Loading...
HomeMy WebLinkAboutWPO202100007 Approval - Agencies 2022-02-07Graham Murray From: Pat Valentine < Pat.Valentine@ContechES.com > Sent: Friday, February 4, 2022 11:41 AM To: Graham Murray Cc: Matthew Kennedy Subject: Brookhill Blocks 16-17- New/Second UGD System Attachments: 220204 BH Blk 16-17 SWM Sheets.pdf Graham, We don't see any issues with the design and layout of the two 120" CMP systems on the plans revised 2/4/2022. Thanks, Pat Valentine P.E.* Stormwater Consultant I Virginia Contech Engineered Solutions LLC Richmond, VA 804-971-0400 Pat.Va lentineCdCOntechES.com www.ContechES.com -Licensed in MD