HomeMy WebLinkAboutSDP202100074 Review Comments Final Site Plan and Comps. 2022-02-08 (2)$ County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT Memorandum To: Ben Holt From: Emily Cox Date: 11/15/2021 Rev. 1: 2/1/2022 Subject: Pleasant Green Phase 2A (SDP202100074) 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG The Pleasant Green Phase 2A Final Site Plan has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. SUB202000226 road plan must be approved and bonded before this plan can be approved. Rev. 1: Comment not addressed. 2. [Sheet 1] Topography was field verified in 2020. It should be within the last year. Rev. 1: Comment addressed. 3. [Sheet 2] Is the underground detention and level spreader shown on this page already built? If not, it should not be shown on the existing conditions sheet. Also, please label the drainage and SWM facility easement for these facilities. Rev. 1: Comment addressed. 4. [Sheet 2] Please clarify the double floodplain lines near Rambling Brook Lane. Rev. 1: Comment addressed. 5. [Sheet 2] Please label the preserved slopes. Rev. 1: Comment addressed. 6. [Sheet 4] Please clarify the 8" roof/foundation drain. The minimum pipe the County allows is 12". Also, there should be cleanouts for maintenance. Rev. 1: The line on lots 58-64 is labeled as 12", however, comment response said it was staying 8". Please clarify. 7. Please provide yard drain profiles and calculations or reference where those calculations are located (WPO? Road plan?) Rev. 1: Comment addressed. 8. [Sheet 4] Please show the 10' easement is sufficient for the private storm drains per the engineering calculation in the design standard manual, page 15. There must be room for equipment and maintenance: https://www.albemarle.org/Home/ShowDocument?id=270 Rev. 1: Comment addressed. 9. [Sheet 4] Please show spot shots in the rear of houses to show that water drains away from the house. Rev. 1: Comment addressed. 10. [Sheet 4] Please add note showing where the roof drains tie into storm system. Rev. 1: Comment partially addressed. There is a note showing where yard drains tie in to storm system. Please specify that roof drains must tie into the yard drain system. If there is no yard drain, please specify splash blocks. 11. [Sheet 7] Street trees should be at least 5' from storm pipes. Rev. 1: Comment not addressed. Trees on Litchford road are closer than 5' to storm pipe. SDP2021-74 Pleasant Green — Phase 2A Comments: Albemarle Co Fire & Rescue — Howard Lagomarsino hlaeomarsino@albemarle.org 1-31-2022 1) During construction, the following fire prevention steps are required, so please note them on the plan: a) Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b) Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia Statewide Fire Prevention Code. c) Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction and demolition sites, provide access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting fire apparatus in all weather conditions. d) Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code e) An approved water supply for firefighting operations shall be in place and available as soon as combustible materials arrive on site. f) Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code g) Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special; hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code h) Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Fire Marshal's Office (Z) COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 January 25, 2022 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Ben Holt Re: SDP-2021-00074 — Pleasant Green Subdivision, Phase 2A — Final Site Plan Review# 2 Dear Mr. Holt: (804) 786-2701 Fax: (804) 786,2940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section has reviewed the Pleasant Green Subdivision, Phase 2A — Final Site Plan, dated December 30, 2021 as submitted by Collins Engineering and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process. If you have further questions, please contact Max Greene at 434-422-9894. Sincerely, Doug McAvoy Jr., P.E. Area Land Use Engineer VDOT - Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING