HomeMy WebLinkAboutSUB202000016 Checklist - Project Closeout (Administrative) 2020-07-09 .
SUBDIVISION/SITE PLAN
FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS •
CHECKLIST
, Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC
and status label. CDA will forward to the Imaging•Center for digital closeout.
SDP/SUB`# S�2A20— 6 PROJECT TITLE IIv1t —7`l3 Poe,&5 2c)i 1) a,d 2OMS LA
FULL NAME OF LEAD REVIEWER. J/ Iak Ct FINAL ACTION DATE: 7,
Co tyView—
pplication,Page 2 Data Entered
/ taffRePort,Ground Water Assessment,or other documents placed in"Does&Pies"
Hardcopy.—File Folder Closeout: Ali*items listed should be placed in project folder,in reverse
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file,place.an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other"lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document;or;if the document is already in digital format,can be saved to LaserFiche. Please provide the digital •
tion(path/name)of the document in the space provided.
o .
Engineering Folder Information/documentation
❑ Scan 0 Saved location
•
❑ Application(signature copy)❑ Scan �aved.location A 'tdy l\n CV c - i
IL ,' blic Notification records/Abutting Owner correspondence
❑ Scan ❑S ved location
❑ Applicant Correspondence'(to/ 3 m,memos/emails) C 7-65et,
❑ Scan d location A� �'/�
OCk •
❑ Complete.set of printed Review omments
El Scan aved location. Alredy ("A CU 1,q i t k2
0 Approv plan//pplat(signed,or stamped"Approved"wi ,P� er/Fngineer name)
El Saved location l S6c/(1 lY6J l d �
Ft Action Letter(Administrative Approval) it) �'a l e�- r i
❑. Scan 0'Saved location
• . I1 White Envelope-PC/BOS Meeting Package_:Staff Report(include plan/plat presented,PC/BOS Action Letter)
0Saved.location
IL .and Water Assessments`
❑ Scan 0 Saved location
1111 Other(Please explain—i.e.Studies)
❑. Scan ❑ Saved location '
TV Other(Please explain—i.e.Studies)
0. Scan 0 Saved location , ,.
III At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is.referenced in the
staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be
. clearly marked as unapproved and contain a note clarifying why it was included. .
❑ Scan ❑Saved location
•
Additional Information on.this,project:
• Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary ,
♦ Board of Supervisor Minutes—maybe obtained online or by contacting the Clerk of BOS •
• Construction Documents—will be added to this folder after completion of project. Prior to completion, Y '
documents may be obtained by contacting the County Engineer..
NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: •
•
1) Checklist is completed and included in folder; •
2) Folder has a typed status label.(same font&label color as project label)placed under the project label to • `
;reflect current project status and date;
• 3) Documents are Acco-fastened(except.plats/plans),and in chronological order(latest•.documents on top);
4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. '
If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of.
Planning for corrective action. ,
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012 ,