019 9:52 AM
To: tmiller@meridianwbe.com; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Attachments: SDP201900045 VDOT First Review Comment Letter.pdf, SDP201900045 VDOT AM-E
Approval 1-6-2017.pdf
Hi Tim,
The only thing I have received from VDOT is the attached comment letter dated 8-27-2019. 1 also received a copy of the
AM-E request approval, attached.
ACSA has not sent anything directly to me on this application. I have no emails, comments, approvals, etc.
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille <blangille@albemarle.org>; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
174
From: Cameron Langille <blaneille@albemarle.ore>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blaneille@albemarle.ore
175
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Friday, November 8, 2019 10:27 AM
To: Cameron Langille; randy@ralstonpc.com
Subject: RE: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
I received an e-mail approval from VDOT last month.
I also received an e-mail approval from ACSA last week.
Have you received anything from them?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
From: Cameron Langille <blangille@albemarle.org>
Sent: Tuesday, October 29, 2019 5:29 PM
To: Tim Miller <tmiller@meridianwbe.com>; randy@ralstonpc.com
Subject: SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
176
434-296-5832 (ext. 3432)
blangille@albemarle.org
177
Cameron Langille
From:
Cameron Langille
Sent:
Tuesday, October 29, 2019 5:29 PM
To:
Tim Miller, randy@ralstonpc.com
Subject:
SDP201900045 - 5th Street Minor Amendment - 2nd Review Comments
Attachments:
SDP201900045 2nd Review Comments.pdf
Hi Tim & Randy,
Attached are the second review comments for this site plan amendment. Please note that I have not received and
comments or approvals from ACSA and VDOT as of today. I will forward any comments or approvals from them to you
upon receipt.
Please let me know if you have any questions. Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blangille@albemarle.org
178
Cameron Langille
From:
Sent:
To:
Subject:
Attachments:
BizHubPlanning@albemarle.org
Tuesday, October 29, 2019 3:02 PM
Cameron Langille
Message from KM_364e
S K M _3 64e - P 119102 914010. p d f
179
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Tuesday, October 29, 2019 10:09 AM
To: Cameron Langille
Cc: 'Randy Ralston'
Subject: RE: SDP 201900045 5th street commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
We did submit copies to ACSA.
We also submitted the revised easement plat last week.thanks,
Tim
Sent from my Sprint Phone.
-------- Original message --------
From: Cameron Langille <blangille@albemarle.org>
Date: 10/29/19 10:00 AM (GMT-05:00)
To: tmiller@meridianwbe.com
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: SDP 201900045 5th street commercial
Hi Tim & Randy,
I expect to have the comments out to you by the end of the week. I am still working on my review but the other
reviewers have finished. I've attached their comments.
By the way, did you send a copy of the revised plan over to ACSA when you sent these copies to County staff?
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Monday, October 28, 2019 2:56 PM
To: Cameron Langille <blangille@albemarle.org>
180
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: SDP 201900045 5th street commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Any news on the review?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, October 22, 2019 4:16 PM
To: 'Cameron Langille' <blangille@albemarle.org>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: SDP 201900045 5th street commercial
Cameron,
181
Can you tell me the status of the review of plans that were submitted on 9/17?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
182
Cameron Langille
From: Cameron Langille
Sent: Tuesday, October 29, 2019 10:00 AM
To: tmiller@meridianwbe.com
Cc: 'Randy Ralston'
Subject: RE: SDP 201900045 5th street commercial
Attachments: SDP201900045 ARB 2nd Review Comments.pdf, SDP201900045 Fire Rescue 2nd Review
Comments.pdf, SDP201900045 Inspections 2nd Review Comments.pdf
Hi Tim & Randy,
I expect to have the comments out to you by the end of the week. I am still working on my review but the other
reviewers have finished. I've attached their comments.
By the way, did you send a copy of the revised plan over to ACSA when you sent these copies to County staff?
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Monday, October 28, 2019 2:56 PM
To: Cameron Langille <blangille@albemarle.org>
Cc:'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: RE: SDP 201900045 5th street commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Any news on the review?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
+ Planning Group
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, October 22, 2019 4:16 PM
To:'Cameron Langille' <blaneille@albemarle.ore>
183
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: SDP 201900045 5th street commercial
Cameron,
Can you tell me the status of the review of plans that were submitted on 9/17?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
Meridian
Planning Group
184
Cameron Langille
From: Emily Cox
Sent: Monday, October 28, 2019 4:11 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor.
Attachments: SDP201900045 5th street commercial -minor amend_Revl.pdf
The Review for the following application has been completed:
Application Number = SDP201900045
Reviewer= Emily Cox
Review Status = Requested Changes
Completed Date = 10/28/2019
This email was sent from County View Production.
185
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Monday, October 28, 2019 2:56 PM
To: Cameron Langille
Cc: 'Randy Ralston'
Subject: RE: SDP 201900045 5th street commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Any news on the review?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Tuesday, October 22, 2019 4:16 PM
To: 'Cameron Langille' <blangille@albemarle.org>
Cc: 'Randy Ralston' <err@rralston.comcastbiz.net>
Subject: SDP 201900045 5th street commercial
Cameron,
Can you tell me the status of the review of plans that were submitted on 9/17?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
186
187
Cameron Langille
From:
tmiller@meridianwbe.com
Sent:
Tuesday, October 22, 2019 4:16 PM
To:
Cameron Langille
Cc:
'Randy Ralston'
Subject:
SDP 201900045 5th street commercial
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
Can you tell me the status of the review of plans that were submitted on 9/17?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
188
Cameron Langille
From: Margaret Maliszewski
Sent: Friday, October 11, 2019 3:04 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor.
1. Submit an ARB application for a Countywide Certificate of Appropriateness for a minor amendment. Submit a revised plan
addressing the comments below.
2. Parking lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent appearance
throughout the development. If lighting changes are proposed in this minor amendment, lighting on the entire site must be
addressed with this amendment. If Phase 2 lighting changes can't be shown on this plan, include notes on this plan indicating that
with this amendment all Phase 2 lighting is eliminated. When you submit your Phase 2 amendment, you can add lighting back
that matches Phase I approved lighting.
3. The photometric plan shows maximum light levels exceeding 20 footcandles. 20 footcandles is the maximum approvable to meet
EC guidelines. Revise the plan accordingly.
4. Revise the quantity and spacing of the large trees along 5th Street to 35' on center all along the frontage.
5. Inconsistencies remain between the plant schedule and the plan in the quantities of Allee Elm and Eastern Red Cedar.
6. Revise the landscape plan to include the 4 serviceberry trees along the south perimeter of the site that were approved with the
previous plan.
7. Identify light pole/fixture color on the lighting plan. Bronze, dark brown or black are recommended and approvable.
8. Include a note on the lighting plan that maximum light pole height is 20', including any base that may be proposed.
The Review for the following application has been completed:
Application Number = SDP20190004S
Reviewer= Margaret Maliszewski
Review Status = Requested Changes
Completed Date = 10/11/2019
This email was sent from County View Production.
189
Cameron Langille
From:
Cameron Langille
Sent:
Wednesday, September 11, 2019 5:21 PM
To:
Tim Miller
Subject:
SDP201900045 - First Review Comments
Attachments:
SDP201900045 First Review Comments.pdf
Hi Tim,
Attached are the first review comments for this site plan amendment. Please let me know if you have any questions.
Thanks,
Cameron
Cameron Langille
Senior Planner
Department of Community Development
Albemarle County, VA
434-296-5832 (ext. 3432)
blangille@albemarle.org
190
Cameron Langille
From: Emily Cox
Sent: Thursday, September 5, 2019 4:12 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor
Attachments: SDP201900045 5th street commercial -minor amend.doc
The Review for the following application has been completed:
Application Number = SDP201900045
Reviewer= Emily Cox
Review Status = Requested Changes
Completed Date = 09/05/2019
This email was sent from County View Production.
191
Cameron Langille
From: Cameron Langille
Sent: Wednesday, September 4, 2019 11:04 AM
To: tmiller@meridianwbe.com
Subject: RE: SDP201900045 - 5th Street Commercial
Tim,
The comments will go out by the end of this week or early next week.
-Cameron
From: tmiller@meridianwbe.com <tmiller@meridianwbe.com>
Sent: Wednesday, September 04, 2019 6:54 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: SDP201900045 - 5th Street Commercial
Cameron,
Can you tell me when the comments on Minor Site Plan will be ready?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
www.meridianwbe.com
Meridian
Planning Group
192
Cameron Langille
From: tmiller@meridianwbe.com
Sent: Wednesday, September 4, 2019 6:54 AM
To: Cameron Langille
Subject: SDP201900045 - 5th Street Commercial
Cameron,
Can you tell me when the comments on Minor Site Plan will be ready?
Thanks,
Timothy Miller, P.E., L.S.
Principal
434-882-0121
` 9
Meridian
+ Planning Group
193
Cameron Langille
From: Cameron Langille
Sent: Wednesday, August 28, 2019 5:17 PM
To: Emily Cox
Subject: RE: Planning Application Review for SDP201900045 5th Street Development - Minor.
Yeah, it's definitely Meridian and I think Tim Miller is doing the plans. Tim was who represented the owner at the
preapp we had about this site plan amendment. Tim did the subdivision and easement plats that were part of the
original site plan, so he's at least familiar with the site.
From: Emily Cox <ecox2@albemarle.org>
Sent: Wednesday, August 28, 2019 4:33 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor.
I haven't done my review, but I just opened the plans and it is not Collins? It is meridian? I have to really check this
layout and compare with the WPO to see if they need any revisions to that.
194
Cameron Langille
From: Emily Cox
Sent: Wednesday, August 28, 2019 4:33 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor.
I haven't done my review, but I just opened the plans and it is not Collins? It is meridian? I have to really check this
layout and compare with the WPO to see if they need any revisions to that.
195
Cameron Langille
From: Bedsaul, Willis <willis.bedsaul@vdot.virginia.gov>
Sent: Tuesday, August 27, 2019 3:52 PM
To: Cameron Langille
Cc: Adam Moore
Subject: SDP-2019-00045-5th Street Commercial Development- Minor Site Plan Amendment
Attachments: 5th Street Commercial AM-E_approval.pdf, SDP-2019-00045- 5th Street Commercial
Development -Minor Site Plan Amendment- 8-27-19.pdf
Cameron,
Attached you'll find the review letter on the above subject, if you have any questions please call.
Thanks,
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
701 VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-219-5492
196
Cameron Langille
From: Margaret Maliszewski
Sent: Tuesday, August 27, 2019 3:24 PM
To: Cameron Langille
Subject: Planning Application Review for SDP201900045 5th Street Development - Minor.
Submit an ARB application for a Countywide Certificate of Appropriateness for a minor amendment. Submit a revised
plan addressing these comments:
1. The lighting plan shows a number of revisions not included in the description on the site plan cover sheet. Parking
lot pole light fixtures differ from those previously approved. Parking lot pole lights must have a consistent
appearance throughout the development. If lighting changes are proposed in this minor amendment, lighting on
the entire site must be addressed with this amendment.
2. Footcandle levels on the photometric plan are spread too far apart to determine consistency with the ordinance
and guidelines. Revise the photometric plan to provide light levels all along the property line along 51 Street.
3. The photometric plan shows a maximum light level of 29.7 footcandles. 20 footcandles is the maximum
approvable to meet EC guidelines. Please revise the plan accordingly.
4. Include the standard lighting note on the lighting plan: Each outdoor lummaire equipped with a lamp that emits
3, 000 or more initial lumens shall he a full cutoff lumtnaire and shall he arranged or shielded to reflect light
away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires
onto public roads andproperty in residential or rural areas zoning districts shall not exceed one-half footcandle.
5. Light pole locations shown on the lighting plan differ somewhat from those shown on the site, grading and utility
plans. Please revise for consistency throughout.
6. Revise the quantity and spacing of the large trees along 51 Street to 35' on center all along the frontage.
7. The landscape plan is difficult to read. Many plant symbols are too light to read when shown under pipes, etc. In
the plant schedule, the smallest symbols are too small to clearly distinguish them from each other. Revise
accordingly.
8. There appear to be inconsistencies between the plant schedule and the plan in the quantities of some plants. Please
check the Red Maple, Willow Oak, Allee Elm, and Eastern Red Cedar.
9. Show on the landscape plan a boundary between the Phase 1 and Phase 2 Nellie Stevens/Little Gem planting that
corresponds to the Phase 1 and Phase 2 quantities in the plant schedule.
The Review for the following application has been completed:
Application Number = SDP201900045
Reviewer= Margaret Maliszewski
Review Status = Requested Changes
Completed Date = 08/27/2019
This email was sent from County View Production.