Loading...
HomeMy WebLinkAboutSDP202100001 Correspondence 2022-02-07f 608 Preston Avenue P 434.295.5624 TIMMONS GROUP Suite20o F.immo00 Charlottesville, VA 22903 wwwww.timmons.wm February 3, 2022 Mariah Gleason, Senior Planner County of Albemarle Dept. of Community Dev. 401 McIntire Rd, North Wing Charlottesville, VA 22902 RE: Ivy Proper— Final Site Plan Review— SDP202100001 -Comment Response Letter Dear Ms. Gleason: We have reviewed all of your comments from (Rev. 4) January 12, 2022 and made the necessary revisions. Please find our responses to the comments below in bold lettering. 1. [32.5.2(a)] Application ID. Final site plan receive unique application numbers, separate from initial site plans. Please include the application numbers for both the final site plan (SDP202100001) and initial site plan (SDP2020000065) for this development on the Cover Sheet. Both site plan numbers are now included on the cover sheet. Rev. 1 Comment addressed. 2. [32.5.2(i), 32.5.2(m)] Easement Plat. Prior to final site plan approval, any required easements supporting the site plan will need to be reviewed, approved, and recorded. The recorded easements will then need to be located on the site plan with the recorded deed book and page noted. According to the site plan, the plat will need to address the following: a. Private shared access easement for the entrance and parking area (for the benefit of TMP 58A2-20A). A shared use parking agreement and easement plat was submitted on October 22, 2021 and is currently under review. b. Drainage easements. Drainage and SWM easements are included on the site plan. An easement plat was submitted on October 22, 2021 and is currently under review. c. Private landscaping, construction, and maintenance easements, as necessary. All applicable easements are included on the site plan. An easement plat was submitted on October 22, 2021 and is currently under review. d. (Optional) Vacation of property line as shown on the Existing Conditions Sheet. Rev. 1 Comment remains. Please submit the requested easement plat to allow the approval of required aspects of the site plan. ENGINEERING I DESIGN I TECHNOLOGY Acknowledged. Easements will be recorded prior to final approval. Rev. 2 Comment remains. Please submit the easement plat when ready. Reminder that the easement plat will need to be submitted, reviewed, approved, and recorded prior to final site plan approval. An easement plat is currently being prepared and will be submitted shortly. Rev. 3 : Comment remains. An easement plat has been submitted in association with this site plan. Be advised, the easement plat will need to be approved, recorded, and reflected in the final site plan. Staff recommends adding placeholders for recordation information on the plan maps to make it easy to input this information later, once known. Placeholders for deed book and page number have been added to easement labels. Rev. 4 : Comment remains. The easement plat supporting this site plan is currently under review. The plat will need to be approved and recorded prior to the approval of the site plan. Thank you for including place holders for the future deed book and page. Please update individual easement names to align with those provided on the easement plat. Approved easement plat signature set was submitted on February 2, 2022. 3. [32.7.9] Landscape Plan. (Note: If there are conflicts between comments made by Planning and ARB, once their review begins, Planning will defer to the ARB as their guidelines are more strict.). a. Staff recommends providing the landscape plan as a separate sheet within the site plan. A separate landscape plan is now provided. See sheet L3.0. Rev. 1 Comment Addressed. b. If existing landscape features will be preserved, as shown on the northern and western portions of the lot, the landscape plan should show— as applicable —the tree area to be preserved, the limits of clearing, the location and type of protective fencing, any grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. Also, a signed conservation checklist will be needed in accordance with 32.7.9.4(b). Tree protection fencing and limits of disturbance have been copied to Landscape Plan from the Erosion & Sediment Control Plans. Conservation checklist has been added, to be signed by the contractor. Rev. 1 The comment response letter from the applicant states that tree protection information has been omitted from the plan since existing trees will not be used to meet landscape plan requirements. Please be aware that existing tree stands can be used to meet the Tree Canopy requirements of Sec. 32.7.9.8. Noted. Existing forested areas along perimeter of site have been added to Tree Cover Calculations. Approximately 8,995 SF of trees are expected to remain. Rev. 2 Comment renewed because it is relevant to the revised plan dated 06- 24-2021. In this version, the Tree Canopy requirements of Sec. 32.7.9.8 are being met through a combination of new plantings and existing trees/forest area to be preserved. As such, the Landscape Plan needs to: i. Identify the tree areas to be preserved and their respective square footages. The total square footage of preserved tree areas noted on the plan map and the information contained in the Tree Cover Calculations table should align with one another. 3,203 SF tree preservation area has been hatched and labeled. Calculations have been updated to only include this area for existing tree cover to remain. ii. Identify the location and type of protective tree fencing. (If "TP" is an acronym for "tree protection" please provide a note on the sheet.) Tree protection fence was labeled in previous submittal in addition to TP linetype. Tree protection fence label has been revised to clarify that orange construction fence is intended, in accordance with detail on C3.1. iii. A signed Conservation Plan Checklist will need to be included in the plans prior to final site plan approval. Conservation Plan Checklist has been signed by owner. Contractor signature remains blank, as contractor has not yet been selected. Rev. 3 : Comment not fully addressed. Please show the type of protective fencing to be used, grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing, to meet the ordinance requirements fully. Note: A label on the plan states that a detail for the proposed tree protective fencing can be found on Sheet C3.1. However, that Sheet does not appear to be included. Existing and proposed grading have been turned on for sheet L1.0, Landscape Plan. Checklist has been updated to indicate that no trenching or tunneling has been proposed beyond the limits of clearing. Sheet C3.1 has been added to Site Plan sheet set, which includes tree protection fence detail. Rev. 4 : Comment addressed in this version; however, Engineering has requested that Sheet C3.1— the sheet that addressed this comment — be removed from the final site plan as it contains E&SC and SWM information that is reviewed separately with the VSMP application. Planning is amendable to the removal of Sheet C3.1, as the only information needed was the protective tree fencing detail. In which case, the protective fencing detail will still need to be provided somewhere within the final site plan. (Note: Moving/duplicating this detail to another sheet may also require an update to the TP label provided on Sheet L1.0. Also, to note, the detail provided is not the typical protective fencing detail seen in most approved final site plans in the County, however the detail provided is sufficient for this development). Tree protection detail from sheet C3.1 has been copied to sheet L1.0, and sheet C3.1 has been removed from the Site Plan set. c. The Plat Schedule notes 12 Willow Oaks are being provided, however the plan map only shows 11 Willow Oaks. Please revise accordingly. The landscape plan has been revised. Planting schedule has been revised to agree with the trees shown graphically in plan view. Rev. 1 This comment is no longer necessary. Revisions removed Willow Oaks from the plan. d. The plan indicates that 8 large trees are being provided along Ivy Road, however the Landscaping Along The Frontage table indicates only 7 large trees are being provided. Please revise accordingly. The landscape plan has been revised and now includes 8 large street trees. Rev. 1 This comment is no longer necessary. ARB will review and comment on landscaping along the Entrance Corridor. e. Please clarify what is being used to calculate the 891 square feet of interior parking lot landscaping area that is being provided by the plan. Additional breakdown of interior parking lot landscaping will be provided. Rev. 1 Comment not fully addressed. The County evaluates Sec. 32.7.9.6 — Landscaping Within A Parking Area, based on the canopy provided by trees and shrubs located within the parking area (as defined in the same section). Based on the plantings within said area, staff estimates 685sf of landscaped area to be provided, based on 3 Ginkgos, 1 Hornbeam, and the shrubs. In which case, this requirement is still satisfied. Please review and revise the plan accordingly. Noted. "Provided" column in Interior Parking Lot Landscape Area Requirements table has been revised to 685 SF, which meets the minimum requirement of 671 SF. Rev. 2 Comment not fully addressed. Since this requirement is being satisfied by plantings in the parking lot islands, please revise the "Provided" information to more accurately state: 685 SF (plantings in parking lot island areas). Wording of plantings provided has been revised as requested. Rev. 3 : Addressed. f. The Tree Canopy requirement should be based off the total parcel area, as surveyed, which is 0.87 acres. Please update the Tree Cover Calculations table accordingly. The canopy calculation has been updated accordingly. Rev. 1 Comment addressed. g. Rev. 1 Please update the Parking Area calculation to align with the number of parking spaces provided (36 parking spaces shown). Parking Area calculation has been updated to reflect the 36 parking spaces proposed by the current design. Rev. 2 Comment addressed. h. Rev. 1 Per Sec. 32.7.9.8 — Tree Canopy, the tree canopy required by subsection (a) must be composed of all areas of the site that would be covered by trees and other plant materials exceeding five feet in height at a maturity of ten years after planting. Since the proposed shrubs (Winter Jasmin) will not exceed five feet in ten years, they cannot be used to meet this requirement. In which case, the Tree Canopy requirement is not yet met. Please review and revise the plan accordingly. Tree Cover Calculations have been revised to remove proposed shrubs from the calculations and add existing trees to remain along the perimeter of the site. Rev. 2 Comment addressed. i. Rev. 3 : Similar comments provided by ARB below, there is a discrepancy in the frontage tree species noted in the plant schedule (European Hornbeam) and the tree species notated on the plan (Armstrong Red Maple). This is a new Please correct this discrepancy. Note, the canopy for a 2.5" caliper Armstrong Red Maple is significantly lower than a European Hornbeam. If the applicant desires to move forward with the Armstrong Red Maples, more landscaping will be needed to satisfy the ordinance's tree canopy regulations. Plan has been revised to indicate European Hornbeam. Rev. 4 : Comment addressed. 4. [32.5.2(n)] Outdoor Lighting. Is there any outdoor lighting proposed for this project? If so, please see Sec. 32.6.2(k) and Sec. 4.17 regarding materials that need to be provided for staff review and minimum performance standards/design requirements, respectively. Also, please keep the character of the surrounding area in mind when developing the light plan. A photometric plan and lighting cut sheets have been included and comply with County Ordinance. Rev. 1 Thank you for providing the photometric plan and fixture cutsheets. Please revise the photometric plan so fixture labels can be easily read within the plan map. Many labels are currently obscured by other linework. Otherwise, please see comments provided by ARB. Text has been revised to include background masks for drawing clarity. Rev. 2 Comments remain. Revise the photometric plan so fixture labels and symbols can be easily read within the plan map. Staff are currently unable to easily identify where fixtures listed in the lighting schedule are located on the plan map, as several of these elements are obscured by other linework. Please see additional comments provided by ARB staff below. Fixture labels and symbols have been revised for drawing clarity. Rev. 3 : Addressed. 5. [32.5.2(n), 32.7.2.3] Sidewalks along streets. Revise the walkway in front of the building to meet VDOT standards. See Sec. 32.7.2.3 for more information. The material of this walk has been revised to be concrete. Rev. 1 Comment addressed. 6. [32.5.2(n), 4.12.19] Dumpster Pad. Provide details for the proposed dumpster pad that demonstrates that the minimum design requirements contained in Sec. 4.12.19 are being met. The proposed dumpster pad is 20'X32' which provides 8' of heavy-duty concrete outside of the enclosure for garbage truck front wheel loading. Rev. 1 Comment not fully addressed. Please provide a measurement and label on the plan to demonstrate that the concrete dumpster pad is extending at least, and no less than, eight feet beyond the front of the proposed dumpster(s). Dimension has been added, showing 8' from front of the dumpster enclosure to the edge of the concrete pad. Rev. 2 Comment addressed. 7. [32.5.2(a)] Owner Information. Following the recent sale of the property, update the parcel owner and associated information for the subject properties across all applicable sheets. (Note: This information may need to be updated again when an easement plat is approved and recorded. See Comment 2). The owner information and associated information has been updated for the subject properties. Rev. 1 Comment remains. It doesn't appear this information was updated in the revised plan. Owner information has been updated on cover sheet and existing conditions. Rev. 2 Comment remains. It doesn't appear this information was updated in the revised plan. Albemarle County records indicate that LENVIC LLC is the previous owner, and that the property was sold to Ivy Proper LLC on 01/26/2021. Owner information has been updated on cover sheet and existing conditions. Rev. 3 : Comment partially addressed. Staff acknowledges that the Cover Sheet reflects updated owner information. Owner information on the Existing Conditions sheet should be updated with the new owner's names as well. Owner information has been updated on the Existing Conditions sheet. Rev. 4 : Comment addressed. Planning Comments 8-20 have previously been addressed. Additional Comments based on revised plan dated 09/16/2021: 21. [Comment] Plan revision date. The revised plan dated 09/16/2021 included two new sheets (S-1 and S-2) which show information related to the proposed retaining walls. The County commonly references plans by using a singular "last revised" date. Revise the aforementioned sheets to be consistent with the larger plan by noting the same "date of last revision" as noted throughout the plan. Title block on retaining wall plans and details sheets has been revised to match the rest of the submittal set. Rev. 4 : Comment addressed. 22. [Comment] Water system capacity. VDH has confirmed their approval of the planned onsite sewage disposal system design with a capacity of 875 gallons per day; however, County regulations for onsite water usage for the subject property are restricted to a maximum of 348 gallons per day. If additional water use is desired above the 348 gallons per day limit, a special use permit will be required. Please add the following note to the plan under the "Utility Demands" on the Cover Sheet: "Per Chapter 18, Section 22.2.2 (11) of the Albemarle County Code, onsite water usage cannot exceed 348 gallons per day." Note has been added to Cover Sheet. Rev. 4 : Comment addressed. Thank you. Additional comments based on revised plan dated 11/29/2021: 23. [Comment] Shared parking agreement. In conversation with the Zoning Division, the proposed parking arrangement will require a shared parking agreement. To be specific, the site plan exceeds the number of required parking spaces by more than the ordinance allows (e.g. 20% under Section 4.12.4(a), as the proposed building and use require 26 parking spaces, but the plan provides 36 parking spaces). The plan already notes on the Cover Sheet that seven (7) parking spaces will be for the adjacent parcel (TMP 58-A2-20A). However, since no planned easement identifies the parking spaces to be shared nor a sufficient agreement in place, a shared parking agreement will be needed with the site plan. Staff will provide the applicant with an example of a previously approved shared parking agreement as soon as it is received from Zoning staff. A shared parking agreement has been provided to Albemarle County staff by the developer. Albemarle County Engineering Services — David James - Engineer: 1. VSMP plan & application will need to be submitted and approved prior to FSP approval. A VSMP application and WPO has been included with this submittal. (Rev. 1/2/3/4) Acknowledged; WPO currently under review / not approved. Acknowledged. 2. A plat will need to be recorded prior to FSP approval. Acknowledged. Applicable plats will be submitted and recorded prior to FSP approval. (Rev. 1/2/3/4) Currently not addressed. Acknowledged. Approved easement plat signature set was submitted on February 2, 2022. 3. Please remove the E&SC and SWM-related sheets from the site plan. They're to be submitted & reviewed separately with the VSMP application (Sheets C3.0-C3.3, C6.0). Comment acknowledged. The ESC and SWM related sheets will be removed from the site plan and included in the VSMP submission. Rev.1 Addressed. 4. Show public drainage easement over storm str/pipes 115 to 101. Drainage easements have been included. Rev. 1 N/A Addressed. Appears to be in ROW. S. Show public drainage easement over storm str/pipes 111 to 106 (pipes appear to carry stormwater from off -site that pass through the site). Drainage easements have been provided as requested. Rev. 1 Partially addressed. The drainage easement needs to be shown separate from the SWM Facility easement. Note: Easements can overlap. Use different linetype & / or key to identify. Drainage easements and SWM Facility easements have been revised to display as separate entities with different line types. Where storm pipes are near the CMP storage pipe, easements overlap. Rev. 2 Partially addressed. The Trapezoidal channel will need to be included in the public drainage easement. Public drainage easement has been revised to include trapezoidal channel. Rev.3 Addressed. 6. Ensure SWM pipe meet easement width requirement shown on page 15, ACDSM. SWM easements have been revised accordingly to meet the easement width requirements. Rev.l Acknowledged. 7. For the DI-1s, provide half -clogged design following VDOT drainage manual, chpt. 9. DI-1`s have been updated to design at half clogged. Rev.l Addressed. 8. Rev. 1 Critical slopes waiver will need to be approved. Critical Slopes Waiver was approved by the Board of Supervisors on May 19, 2021. Letter of approval has been included in this submittal for reference. Rev.2 Addressed. 9. Rev. 1 Show/ Provide the number of well connections. One well connection is proposed. Approximate location is shown on sheet C4.0. Rev.2 Addressed. 10. Rev. 1 Sheet 4: a. Provide safety railing for the walls where over 30" high. Safety railings have been added. b. Ensure accurate horizontal depth (batter) of retaining walls. It is anticipated that batter will be minimal on the proposed retaining walls, as we are anticipating a poured concrete design. Final wall design will be provided prior to Site Plan Approval. c. Show line extent of geogrid/tieback or amount of horizontal excavation necessary for retaining wall whichever's greater. Geogrid is not anticipated for this wall. Final wall design information will be provided prior to Site Plan Approval. Rev.2 Acknowledged. 11. (Rev. 1) Sheet 5: a. Provide CG-6. CG-6 has been added along the west side of the entrance. b. Direct area (not captured) to str 116 by adjusting grading. Provide slight crown to better direct water from entrance. Grading has been revised to direct more of the entrance toward structure 116, including adding a crown. Inlet and pipe calculations have been updated accordingly. Rev.2 Addressed. 12. Rev. 1 Provide engineering design plans for the walls over 4' high prior to plan approval. Final wall design information will be provided prior to Site Plan Approval. Please note, the preliminary wall design has been included within this plan set. Rev. 2 Currently not addressed. Rev. 3 The drawings will need to include the registered design professional's stamp per Building Inspector's comment. Rev.4 Addressed. 13. Note: Drainage easement shown over str/pipe 114 appears to be private. This easement has been revised to a "30' Private Drainage Easement." Rev.2 Addressed. 14. Rev .3 Show all proposed easements and deed book references once recorded. This easement has been revised to a "30' Private Drainage Easement." Rev. 4 Not currently addressed. Provide the correct easement labels per the plat — [S U B202100169]. Public Storm Drainage and Stormwater Management Facility easements have been included on the approved easement plat. Approved easement plat signature set was submitted on February 2, 2022. 15. Rev.4 Cover: a. Please remove the initial site plan and wpo application numbers from the title. They can be referenced in the site data section. Initial site plan and WPO numbers have been moved to Site Data section of Cover Sheet for Site Plan set. b. Strikeout sheet C3.1. Sheet C3.1 has been removed from the Site Plan set. 16. Rev. 4 Sheet C3.1: Please remove. Sheet C3.1 has been removed from the Site Plan set. 17. Rev. 4 [18-4.3.3.A.] Provide 3' separation between walls and provide screening shrubs. 3' separation between walls was labeled on sheet C4.0 on previous submittal. Additional screening shrubs (winter jasmine) have been added between the upper and lower walls; see sheet L3.0. Albemarle County Information Services (E911) — Brian Becker: 1. No objection. Albemarle County Building Inspections — Betty Slough No Objection. Add the following notes to the general notes page: 1. Retaining walls greater than 3 feet in height requires a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. Acknowledged. Stamped wall plans will be provided to the County for review and approval prior to installation. 2. Accessible parking spaces, access isles, and accessible route shall be installed in accordance with ICC ANSI A117.1-09 and the 2015 Virginia Construction Code. Noted 3. All water lines, sewer lines, and fire lines from the main to the structure located on private property MUST have a visual inspection performed by the building department. Comment noted. There are no proposed fire lines on this project 4. All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. Noted. All roof drainage is picked up in underground roof drains and tie to adjacent inlet structures. 8" roof drain pipes that tie to adjacent inlets have been added to the plan. 5. Depending on the occupant load and egress travel paths, the pea gravel sidewalk on the south side may not meet egress travel requirements. The path has been revised to concrete. Rev. 1 No objection. Albemarle County Dept of Fire Rescue — Shawn Maddox: 1. No objection. Albemarle County Service Authority — Richard Nelson: 1. No objection. Virginia Department of Health —Josh Kirtley: No objection; See recommendation below 1. The applicant has a valid VDH permit to treat and disperse up to 875 gpd. If the applicant is proposing to use significantly less water, then the system will be over constructed. I advised the applicant that they could submit a new application and design for the much lower water use proposal in order to save a significant amount of money. Comment acknowledged. Virginia Dept of Transportation —Adam Moore: 1. The left turn lane warrant, AM-E and Design Waiver are under review and information will be forward as received. Acknowledged. Albemarle County Planning Services ARB — Khris Taggard: 1. No objection. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email clint.shifflett@timmons.com . Sincerely, Clint Shifflett, PE