Loading...
HomeMy WebLinkAboutZMA202100008 Study 2022-02-08Old Ivy Residences Traffic Impact Analysis Albemarle County, Virginia July 19, 2021 Revised November 15, 2021 Revised February 4, 2022 Ty O UO THOMAS DOWNE RUFF a Lic�No. 055085 Prepared For: Greystar Real Estate Partners TIMMONS GROUP ,•••••� YOUR VISION ACHIEVED THROUGH OURS. • • PAGE INTENTIONALLY BLANK February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA TABLE OF CONTENTS TABLEOF CONTENTS........................................................................................................................I APPENDICES..................................................................................................................................II LISTOF TABLES.............................................................................................................................III LISTOF FIGURES.......................................................................................................................... IV 1 EXECUTIVE SUMMARY.............................................................................................................1-1 1.1 PROJECT OVERVIEW............................................................................................................ 1-1 1.2 PROJECT SCOPE.................................................................................................................. 1-2 1.3 STUDY FINDINGS................................................................................................................ 1-3 1.4 RECOMMENDATIONS............................................................................................................ 1-4 2 ANALYSIS OF EXISTING CONDITIONS....................................................................................2-1 2.1 CAPACITY ANALYSES............................................................................................................2-1 2.2 EXISTING CONDITIONS.........................................................................................................2-3 2.3 2021 EXISTING CONDITIONS ANALYSIS....................................................................................2-4 3 ANALYSIS OF BACKGROUND CONDITIONS.............................................................................3-1 3.1 2025 BACKGROUND TRAFFIC GROWTH.....................................................................................3-1 3.2 2025 BACKGROUND CONDITIONS ANALYSIS..............................................................................3-1 4 SITE TRIP GENERATION AND DISTRIBUTION........................................................................4-1 4.1 TRIP GENERATION...............................................................................................................4-1 4.2 SITE TRIP DISTRIBUTION......................................................................................................4-1 4.3 SITE TRIP ASSIGNMENT........................................................................................................4-1 5 ANALYSIS OF FUTURE CONDITIONS WITH DEVELOPMENT....................................................5-1 5.1 2025 TOTAL TRAFFIC VOLUMES............................................................................................. 5-1 5.2 2025 FUTURE CONDITIONS ANALYSIS...................................................................................... 5-1 5.3 YEAR-TO-YEAR ANALYSIS COMPARISON.................................................................................... 5-3 6 TURN LANE WARRANT ANALYSIS...........................................................................................6-1 6.1 2025 FUTURE CONDITIONS ANALYSIS...................................................................................... 6-1 7 CONCLUSIONS AND RECOMMENDATIONS..............................................................................7-1 7.1 STUDY FINDINGS................................................................................................................7-1 7.2 RECOMMENDATIONS............................................................................................................ 7-2 i TIMMONS GROUP ••"e• February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA APPENDICES Appendix A — Traffic Counts Appendix B — Synchro Analysis for 2021 Existing Conditions Appendix C — Synchro Analysis for 2025 Background Conditions Appendix D — Synchro Analysis for 2025 Total Future Conditions TIMMONS GROUP •••••e f � February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA LIST OF TABLES TABLE 1-1: TRIP GENERATION COMPARISON...................................................................................1-1 TABLE 2-1: LEVEL OF SERVICE DEFINITIONS...................................................................................2-1 TABLE 2-2: SIGNALIZED AND UNSIGNALIZED INTERSECTION LEVEL OF SERVICE CRITERIA ..........................2-2 TABLE 2-3: LOS, DELAY, AND QUEUE LENGTH SUMMARY 2021 EXISTING CONDITIONS.............................2-5 TABLE 3-1: LOS, DELAY, AND QUEUE LENGTH SUMMARY 2025 BACKGROUND CONDITIONS .......................3-2 TABLE 4-1: TRIP GENERATION SUMMARY.......................................................................................4-1 TABLE 5-1: LOS, DELAY, AND QUEUE LENGTH SUMMARY 2025 FUTURE CONDITIONS...............................5-2 TABLE 5-2: LOS, DELAY, AND QUEUE LENGTH SUMMARY 2025 FUTURE CONDITIONS...............................5-4 TIMMONS GROUP ,••`•�� . f • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA LIST OF FIGURES FIGURE 1-1: VICINITY MAP FIGURE 1-2: CONCEPTUAL PLAN FIGURE 1-3: STUDY INTERSECTIONS FIGURE 2-1: 2021 EXISTING VOLUMES FIGURE 2-2: 2021 ADJUSTED EXISTING VOLUMES FIGURE 2-3: EXISTING GEOMETRY FIGURE 3-1: 2025 BACKGROUND VOLUMES FIGURE 4-1: GLOBAL TRIP DISTRIBUTION FIGURE 4-2: TRIP DISTRIBUTION FIGURE 4-3: GENERATED TRIPS FIGURE 5-1: 2025 FUTURE VOLUMES FIGURE 5-2: FUTURE GEOMETRY FIGURE 6-1: 2025 FUTURE VOLUMES —AM PEAK, LEFT TURN WARRANT EB OLD Ivy ROAD AT PROPOSED SITE ENTRANCE FIGURE 6-2: 2025 FUTURE VOLUMES — PM PEAK, LEFTTURN WARRANT EB OLD Ivy ROAD AT PROPOSED SITE ENTRANCE FIGURE 6-3: 2025 FUTURE VOLUMES, RIGHT TURN WARRANT WB OLD Ivy ROAD AT PROPOSED SITE ENTRANCE iv TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. R . February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 1 EXECUTIVE SUMMARY This report presents the findings of the traffic impact analysis (TIA) prepared for the proposed Old Ivy Residences residential development in Albemarle County, Virginia. The TIA has been prepared in accordance with the procedures outlined in the Virginia Department of Transportation's (VDOT) Traffic Impact Analysis Regulations and the Traffic Operations and SafetyAnaiysisManual version 2.0 (TO5AM). A scoping meeting with Albemarle County, the City of Charlottesville, and VDOT was held on April 29, 2021, to determine the scope of the TIA. It was determined that, based on the size of the proposed development, a VDOT Chapter 527 TIA was not required. However, Albemarle County requested the completion of a TIA to determine the impacts of the proposed site entrance and the surrounding roadway network to the site entrance. 1.1 PROJECT OVERVIEW The proposed development is located north of Old Ivy Road, south of Leonard Sandridge Parkway, east of US Route 29/Route 250, and west of Harvest Drive as shown in Figure 1-1 (all figures are located at the end of their respective chapter). The proposed development will consist of 80 single family detached homes, 60 single family detached duets, 335 units of multi -family housing, and 50 units of multifamily housing townhomes; this is the maximum development allowed under zoning. Access to the site will be provided via one (1) entrance on Old Ivy Road. The conceptual site plan can be found in Figure 1-2. When complete, the proposed development will generate a total of 4,326 average daily trips, 284 AM peak hour trips (67 in and 217 out), and 349 PM peak Hour trips (220 in and 129 out), as shown in Table 1-1. Table 1-1: Trip Generation Comparison LAD USE rrE CODE AMOUNT UNITS WEEKDAY AM PEAK HOUR PM PEAK HOUR ADT IN OUT TOTAL IN OUT TOTAL Single -Family Detached Housing 210 80 DwellingUnits 847 15 47 62 52 30 82 Single -Family Detached Homing- Duets 210 60 DwellingUnits 650 12 35 47 39 23 62 Multi -Family Housin Low -Rise - Apartments 220 335 DwellingUnit5 2,492 35 116 150 109 64 173 Multi -Family HousingLDw-Rise-Townhorne5 220 50 DwellingUnits 337 6 19 25 20 12 32 TOTAL 525 DwellingUnits 4,326 67 217 284 220 129 349 SOURCE: InsUb to of Transparta8on Engineers' Trip Generation Manual 10th Edition (2017) As agreed upon during the scoping meeting with Albemarle County and VDOT, the study limits include the following existing intersections (see Figure 1-3): 1. Ivy Road and Canterbury Road/Route 846 (signalized) 2. Old Ivy Road and US Route 29/Route 250 Off -Ramp (unsignalized) 3. Old Ivy Road and Faulconer Drive (unsignalized) 4. Old Ivy Road and US Route 29/Route 250 On -Ramp (unsignalized) 5. Old Ivy Road and Ivy Road (signalized) 6. Proposed Site Entrance and Old Ivy Road (unsignalized) — 2025 Build Conditions Only For purposes of this analysis, the development was assumed to be complete and occupied by 2025. 1-1 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis — Albemarle County, VA It is specifically noted that this study was prepared during the COVID-19 pandemic and traffic patterns and volumes were atypical. In order to accommodate for the discrepancy, a 10% adjustment factor was applied to the field counts. Based on the 2018 VDOT STARS study for US Route 250 (Ivy Road) there are several proposed improvements regarding signal timings, median improvements, and pavement striping. As of July 2021, none of the proposed improvements had been implemented and no funding has been identified. It is not anticipated that the proposed improvements will be implemented prior to the development of the site (i.e. 2025). 1.2 PROJECT SCOPE Per the scope of services, the following steps were taken to determine the potential traffic impacts associated with the proposed project: 1. Data Collection — Peak hour (7-9 AM and 4-6 PM) directional turning movement counts were performed on Thursday, May 6, 2021, at five (5) intersections within the study area. The raw data collected has been included in Appendix A. 2. Background Traffic Growth — A 1% growth rate was applied to the existing 2021 volumes to reach the background 2025 volumes. 3. Trip Generation — Traffic generated by the proposed development was estimated using the 101h edition of the Institute of Transportation Engineers' (ITE) Trio Generation Manual. 4. Traffic Distributions — The distribution of trips generated by the proposed development was based on the existing traffic volumes, the nature of the use, the surrounding roadway network, and local knowledge of traffic patterns in the area. 5. Traffic Projections — Future traffic volumes were determined using the existing traffic counts, a 1% background growth rate, and the trips generated by the proposed site. 6. Operational and Queuing Analysis — Level of service, delay, and queuing calculations were completed at the study intersections for 2021 existing, 2025 background, and 2025 future conditions using SYNCHRO Version 10 with SimTraffic. The 95"' percentile queue lengths (SYNCHRO) and maximum queues (SimTraffic) were reviewed at the study intersections. 1-2 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 1.3 STUDY FINDINGS Based on the operational analyses the following is offered: Under the 2021 existing and 2025 background conditions: • The signalized intersection of Ivy Road and Canterbury Road operates at an overall LOS D in the AM and PM peaks, with queues in both mainline approaches and the southbound approach that create access issues to nearby entrances and intersections. o At the unsignalized intersection of Old Ivy Road and US Route 29/250 Off -Ramp, the combination of queues from the Ivy Road/Canterbury Road signal and the high volume from the US Route 29/250 Off -Ramp block access for the eastbound and westbound movements of Old Ivy Road, effectively creating a 4-way stop intersection. The US Route 29/250 Off Ramp experiences queues that extend to mainline US Route 29/250. o The unsignalized intersection of Old Ivy Road and Faulconer Road sees queuing issues for southbound traffic attempting to make a left onto Old Ivy Road during both peak hours. The queues at Old Ivy Road extend downstream into the US Route 29/250 Off -Ramp, which could create safety and operational issues on the ramp. o The unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp does not have any operational or queuing issues of note, with maximum queues of approximately 300' in the EB direction which do not interfere with other intersections or access points. o The signalized intersection of Ivy Road and Old Ivy Road operates at an overall LOS B in both the AM and PM peak. The only queuing issues noted are for through movement queues blocking access to nearby commercial entrances. o On either end of the study corridor, there are narrow railroad bridges over Old Ivy Road that severely limit the ability to widen the roadway and sometimes require vehicles to operate as if there were only a single lane. This constraint impacts the intersections of Old Ivy Road at Ivy Road, Old Ivy Road at US Route 29/250 Off -Ramp, and Ivy Road at Canterbury Road. • Under 2025 total future conditions with the traffic from the proposed Old Ivy Road Development: o Overall, all existing intersections see an increase in delays and queuing with the addition of the proposed site traffic. o The signalized intersection of Ivy Road and Canterbury Road continues to create operational issues for the US Route 29/250 Off -Ramp, Old Ivy Road, and Faulconer Road. Without improvements to the signalized intersection or the off -ramp, operations on Old Ivy Road will not improve. o At the unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp, the additional site traffic does not significantly increase delays along Old Ivy Road. o At the signalized intersection of Old Ivy Road and Ivy Road, the increased traffic volumes do not significantly change the operations of the existing signal. o The proposed site entrance does not introduce any queueing or delays for mainline Old Ivy Road and the proposed turn lanes can fully accommodate the site -generated traffic. 1-3 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA 1.4 RECOMMENDATIONS In order to accommodate the increased traffic volumes associated with the proposed Old Ivy Residences residential development, the following operational and capacity improvements are recommended: 1. Install an eastbound left turn lane on Old Ivy Road at the proposed site entrance, minimum 100' storage and 100' taper. 2. Install a westbound right turn lane on Old Ivy Road at the proposed site entrance, minimum 100' storage and 100' taper. 3. Install a westbound right turn lane on Old Ivy Road at the US Route 29/250 on -ramp. All recommended improvements are on Old Ivy Road across the frontage of property controlled by the development of Old Ivy Residences. The proposed improvements are expected to be constructable within existing right-of-way and along the development frontage. 1-4 TIMMONS GROUP ••`••. • f � 'Faylpner Way ' • Rd a� a s 1 sow o . �' ¢! f 3 1 r yd9:. � . rr 'r 'r.r -. �neeo- if J�y._�"►�ay�if r t NOT TO .SCALE b OU O 1 41 J=H opium we wmM cn[reren rI \`':� —O".Il Summary: Aped medta: 284 du (3 bltlgs x 48 du ea&: 2 bltlgs x 80 du) / = SFO 30'x50' Im: 40 du � SFD 405tT0' lot n du Duet M0 'lot: 58 du(N lots) ii TH 21'45': 43 du / Total: 442 du PatMm Summary: Apartments: 400 spaces (Ratio: 1.52 spaceeldu) � ♦/ SFD/Due . 285 spaces (Ratio: 1 50 spaces(du] T0181: 685 spaces (Ratio: 1.55 spacesltu) / ♦ / ANOSdX A3NNHP HOd Ot, SI M31Aa OLD IVY ROAD CONCEPTUAL PLANNING SITE STUDY: APTS REVISED owxoreawe�,w 4mmNN 0.1--111,-1 = b a ,m I'—arearva c1e-111 .00*00 Conceptual Layout 0 Old Ivy Residences — Traffic Impact Analysis TIMMONS GROUP p y Albemarle County, Virginia Figure 1-2 i i� February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 1-8 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 2 ANALYSIS OF EXISTING CONDITIONS 2.1 CAPACITY ANALYSES Capacity analysis allows traffic engineers to determine the impacts of traffic on the surrounding roadway network. The Transportation Research Board's (TRB) Highway Capacity Manual (HCM) methodologies govern how the capacity analyses are conducted and how the results are interpreted. There are six letter grades of Levels of Service (LOS) from A to F, with LOS A representing the best operating conditions and LOS F the worst operating conditions. Table 2-1 shows in detail how each of these levels of service are interpreted. Table 2-1: Level of Service Definitions Level of Roadway Segments or Service Controlled Access Highways Intersections A Free flow, low traffic density. 6 rR C E F Delay is not unreasonable, stable traffic flow. Stable condition, movements somewhat restricted dueto higher volumes, but not objectionable for motorists. Movements more restricted, queues and delays may occur during short peaks, but lower demands occur often enough to permit clearing, thus preventing excessive backups. Actual capacity of the roadway i nvl over del ay to all motorists dueto congestion. Forced flow with demand volumes greater than capacity resulting in complete congestion. Volumes drop to zero in extreme cases. No vehicle waits longer than one signal indication. On a rare occasion motorists wa it through more than one signal indication. Intermittently drivers wait through more than one signal indication, and occasionally backups may develop behind left turning vehicles, traffic flow still stable and acceptable. Delays at intersections may become extensive with some, especial ly left -turning vehicles waiting two or more signal indications, but enough cycles with lower demand occur to permit periodic clearance, thus preventing excessive backups. Very long queues may create lengthly delays, especially for left -turning vehicles. Backups from locations downstrea m restri ct or prevent movement of vehi cl es out of approach creating a storage a res during part or all of an hour. SOURCE: 'A Policyon Design of Design of Urban Highways and Arterial 5treets"-AASHTO, 1973 based upon material published in "Highway Capacity Manual", National Academy of Sciences, 1965. 2-1 TIMMONS GROUP 4P.••••0. YOUR VISION ACHIEVED THROUGH OURS. R . February 2022 Old Ivy Residences TrafFc Impact Analysis — Albemarle County, VA For signalized and unsignalized intersections, level of service is defined in terms of delay, a measure of driver discomfort, frustration, fuel consumption and lost travel time. Table 2-2 summarizes the delay associated with each LOS category: Table 2-2: Signalized and Unsignalized Intersection Level of Service Criteria Signalized Intersections Unsignalized Intersections Level of Service Control Delay per Vehicle (sec/veh) Level of Service Average Control Delay (sec/veh) A <<-10 A 0to10 B >10to<-20 B >10to<-15 C >20to<-35 C >15to<-25 D >35to!555 D >25to<-35 E >55to<-80 E >35to<-50 F >80 F >50 Source: Exhibit 16-2 and Exhibit 17-2 from TRB's 'Highway Capacity Manual 2000" Generally, the standard acceptable minimum for the overall intersection is LOS D, while the standard acceptable minimum for an individual traffic movement is LOS E. Capacity analyses were performed to assess existing (2021), background (2025), and future (2025) operational conditions. The signalized and unsignalized intersections were analyzed using SYNCHRO Version 10 based on HCM 2000 methodologies with the following assumptions: • Level terrain; 12-foot lane widths; • No parking activity or bus stops; • Existing peak hour factor as determined by the traffic counts (by intersection) for existing scenario; • The higher of the existing peak hour factor as determined by traffic counts (by intersection) or a peak hour factor of 0.92. Heavy vehicle percentage as determined by the traffic counts (by movement); and Traffic signals timing data provided by VDOT on May 18, 2021. HCM 2000 methodologies were utilized for analysis as opposed to the latest HCM Sixth Edition or HCM 2010 methodologies. This selection is due to the non-standard NEMA phasing that is present at all of the signalized intersections. The HCM Sixth Edition and HCM 2010 methodologies only provide measures of effectiveness for signalized intersections following strict NEMA phasing. Queuing analysis allows traffic engineers to identify where vehicles queues are not adequately accommodated by existing storage bays and impact adjacent travel lanes. 2-2 TIMMONS GROUP •••••• February 2022 Old Ivy Residences Traffic Impact Analysis — Albemarle County, VA Queuing analyses were conducted using both the HCM 2000 methodology (as calculated by SYNCHRO) and SimTraffic simulations. The Synchro 95"' percentile queue is the maximum back of queue for a particular lane within a lane group considering 95"' percentile traffic volumes. The SimTraffic maximum queues are the average maximum queues after 10 runs of 60 minutes each. Note that it is possible for the 95th percentile queue to be higher than the SimTraffic maximum queue due to the method in which each software calculates its respective value. The 95th percentile queue is based on an HCM formula while the SimTraffic maximum queue varies based on simulation results. 2.2 EQSTING CONDITIONS Existing count data was obtained from directional turning movement (DTM) counts at the five (5) study intersections: 1. Ivy Road and Canterbury Road/Route 846 (signalized) 2. Old Ivy Road and US Route 29/Route 250 Off -Ramp (unsignalized) 3. Old Ivy Road and Faulconer Drive (unsignalized) 4. Old Ivy Road and US Route 29/Route 250 On -Ramp (unsignalized) 5. Old Ivy Road and Ivy Road (signalized) The turning movement counts were collected on Thursday, May 6, 2021, between 7 — 9 AM and 4 — 6 PM. The data collection provided pedestrian counts for the entire duration and heavy vehicles by movement for the peak hours. The 2021 existing volumes are shown on Figure 2-1 (all figures located at the end of the chapter). The complete count data for the turning movement counts is provided in Appendix A. It is noted that this study was prepared during the COVID-19 pandemic and traffic patterns and volumes were atypical. In order to accommodate for the discrepancy, a 10% adjustment factor was applied to the field counts. The 2021 adjusted existing volumes are shown on Figure 2-2. The existing roadways within the study area include the following: Old Ivv Road is a two-lane, undivided major collector with a posted speed limit of 35 mph. According to 2019 VDOT count data, Old Ivy Road services 8,300 vehicles per day. • Ivv Road (US Route 250) is a two-lane, undivided minor arterial with a posted speed limit of 35 mph. According to 2019 VDOT count data, Ivy Road services 13,000 vehicles per day between Dick Woods Road and US Route 29 and 58,000 vehicles per day between US Route 29 and the Charlottesville city limits. • Falconer Drive is a two-lane, undivided local road with a posted speed limit of 30 mph. According to 2019 VDOT count data, Faulconer Drive services 1,300 vehicles per day. The existing roadway geometry for each study intersection can be found on Figure 2-3. Per a 2018 STARS study for Ivy Road there are several proposed improvements regarding signal timings and pavement striping. As of May of 2021, none of the proposed improvements have been implemented and it is not anticipated that they will be implemented prior to the development of the site. Due to software limitations, to accurately model intersections with significant spillback, a three-way stop geometry was utilized for SimTraffic and the field conditions geometry was used for LOS conditions for the intersection of Old Ivy Road and US Route 29/250 Off -Ramp. 2-3 TIMMONS GROUP •.••••� YOUR VISION ACHIEVED THROUGH OURS. • . February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 2.3 2021 EXISTING CONDITIONS ANALYSIS Table 2-3 summarizes the 2021 existing intersection LOS, delay, and queues based on the 2021 adjusted existing traffic volumes shown on Figure 2-2 and the existing intersection geometry and traffic controls shown on Figure 2-3. The corresponding SYNCHRO worksheets are included in Appendix B. Level of service calculations for the five (5) existing intersections within the study area were performed using the methodology described above. To evaluate the impacts of the traffic generated by the proposed development, analyses were completed for the AM and PM peak hours: 1. Weekday AM peak hour of the adjacent street (8:00 AM — 9:00 AM); and 2. Weekday PM peak hour of the adjacent street (4:30 PM — 5:30 PM). The signalized intersection of Ivy Road and Canterbury Road operates at an overall LOS D in the AM with a delay of 48.2 seconds/vehicle and at LOS D in the PM peak with a delay of 45.9 seconds/vehicle. There are multiple movements that operate at LOS E and F during both peak hours. The maximum queue for the eastbound left is 394 feet in the AM peak and 554 feet in the PM peak. For the westbound through - right approach, the maximum queue in the AM peak is 629 feet and the maximum queue in the PM peak is 610 feet. The queues for the mainline through and turning movements extend beyond the existing storage length and may create operational issues with other intersections along Ivy Road. The southbound approach has queues in excess of 200 feet during both peak hours, which indicates that queues from Ivy Road are impacting Old Ivy Road on the western end. At the unsignalized intersection of Old Ivy Road and US Route 29/250 Off -Ramp, the eastbound approach operates at LOS F in the AM peak with 87.3 seconds/vehicle of delay and LOS D in the PM peak with 27.5 seconds/vehicle delay. The westbound approach operates at LOS F in the AM and LOS E in the PM peak with a delay of 167.7 seconds/vehicle in the AM peak and 47.1 seconds/vehicle in the PM peak. Although the southbound approach operates at LOS A during both peak hours, the maximum queue is 1,160 feet in the AM peak and 1,156 feet in the PM peak due to the operations of the Ivy Road at Canterbury Road signal. At the unsignalized intersection of Old Ivy Road and Faulconer Road, the southbound approach operates at LOS F in the AM peak and LOS C in the PM peak with a delay of 349.1 seconds/vehicle in the AM peak and 20 seconds/vehicle in the PM peak. In the AM peak, the maximum queue in the southbound direction is 325 feet and 121 feet in the PM peak. The eastbound and westbound approaches of Old Ivy Road operate at LOS A during both peak hours. At the unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp, the mainline eastbound and westbound approaches operate at LOS A during both peak hours. The northbound approach operates at LOS A during the AM peak hour and at LOS F during the PM peak hour. However, the maximum queue on the northbound approach during either peak hour is 21 feet, or approximately 1 vehicle. There are no queuing issues at this intersection. The signalized intersection of Ivy Road and Old Ivy Road operates at an overall LOS B in both the AM and PM peak with a delay of 13.3 seconds/vehicle in the AM peak and 13.2 seconds/vehicle in the PM peak. All movements and approaches operate at LOS C or better during both peak hours. The only queuing issues noted at this intersection are the through maneuvers blocking access to entrances along Ivy Road. 2-4 TIMMONS GROUP •.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Table 2-3: LOS, Delay, and Queue Length Summary 2021 Existing Conditions Effective AM PEAK HOUR PM PEAK HOUR Delay' (sec/veh) LOS` SYNCHRO SimTraffic PeMaximum Queue �QueeueR Length (ft) Delay (sec/veh) SYNCHRO LOS' PercentileMaximum Lennuth ft SimTraffic Queue length (R) Intersection and Type of Control Movement and Approach Turn lane Storage (ft) LEVY Road(E-W) at EB Left 58.4 E #460 394 56.8 E #523 554 Cantebury Road/Route 846(N-S) EB Thru 17.8 B 477 321 16.9 8 464 374 Signalized EB Right 450 9.9 A 0 26 9.7 A 0 32 EHAPproachl 1 33.2 C -- -- 32.5 C - -- W B Left 200 1 19.1 B 17 199 18.5 B 23 200 WBThru-Right 64.5 E #850 629 58.4 E #821 610 WBApproach 62.8 E -- -- 56.2-' E -- -- NB Lek-Thru 55.4 E 59 80 55.2 E 51 84 NB Right 180 53.8 D 0 52 53.9 Dr26 64 NBApproach 54.7 D -- -- 54.5 D -- SBThru-Left 58.9 E 132 212 67.3 E 214 SB Right 75 J 54.7 D #440 76 53.9 D 75 SBApproach 55.3 E -- -- 55.6 E Overall 48.2 D -- -- 45.9 D2.Old Ivy Road (E-W) at EB Thru-Right 87.3 F 123 116 27.5 D 93 29 Off Ramp/Route 846 (N-5) EBApproac87.3 F -- -- 275 D -- Unsignalized WE Left-Thru 167.7 F 98 75 47.1 1 E ''. 83 118 WBApproach 7677 F -- -- 471 E.. -- -- NB L-T-R 0.7 A 2 71 0.9 A 3 69 NBApproach 0.7 A -- -- 0.9 A -- -- SB L-T-R 190 1.5 A 2 1160 0.3 A 1 1156 SBApproach 1.5 A -- -- 0.3-- 3.Old Ivy Road (E-W) at EB Left-Thru 2.6 A 9 ill 0.7 A 2 53 Faulconer Road/Commercial Ent EB Right 150 0.0 A 0 0 0.0 A 0 0 U-19nalized EBApproach 26 A -- -- 0.7 A -- -- WB L-T-R 0.0 A 0 0 0.0 A 0 0 WBApproach 0.0 A -- -- 0.0 A -- -- NB L-T-R 25.3 D 2 30 1 11.7 1 B 1 28 NBApproach 25.3 D -- -- 17.7 B -- -- SBLeft-Thru 349.1 F 506 325 20.0 C 45 121 SB Right 190 0.0 A 0 88 0.0 A 0 30 SBApproach 349.1 F -- -- 10.0 C - -- 4. Old Ivy Road (E-W) at EB L-T-R 7.4 A 46 166 8.8 A 52 279 Route 29 On -Ramp/ EBApproach 74 1 A I -- -- 8.8 A -- -- WB Lek-Thru 0.0 t 0 0 0.0 t 0 3 Commercial Entrance(N-S) L47signahzed WE Right 50 0.0 A 0 44 0.0 A 0 49 WBApproach 0.0 t -- -- 0.0 t -- -- NB L-T-R 0.0 t 0 0 57.5 t 1 21 NEApproachl 0.0 A -- -- 57.5 F -- -- 5.IvV Road(E-W) at EB Left 90 7.9 A 43 81 1 8.0 A 32 72 Old Ivy Road (N-S) EBThru 13.3 B #421 241 10.1 B 253 153 Signalized EBApproach 12.7 B -- -- 9.9 A -- WBThru 9.2 A 169 174 14.5 B #467WB Right 7.6 A 29 66 7.5 A 39 WbApproach 8.8 A -- -- 12.5 BNB L-T-R 32.7 C 20 39 28.5 C 0 d328 NBApproach 32.7 C -- -- 28.5 C -SB L-T-R 23.7 C 98 178 23.8 C 82 SBApproach 23.7 C -- -- 238 C --Overall 13.3 ' Overall intersection LOS and delay reported for signalized interserllons and roundabou6' only t SYNCHRO does not provide level of service or delay for unsignalized movements with no conflicting volumes. # - 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. 2-5 TIMMONS GROUP ..••••a YOUR VISION ACHIEVED THROUGH OURS. R 0 a February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 2-6 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • n E C 2 O fV vm o(3) O -LL o �. ao �V' P'IIm L34(18) 15 (50) 37 (92) Old Garth 28 (50) Old I T o (o) Road ` () 59 f Road (2) 106 (1919) 30 m.+ (420) 426 I "o (1)10� v O � v ti L 93 (62) c ^ 494 (561) Ivy Road C- 23 (36) 0 (382) 341 - o -,t r (570) 543 -� � (18)9ZI -,mom N ti O n rV E 0, o� �0 L 87 (203) 72 (114) 0 (0) (416) 383 (141) 236 (0)1� o00 otio (] 0 O N m ti 1P I� r y L 117 (238) Ivy Road U 292 (603) (36) 60 t r (431) 545 N O 1�1 LEGEND: Existing Road — —gi�pp— Proposed Road �b Signalized Intersection Stop Controlled Intersection f Stop Sign Location 4— Lane Configuration 00 AM Peak Hour Volumes (00) PM Peak Hour Volumes .00000 2021 Existing Volumes 0 Old Ivy Residences — Traffic Impact Analysis TIMMONS GROUP p y Albemarle County, Virginia Figure 2-1 O 1) 2 & n ro m C cy)n O o v ® E N @ p Of 0GlL ra O G 0�0 37 20 ( ) t 96 (223) 1 �. �17(55) -041 (0) 1) �79(125) T (0) 0 Old Garth .I `31 (55) (0) Old I Od (35) 65 Road (32) 117 * r (458) i I (21) 33 (462) 469 (155) 260 260 —� I r O P o (S) 11 m O (0) 1 O O O fy 00 N� OHO 'p CIO/ O O (D v LL p � Df �m O L102(68) � 543 (617) 1m lm r y L 129 (262) I�+ Im Ivy Road Y 1 I. i 25 (40) Ivy Road 321 (663) 0 0 (420) 375 (40) 66 o t (627) 597 —� (474) 600 o O (20)10� Nmv ry .moo m F OP v LEGEND: Existing Road a1 — Proposed Road — —�p 100 �6 Signalized Intersection U Stop Controlled Intersection f Stop Sign Location 4— Lane Configuration 00 AM Peak Hour Volumes (00) PM Peak Hour Volumes 2021 Adjusted Existing Volumes .00000 • Fi Figure 9 Old I Residences — Traffic Impact Analysis � p y TIMMONS GROUP 2-2 Albemarle County, Virginia n a N E 2 O C O �. + ) Of 0 rn ra LL I] 7 i o ,_ Q� 0 Ir t S'=50' + Old Garth Old I 7 oa F Road 4 .1r* S'=150' 7 + + v 1 O rr00 p Qf I I O Oa Ivy Road r Z' .-S'=200' '^' Ivy Road I o t LMT S'=250' } ° S'=90'-J ° ltr S'=450'00 0 I I n LEGEND: Existing Road 9 �y Signalized Intersection Stop Controlled Intersection UMO f Stop Sign Location S' Effective Storage (in feet)* LMT Lane Must Turn j' Lane Configuration * Per TOSAM guidelines, effective storage equals the full width storage length + 1/2 the taper length Existing Geometry .00000 • Fi Figure 9 Old I � Residences — Traffic Impact Analysis p y TIMMONS GROUP 2-3 Albemarle County, Virginia February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK z-lo TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA 3 ANALYSIS OF BACKGROUND CONDITIONS 3.1 2025 BACKGROUND TRAFFIC GROWTH The background 2025 volumes were analyzed assuming the existing intersection geometry in conjunction with projected background traffic volumes. The background traffic volumes were developed based on a 1% annual growth rate. The growth rate was compounded annually for the 4-year period from 2021 to 2025. The resulting 2025 existing volumes plus background growth are shown on Figure 3-1. 3.2 2025 BACKGROUND CONDITIONS ANALYSIS Table 3-1 summarizes the 2025 background intersection LOS, delay, and queues based on the 2025 background traffic volumes shown on Figure 3-1 and the existing intersection geometry and traffic controls shown on Figure 2-3. The corresponding SYNCHRO worksheets are included in Appendix C. The signalized intersection of Ivy Road and Canterbury Road continues to operate at an overall LOS D in both peak hours with a delay of 53 seconds/vehicle in the AM peak and 54 seconds/vehicle in the PM peak. The mainline eastbound and westbound approaches operate at LOS C or worse during both peak hours with queues that are in excess of 400 feet during both peak hours. The southbound approach has queues in excess of 200 feet during both peak hours, which indicates that queues from Ivy Road are impacting Old Ivy Road on the western end. At the unsignalized intersection of Old Ivy Road and the US Route 29/250 Off -Ramp the eastbound and westbound approaches operate at LOS F during both peak hours with queues in excess of 100 feet during both peak hours. Although the southbound approach operates at LOS A during both peak hours, the maximum queue is 1,164 feet in the AM peak and 1,147 feet in the PM peak due to the operations of the Ivy Road at Canterbury Road signal. At the unsignalized intersection of Old Ivy Road and Faulconer Road the southbound approach operates at LOS F in the AM peak and LOS D in the PM peak with a delay of 85.7 seconds/vehicle in the AM peak and 25.1 seconds/vehicle in the PM peak. In the southbound direction the maximum queue is 138 feet in the PM peak and 232 feet in the AM peak. The eastbound and westbound approaches of Old Ivy Road operate at LOS A during both peak hours. At the unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp, the mainline eastbound and westbound approaches operate at LOS A during both peak hours. The northbound approach operates at LOS A during the AM peak hour and at LOS F during the PM peak hour. However, the maximum queue on the northbound approach during either peak hour is 38 feet, or approximately 2 vehicles. There are no queuing issues at this intersection. The signalized intersection of Ivy Road and Old Ivy Road operates at an overall LOS B in both the AM and PM peak hours. All movements and approaches operate at LOS C or better during both peak hours. The only queuing issues noted at this intersection are the through maneuvers blocking access to entrances along Ivy Road. All operational and queuing issues noted in the 2021 existing conditions are found to be equal or worse under the 2025 background conditions. 3-1 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences TrafFc Impact Analysis - Albemarle County, VA Table 3-1: LOS, Delay, and Queue Length Summary 2025 Background Conditions Effective AM PEAK HOUR PM PEAK HOUR Delay ' (sec/veh) WS` SYNCHRO Percentile Queue Length R SimTraffc Maximum Length ft 9 () Delay l (sec/veh) LOS' SYNCHRO Percentile Queue Len th R SimTraffic Maximum Length ft ( ) Intersection and Type of Control Movement and Approach Turn Lane St(rfta)ge l.Ivy Road(E-W)at EB Left 56.9 E #484 456 53.8 D #550 609 Cantebury Road/Route 846 (N-5) EBThru 18.2 B 499 420 18.8 B 493 415 Signalized EB Right 450 9.9 A 0 29 10.4 B 0 31 EBApproach 32.9 C -- -- 32.4 C -- -- WBLeR 200 20.0 B 1 IB 199 20.4 C 23 200 638 980.6 22WBThruRight F 0 WBApproach 78.4 E -- -- 88.3 F -- -- NB Left-Thru 55.4 E 60 90 55.2 E 51 82 NB Right 180 53.8 D 0 41 53.9 D 0 66 NBApproach 54.7 D -- -- 54.5 D -- SBThru-Left 59.9 E 135 213 56.8 E 119 214 SB Right 75 56.6 E #511 76 50.2 D #576 76 SBApproach 57.1 E -- -- 51.0 D -- -- Overall 53.0 D -- -- 54.0 D -- -- 2.01d Ivy Road (E-W) at EB Thru-Right 69.8 1 F 1 105 138 1 30.2 1 D 30 80 29 Off Ramp/Route 846 (N-S) EBApproach 69.8 F -- -- 30.2 D -- -- U-finalized WB LeR-Thru 108.1 F 77 86 I 58.7 I F 101 141 WBApproach 108.1 F -- -- 58.7 F -- -- NB L-T-R 0.7 A 2 73 0.9 A 3 71 NBApproach 0.7 A -- -- 0.9 A -- -- 5B L-T-R 190 1.5 A 5 1164 0.3 A 1 1147 SBApproach 1.5 A -- -- 0.3 A -- -- 3.Old Ivy Road (E-W) at EB Left-Thru 2.3 A 7 87 0.8 A 2 58 Faulconer Road/Commercial Ent EB Right 150 0.0 A 0 3 0.0 A 0 0 L,hSignalized EBApproach 2.3 A -- -- 0.0 A -- -- WBL-T-R 0.0 A 0 6 0.0 A 0 2 WBApproach 0.0 A -- -- 0.0 A -- -- NB L-T-R 19.4 C 1 28 12.3 B 1 28 NBApproach 19.4 C -- -- 12.3 B -- SB Left-Thru 85.7 F 221 232 25.1 , D 65 138 SB Right 190 0.0 A 0 46 - 00 A- 0-- 47-- SBApproach 8..7 F -- -- 25.1 D 4. Old Ivy Road (E-W) at EB L-T-R 7.0 A 39 160 9.1 A 57 310 Route 29 On -Ramp/ EBApprci ZO A -- -- 9.1 A -- -- Commercial Entrance (N-S) WB LeR-Thru 0.0 A 0 0 0.0 t 0 5 Lh7signalized WB Right 50 0.0 A 0 0 0.0 A 0 44 WBApproach DO A -- -- 0.0 t -- -- NB L-T-R 0.0 A 0 38 64.8 t 1 17 NBApproach 0.0 A -- -- 64.8 F -- -- 5.IvyRoad(E-W)at EB Left 90 7.9 A 46 89 8.3 A 34 78 Old Ivy Road (N-5) EBThru 13.7 B #452 254 10.3 1 B 260 190 Signalized EBApprctach 13.1 B -- -- 10.2 B -- -- WBThru 9.2 A 178 158 15.1 B #481 322 WB Right 7.6 A 29 77 7.7 A 41 92 Wb Approach 8.8 A -- -- 13.0 B -- -- NB LET-R _ -- -- 33.9 C 20 50 28.6 C 0 49 NBApproach 33.9 C -- -- 28.6 C -- -- 58 L-T-R 24.5 C 103 185 23.8 C 83 160 SBApprai 14.5 C -- -- 23.8 C -- -- Overall 23.6 B -- I -- 1 23.5 1 B -- I -- ' Overall intersedlon LOS and delayreported for signalized intersections and roundabouts only t SYNCHRO does not provide level of service or delay for unsignalized movements with no conflicting volumes. # - 95th percentile volume exceeds capatlty, queue may be longer. Queue shown is maximum after two cycles. 3-2 TIMMONS GROUP a1116660 YOUR VISION ACHIEVED THROUGH OURS. r 0 n E C 2 O fV vm o(3) O -LL o L39(22) 18 (57) 43 (113) Old Garth .J 1 �. `32 (57) Old I T —0(0) od () 68 Road ) 122 (2222) 34 � (51515) 488 � I 00 O 00 V. 1 O v o L 106 (71) �+ 565 (642) Ivy Road J s z6 (41) , 0 o (437) 390 - (652) 622 —� (21)10 —'N n m ZnZI O n rV E 0, oC �0 L 100 (232) 82 (130) 0 (0) (477) 438 --f (161) 271 (0)1� 000 O H O 0/ O LL m 1M Im r y L 134 (273) Ivy Road O 334 (690) (42) 69 (493) 624 t o O mom LEGEND: Existing Road — —gi�pp— Proposed Road �b Signalized Intersection Stop Controlled Intersection f Stop Sign Location 4— Lane Configuration 00 AM Peak Hour Volumes (00) PM Peak Hour Volumes .00000 2025 Background Volumes 0 Old Ivy Residences — Traffic Impact Analysis TIMMONS GROUP p y Albemarle County, Virginia Figure 3-1 February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 3-4 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 4 SITE TRIP GENERATION AND DISTRIBUTION 4.1 TRIP GENERATION The site -generated traffic volumes shown in Table 4-1 were estimated using the 10th edition of the Institute of Transportation Engineers' (ITE) Trip Generation Manua/and were calculated using the number of dwelling units as the independent variable. Table 4-1: Trip Generation Summary LAND USE ITE CODE AMOUNT UMrS WEEKDAY AM PEAK HOUR PM PEAK HOUR IN OUT TOTAL IN our TOTAL Sin le-Famil Detached Housi 210 80 Dwelli Units 15 47 62 52 30 82 Sin le-Famil Detached Housi - Duets 210 60 DwellingUnits E4,326 12 35 47 39 23 62 Multi-Famil Housin Low -Rise - A rtaients 220 335 DwellingUnits 35 116 150 109 64 173 Multi-Famil Housin Low-Rise-Townhomes 220 50 DwellingUnits 6 19 25 20 12 32 TUrAL 525 Dwell Units 67 21 2284 220 129 349 SOURCE: Institute of Transportation Engineers' Trip Generation Manual SOth Edition (2017) When complete, the proposed development will generate a total of 4,326 average daily trips, 284 AM peak hour trips (67 in and 217 out), and 349 PM peak Hour trips (220 in and 129 out), as shown in Table 4-1. 4.2 SITE TRIP DISTRIBUTION The distribution of site trips generated by the proposed residential development was based on the existing traffic volumes, the nature of the use, the surrounding roadway network, and local knowledge of traffic patterns in the area. The global trip distributions are shown on Figure 4-1 and the proposed trip distributions by study intersection are shown on Figure 4-2. 4.3 SITE TRIP ASSIGNMENT The trip distribution percentages for the site trips were applied to the trip generation volumes shown in Table 4-1 to calculate the site trips for the surrounding roadway network. The resulting site generated trips are shown on Figure 4-3. 4-1 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 4-2 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • 4 A 2 O n fV l= N to O C 0 a 0 W 0 Io y Old Garth j- (30%) Old I T (30%) oa F I' �. Road 30%-. a � 00 1 O Ivy Road O �-- (30%) (30%) 60%� i 60% 1 LEGEND: Existing Road o Signalized Intersection Stop Controlled Intersection j Stop Sign Location r- Lane Configuration 00% Entering Peak Hour Trips (00%) Exiting Peak Hour Trips .00*00� Trip Distribution TIMMONS GROUP Old Ivy Residences — Traffic Impact Analysis Albemarle County, Virginia Figure 4-2 n O fV E O C 2 Yro oOf 0 � L W 0 OI Y Old Garth ` 65 (39) Old Ivy T 65 (39) oa Road (66) 20 —. y O O1 0 m m Ivy Road L 10 (33) 0 (33) 10 L 65 (39) 65 (39) (132) 40 'i' (132) 401 qI N ~ L 27 (88) LEGEND: Existing Road Signalized Intersection Stop Controlled Intersection j Stop Sign Location r- Lane Configuration 00 AM Peak Hour Trips (00) PM Peak Hour Trips .00*00 Generated Trips TIMMONS GROUP Old Ivy Residences — Traffic Impact Analysis Albemarle County, Virginia Figure 4-3 February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 4-6 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 5 ANALYSIS OF FUTURE CONDITIONS WITH DEVELOPMENT 5.1 2025 TOTAL TRAFFIC VOLUMES To complete the analysis of the 2025 future conditions (with the proposed development), the estimated site trips were added to the background 2025 volumes. The projected total future (background + site) volumes were then used to complete the capacity analysis. To generate the 2025 total future traffic volumes, the site trips shown on Figure 4-1 and the background 2025 traffic volumes shown in Figure 3-1 were combined. The resulting 2025 total future traffic volumes are shown in Figure 5-1. 5.2 2025 FUTURE CONDITIONS ANALYSIS Table 5-1 summarizes the 2025 future intersection LOS, delay, and queues based on the 2025 future traffic volumes shown on Figure 5-1 and the future intersection geometry and traffic controls shown on Figure 5-2. The corresponding SYNCHRO worksheets are included in Appendix D. The signalized intersection of Ivy Road and Canterbury Road operates at an overall LOS E in both peak hours. The mainline eastbound and westbound approaches operate at LOS C or worse during both peak hours with queues that are in excess of 500 feet during both peak hours. The southbound approach has queues in excess of 200 feet during both peak hours, which indicates that queues from Ivy Road are impacting Old Ivy Road on the western end. At the unsignalized intersection of Old Ivy Road and the US Route 29/250 Off -Ramp, the eastbound and westbound approaches continue to operate at LOS F during both peak hours with queues in excess of 100 feet during both peak hours. Although the southbound approach operates at LOS A during both peak hours, the maximum queue is 1,163 feet in the AM peak and 1,150 feet in the PM peak due to the operations of the Ivy Road at Canterbury Road signal. At the unsignalized intersection of Old Ivy Road and Faulconer Road, the southbound approach operates at LOS F in the AM and PM peaks. In the southbound direction the maximum queue is 268 feet in the AM peak and 218 feet in the PM peak. The eastbound and westbound approaches of Old Ivy Road operate at LOS A during both peak hours. At the unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp, the mainline eastbound and westbound approaches operate at LOS A during both peak hours. The northbound approach operates at LOS A during the AM peak hour and at LOS F during the PM peak hour. However, the maximum queue on the northbound approach during either peak hour is 47 feet, or approximately 2 vehicles. There are no queuing issues at this intersection. The signalized intersection of Ivy Road and Old Ivy Road operates at an overall LOS B in both the AM and PM peak hours. All movements and approaches operate at LOS C or better during both peak hours. The through maneuver queues will continue to block access to entrances along Ivy Road. At the proposed site entrance, the southbound approach operates at a LOS B in the AM peak and LOS C in the PM peak. In the eastbound direction, there is a maximum queue of 44 feet in the AM peak and 70 feet in the PM peak. The mainline movements along Old Ivy Road at the proposed site entrance are not adversely impacted by the introduction of the site traffic and the queues will not impact through traffic. 5-1 TIMMONS GROUP �Ibsees YOUR VISION ACHIEVED THROUGH OURS. R February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Table 5-1: LOS, Delay, and Queue Length Summary 2025 Future Conditions Intersedbn aM ype of COnRd MDvementaM Approach Eiiective AM PEAK HOAR PM PEAK HOAR Tum one Storage (ft) EVEIN (sec/ ) LDS ' SYNCt 95tN Percentile QUEUE U R SimTrRlfiC Maltimum Queue Lengtll(R) Delay' (seWeh) LDS Sy95t th Ps.IYle Queue le it SimTratfic Maximum Queue length(R) LTVV Road(E-W)a Canhbury Roae/Route 846 (N-S) ssg #z MLeft 52.1 1 D #498 453 71.6 E #611 621 MThm 18.8 B 499 386 19.0 B 493 5M EB Right 450 10.2 B 0 26 10.5 B 0 29 a4gp earn 31.6 C -- - 4125 D - Will Left 20D 22.1 C 18 199 20.9 C 23 200 WBThu-Right 112.1 F I #904 640 113.7 F *930 624 MApprgxh 1,88 F - - 1069 F - -- NBLeR-Thm 55.4 E 60 68 55.2 E 51 72 NB RgM 180 53.8 D 0 43 53.9 D 0 55 AMAppiparh SBThrG-Left 54.2 ]1.4 D E - #196 - 214 54.5 61.7 D E - 141 -- 212 SB Right JS 56.9 E #651 75 54.5 D #653 M sBApprcach 59.5 E - - H..6 E - -- Overaa 6L6 E 64.7 E 2.OId IVY Road(E-W)at 29 OR Ramp/Rovbe 846 (N-S) thlw -ed MTh. -Right 75.7 F 110 117 34.4 D 35 85 BBApprarh 75.7 F - - 34.4 D - -- WB WIT Thru W1.2 F 1 285 149 140.1 F 205 184 WBApreuh 544.2 F - -- 1401 F - -- NBL-T-R AMApzgrh 0.] 07 A A 2 - 69 - 0.9 0.9 A A 3 - 84 -- SBL-T-R 190 1.5 A 5 1163 0.3 A 1 1150 SBAppieuh 1.5 A - - 0.3 A - -- 3.01d IVY Road (E-W) Rt Faulco er Rmd/COmmefdal Ent L4rvg I-% EB Left -Thu 2.3 A 8 89 0.7 A 2 90 EB Right 150 0.0 A 0 0 0.0 A 0 0 B9AID erh 2.3 A - - 0.7 A I - -- Will L-T-R 0.0 A 0 3 0.0 A 0 5 WBAppea,-h 00 A - - 0.0 A - -- NBL-T-R 21.8 C 0 25 13.2 B 1 30 MAp~ 21.8 C - - 13.2 B - -- SBIeR-Thm 176.1 F 1 268 62.1 F 183 218 SBRgh 190 0.0 A 336 41 0.0 A 0 76 SBAppraad; 1261 F -- -- 0..1 F - -- 4. Old Ary Road (E-W) at Route 290n-Ramp/ Commertlal EMance (N-S) IAEsgiu!¢ed EB L-T-R ].] A 47 1% 9A A 64 324 EBAppierh 11 A 9.4 A Will Left -Thu 0.0 A 0 0 0.0 A 0 0 Will Right 250 0.0 A 0 1 39 0.0 1 A 0 9J MAppreah 00 A - - 0.0 A - -- NB L-T-R 0.0 A 0 0 93.1 F 2 16 MAppiexh 0.0 A - - 93.1 F - -- S.Ivy ROad(EW) at 0ld Ivy Road (N-5) SigxVGwd EB Left 25D 9.2 A 48 85 9.2 A 38 86 EB Thu 16.6 B ✓f975 320 11.2 B 285 241 l$4ppr0arh 15.8 B -- - 11.1 B - -- WBThu 10.8 B 189 206 16.8 B #519 352 WB Right 8.9 A 34 71 8.6 A 50 116 Wt,Approxh 10.2 B - - 14.0 B - -- NB L-T-R 34.5 C 21 W 29.5 C 0 43 MAD~ 34.5 C - - 19.5 C I - -- SBL-T-R 28.9 C 166 238 25.1 C 11] 1" SBAppmu 28.9 C - - 25.1 C - -- Ovens Me 6 1" a -- A. Old Ivy Road (E-W) at SHE EMaIRs (N) #bEv I.ed M Left 150 ].8 A 3 M 8.7 A 11 70 EBThu QO A 0.0 A - -- 1.0 A 3.9 A WBThu 0.0 t 0 0 0.0 t 0 0 Will Right 150 0.0 t 0 0 0.0 t 0 12 MApprgxh QO t - - 0.0 t - -- SBLeR-Rgh 14.5 B 45 103 16.2 C 32 96 SBAA.aa 14.5 B - - 162 C - -- ` Dlera//b#ersection LOsaMdeHYreAvi2vJlOrsrgna#zMmhrsecdas aiMrmaMaba2s <v#Y. t Sy HRO does mt pro a level of mNM m delay for umgnalized mo me with m mnfli N vdumes. # - 95th percentile volume exceeds Capadty, queue may be Imger. Queue shown is maximum after two cyck E. 5-2 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 5.3 YEAR-TO-YEAR ANALYSIS COMPARISON Table 5-2 provides a comparison of the 2021 existing, 2025 background, and 2025 future intersection LOS and delay, as provided throughout the report. At the signalized intersection of Ivy Road and Canterbury Road, the overall intersection operates with multiple issues and delays under all 3 analyzed conditions. The additional site traffic will add delay to the southbound approach, the westbound through -right movement, and the eastbound left turn movement. Overall, this intersection operates poorly today and in background conditions and the introduction of site traffic will only marginally increase delays. At the unsignalized intersection of Old Ivy Road and the US Route 29/250 Off -Ramp, the volume of traffic on the southbound approach from the US Route 29/250 Off -Ramp overwhelms all other movements at the intersection. Under existing and background conditions, the Old Ivy Road eastbound and westbound approaches operate with high delays and limited opportunities to enter the intersection. The addition of site traffic increases the delays for westbound Old Ivy Road to access Canterbury Road and the adjacent signal to US Route 250 (Ivy Road). At the unsignalized intersection of Old Ivy Road and Faulconer Road, mainline Old Ivy Road in both directions operates well under all analyzed conditions. The northbound approach of Faulconer Road operates well but experiences much lower volumes, which contribute to the acceptable operations. The southbound approach of Faulconer Road experiences major delays during both the AM and PM peak hour during all 3 analyzed conditions. The heavy volume of traffic using the US Route 29/250 Off -Ramp and then traveling to Old Ivy Road via Faulconer Road are in conflict with the high through volumes on Old Ivy Road. The queues and delays for the southbound approach have the potential to create queuing and safety issues for the US Route 29/250 Off -Ramp under all 3 analyzed conditions. At the unsignalized intersection of Old Ivy Road and the US Route 29/250 On -Ramp, all 3 analyzed conditions show acceptable levels of service and minimal delays. The addition of site traffic does not impact the operations of the Old Ivy Road mainline approaches. The northbound approach from the parking lot of an adjacent development currently operates with a level of service F and continues to do so under background and future conditions. However, this approach has less than 5 vehicles, which is the basis for the high delay on that approach. At the signalized intersection of Old Ivy Road and Ivy Road, there are no operational issues under existing, background, or future conditions. The addition of site traffic will not adversely affect the signal operations and there are minimal to no queuing issues observed. The signal will continue to operate with acceptable levels of service and delay under all analyzed conditions. 5-3 TIMMONS GROUP �@see* YOUR VISION ACHIEVED THROUGH OURS. R . February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA Table 5-2: LOS, Delay, and Queue Length Summary 2025 Future Conditions Intersection and Type of Control Movement and Approach 2021 Fasting Cowin 25 Background Conditions 2025 Total Conditions AM PEAK HOUR PM PEAK HOURK HOUR PM PEAK HOUR AM PEAK HOUR PM PEAK HOUR Del Delay seUveh LOS ) Delay',Delay' SeUveh DS OS ) Del ay SeUveh LOS r Delay ) seUveh Los 1 Delay SeUveh Los r LIvy Road(E-W)at Cantebur Road/Rome 846 (N-S) 519w/¢ed EB Left 58.4 E 56.8 E E 53.8 D 52.1 D 71.6 E EB Thru 17.8 B 16.9 B r8O.96phEo B 18.8 B 18.8 B 19.0 B EB Right 9.9 A 9.7 A A 10.4 B 10.2 B 10.5 B EBApproadh 33.2 C 32.5 C C 324 C 31.6 C 40.5 D WB Left 19.1 B 18.5 B B 20.4 C 22.1 C 20.9 C WBThru-Right 61.5 E 58.4 E F 92.2 F 112.1 F 113.7 F WBApproaC/I 62.8 E 56.2 E 78.4 E 88.3 F 188.8 F 108.9 F NB Left-Thru 55.4 E 55.2 E 55.4 E 55.2 E 55.4 E 55.2 E NB Right 53.8 D 53.9 D 53.8 D 53.9 D 53.8 D 53.9 D ABApp-pall) 54.7 D 54.5 D 54.7 D 54.5 D 54.7 D 54.5 D SBThn -Left SB Right 58.9 54.7 E D 67.3 53.9 E D 59.9 56.6 E E 56.8 50.2 E D 71.4 56.9 E E 61.7 54.5 E D SBApprevdh 55.3 E 55.6 E 57.1 E 51.0 D 59.5 E 55.6 E Overall 48.2 D 45.9 D 53.0 D 54.0 D 61.8 E 64.7 E 2.OId Ivy Road (E-W) at 29 Off Ramp/Route 846 (N-S) Iksgnahzed EB Thru-Right 87.3 F 27.5 D 69.8 F 30.2 D 75.7 F 34.4 D EBApproad) 87..3 F 27.5 D 69.8 F 30.2 D 75.7 F 34.4 D WB Left-Thru 167.7 F 47.1 E 108.1 F 58.7 F 544.2 F 140.1 F WBApprow, 167..7 F 47.1 E 109..1 F 58.7 F 544.2 F 140.1 F NB L-T-R 0.7 A 0.9 A 0.7 A 0.9 A 0.7 A 0.9 A NBApproadh 0.7 A 0.9 A 0.7 A 0.9 A 0.7 A 0.9 A SBL-T-R 1.5 A 0.3 A 1.5 A 0.3 A 1.5 A 0.3 A SBApprcHdh L5 A 0.3 A 1.5 A 0.3 A L5 A 0.3 A 3.Old Ivy Road (E-W) at Faulconer Road/Commercial Ent 07516 allzed EB Left Thou 2.6 A 0.7 A 2.3 A 0.8 A 2.3 A 0.7 A EB Right 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A EBApproadh 2.6 A 0.7 A 2.3 A 0.0 A 2.3 A 0.7 A TB L-T-R 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A WBApproaM 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A 0.0 1 A NB L-T-R 25.3 D 11.7 B 19.4 C 12.3 B 21.8 C 13.2 B A9Apprevdh 25.3 D 11.7 B 19.4 C 12.3 8 21.8 C 13.2 B SB Left-Thru 349.1 F 20.0 C 85.7 F 25.1 D 176.1 F 62.1 F SB Right 58AW.1h 0.0 349.1 A F 0.0 20.0 A C 0.0 85.7 A F 0.0 75.1 A D 0.0 176.1 A F 0.0 621 A F 4. Old Iv/ Road (E-W) at Route 290n-Ramp/ Commercial 5&ance(N-S) 02919 _zed EB L-T-R 7.4 A 8.8 A 7.0 A 9.1 A 7.7 A 9.4 A E860ffioach WB Left-Thru Z4 0.0 A t 8.8 0.0 A t ZO 0.0 A A 9.1 0.0 A t 7.7 0.0 A A 9.4 0.0 A A WB Right 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A 0.0 A WBApproach 0.0 t 0.0 t 0.0 A 0.0 t 0.0 A 0.0 A NB L-T-R NBApproarh 0.0 0.0 t A 57.5 57.5 t F 0.0 0.0 A A 64.8 64.8 t F 0.0 0.0 A A 93.1 93.1 F F S.Hq Road(E-W) at Ivy Road(WS) Signalized EB Left 7.9 A 8.0 A 7.9 A 8.3 A 9.2 A 9.2 A EBThru 13 3 1Old 6 B 11.2 B EBAppro" 12.7 B 9.9 A 13.1 B 10.2 8 15.8 B 11.1 B WBThm 9.2 A 14.5 B 9.2 A 15.1 B 10.8 B 16.8 B WB Right 7.6 A 7.5 A 7.6 A 7.7 A 8.9 A 8.6 A Wb App-carh 9..8 A 12.5 B 8.8 A 13.0 B 10.2 B 14.0 B NB L-T-R 32.7 C 26.5 C 33.9 C 28.6 C 34.5 C 29.5 C 28.5 C 39 78.6 C 34.5NBApprowh2.7 C 29.5 c SBL-T-R SBAp 111ii 0reraE 23.7 237 13.3 C C B 5.8 238 13.2 C C B 24.5 24.5 13.6 C C B 23.8 23.8 13.5 C C B 28.9 18.9 1 16.8 C C B 25.1 25.1 1 14.8 C C 1 B 5-4 TIMMONS GROUP •'•• M 2 0 Y 0 Ce P O vpl Old Garth 1 od (36) 68 (22) 34 0 P V N L 39 (22) 18 (57) `97 (96) T � 108 (152) —0(0) Old I Road (36) 132 (592) 512 + N ti 1) 11I I �V1 O V P Cv ti0 ti O V O�V1 � n m L116(104) oQti -+ ^ 565 (661) Ivy Road C-" 26 (41) 0 (470) 400 1 r (652) 622 —� (21)10 n—m Zn ZI % TIMMONS GROUP 4 z V Oq M L (Y �_ N Y+ �I w � 0 n o 127 L 165 (271) (88) 147 (169) I°I y r 204 (315) 0 (0) T (477) 438 (132) 40 -1 (293) 311 —� ♦ (161) 271 (0)1� 000 fy O ti 0 M 0 O O O 1M IN r y L 161 (361) Ivy Road U 334 (690) (42) 69 t (493) 624 o O mom LEGEND: Existing Road o Signalized Intersection Stop Controlled Intersection f Stop Sign Location r Lane Configuration 00 AM Peak Hour Volumes (00) PM Peak Hour Volumes 2025 Future Volumes Old Ivy Residences — Traffic Impact Analysis Albemarle County, Virginia Figure 5-1 O Old Garth L Q U O C ! O cV lro = O I� rnLL O a ++ C IY 0 �I LL II Iin r Z' T S'=250' � S'=150' I Id 7 4 o S'=150'-� O00 1 y O 0 r, II � Q Ivy Road ,-S'=200' Ivy Road • o o S'=460'Z S'=85'� o 0 I LEGEND: n Existing Road — — — Proposed Road y -2 �6 Signalized Intersection a) (a ® Stop Controlled Intersection V O U f Stop Sign Location S, Effective Storage (in feet)* T Taper Length (in feet) j-- Lane Configuration * Per TOSAM guidelines, effective storage equals the full width storage length + 1/2 the taper length .00000 • Future Geometry Figure Fi Old I Residences — Traffic Impact Analysis 9 TIMMONS GROUP � p y Albemarle County, Virginia 5-2 February 2022 Old Ivy Residences Traffic Impact Analysis — Albemarle County, VA 6 TURN LANE WARRANT ANALYSIS 6.1 2025 FUTURE CONDITIONS ANALYSIS Using 2025 future traffic volumes on Figure 5-1 and the appropriate turn lane warrant nomographs from Appendix F of the VDOT Road Design Manual, a turn lane warrant analysis was completed for the proposed site entrance on Old Ivy Road. The turn lane warrants were completed for the eastbound left and the westbound right turning movements from Old Ivy Road into the proposed site entrance. Under 2025 future conditions, both an eastbound left and a westbound right turn lane are warranted on Old Ivy Road at the proposed site entrance. The left and right turn lane warrants can be found in Figures 6-1 through 6-3. Based on the posted speed limit (35 MPH) and the functional classification of Old Ivy Road (urban collector), a minimum taper of 100' and a minimum storage of 100' is required for both turn lanes per the VDOT Road Design Manual. 6-1 TIMMONS GROUP see** YOUR VISION ACHIFVfO THROUGH OURS. February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 6-2 TIMMONS GROUP �@see* YOUR VISION ACHIEVED THROUGH OURS. R . GUIDELINES FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) FIGURE 3-26 VDOT ROAD DESIGN MANUAL APPENDIX F 100 88 80 60 40 27 20 NO TURN LANE OR TAPERS REQUIRED 100 200 231 300 LEGEND AM Peak Hour — — — - PM Peak Hour _gin PHV APPROACH TOTAL, VEHICLES PER HOUR To] RIGHT TURN LANE AND TAPER WARRANTED Right -Turn Lane Guideline 2025 Total Future Volume Figure TIMMONS GROUP WB Old Ivy Road at Proposed Site Entrance 6-3 February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA PAGE INTENTIONALLY BLANK 6-6 TIMMONS GROUP �@see* YOUR VISION ACHIEVED THROUGH OURS. R . February 2022 Old Ivy Residences Traffic Impact Analysis -Albemarle County, VA 7 CONCLUSIONS AND RECOMMENDATIONS 7.1 STUDY FINDINGS Based on the operational analyses the following is offered: • Under the 2021 existing and 2025 background conditions: • The signalized intersection of Ivy Road and Canterbury Road operates at an overall LOS D in the AM and PM peaks, with queues in both mainline approaches and the southbound approach that create access issues to nearby entrances and intersections. o At the unsignalized intersection of Old Ivy Road and US Route 29/250 Off -Ramp, the combination of queues from the Ivy Road/Canterbury Road signal and the high volume from the US Route 29/250 Off -Ramp block access for the eastbound and westbound movements of Old Ivy Road, effectively creating a 4-way stop intersection. The US Route 29/250 Off Ramp experiences queues that extend to mainline US Route 29/250. • The unsignalized intersection of Old Ivy Road and Faulconer Road sees queuing issues for southbound traffic attempting to make a left onto Old Ivy Road during both peak hours. The queues at Old Ivy Road extend downstream into the US Route 29/250 Off -Ramp, which could create safety and operational issues on the ramp. o The unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp does not have any operational or queuing issues of note, with maximum queues of approximately 300' in the EB direction which do not interfere with other intersections or access points. o The signalized intersection of Ivy Road and Old Ivy Road operates at an overall LOS B in both the AM and PM peak. The only queuing issues noted are for through movement queues blocking access to nearby commercial entrances. o On either end of the study corridor, there are narrow railroad bridges over Old Ivy Road that severely limit the ability to widen the roadway and sometimes require vehicles to operate as if there were only a single lane. This constraint impacts the intersections of Old Ivy Road at Ivy Road, Old Ivy Road at US Route 29/250 Off -Ramp, and Ivy Road at Canterbury Road. • Under 2025 total future conditions with the traffic from the proposed Old Ivy Road Development: • Overall, all existing intersections see an increase in delays and queuing with the addition of the proposed site traffic. • The signalized intersection of Ivy Road and Canterbury Road continues to create operational issues for the US Route 29/250 Off -Ramp, Old Ivy Road, and Faulconer Road. Without improvements to the signalized intersection or the off -ramp, operations on Old Ivy Road will not improve. • At the unsignalized intersection of Old Ivy Road at the US Route 29/250 On -Ramp, the additional site traffic does not significantly increase delays along Old Ivy Road. • At the signalized intersection of Old Ivy Road and Ivy Road, the increased traffic volumes do not significantly change the operations of the existing signal. • The proposed site entrance does not introduce any queueing or delays for mainline Old Ivy Road and the proposed turn lanes can fully accommodate the site -generated traffic. 7-1 TIMMONS GROUP �.••••� YOUR VISION ACHIEVED THROUGH OURS. R . • February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA 7.2 RECOMMENDATIONS In order to accommodate the increased traffic volumes associated with the proposed Old Ivy Residences residential development, the following operational and capacity improvements are recommended: 1. Install an eastbound left turn lane on Old Ivy Road at the proposed site entrance, minimum 100, storage and 100' taper. 2. Install a westbound right turn lane on Old Ivy Road at the proposed site entrance, minimum 100' storage and 100' taper. 3. Install a westbound right turn lane on Old Ivy Road at the US Route 29/250 on -ramp. All recommended improvements are on Old Ivy Road across the frontage of property controlled by the development of Old Ivy Residences. The proposed improvements are expected to be constructable within existing right-of-way and on the development frontage. 7-2 TIMMONS GROUP •••••� February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Appendix A Traffic Counts February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Data Collection Group LSmith@DataCollectionGroup.net File Name : Canterbury and Ivy Site Code Start Date : 5/6/2021 Page No 1 r ,. oa printed_ pa--- Veh _ T-V. Old Garth Ivy Canterbury IVY From North From East From South From West Suit TII[lC Right Thru Left Peds A, Total Right Thru Left Peds App. Tore) Right Thru Left Peds App. T.W Right Thm Left Peds App. Told ha, Total 07:00 AM 71 1 19 0 91 12 49 2 0 63 0 I 1 0 2 0 82 39 0 121 277 07:15 AM 59 0 16 0 75 15 59 0 0 74 2 I 0 0 3 0 80 65 0 145 297 07:30 AM 84 1 9 0 94 27 115 2 0 144 1 2 1 0 4 1 130 93 0 224 466 07:45 AM 140 3 8 0 151 24 129 3 0 156 4 2 2 0 8 3 145 94 0 242 557 Total 354 5 52 0 411 78 352 7 0 437 7 6 4 0 17 4 437 291 0 732 1597 08:00 AM 113 2 30 0 145 32 117 6 0 155 3 3 3 0 9 2 175 101 0 278 587 08:15 AM 127 3 27 0 157 26 117 2 0 145 6 6 1 0 13 0 128 94 0 222 537 08:30 AM 128 1 9 0 138 16 122 5 0 143 5 5 6 0 16 2 101 59 0 162 459 08:45 AM 128 6 5 0 139 19 138 10 1 168 8 2 1 0 11 5 139 87 0 231 549 Total 496 12 71 0 579 93 494 23 1 611 22 16 11 0 49 9 543 341 0 893 1 2132 04:00 PM 146 2 26 0 174 20 157 4 0 181 4 1 2 0 7 2 163 84 1 250 612 04:15 PM 132 3 11 0 146 9 l33 2 0 144 7 4 5 0 16 5 135 82 0 222 528 04:30 PM 126 5 l0 0 141 12 140 7 0 159 8 2 2 0 12 4 141 115 0 260 572 04:45 PM 133 1 15 0 149 20 128 9 0 157 6 I 4 0 11 2 136 98 0 236 553 Total 1 537 11 62 0 610 1 61 558 22 0 641 1 25 8 13 0 46 1 13 575 379 1 968 1 2265 05:00 PM 101 3 16 0 120 18 149 15 0 182 9 3 5 0 17 7 151 70 1 229 548 05:15 PM 152 6 17 0 175 12 144 5 0 161 8 2 4 0 14 5 142 99 0 246 596 05:30 PM 115 3 5 0 123 7 129 8 0 144 7 3 5 t 16 2 122 95 0 219 502 05:45 PM 139 2 14 0 155 14 92 6 0 112 2 3 4 0 9 0 100 70 0 170 446 Total 507 14 52 0 573 51 514 34 0 599 26 11 18 t 56 14 515 334 1 864 1 2092 Grand Total 1894 42 237 0 2173 283 1918 86 1 2288 80 41 46 t 168 40 2070 1345 2 3457 8086 Apprch % 87.2 1.9 10.9 0 12.4 83.8 3.8 0 47.6 24.4 27.4 0.6 1.2 59.9 38.9 0.1 Total % 23.4 0.5 2.9 0 26.9 3.5 23.7 1.1 0 28.3 1 0.5 0.6 0 2.1 0.5 25.6 16.6 0 42.8 Passenger Veh 1848 42 231 0 2121 280 1856 84 1 2221 77 41 45 I 164 40 2023 1312 2 3377 7883 %Pe r Veh 97.6 100 97.5 0 97.6 98.9 96.8 97.7 100 97.1 96.2 100 97.8 100 97.6 100 97.7 97.5 100 97.7 97.5 Trucks 46 0 6 0 52 3 62 2 0 67 3 0 1 0 4 0 47 33 0 80 203 %Trucks 2.4 0 2.5 0 2.4 1.1 3.2 2.3 0 2.9 3.8 0 2.2 0 2.4 0 2.3 2.5 0 2.3 2.5 Data Collection Group LSmith@DataCollectionGroup.net File Name : Canterbury and Ivy Site Code Start Date : 5/6/2021 Page No : 2 Old Garth From North Ivy From East Canterbury From South IVY From West Start Time Right I Thru I Left I Peds I A,P Total Right I Ttva Left Peds App. Total Right Thru Left Peds App. Total Right Thou Left I Peds I App, Toot Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of l Peak Hour for Entire Intersection Bepns at 07:30 AM Int. Tota 07:30 AM 84 1 9 0 94 27 115 2 0 144 1 2 1 0 4 1 130 93 0 224 466 07:45 AM 140 3 8 0 151 24 129 3 0 156 4 2 2 0 8 3 145 94 0 242 557 08:00 AM 113 2 30 0 145 32 117 6 0 155 3 3 3 0 9 2 175 101 0 278 587 08:15 AM 127 3 27 0 157 26 117 2 0 145 6 6 1 0 13 0 128 94 0 222 537 Total Volume 464 9 74 0 547 109 478 13 0 600 14 13 7 0 34 6 578 382 0 966 2147 % AVV. Total 84.8 L6 13.5 0 18.2 79.7 2.2 0 41.2 38.2 20.6 0 0.6 59.8 39.5 0 PHF 829 .750 .617 .000 .871 .852 926 542 .000 .962 .583 .542 .583 .000 .654 .500 826 .946 .000 .869 .914 Passenger Veh 449 9 72 0 530 108 446 13 0 567 13 13 7 0 33 6 563 374 0 943 2073 %Passenger Veh 96.8 100 97.3 0 96.9 99.1 93.3 100 0 94.5 92.9 100 100 0 97.1 100 97.4 97.9 0 97.6 96.6 Trucks 15 0 2 0 17 1 32 0 0 33 1 0 0 0 1 0 15 8 0 23 74 % Trucks 3.2 0 2.7 0 3.1 0.9 6.7 0 0 5.5 7.1 0 0 0 2.9 0 2.6 2.1 0 2.4 3.4 Data Collection Group LSmith@DataCollectionGroup.net File Name : Canterbury and Ivy Site Code Start Date : 5/6/2021 Page No : 3 Old Garth Out In Total 495 530 1025 9 17 28 1 1 449 9 72 0 75 0 2 0 474 ht Right Thru Left Pads tI 1 Y Peak Hour Data mbON n1ON� ♦ p p W W W r 2 Nodh 4---2 Peak Hour Begins at 07:30 3i €;' t ro o = Passenger Veh r o w Bova OW W oo W �+ m m Trucks s v w Nm WW W�W— a mono 4� ? r Left Thru Ri ht Pads 7 13 13 0 0 0 1 0 7 13 14 28 33 87 0 1 i 2 62 Out In Total Old Garth Data Collection Group LSmith@DataCollectionGroup.net Ivy I Canterbury File Name : Canterbury and Ivy Site Code Start Date : 5/6/2021 Page No 4 IVY I .Start Time I Right I Thm I Left I Peds I App. Total I Right I Thru I Left I Peds I App, Total I Right I Thru I Left I Peds I App. Total I Right I Thou I Left I Peds I App, Total I Int. Total I Peak How Analysis From 12:00 PM to 05:45 PM - Peak t of 1 Ptak Hnnr fnr Fntire Tnterw,&inn 11eoins at 04-10 PM 04:30 PM 126 5 l0 0 141 12 140 7 0 159 8 2 2 0 12 4 141 115 0 260 572 04:45 PM 133 1 15 0 149 20 128 9 0 157 6 I 4 0 11 2 136 98 0 236 553 05:00 PM 101 3 16 0 120 18 149 15 0 182 9 3 5 0 17 7 151 70 1 229 548 05:15 PM 152 6 17 0 175 12 144 5 0 161 8 2 4 0 14 5 142 99 0 246 596 Total Volume 512 15 58 0 585 62 561 36 0 659 31 8 15 0 54 18 570 382 1 971 2269 % Avy.Total 87.5 2.6 9.9 0 9.4 85.1 5.5 0 57.4 14.8 27.8 0 1.9 58.7 39.3 0.1 PHF .842 .625 .853 .000 .836 .775 .941 .600 .060 .905 .861 .667 .750 .000 .794 .643 .944 .830 .250 .934 .952 Passenger Veh 504 15 56 0 575 62 555 35 0 652 29 8 14 0 51 18 562 371 1 952 2230 % Passenger Veh 98.4 100 96.6 0 98.3 too 98.9 97.2 0 98.9 93.5 100 93.3 0 94.4 100 98.6 97.1 100 98.0 98.3 Trucks 8 0 2 0 10 0 6 1 0 7 2 0 1 0 3 0 8 11 0 19 39 %Trucks 1.6 0 3.4 0 1.7 0 1.1 2.8 0 1.1 6.5 0 6.7 0 5.6 0 1.4 2.9 0 2.0 1.7 Data Collection Group LSmith@DataCollectionGroup.net File Name : Canterbury and Ivy Site Code Start Date : 5/6/2021 Page No : 5 Old Garth Out In Total 441 575 1018 ii 10 21 1 7 504 15 58 0 8 0 2 0 512 7 Right Thru Left Pads tI 1 Y Peak Hour Data 0No9N FN N F�NC�' m J 1-o=� ^W W W W0 w m Nodh NON � � N J Peak Hour Begins at 04:30 P Passenger Veh Trucks r N a aoWo P1O fO 4-1 ? r Left Thru Ri ht Pads 14 8 29 0 1 0 2 0 15 8 31 68 51 119 1 3 4 12 Out In Total Data Collection Group LSmith@DataCollectionGroup.net File Name : Cantebury and Old Ivy Site Code Start Date : 5/6/2021 Page No 1 r ,. oa ➢rintnd_ ➢aaa-- Vnh _ T-V. 29.250 SB Off Ramp/Canterbury Old Ivy Canterbury Old Garth From North From East From South From West Start T1ma Right Thru I Left I PedS App, Told Right Thru I Left I Peds App, Tote) Right Thru Left Peds App. Tolal Right Thru I Left I Peds App ToW It. Total 07:00 AM 1 84 2 0 87 0 1 5 0 6 54 0 3 0 57 5 3 0 0 8 158 07:15 AM 1 70 3 0 74 0 0 7 0 7 78 0 2 0 80 2 9 0 0 11 172 07:30 AM 0 85 7 0 92 0 0 3 0 3 118 0 3 0 121 4 12 0 0 16 232 07:45 AM 5 148 6 0 159 0 1 3 0 4 116 0 4 0 120 5 12 0 0 17 300 Total 7 387 18 0 412 0 2 18 0 20 366 0 12 0 378 16 36 0 0 52 862 08:00 AM l0 127 35 0 172 0 3 8 0 11 138 0 2 0 140 7 19 0 0 26 349 08:15 AM 16 146 11 0 173 0 7 7 0 14 116 0 9 0 125 IO l0 0 0 20 332 08:30 AM 5 124 1 0 130 0 4 8 0 12 77 0 4 0 81 4 14 0 0 18 241 08:45 AM 4 133 0 0 137 0 1 5 0 6 100 0 3 0 103 9 16 0 0 25 271 Total 35 530 47 0 612 0 15 28 0 43 431 0 18 0 449 30 59 0 0 89 1 1193 04:00 PM 10 147 3 0 160 0 5 10 0 15 101 0 9 0 110 5 7 0 0 12 297 04:15 PM 5 140 1 0 146 0 5 10 0 l5 86. 0 6 0 92 7 8 0 0 15 268 04:30 PM 3 124 1 0 128 0 18 13 0 31 121 0 9 0 130 3 7 0 0 10 299 04:45 PM 0 137 3 0 140 0 12 13 0 25 113 0 5 0 118 5 10 0 0 15 298 Total 1 18 548 8 0 574 1 0 40 46 0 86 1 421 0 29 0 450 1 20 32 0 0 52 1 1162 05:00 PM 2 114 4 0 120 0 7 18 0 25 81 0 9 0 90 2 6 0 0 8 243 05:15 PM 8 154 0 1 163 0 13 6 0 19 102 0 3 0 105 9 9 0 0 18 305 05:30 PM 8 125 1 0 134 0 7 7 0 14 103 0 3 0 106 4 4 0 0 8 262 05:45 PM 5 132 2 0 139 0 10 11 0 21 84 0 7 0 91 4 4 0 0 8 259 Total 23 525 7 1 556 0 37 42 0 79 370 0 22 0 392 19 23 0 0 42 1 1069 Grand Total 83 1990 80 1 2154 0 94 134 0 228 1588 0 81 0 1669 85 150 0 0 235 4286 Apprch % 3.9 92.4 3.7 0 0 41.2 58.8 0 95.1 0 4.9 0 36.2 63.8 0 0 Total % 1.9 46.4 1.9 0 50.3 0 2.2 3.1 0 5.3 37.1 0 1.9 0 38.9 2 3.5 0 0 5.5 Passenger Veh 82 1944 80 1 2107 0 94 128 0 222 1559 0 81 0 1640 83 150 0 0 233 4202 %Passe r Veh 98.8 97.7 100 100 97.8 0 100 95.5 0 97.4 98.2 0 100 0 98.3 97.6 100 0 0 99.1 98 Trucks 1 46 0 0 47 0 0 6 0 6 29 0 0 0 29 2 0 0 0 2 84 %Trucks 1.2 2.3 0 0 2.2 0 0 4.5 0 2.6 l.8 0 0 0 1.7 2.4 0 0 0 0.9 2 Data Collection Group LSmith@DataCollectionGroup.net File Name : Cantebury and Old Ivy Site Code Start Date : 5/6/2021 Page No : 2 29.250 SB Off Ramp/Canterbury From North Old Ivy From East Canterbury From South Old Garth From West Start Time Right I Tbru I Left I Peds App Tore) Right I Thru I Left I Peds I App. Toud Right Thru Left Peds App. Total I Right I Thm I Left I Peds I App, Tors) Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of l Peak Hour for Entire Intersection Bepns at 07:45 AM Int. Tota 07:45 AM 5 148F 6 0 159 0 1 3 0 4 116 0 4 0 120 5 12 0 0 17 300 08:00 AM 10 127 35 0 172 0 3 8 0 11 138 0 2 0 140 7 19 0 0 26 349 08:15 AM 16 146 11 0 173 0 7 7 0 14 116 0 9 0 125 10 10 0 0 20 332 08:30 AM 5 124 1 0 130 0 4 8 0 12 77 0 4 0 81 4 14 0 0 18 241 Total Volume 36 545 53 0 634 0 15 26 0 41 447 0 19 0 466 26 55 0 0 81 1222 % AVV. Total 5.7 86 8.4 0 0 36.6 63A 0 959 0 4.1 0 32A 67.9 0 0 PIE .563 921 .379 .000 .916 .000 536 .813 .000 .732 .810 .000 .528 .000 .832 .650 .724 .000 .000 .779 .875 Passenger Veh 36 527 53 0 616 0 15 24 0 39 438 0 19 0 457 26 55 0 0 81 1193 %Passenger Veh 100 96.7 100 0 97.2 0 100 92.3 0 95.1 98.0 0 100 0 98.1 100 100 0 0 100 97.6 Trucks 0 18 0 0 18 0 0 2 0 2 9 0 0 0 9 0 0 0 0 0 29 % Trucks 0 3.3 0 0 2.8 0 0 7.7 0 4.9 2.0 0 0 0 1.9 0 0 0 0 0 2.4 Data Collection Group LSmith@DataCollectionGroup.net File Name : Cantebury and Old Ivy Site Code Start Date : 5/6/2021 Page No 3 29.250 SIB Off Ramp/Canterbury Out In Total 0 618 816 0 18 18 36 527 53 0 0 18 0 0 36 Rigght Thru Left Peds t 1 Y. Peak Hour Data m no`n o0 t� 1 *Lz- NO t _ _ n o m 2 Nodh ~c m �o $i r� Peak Hour Begins at 07:45 5; — o �+ = Passenger Veh Trucks r p N m S n O o O _ 00 m q N Wd_ 4-1 ? r Left Thru Ri ht Pads 19 0 438 0 0 0 s 0 19 0 447 577 4597 1034 z s z 7 1 3 Out In Total 29.250 SB Off Ramp/Canterbury Data Collection Group LSmith@DataCollectionGroup.net Old Ivy I Canterbury File Name : Cantebury and Old Ivy Site Code Start Date : 5/6/2021 Page No :4 ur[Yl I Start Time I Right I Thm I Left I Peds I App. Tome I Right I Thm I Left I Peds I App, ToW I Right I Thm I Left I Peds I App. Tows I Right I Thm I Left I Peds I App, Total I hrt. Total I Peak How Analysis From 12:00 PM to 05:45 PM - Peak t of 1 Peak Hnnr fnr Fntire Tnterw,&inn Tteoins at 04-60 PM 04:00 PM 10 147 3 0 160 0 5 10 0 15 101 0 9 0 110 5 7 0 0 12 297 04:15 PM 5 140 1 0 146 0 5 10 0 15 86 0 6 0 92 7 8 0 0 15 268 04:30 PM 3 124 1 0 128 0 18 13 0 31 121 0 9 0 130 3 7 0 0 10 299 04:45 PM 0 137 3 0 140 0 12 13 0 25 113 0 5 0 118 5 10 0 0 15 298 Total Volume 18 548 8 0 574 0 40 46 0 86 421 0 29 0 450 20 32 0 0 52 1162 %A .Total 3.1 95.5 1.4 0 0 46.5 53.5 0 93.6 0 6.4 0 38.5 61.5 0 0 PHF .450 .932 .667 .000 .897 .000 .556 .885 .000 .694 .870 .000 .806 .000 .865 .714 .800 .000 .000 .867 .972 Passenger Veh 18 547 8 0 573 0 40 45 0 85 413 0 29 0 442 20 32 0 0 52 1152 % Passenger Veh 100 99.8 100 0 99.8 0 100 97.8 0 98.8 98.1 0 100 0 98.2 100 100 0 0 100 99.1 Trucks 0 1 0 0 1 0 0 1 0 1 8 0 0 0 8 0 0 0 0 0 10 %Trucks 0 0.2 0 0 0.2 0 0 2.2 0 1.2 L9 0 0 0 1.8 0 0 0 0 0 0.9 Data Collection Group LSmith@DataCollectionGroup.net File Name : Cantebury and Old Ivy Site Code Start Date : 5/6/2021 Page No 5 29.250 SIB Oft Ramp/Canterbury Out In Total 0 573 573 0 1 1 74 18 547 8 0 0 1 0 0 1 Right Thru Left Peds Y. Peak Hour Data o, ~ f 0.n a� J O O O A N O m o 2 r-4 Nodh Peak Hour Begins at 04:00 P ~2 0 0 0 m w n c7 — O o Passenger Veh Trucks _ Smom O K+ ro a � a000 wa 'rmm— 4-1 ? r Left Thru Ri ht Pads 29 0 413 0 0 0 8 0 29 0 421 612 442 1054 2 8 10 14 4 1 Out In Total Data Collection Group 757.478.6761 LSmith@DataCollectionGroup.net r,m..ns Printed- Passenner Veh - Tn.Pks File Name : Old Ivy and Faulconer Site Code : 00033668 Start Date : 5/6/2021 Page No 1 Faulconer Old Ivy Driveway Old Ivy From North From East From South From West Start Time Right Thru Left Peds App Total Right Thru Left Peds App Total Right Thru Left Peds N+p Total Right I Thru I Left Peda Mp ro ai Int. Total 07:00 AM 0 1 8 0 9 2 6 0 0 8 0 0 0 0 0 0 59 2 0 61 78 07:15 AM 0 1 12 0 13 5 7 0 0 12 0 0 0 0 0 1 82 7 0 90 115 07:30 AM 1 0 7 0 8 10 5 0 0 15 1 0 0 0 1 3 90 36 0 129 153 07:45 AM 0 3 37 0 40 17 6 0 0 23 0 0 0 0 0 2 87 51 0 140 203 Total 1 5 64 0 70 34 24 0 0 58 1 0 0 0 1 6 318 96 0 420 549 08:00 AM 2 1 57 0 60 22 8 0 0 30 0 0 0 0 0 2 129 64 0 195 285 08:15 AM 0 2 72 0 74 5 15 0 0 20 0 0 0 0 0 4 97 30 0 131 225 08:30 AM 1 1 32 0 34 5 10 0 0 15 0 0 3 0 3 3 87 8 0 98 150 08:45 AM 1 0 30 0 31 2 4 0 0 6 0 1 0 0 1 1 113 4 0 118 156 Total 4 4 191 0 199 34 37 0 0 71 0 1 3 0 4 10 426 106 0 5421 816 BREAK "• 04:00 PM 1 0 52 0 53 6 12 1 0 19 3 0 4 0 7 0 101 12 0 113 192 04:15 PM 0 0 45 0 45 3 16 0 0 19 3 0 0 0 3 2 90 4 0 96 163 04:30 PM 2 0 25 0 27 2 32 0 1 35 2 0 0 0 2 0 115 4 0 119 183 04:45 PM 3 0 23 0 26 5 22 0 0 27 0 0 1 0 1 1 111 7 0 119 173 Total 6 0 145 0 151 16 82 1 1 100 8 0 5 0 13 3 417 27 0 4471 711 05:00 PM 6 0 33 0 39 7 19 0 0 26 3 0 0 0 3 0 93 6 0 99 167 05:15 PM 1 0 42 0 43 4 19 0 0 23 0 0 0 1 1 0 101 12 0 113 180 05:30 PM 1 1 26 0 28 3 11 0 0 14 1 0 0 0 1 0 104 4 0 108 151 05:45 PM 3 0 33 0 36 6 19 0 0 25 1 0 0 0 1 0 84 6 0 90 152 Total 11 1 134 0 146 20 68 0 0 88 5 0 0 1 6 0 382 28 0 4101 650 Grand Total 22 10 534 0 566 104 211 1 1 317 14 1 8 1 24 19 1543 257 0 1819 2726 Apprch % 3.9 1.8 94.3 0 32.8 66.6 0.3 0.3 58.3 4.2 33.3 4.2 1 84.8 14.1 0 Total % 0.8 0.4 19.6 0 20.8 3.8 7.7 0 0 11.6 0.5 0 0.3 0 0.9 0.7 56.6 9.4 0 66.7 Passenger Veh 22 10 525 0 557 102 204 0 1 307 14 1 7 1 23 19 1505 256 0 1780 2667 %Passenger Van 100 100 98.3 0 98A 98.1 96.7 0 100 96.8 100 100 87.5 100 95.8 100 97.5 99.6 0 97.9 97.8 Trucks 0 0 9 0 9 2 7 1 0 10 0 0 1 0 1 0 38 1 0 39 59 % Trucks 0 0 1.7 0 1.6 1.9 3.3 100 0 3.2 0 0 12.5 0 42 0 2.5 0.4 0 2.1 2.2 Data Collection Group 757.478.6761 LSmith@DataCollectionGroup.net File Name : Old Ivy and Faulconer Site Code : 00033668 Start Date : 5/6/2021 Page No : 2 Faulconer From North Old Ivy From East Driveway From South Old Ivy From West Start Time Right Thru Left Peds APP Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Beains at 07:30 AM Int. Total 07:30 AM 1 0 7 0 8 10 5 0 0 15 1 0 0 0 1 3 90 36 0 129 153 07:45 AM 0 3 37 0 40 17 6 0 0 23 0 0 0 0 0 2 87 51 0 140 203 08:00 AM 2 1 57 0 60 22 8 0 0 30 0 0 0 0 0 2 129 64 0 195 285 08:15 AM 0 2 72 0 74 5 15 0 0 20 0 0 0 0 0 4 97 30 0 131 225 Total Volume 3 6 173 0 182 54 34 0 0 88 1 0 0 0 1 11 403 181 0 595 866 %App. Total 1-6 3.3 95.1 0 61.4 38.6 0 0 100 0 0 0 1.8 67.7 30.4 0 PHF .375 .500 .601 .000 .615 .614 .567 .000 .000 .733 .250 .000 .000 .000 .250 .688 .781 .707 .000 .763 .760 Passenger Veh 3 6 168 0 177 53 32 0 0 85 1 0 0 0 1 11 393 181 0 585 848 % Passenger Veh 100 100 97.1 0 97.3 98.1 94.1 0 0 96.6 100 0 0 0 100 100 97.5 100 0 98.3 97.9 Trucks 0 0 5 0 5 1 2 0 0 3 0 0 0 0 0 0 10 0 0 10 18 % Trucks 0 0 2.9 0 2.7 1.9 5.9 0 0 3.4 0 0 0 0 0 0 2.5 0 0 1.7 2.1 Data Collection Group 757.478.6761 LSmith@DataCollectionGroup.net Faulwner In T I 2 17 411 1 5 8 2 41 3 6 16 0 0 0 5 0 Right Thou Left Peds Peak Hour Data .V �N PP m o North J N Peak Hour Begins at 07:30 2 � N o— K iDoucks0 Passenger Veh m N S mr 0 �L T r L Thru Riaht Peds 0 0 1 0 0 0 0 0 1 17 1 18 17 1 1 Out In Total File Name : Old Ivy and Faulconer Site Code : 00033668 Start Date : 5/6/2021 Page No : 3 Data Collection Group 757.478.6761 LSmith@DataCollectionGroup.net File Name : Old Ivy and Faulconer Site Code : 00033668 Start Date : 5/6/2021 Page No : 4 Faulconer From North Old Ivy From East Driveway From South Old Ivy From West Start Time I Right I Thru I Lett I Peds I App. Totai Right I Thro Left F Peds App. Total Right Thru Left Peds App. Total Right I Thru I Left I Peds I App. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Beams at 04:00 PM 04:00 PM 1 0 52 0 63 6 12 1 0 19 3 0 4 0 7 0 101 12 0 113 192 04:15 PM 0 0 45 0 45 3 16 0 0 19 3 0 0 0 3 2 90 4 0 96 163 04:30 PM 2 0 25 0 27 2 32 0 1 35 2 0 0 0 2 0 115 4 0 119 183 04:45 PM 3 0 23 0 26 5 22 0 0 27 0 0 1 0 1 1 111 7 0 119 173 Total Volume 6 0 145 0 151 16 82 1 1 100 8 0 5 0 13 3 417 27 0 447 711 %App. Total 4 0 96 0 16 82 1 1 61.5 0 38.5 0 0.7 93.3 6 0 PHF .500 .000 .697 .000 .712 .667 .641 .250 .250 .714 .667 .000 .313 .000 .464 .375 .907 .563 .000 .939 .926 Passenger Veh 6 0 145 0 151 15 81 0 1 97 8 0 4 0 12 3 405 26 0 434 694 %passenger van 100 0 100 0 100 93.8 98.8 0 100 97.0 100 0 80.0 0 92.3 100 97.1 96.3 0 97.1 97.6 Trucks 0 0 0 0 0 1 1 1 0 3 0 0 1 0 1 0 12 1 0 13 17 % Trucks 0 0 0 0 0 6.3 1.2 100 0 3.0 0 0 20.0 0 7.7 0 2.9 3.7 0 2.9 2.4 Data Collection Group 757.478.6761 LSmith@DataCollectionGroup.net Faulwner In T I 41 151 19 2 0 2 1 6 0 1 0 0 0 0 0 Right Thou Left Peds Peak Hour Data �A N N North Peak Hour Begins at 04:00 P W U 2 � , m JO mS o— " S O Passenger Veh TILICIM r� a mN 0 J o T r Left Thru Riaht Peds 4 0 8 0 1 0 0 0 17 4 11 Out In Total File Name : Old Ivy and Faulconer Site Code : 00033668 Start Date : 5/6/2021 Page No : 5 Data Collection Group LSmith@DataCollectionGroup.net File Name : Old Ivy and 29-250 NB On Ramp Site Code Start Date : 5/6/2021 Page No 1 r ,. oa lhintnd_ Pa--- Vnh - T—V. 29/250 On Ramp Old Ivy Driveway Old Ivy From North From East From South From West Suit TlIrit: Right Tlvu I Left I Peds App, Told Right Thru I Left I Peds App, Tore) Right Thm Left Peds App. ToW Right Thm I Left I Peds App. ToW ha, Total 07:00 AM 0 0 0 0 0 9 8 0 0 17 0 0 0 0 0 2 14 52 0 68 85 07:15 AM 0 0 0 0 0 11 12 0 0 23 0 0 1 0 1 3 21 64 0 88 112 07:30 AM 0 0 0 0 0 6 14 0 0 20 0 0 0 0 0 0 21 77 0 98 118 07:45 AM 0 0 0 0 0 17 23 0 0 40 0 0 0 0 0 0 38 78 0 116 156 Total 0 0 0 0 0 43 57 0 0 100 0 0 1 0 1 5 94 271 0 370 471 08:00 AM 0 0 0 0 0 21 33 0 0 54 0 0 0 0 0 1 64 120 0 185 239 08:15 AM 0 0 0 0 0 21 20 0 0 41 0 0 0 0 0 0 70 104 0 174 215 08:30 AM 0 0 0 0 0 24 13 0 0 37 0 0 0 0 0 0 43 75 0 118 155 08:45 AM 0 0 0 0 0 21 6 0 0 27 0 0 0 0 0 0 59 84 0 143 170 Total 0 0 0 0 0 87 72 0 0 159 0 0 0 0 0 1 236 383 0 620 1 779 04:00 PM 0 0 0 0 0 56 19 0 0 75 0 0 0 0 0 0 37 115 0 152 227 04:15 PM 0 0 0 0 0 33 17 0 0 50 0 0 0 0 0 0 38 ]02 0 140 190 04:30 PM 0 0 0 0 0 46 35 0 0 81 0 0 0 t 1 0 26 127 0 153 235 04:45 PM 0 0 0 0 0 48 29 0 0 77 0 1 0 0 1 0 26 109 0 135 213 Total 1 0 0 0 0 0 1 183 100 0 0 283 1 0 1 0 1 2 1 0 127 453 0 580 1 865 05:00 PM 1 0 0 0 0 0 64 26 0 0 90 0 0 0 0 0 0 44 85 0 129 219 05:15 PM 0 0 0 1 1 45 24 0 0 69 0 0 0 l 1 0 45 95 0 140 211 0S:30 PM 0 0 0 0 0 49 14 0 0 63 0 0 0 0 0 1 27 103 0 131 194 Grand Total 0 0 0 1 1 513 317 0 0 830 0 1 1 2 4 7 611 1470 0 2088 2923 Apprch % 0 0 0 100 61.8 38.2 0 0 0 25 25 50 0.3 29.3 70.4 0 Total % 0 0 0 0 0 17.6 10.8 0 0 28.4 0 0 0 0.1 0.1 0.2 20.9 50.3 0 71.4 Passenger Veh 0 0 0 1 1 508 311 0 0 819 0 1 0 2 3 6 600 1445 0 2051 2874 %Passe rVeh 0 0 0 100 100 99 98.1 0 0 98.7 0 100 0 100 75 85.7 98.2 98.3 0 98.2 98.3 Trucks 0 0 0 0 0 5 6 0 0 11 0 0 1 0 1 1 11 25 0 37 49 %Trucks 0 0 0 0 0 1 1.9 0 0 1.3 0 0 100 0 25 14.3 1.8 1.7 0 1.8 1.7 Data Collection Group LSmith@DataCollectionGroup.net File Name : Old Ivy and 29-250 NB On Ramp Site Code Start Date : 5/6/2021 Page No 2 29/250 On Ramp From North Old Ivy I From East Driveway From South Old IVY From West Start Time Right I Thru I Left I Peds I ApP Toni I Right I Thru I Left I Peds App. Tom1 Right Thru Left Peds App. TOW Right I Thru I Left Peds I App, Tots) Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of l Peak Hour for Entire Intersection Bepns at 08:00 AM Int. Total 08:00 AM 0 0 0 0 0 21 33 0 0 54 0 0 0 0 0 1 64 120 0 185 239 08:15 AM 0 0 0 0 0 21 20 0 0 41 0 0 0 0 0 0 70 104 0 174 215 08:30 AM 0 0 0 0 0 24 13 0 0 37 0 0 0 0 0 0 43 75 0 118 155 08:45 AM 0 0 0 0 0 21 6 0 0 27 0 0 0 0 0 0 59 84 0 143 170 Total Volume 0 0 0 0 0 87 72 0 0 159 0 0 0 0 0 1 236 383 0 620 779 % AVV. Total 0 0 0 0 54.7 45.3 0 0 0 0 0 0 0.2 38.1 61.8 0 PIE .000 000 .000 .000 .000 .906 .545 .000 .000 .736 .000 .000 .000 .000 .000 .250 .843 .798 .000 .838 .815 Passenger Veh 0 0 0 0 0 86 68 0 0 154 0 0 0 0 0 1 227 377 0 605 759 %Passenger Veh 0 0 0 0 0 98.9 94.4 0 0 96.9 0 0 0 0 0 100 96.2 98.4 0 97.6 97.4 Trucks 0 0 0 0 0 1 4 0 0 5 0 0 0 0 0 0 9 6 0 15 20 % Trucks 0 0 0 0 0 1.1 5.6 0 0 3.1 0 0 0 0 0 0 3.8 1.6 0 2.4 2.6 Data Collection Group LSmith@DataCollectionGroup.net File Name : Old Ivy and 29-250 NB On Ramp Site Code Start Date : 5/6/2021 Page No : 3 29/250 On Ramp Out In Total 4fi3 0 4fi3 7 0 7 47 47 0 0 0 0 0 0 0 0 Right Thlru Left Peds I IY Peak Hour Data .r.—•�' - 'm p r-m 2 North Peak Hour Begins at 08:00 Al ~RNnm _4 a Passenger Veh Trucks maw gm r + oc i y �o O A J H O O D 4-1 ? r Left Thou Ri ht Pads 0 0 0 0 0 0 0 0 00 i o t Out In Total Data Collection Group LSmith@DataCollectionGroup.net File Name : Old Ivy and 29-250 NB On Ramp Site Code : Start Date : 5/6/2021 Page No 4 29/250 On Ramp Old Ivy Driveway Old Ivy From North From East From South From West Start Time Right I Thru I Left I Peds I App. Toms Right I Thru I Left I Peds I App, Toml Right Thru LeftPeds App.Towl I Right I Thm I Left I Peds I Am, Toms hrt. Total Peak How Analysis From 12:00 PM to 06:00 PM - Peak t of 1 Pmk Hnnr fnr Fntire TMerceMinn Tteoins at 04-10 PM 04:30 PM 0 0 0 0 0 46 35 0 0 81 0 0 0 1 1 0 26 127 0 153 235 04:45 PM 0 0 0 0 0 48 29 0 0 77 0 1 0 0 1 0 26 109 0 135 213 05:00 PM 0 0 0 0 0 64 26 0 0 90 0 0 0 0 0 0 44 85 0 129 219 05:15 PM 0 0 0 1 1 45 24 0 0 69 0 0 0 l 1 0 45 95 0 140 211 Total Volume 0 0 0 1 1 203 114 0 0 317 0 t 0 2 3 0 141 416 0 557 878 % Avy.Total 0 0 0 100 64 36 0 0 0 33.3 0 66.7 0 25.3 74.7 0 PHF .000 .000 .000 .250 .250 .793 .814 .000 .000 .881 .000 .250 .000 .500 .750 .000 .783 .819 .000 .910 .934 Passenger Veh 0 0 0 1 1 202 113 0 0 315 0 1 0 2 3 0 141 408 0 549 868 %Passenger Veh 0 0 0 100 100 99.5 99.1 0 0 99.4 0 100 0 100 100 0 100 98.1 0 98o 98.9 Trucks 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 0 8 0 8 10 % Trucks 0 0 0 0 0 0.5 0.9 0 0 0.6 0 0 0 0 0 0 0 1.9 0 1.4 1.1 Data Collection Group LSmith@DataCollectionGroup.net File Name : Old Ivy and 29-250 NB On Ramp Site Code Start Date : 5/6/2021 Page No : 5 29/250 On Ramp Out In Total 811 1 612 9 0 9 627 0 0 0 1 0 0 0 0 0 7 Right Thlru Left Pads Peak Hour Data o m Ca a m� '_z-N N O a o a 2 North o' Peak Hour Begins at 04:30 PM ~P n w O w 'a m O oo =a-� Passenger Veh Trucks O0 oo i irw mNm— '"000 4-1 ? r Left Thou Ri ht Pads 0 1 1 0 2 0 0 0 0 1 02 3 0 P 0 Out In Total Data Collection Group LSmith@DataCollectionGroup.net File Name : Ivy and Old Ivy Site Code Start Date : 5/6/2021 Page No :1 Groans Printed- Passenger Veh - Trucks Driveway Ivy Saint Ames Ivy Old Ivy From North From East From South From West From Northwest Start Time " Right Th. Left Ras T Rigln CIO Thm Left Pod: arrrm Right Thm ��0 Left PI, i Riehl Thru Left Peas W " "d �0 .. .�0 Peds p_i 12 In1 Tow 0):00n 0 0 0 1 0 I 0 33 0 0 43 1 0 0 0 1 0 n 1 4 0 76 8 0 133 azlsAM 1 0 0 0 o I o u si o o a o 0 0 0 0 0 0 ]a o s a ss o 0 19 o a 19 Is9 07 M n 0 0 0 0 0 0 0 20 55 0 0 75 0 0 0 1 0 1 0 122 0 s 0 m 2 0 15 0 0 n 220 T4 nm o s) a 0 0 1 4 20 Is4 4 0 z Toml 1 0 a 1 0 2 0 82 196 0 0 3)8 1 0 0 1 0 2 a m 1 34 0 l32 10 0 71 0 0 81 795 08:OOAM 1 0 a 0 0 1 0 3a 9) 0 0 127 0 0 0 0 0 a 0 135 0 25 0 1W 9 0 M 2 0 43 331 08:15 AM 3 0 a 0 0 3 0 28 56 0 0 8l 0 0 0 I 0 1 0 119 0 p 0 136 9 a W 1 0 M 288 0830 AM 0 0 a p 0 0 0 R 0 0 0 103 0 0 1 3 0 4 0 I W 0 8 0 142 9 0 33 0 0 42 291 OB:45AM 1 0 0 0 0 1 0 25 ]II 0 0 95 0 0 0 5 0 5 0 157 0 10 0 16] 5 0 3B 2 0 45 313 Tom1 1 5 0 0 0 0 5 1 0 117 2W 0 0 Na 1 0 0 1 9 0 10 1 0 WS 0 60 0 605 I 30 0 159 5 0 1% 1 1223 "M 2 0 0 p 1 3 0 55 136 0 0 191 0 0 0 1 0 1 0 103 0 9 0 111 10 0 36 2 0 48 356 W:IS Ptd 1 1 0 p 1 3 0 52 136 0 0 I88 1 0 0 0 0 1 0 Ip 0 ) 0 IId 10 a 26 2 0 38 356 W30 PId 1 1 0 p 6 6 0 6a 122 p 0 182 0 0 0 I 0 1 a IOp 0 ) 0 1% 12 a 30 6 0 46 342 WA5 PM11 1 1 0 0 0 2 1 64 13] 0 0 2((1 0 0 0 2 0 2 a 109 0 I3 0 122 ) a 2) 3 0 37 365 Toml 5 3 0 0 6 14 1 231 531 0 0 763 1 1 0 0 4 0 5 1 0 428 0 36 0 46l1 39 0 119 11 0 va, 1 1415 05:W PId 3 1 0 1 1 6 0 65 163 0 0 228 3 0 0 9 0 12 0 119 0 9 0 128 Id 0 29 I 0 44 418 05:IS PM 1 1 0 0 0 2 0 a 181 0 0 229 0 0 0 0 0 0 0 103 0 ) 0 IIO 11 a 26 I 0 38 3A 0590 PM 1 0 0 0 1 2 0 50 126 0 0 176 0 0 0 2 0 2 0 93 0 6 0 99 6 0 25 2 0 33 312 O545 PM 0 2 0 0 0 2 0 52 1W 0 0 161 0 0 0 4 0 4 0 M 1 6 0 93 6 a 14 3 0 23 283 Toml 5 4 0 1 2 12 0 215 5W 0 0 7% 3 0 0 I5 0 18 0 on 1 28 0 430 3] 0 W ) 0 138 1 1392 Glans Total 16 7 0 2 8 33 1 645 1598 0 0 nu 5 0 1 29 0 35 0 1771 2 158 0 1931 116 0 443 23 0 582 4825 Approh% 485 212 0 61 242 0 287 712 0 0 143 0 29 929 0 0 917 0.1 82 0 149 0 76.1 4 0 raw % 0.3 0.1 0 0 02 07 0 134 33.1 0 0 46.5 0.1 0 0 06 0 0.7 0 367 0 33 0 40 2.4 0 92 OS 0 12.1 x v.a< vm IN IN 0 IN IN IN Iro 98.3 97.5 0 0 97.7 100 0 100 100 0 100 0 98.2 100 100 0 98.4 100 0 98 100 0 98.5 98.1 Trucks 0 0 0 0 0 0 0 11 40 0 0 51 0 0 0 0 0 0 0 31 0 0 0 31 0 0 9 0 0 9 91 %Trucks 0 0 0 0 0 0 0 1.7 2.5 0 0 2.3 0 0 0 0 0 0 0 1.8 0 0 0 1. 0 0 2 0 0 1.5 1.9 Data Collection Group LSmith@DataCollectionGroup.net File Name : Ivy and Old Ivy Site Code Start Date : 5/6/2021 Page No 2 Driveway From North Ivy From East Saint Ames From South IVY From West Old Ivy From Northwest Start Time " Right Thra Left reds .yo.. Right Thru Left eels ,rm Right '1'hrn Left Beds ,,, rm Right Th. Left Ped3 Y[ HoueAMlyy54Nm U]'W AM b 11'<5 FM-PRk 1 N 1 �r xab w. em0� maren� Runs az oam un n 0 0 0 0 0 0 0 0 0 135 08:15 AM 3 0 0 0 0 3 0 28 56 0 0 84 0 0 0 1 0 I 0 119 08:30 AM 0 0 0 0 0 0 0 34 69 0 0 103 0 0 1 3 0 4 0 134 08:45 AM 1 0 0 0 0 1 0 25 70 0 0 95 0 0 0 5 0 5 0 157 Toml VoWme 5 0 0 0 0 5 0 117 292 0 0 409 0 0 1 9 0 10 0 545 Ped3 -TOW 0 0 160 7 0 34 0 43 331 0 17 0 136 9 0 54 1 0 64 288 0 8 0 142 9 0 33 0 0 42 291 r.",, Vm 5 0 0 0 0 5 0 112 282 0 0 394 0 0 1 9 0 10 0 -137 0 60 0 597 30 0 152 5 0 187 1193 x w., Vm 1. 0 0 0 0 109 0 95.7 96.6 0 0 96.3 0 0 100 I00 0 100 0 98.5 0 I00 0 98.7 100 0 95.6 100 0 96A 97.5 Trucks 0 0 0 0 0 0 0 5 10 0 0 15 0 0 0 0 0 0 0 8 0 0 0 8 0 0 7 0 0 7 30 % Trucks 0 0 0 0 0 0 0 4.3 3.4 0 0 3.7 0 0 0 0 0 0 0 1.5 0 0 0 1.3 0 0 4.4 0 0 3.6 2.5 Data Collection Group LSmith@DataCollectionGroup.net File Name : Ivy and Old Ivy Site Code Start Date : 5/6/2021 Page No 3 Old Ivy Driveway o^ Out In Total o�^ti 8 10 ^o 0 0 0 0 ^ ^ G 9 ^ o 0 0 0 0 o Hard Rght ru LePed FRhtL �s 1 Peak Hour Data 1p mmm _ sm � o F oo A J m� as ,°�' m $ m f° 2 Peak Hour Begins at 08:00 Passenger Veh 0o a Tmcks Om m s000 �^ 0 o p N9 wow a d 4 Bear Left Left Thm Ri ht Peds 9 1 0 0 0 0 0 0 0 0 1 PO 10 10 1 1 Ord In Total Data Collection Group LSmith@DataCollectionGroup.net File Name : Ivy and Old Ivy Site Code Start Date : 5/6/2021 Page No : 4 Driveway IVY I Saint Armes IVY Old Ivy From North From Fast From South From West From Northwest Start Time Itighl Tlw Left PMs apPrw m6M Tfw Left Beds nw.rw Rignc Tlw Left Beds nw.rw RiBbt Tlw Left Peels .q.. row Peels .bP. row IN Taal Ppk Hone MNYas Fmm 12 00 PM b O5:<5 PM-Ppk I MI Ppk Hoirt WrF 're lno-ration Be@rtsat03JOPM ^�^ 0 0 0 60 122 0 0 182 0 0 0 1 0 1 0 100 0 7 0 107 12 0 4 0 46 342 04:45 PM 1 1 0 0 0 2 1 64 137 0 0 202 0 0 0 2 0 2 0 109 0 13 0 122 7 0 27 3 0 37 365 05:00 PM 3 1 0 1 1 6 0 65 163 0 0 228 3 0 0 9 0 12 0 119 0 9 0 128 14 0 29 1 0 44 418 05:15 PM 1 1 0 0 0 2 0 48 181 0 0 229 0 0 0 0 0 0 0 103 0 7 0 Ito 11 0 26 1 0 38 379 Taal W.. 6 4 0 1 5 16 1 237 603 0 0 841 3 0 0 12 0 15 0 431 0 36 0 467 44 0 112 9 0 165 1504 .Total 375 25 0 6.2 312 0.1 28.2 71.7 0 0 20 0 0 80 0 0 92.3 0 7.7 0 26.7 0 6T9 5.5 0 1'0 PHF .000 .250 .313 .667 .250 M2 .833 000 .918 .250 .000 o00 .333 .313 .000 .905 .692 .912 .786 000 .563 .000 .897 .900 .500 .000 .000 .000 .000 .933 Passenger vw 6 4 0 1 5 16 1 235 597 0 0 833 3 0 0 12 0 15 0 424 0 36 0 460 44 0 112 9 0 165 1489 IN 1, o IN I. IN IW 919.2 99.0 0 0 99.0 100 0 0 100 0 100 0 98.4 0 100 0 98.5 100 0 100 100 0 100 99.0 Trucks 0 0 0 0 0 0 0 2 6 0 0 8 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 0 0 0 15 %Trucks 0 0 0 0 0 0 0 0.8 LO 0 0 1.0 0 0 0 0 0 0 0 1.6 0 0 0 1.5 0 0 0 0 0 0 LO Data Collection Group LSmith@DataCollectionGroup.net File Name : Ivy and Old Ivy Site Code Start Date : 5/6/2021 Page No 5 Old Ivy Driveway o� Out In Total �` Oy � OPryy 10 10 26 0 0 0 0 009 8 4 0 1 5 0 0 0 1 0 4 Hard Ri ht Thru Lefl Peds 0vg� F' ht � 1 L Q� 21?O 2� Peak Hour Data p W ds 1� JJOO r r v n Peak Hour Begins at 04:30 P _ g ~� o m p w�'� Passenger Veh w m J LAW nmm 00 'c Tmcks O m 0o w v wvw— m D, �000 Bear Left Left Thm Ri ht Peds 12 0 0 3 0 0 0 0 0 0 12 15 15 0 0 0 1 15 ON In Total February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Appendix B Synchro Analysis for 2021 Existing Conditions February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Queues 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 Lane Group EBL EBT EBR WBL WBT NBT NBR SBT SBR Lane Group Flow (vph) 412 656 11 27 709 33 26 100 600 v/c Ratio 0.91 0.56 0.01 0.06 0.96 0.26 0.08 0.64 0.92 Control Delay 58.1 18.0 0.0 11.0 60.1 58.6 0.5 70.6 40.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 58.1 18.0 0.0 11.0 60.1 58.6 0.5 70.6 40.5 Queue Length 50th (ft) 251 341 0 6 -613 25 0 76 188 Queue Length 95th (ft) #460 477 0 17 #850 59 0 132 #440 Internal Link Dist (ft) 843 543 551 203 Turn Bay Length (ft) 450 200 180 75 Base Capacity (vph) 467 1164 1075 421 740 147 338 199 662 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.88 0.56 0.01 0.06 0.96 0.22 0.08 0.50 0.91 Intersection Summary - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 1 HCM Signalized Intersection Capacity Analysis 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t if ►j 11� +1 r +T r Traffic Volume (vph) 375 597 10 25 543 102 12 18 24 78 13 546 Future Volume (vph) 375 597 10 25 543 102 12 18 24 78 13 546 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 0.98 1.00 0.96 1.00 Satd. Flow (prot) 1770 1845 1615 1736 1760 1863 1538 1761 1553 Fit Permitted 0.07 1.00 1.00 0.42 1.00 0.98 1.00 0.96 1.00 Satd.Flow (perm) 136 1845 1615 759 1760 1863 1538 1761 1553 Peak -hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 412 656 11 27 597 112 13 20 26 86 14 600 RTOR Reduction (vph) 0 0 4 0 5 0 0 0 25 0 0 181 Lane Group Flow (vph) 412 656 7 27 704 0 0 33 1 0 100 419 Heavy Vehicles (%) 2% 3% 0% 4% 6% 2% 0% 0% 5% 4% 0% 4% Turn Type pm+pt NA Perm pm+pt NA Split NA Perm Split NA pm+ov Protected Phases 5 2 1 6 4 4 3 3 5 Permitted Phases 2 2 6 4 3 Actuated Green, G (s) 83.1 71.3 71.3 52.9 48.9 6.5 6.5 10.7 37.1 Effective Green, g (s) 83.1 71.3 71.3 52.9 48.9 6.5 6.5 10.7 37.1 Actuated g/C Ratio 0.69 0.59 0.59 0.44 0.41 0.05 0.05 0.09 0.31 Clearance Time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Vehicle Extension (s) 2.0 4.0 4.0 2.0 4.0 1.5 1.5 1.5 2.0 Lane Grp Cap (vph) 453 1096 959 367 717 100 83 157 480 v/s Ratio Prot c0.20 0.36 0.00 c0.40 c0.02 0.06 c0.19 v/s Ratio Perm 0.43 0.00 0.03 0.00 0.08 v/c Ratio 0.91 0.60 0.01 0.07 0.98 0.33 0.02 0.64 0.87 Uniform Delay, d1 37.0 15.3 9.9 19.1 35.1 54.7 53.7 52.8 39.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 21.4 2.4 0.0 0.0 29.4 0.7 0.0 6.1 15.5 Delay (s) 58.4 17.8 9.9 19.1 64.5 55.4 53.8 58.9 54.7 Level of Service E B A B E E D E D Approach Delay (s) 33.2 62.8 54.7 55.3 Approach LOS C E D E Intersection Summa HCM 2000 Control Delay 48.2 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.91 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 93.7% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 2 HCM Unsignalized Intersection Capacity Analysis 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '+ fi 4* 4+ Traffic Volume (veh/h) 0 65 33 31 17 0 20 0 474 52 583 39 Future Volume (Veh/h) 0 65 33 31 17 0 20 0 474 52 583 39 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 0 76 39 36 20 0 24 0 558 61 686 46 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 283 pX, platoon unblocked 0.88 0.88 0.88 0.88 0.88 0.88 vC, conflicting volume 1168 1437 709 1235 1181 279 732 558 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1121 1428 709 1198 1136 108 732 426 tC, single (s) 7.1 6.5 6.2 7.2 6.5 6.2 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.6 4.0 3.3 2.2 2.2 p0 queue free % 100 30 91 30 88 100 97 94 cM capacity (veh/h) 137 109 438 51 163 834 882 1004 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) EB1 WB1 NB SIB 115 56 582 793 0 36 24 61 39 0 558 46 146 68 882 1004 0.79 0.82 0.03 0.06 122 97 2 5 86.3 164.3 0.7 1.5 F F A A 86.3 164.3 0.7 1.5 F F 13.4 69.4% ICU Level of Service 15 fR Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 3 HCM Unsignalized Intersection Capacity Analysis 3: Commercial Entrance/Faulconer Driver & Old Ivy Road 01/21/2022 --* --* f+-- , t `► 1 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r +T+ 4+ +T r Traffic Volume (veh/h) 117 469 11 0 41 37 3 1 0 210 4 4 Future Volume (Veh/h) 117 469 11 0 41 37 3 1 0 210 4 4 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 Hourly flow rate (vph) 163 651 15 0 57 51 4 1 0 292 6 6 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 8 Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 108 666 1066 1085 651 1060 1074 82 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 108 666 1066 1085 651 1060 1074 82 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 89 100 98 99 100 0 97 99 cM capacity (veh/h) 1495 933 180 195 472 184 197 983 Direction, Lane# EB 1 EB 2 WB 1 NB 1 SIB 1 Volume Total 814 15 108 5 304 Volume Left 163 0 0 4 292 Volume Right 0 15 51 0 6 cSH 1495 1700 933 183 187 Volume to Capacity 0.11 0.01 0.00 0.03 1.63 Queue Length 95th (ft) 9 0 0 2 506 Control Delay (s) 2.6 0.0 0.0 25.3 349.1 Lane LOS A D F Approach Delay (s) 2.6 0.0 25.3 349.1 Approach LOS D F Intersection Summary Average Delay 87.0 Intersection Capacity Utilization 58.9% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 4 HCM Unsignalized Intersection Capacity Analysis 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� fi r 4+ Traffic Volume (veh/h) 421 260 1 0 79 96 0 0 0 0 0 0 Future Volume (Veh/h) 421 260 1 0 79 96 0 0 0 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 520 321 1 0 98 119 0 0 0 0 0 0 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 217 322 1460 1578 322 1460 1460 98 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 217 322 1460 1578 322 1460 1460 98 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 62 100 100 100 100 100 100 100 cM capacity (veh/h) 1353 1249 75 67 719 75 79 958 Direction, Lane# EB 1 WB 1 WB 2 NB 1 Volume Total 842 98 119 0 Volume Left 520 0 0 0 Volume Right 1 0 119 0 cSH 1353 1249 1700 1700 Volume to Capacity 0.38 0.00 0.07 0.00 Queue Length 95th (ft) 46 0 0 0 Control Delay (s) 7.4 0.0 0.0 0.0 Lane LOS A A Approach Delay (s) 7.4 0.0 0.0 Approach LOS A Intersection Summary Average Delay 5.9 Intersection Capacity Utilization 49.7% ICU Level of Service A Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 5 Queues 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--,, 4--- Lane Group EBL EBT WBT WBR NBT SBT Lane Group Flow (vph) 72 652 349 140 12 232 v/c Ratio 0.13 0.63 0.34 0.15 0.07 0.58 Control Delay 9.0 14.5 9.8 2.8 27.0 17.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.0 14.5 9.8 2.8 27.0 17.0 Queue Length 50th (ft) 8 108 47 0 3 28 Queue Length 95th (ft) 43 #421 169 29 20 98 Internal Link Dist (ft) 1062 920 247 459 Turn Bay Length (ft) 90 Base Capacity (vph) 599 1075 1055 947 611 676 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.12 0.61 0.33 0.15 0.02 0.34 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 6 HCM Signalized Intersection Capacity Analysis 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--I, l f-~ 1,-4\ T �' �► 1 d Movement EBL EBT EBR WBL WBT WEIR NBL NBT NBR SBL SBT SBR Lane Configurations t T r 4+ 4+ Traffic Volume (vph) 66 600 0 0 321 129 10 1 0 180 0 33 Future Volume (vph) 66 600 0 0 321 129 10 1 0 180 0 33 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.98 Fit Protected 0.95 1.00 1.00 1.00 0.96 0.96 Satd. Flow (prot) 1805 1881 1845 1553 1781 1726 Fit Permitted 0.55 1.00 1.00 1.00 0.96 0.96 Satd.Flow (perm) 1048 1881 1845 1553 1781 1726 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 72 652 0 0 349 140 11 1 0 196 0 36 RTOR Reduction (vph) 0 0 0 0 0 69 0 0 0 0 108 0 Lane Group Flow (vph) 72 652 0 0 349 71 0 12 0 0 124 0 Heavy Vehicles (°/u) 0% 1 % 0% 0% 3% 4% 2% 2% 2% 4% 0% 0% Turn Type Perm NA NA Perm Split NA Split NA Protected Phases 2 2 4 4 3 3 Permitted Phases 2 2 Actuated Green, G (s) 29.5 29.5 29.5 29.5 0.9 9.1 Effective Green, g (s) 29.5 29.5 29.5 29.5 0.9 9.1 Actuated g/C Ratio 0.50 0.50 0.50 0.50 0.02 0.16 Clearance Time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 3.0 Lane Grp Cap (vph) 528 948 930 783 27 268 v/s Ratio Prot c0.35 0.19 c0.01 c0.07 v/s Ratio Perm 0.07 0.05 v/c Ratio 0.14 0.69 0.38 0.09 0.44 0.46 Uniform Delay, d1 7.7 11.0 8.9 7.5 28.6 22.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 2.3 0.3 0.1 4.2 1.3 Delay (s) 7.9 13.3 9.2 7.6 32.7 23.7 Level of Service A B A A C C Approach Delay (s) 12.7 8.8 32.7 23.7 Approach LOS B A C C Intersection Summa HCM 2000 Control Delay 13.3 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.63 Actuated Cycle Length (s) 58.5 Sum of lost time (s) 19.0 Intersection Capacity Utilization 70.2% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2021 Existing AM Peak Synchro 10 Report Timmons Group Page 7 Queuing and Blocking Report 2021 Existing AM Peak 01/21/2022 Intersection: 1: Cantebury Road /Route 846 & Ivy Road Movement EB EB EB WB WB INS NB SB SB Directions Served L T R L TR LT R LT R Maximum Queue (ft) 394 321 26 199 629 80 52 212 76 Average Queue (ft) 197 149 3 39 467 25 13 184 73 95th Queue (ft) 330 277 16 148 719 60 36 252 83 Link Distance (ft) 882 882 586 575 201 Upstream Blk Time (°/u) 23 18 Queuing Penalty (veh) 0 115 Storage Bay Dist (ft) 450 200 180 75 Storage Blk Time (%) 0 0 43 25 26 Queuing Penalty (veh) 0 0 11 137 23 Intersection: 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road Movement EB WB INS SB Directions Served TR LT LTR LTR Maximum Queue (ft) 112 75 71 1160 Average Queue (ft) 45 30 18 1130 95th Queue (ft) 87 62 55 1158 Link Distance (ft) 394 299 201 1106 Upstream Blk Time (°/u) 97 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Commercial Entrance/Faulconer Driver & Old Ivy Road Directions Served LT LTR LT R Maximum Queue (ft) 111 30 325 88 Average Queue (ft) 17 3 116 9 95th Queue (ft) 65 18 277 64 Link Distance (ft) 299 171 352 Upstream Blk Time (°/u) 5 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 190 Storage Blk Time (%) 0 12 0 Queuing Penalty (veh) 0 1 0 Greystar Old Ivy Road TIA SimTraffic Report Timmons Group Page 1 Queuing and Blocking Report 2021 Existing AM Peak 01/21/2022 Intersection: 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road Movement EB WB Directions Served LTR R Maximum Queue (ft) 166 44 Average Queue (ft) 63 14 95th Queue (ft) 125 42 Link Distance (ft) 332 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 50 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 5: Commerical Entrance/Old Ivy Road & Ivy Road Movement EB EB WB WB NB SIB Directions Served L Maximum Queue (ft) 81 Average Queue (ft) 14 95th Queue (ft) 54 Link Distance (ft) Upstream Blk Time (a/u) Queuing Penalty (veh) Storage Bay Dist (ft) 90 Storage Blk Time (°/a) 0 Queuing Penalty (veh) 0 Network Summary Network wide Queuing Penalty: 291 T T R LTR LTR 241 174 66 39 178 85 75 29 11 91 187 146 58 33 151 1037 956 956 277 420 Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 2 Queues 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 t--I, l 'r~ Lane Group EBL EBT EBR WBL WBT NBT NBR SBT SBR Lane Group Flow (vph) 442 660 21 42 721 27 36 85 593 v/c Ratio 0.90 0.54 0.02 0.10 0.91 0.23 0.11 0.58 0.93 Control Delay 56.9 18.2 0.1 10.7 51.6 58.1 0.7 68.3 44.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 56.9 18.2 0.1 10.7 51.6 58.1 0.7 68.3 44.7 Queue Length 50th (ft) 285 333 0 9 -557 20 0 65 214 Queue Length 95th (ft) #523 464 0 23 #821 51 0 116 #483 Internal Link Dist (ft) 843 543 551 203 Turn Bay Length (ft) 450 200 180 75 Base Capacity (vph) 490 1215 1097 429 789 139 337 187 636 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.90 0.54 0.02 0.10 0.91 0.19 0.11 0.45 0.93 Intersection Summary - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 1 HCM Signalized Intersection Capacity Analysis 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t if ►j T+ +T r +T r Traffic Volume (vph) 420 627 20 40 617 68 17 9 34 64 17 563 Future Volume (vph) 420 627 20 40 617 68 17 9 34 64 17 563 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 0.97 1.00 0.96 1.00 Satd. Flow (prot) 1752 1881 1615 1752 1855 1757 1524 1786 1583 Fit Permitted 0.07 1.00 1.00 0.41 1.00 0.97 1.00 0.96 1.00 Satd.Flow (perm) 131 1881 1615 764 1855 1757 1524 1786 1583 Peak -hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 442 660 21 42 649 72 18 9 36 67 18 593 RTOR Reduction (vph) 0 0 8 0 3 0 0 0 34 0 0 163 Lane Group Flow (vph) 442 660 13 42 718 0 0 27 2 0 85 430 Heavy Vehicles (%) 3% 1% 0% 3% 1% 0% 7% 0% 6% 3% 0% 2% Turn Type pm+pt NA Perm pm+pt NA Split NA Perm Split NA pm+ov Protected Phases 5 2 1 6 4 4 3 3 5 Permitted Phases 2 2 6 4 3 Actuated Green, G (s) 85.6 72.1 72.1 54.3 48.6 6.4 6.4 8.3 37.5 Effective Green, g (s) 85.6 72.1 72.1 54.3 48.6 6.4 6.4 8.3 37.5 Actuated g/C Ratio 0.71 0.60 0.60 0.45 0.41 0.05 0.05 0.07 0.31 Clearance Time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Vehicle Extension (s) 2.0 4.0 4.0 2.0 4.0 1.5 1.5 1.5 2.0 Lane Grp Cap (vph) 487 1130 970 392 751 93 81 123 494 v/s Ratio Prot cO.22 0.35 0.01 xO.39 cO.02 0.05 c0.21 v/s Ratio Perm 0.43 0.01 0.04 0.00 0.06 v/c Ratio 0.91 0.58 0.01 0.11 0.96 0.29 0.02 0.69 0.87 Uniform Delay, d1 36.7 14.7 9.6 18.4 34.7 54.6 53.8 54.6 39.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 20.1 2.2 0.0 0.0 23.7 0.6 0.0 12.7 14.9 Delay (s) 56.8 16.9 9.7 18.5 58.4 55.2 53.9 67.3 53.9 Level of Service E B A B E E D E D Approach Delay (s) 32.5 56.2 54.5 55.6 Approach LOS C E D E Intersection Summa HCM 2000 Control Delay 45.9 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.89 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 96.5% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 2 HCM Unsignalized Intersection Capacity Analysis 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '+ fi 4* +T* Traffic Volume (veh/h) 0 35 21 55 55 0 29 0 459 9 582 14 Future Volume (Veh/h) 0 35 21 55 55 0 29 0 459 9 582 14 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 0 37 22 59 59 0 31 0 488 10 619 15 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 283 pX, platoon unblocked 0.87 0.87 0.87 0.87 0.87 0.87 vC, conflicting volume 982 1196 626 993 960 244 634 488 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 902 1150 626 915 876 50 634 331 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 100 78 95 65 75 100 97 99 cM capacity (veh/h) 178 166 478 168 240 887 959 1073 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) EB1 WB1 NB SIB 59 118 519 644 0 59 31 10 22 0 488 15 219 198 959 1073 0.27 0.60 0.03 0.01 26 83 3 1 27.3 46.9 0.9 0.3 D E A A 27.3 46.9 0.9 0.3 D E 5.8 66.9% ICU Level of Service 15 IS Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 3 HCM Unsignalized Intersection Capacity Analysis 3: Commercial Entrance/Faulconer Driver & Old Ivy Road 01/21/2022 --* --* -,;o, f+-- , t `► 1 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + IN 4+ 4+ +T IN Traffic Volume (veh/h) 32 462 1 0 101 20 1 0 6 135 0 13 Future Volume (Veh/h) 32 462 1 0 101 20 1 0 6 135 0 13 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Hourly flow rate (vph) 33 481 1 0 105 21 1 0 6 141 0 14 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 8 Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 126 482 670 673 481 668 664 116 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 126 482 670 673 481 668 664 116 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 98 100 100 100 99 61 100 99 cM capacity (veh/h) 1473 1091 362 371 589 363 375 942 Direction, Lane# EB 1 EB 2 WB 1 NB 1 SIB 1 Volume Total 514 1 126 7 155 Volume Left 33 0 0 1 141 Volume Right 0 1 21 6 14 cSH 1473 1700 1091 541 399 Volume to Capacity 0.02 0.00 0.00 0.01 0.39 Queue Length 95th (ft) 2 0 0 1 45 Control Delay (s) 0.7 0.0 0.0 11.7 20.0 Lane LOS A B C Approach Delay (s) 0.7 0.0 11.7 20.0 Approach LOS B C Intersection Summary Average Delay 4.4 Intersection Capacity Utilization 56.8% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 4 HCM Unsignalized Intersection Capacity Analysis 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� fi r 4* Traffic Volume (veh/h) 458 155 0 0 125 223 0 1 0 0 0 0 Future Volume (Veh/h) 458 155 0 0 125 223 0 1 0 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 492 167 0 0 134 240 0 1 0 0 0 0 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 374 167 1285 1525 167 1286 1285 134 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 374 167 1285 1525 167 1286 1285 134 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 58 100 100 99 100 100 100 100 cM capacity (veh/h) 1184 1423 96 70 877 95 96 915 Direction, Lane# EB 1 WB 1 WB 2 NB 1 Volume Total 659 134 240 1 Volume Left 492 0 0 0 Volume Right 0 0 240 0 cSH 1184 1423 1700 70 Volume to Capacity 0.42 0.00 0.14 0.01 Queue Length 95th (ft) 52 0 0 1 Control Delay (s) 8.8 0.0 0.0 57.5 Lane LOS A F Approach Delay (s) 8.8 0.0 57.5 Approach LOS F Intersection Summary Average Delay 5.7 Intersection Capacity Utilization 60.7% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 5 Queues 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--,, 4--- Lane Group EEL EBT WBT WBR NBT SBT Lane Group Flow (vph) 44 527 737 291 17 208 v/c Ratio 0.18 0.50 0.69 0.28 0.06 0.55 Control Delay 10.4 10.7 15.3 2.4 0.5 15.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 10.4 10.7 15.3 2.4 0.5 15.4 Queue Length 50th (ft) 5 76 125 1 0 22 Queue Length 95th (ft) 32 253 #467 39 0 82 Internal Link Dist (ft) 1062 920 247 459 Turn Bay Length (ft) 90 Base Capacity (vph) 247 1058 1068 1031 691 685 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.50 0.69 0.28 0.02 0.30 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 6 HCM Signalized Intersection Capacity Analysis 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--I, l f-~ 1,-4\ T �' �► 1 d Movement EBL EBT EBR WBL WBT WEIR NBL NBT NBR SBL SBT SBR Lane Configurations t T r 4+ 4+ Traffic Volume (vph) 40 474 0 0 663 262 13 0 3 134 0 53 Future Volume (vph) 40 474 0 0 663 262 13 0 3 134 0 53 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 0.98 0.96 Fit Protected 0.95 1.00 1.00 1.00 0.96 0.97 Satd. Flow (prot) 1805 1863 1881 1599 1781 1764 Fit Permitted 0.23 1.00 1.00 1.00 0.96 0.97 Satd.Flow (perm) 435 1863 1881 1599 1781 1764 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0. 00 Adj. Flow (vph) 44 527 0 0 737 291 14 0 3 149 0 59 RTOR Reduction (vph) 0 0 0 0 0 136 0 17 0 0 110 0 Lane Group Flow (vph) 44 527 0 0 737 155 0 0 0 0 98 0 Heavy Vehicles(%) 0% 2% 0% 0% 1% 1% 0% 0% 0% 0% 0% 0% Turn Type Perm NA NA Perm Split NA Split NA Protected Phases 2 2 4 4 3 3 Permitted Phases 2 2 Actuated Green, G (s) 30.4 30.4 30.4 30.4 0.7 8.2 Effective Green, g (s) 30.4 30.4 30.4 30.4 0.7 8.2 Actuated g/C Ratio 0.52 0.52 0.52 0.52 0.01 0.14 Clearance Time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 3.0 Lane Grp Cap (vph) 226 971 980 833 21 248 v/s Ratio Prot 0.28 c0.39 c0.00 cO.06 v/s Ratio Perm 0.10 0.10 v/c Ratio 0.19 0.54 0.75 0.19 0.01 0.40 Uniform Delay, d1 7.4 9.3 11.0 7.4 28.5 22.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 0.8 3.5 0.1 0.1 1.0 Delay (s) 8.0 10.1 14.5 7.5 28.5 23.8 Level of Service A B B A C C Approach Delay (s) 9.9 12.5 28.5 23.8 Approach LOS A B C C Intersection Summa HCM 2000 Control Delay 13.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.66 Actuated Cycle Length (s) 58.3 Sum of lost time (s) 19.0 Intersection Capacity Utilization 61.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2021 Existing PM Peak Synchro 10 Report Timmons Group Page 7 Queuing and Blocking Report 2021 Existing PM Peak 01/21/2022 Intersection: 1: Cantebury Road /Route 846 & Ivy Road Movement EB EB EB WB WB NB NB SB SIB Directions Served L T R L TR LT R LT R Maximum Queue (ft) 554 374 32 200 610 84 64 214 75 Average Queue (ft) 262 164 5 58 516 25 17 200 74 95th Queue (ft) 493 318 22 183 736 64 46 230 82 Link Distance (ft) 882 882 586 575 201 Upstream Blk Time (%) 0 34 27 Queuing Penalty (veh) 0 0 179 Storage Bay Dist (ft) 450 200 180 75 Storage Blk Time (%) 0 0 50 26 35 Queuing Penalty (veh) 0 1 20 146 28 Intersection: 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road Movement EB WB NB SIB Directions Served TR LT LTR LTR Maximum Queue (ft) 93 118 69 1156 Average Queue (ft) 34 53 17 1071 95th Queue (ft) 73 97 51 1318 Link Distance (ft) 394 299 201 1106 Upstream Blk Time (°/u) 84 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Commercial Entrance/Faulconer Driver & Old Ivy Road Movement EB NB SIB SIB Directions Served LT LTR LT R Maximum Queue (ft) 53 28 121 30 Average Queue (ft) 4 5 49 12 95th Queue (ft) 25 22 92 35 Link Distance (ft) 299 171 352 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 Storage Blk Time (%) Queuing Penalty (veh) Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 1 Queuing and Blocking Report 2021 Existing PM Peak 01/21/2022 Intersection: 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road Movement EB WB WB NB Directions Served LTR LT R LTR Maximum Queue (ft) 279 3 49 21 Average Queue (ft) 118 0 30 2 95th Queue (ft) 226 3 51 13 Link Distance (ft) 332 2715 193 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 50 Storage Blk Time (%) 1 Queuing Penalty (veh) 1 Intersection: 5: Commerical Entrance/Old Ivy Road & Ivy Road Movement EB EB WB WB NB SIB Directions Served L Maximum Queue (ft) 72 Average Queue (ft) 11 95th Queue (ft) 42 Link Distance (ft) Upstream Blk Time (°/u) Queuing Penalty (veh) Storage Bay Dist (ft) 90 Storage Blk Time (%) 0 Queuing Penalty (veh) 1 Network Summary Network wide Queuing Penalty: 376 T T R LTR LTR 153 328 80 45 166 49 139 40 12 77 125 253 68 37 132 1037 956 956 277 420 Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 2 February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Appendix C Synchro Analysis for 2025 Background Conditions February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Queues 2025 Background AM Peak 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 --* f- ~ t 1 Lane Group EBL EBT EBR WBL WBT NBT NBR SBT SBR Lane Group Flow(vph) 424 676 11 28 729 34 27 103 617 v/c Ratio 0.90 0.58 0.01 0.07 1.01 0.27 0.08 0.65 0.93 Control Delay 57.0 18.5 0.0 11.1 73.7 58.7 0.5 71.3 43.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.0 18.5 0.0 11.1 73.7 58.7 0.5 71.3 43.2 Queue Length 50th (ft) 264 359 0 6 -645 26 0 78 210 Queue Length 95th (ft) #484 499 0 18 #885 60 0 135 #511 Internal Link Dist (ft) 843 543 551 203 Turn Bay Length (ft) 450 200 180 75 Base Capacity(vph) 474 1163 1073 405 719 147 338 199 663 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.89 0.58 0.01 0.07 1.01 0.23 0.08 0.52 0.93 Intersection Summary - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 1 HCM Signalized Intersection Capacity Analysis 2025 Background AM Peak 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 --* 4�- ~ T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SET SBR Lane Configurations t r T* +T i" #T r Traffic Volume (vph) 390 622 10 26 565 106 13 18 25 81 14 568 Future Volume (vph) 390 622 10 26 565 106 13 18 25 81 14 568 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.98 1.00 0.96 1.00 Satd. Flow (prot) 1770 1845 1615 1736 1761 1862 1538 1762 1553 Flt Permitted 0.07 1.00 1.00 0.41 1.00 0.98 1.00 0.96 1.00 Satd.Flow (perm) 135 1845 1615 745 1761 1862 1538 1762 1553 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 424 676 11 28 614 115 14 20 27 88 15 617 RTOR Reduction (vph) 0 0 4 0 5 0 0 0 26 0 0 172 Lane Group Flow (vph) 424 676 7 28 724 0 0 34 1 0 103 445 Heavy Vehicles (%) 2% 3% 0% 4% 6% 2% 0% 0% 5% 4% 0% 4% Turn Type pm+pt NA Perm pm+pt NA Split NA Perm Split NA pm+ov Protected Phases 5 2 1 6 4 4 3 3 5 Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) 2 83.0 83.0 0.69 7.8 2.0 71.3 71.3 0.59 7.8 4.0 2 71.3 71.3 0.59 7.8 4.0 6 51.4 51.4 0.43 7.8 2.0 47.5 47.5 0.40 7.8 4.0 6.5 6.5 0.05 6.5 1.5 4 6.5 6.5 0.05 6.5 1.5 10.8 10.8 0.09 5.4 1.5 3 38.5 38.5 0.32 7.8 2.0 Lane Grp Cap (vph) 470 1096 959 351 697 100 83 158 498 v/s Ratio Prot cO.21 0.37 0.00 c0.41 c0.02 0.06 c0.21 v/s Ratio Perm 0.42 0.00 0.03 0.00 0.08 v/c Ratio 0.90 0.62 0.01 0.08 1.04 0.34 0.02 0.65 0.89 Uniform Delay, d1 37.0 15.6 9.9 19.9 36.2 54.7 53.7 52.8 38.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 19.9 2.6 0.0 0.0 44.4 0.7 0.0 7.1 17.8 Delay (s) 56.9 18.2 9.9 20.0 80.6 55.4 53.8 59.9 56.6 Level of Service E B A B F E D E E Approach Delay (s) 32.9 78.4 54.7 57.1 Approach LOS C E D E Intersection Summary W HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Greystar Old Ivy Road TIA Timmons Group 53.0 HCM 2000 Level of Service D 0.93 120.0 Sum of lost time (s) 27.5 96.4% ICU Level of Service F 15 Synchro 10 Report Page 2 HCM Unsignalized Intersection Capacity Analysis 2025 Background AM Peak 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road 01/21/2022 --* 'r ~ 4\ T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '* a 4+ 44 Traffic Volume (veh/h) 0 68 34 32 18 0 21 0 493 54 607 41 Future Volume (Veh/h) 0 68 34 32 18 0 21 0 493 54 607 41 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 74 37 35 20 0 23 0 536 59 660 45 Pedestrians Lane Width (it) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (it) 283 pX, platoon unblocked 0.87 0.87 0.87 0.87 0.87 0.87 vC, conflicting volume 1124 1382 682 1188 1137 268 705 536 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1069 1365 682 1143 1084 87 705 395 tC, single (s) 7.1 6.5 6.2 7.2 6.5 6.2 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.6 4.0 3.3 2.2 2.2 p0 queue free % 100 38 92 46 89 100 97 94 cM capacity (veh/h) 150 119 453 65 175 852 902 1025 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 111 55 559 764 Volume Left 0 35 23 59 Volume Right 37 0 536 45 cSH 158 84 902 1025 Volume to Capacity 0.70 0.65 0.03 0.06 Queue Length 95th (it) 104 77 2 5 Control Delay (s) 69.1 106.5 0.7 1.5 Lane LOS F F A A Approach Delay (s) 69.1 106.5 0.7 1.5 Approach LOS F F Intersection Summary Average Delay 10.1 Intersection Capacity Utilization 71.6% ICU Level of Service C Analysis Period (min) 15 Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 3 HCM Unsignalized Intersection Capacity Analysis 2025 Background AM Peak 3: Commercial Entrance/Faulconer Driver & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations r{ r 44 + rj r Traffic Volume (veh/h) 122 488 11 0 43 39 3 1 0 219 4 4 Future Volume (Veh/h) 122 488 11 0 43 39 3 1 0 219 4 4 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 133 530 12 0 47 42 3 1 0 238 4 4 Pedestrians Lane Width (ft) Walking Speed (tt/s) Percent Blockage Right turn flare (veh) 8 Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 89 542 868 885 530 864 876 68 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 89 542 868 885 530 864 876 68 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 91 100 99 100 100 6 98 100 cM capacity (veh/h) 1519 1037 253 261 553 254 264 1001 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SIB 1 Volume Total 663 12 89 4 246 Volume Left 133 0 0 3 238 Volume Right 0 12 42 0 4 cSH 1519 1700 1037 255 258 Volume to Capacity 0.09 0.01 0.00 0.02 0.95 Queue Length 95th (ft) 7 0 0 1 221 Control Delay (s) 2.3 0.0 0.0 19.4 85.7 Lane LOS A C F Approach Delay (s) 2.3 0.0 19.4 85.7 Approach LOS C F Intersection Summary Average Delay 22.4 Intersection Capacity Utilization 60.8% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 4 HCM Unsignalized Intersection Capacity Analysis 2025 Background AM Peak 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road 01/21/2022 --t 4\ T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 44 rj r 4+ Traffic Volume (vehlh) 438 271 1 0 82 100 0 0 0 0 0 0 Future Volume (Veh/h) 438 271 1 0 82 100 0 0 0 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 476 295 1 0 89 109 0 0 0 0 0 0 Pedestrians Lane Width (ft) Walking Speed (tt/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 198 296 1336 1446 296 1336 1337 89 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 198 296 1336 1446 296 1336 1337 89 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 65 100 100 100 100 100 100 100 cM capacity (veh/h) 1375 1277 95 86 744 95 100 969 Direction, Lane # EB 1 WB 1 WB 2 NB 1 Volume Total 772 89 109 0 Volume Left 476 0 0 0 Volume Right 1 0 109 0 cSH 1375 1277 1700 1700 Volume to Capacity 0.35 0.00 0.06 0.00 Queue Length 95th (ft) 39 0 0 0 Control Delay (s) 7.0 0.0 0.0 0.0 Lane LOS A A Approach Delay (s) 7.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 5.6 Intersection Capacity Utilization 51.4% ICU Level of Service A Analysis Period (min) 15 Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 5 Queues 2025 Background AM Peak 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 T 1 Lane Group EBL EBT WBT WBR NBT SBT Lane Group Flow (vph) 75 678 363 146 12 240 v/c Ratio 0.13 0.65 0.35 0.16 0.07 0.60 Control Delay 9.3 15.2 9.9 2.7 27.3 17.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.3 15.2 9.9 2.7 27.3 17.6 Queue Length 50th (ft) 9 117 50 0 3 31 Queue Length 95th (ft) 46 #452 178 29 20 103 Internal Link Dist (ft) 1062 920 247 459 Turn Bay Length (ft) 90 Base Capacity (vph) 567 1044 1024 927 593 660 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.13 0.65 0.35 0.16 0.02 0.36 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 6 HCM Signalized Intersection Capacity Analysis 2025 Background AM Peak 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 --t T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SET SBR Lane Configurations t t 1" 44 44 Traffic Volume (vph) 69 624 0 0 334 134 10 1 0 187 0 34 Future Volume (vph) 69 624 0 0 334 134 10 1 0 187 0 34 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.98 Flt Protected 0.95 1.00 1.00 1.00 0.96 0.96 Satd. Flow (prot) 1805 1881 1845 1553 1781 1727 Flt Permitted 0.54 1.00 1.00 1.00 0.96 0.96 Satd.Flow (perm) 1022 1881 1845 1553 1781 1727 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 75 678 0 0 363 146 11 1 0 203 0 37 RTOR Reduction (vph) 0 0 0 0 0 71 0 0 0 0 108 0 Lane Group Flow (vph) 75 678 0 0 363 75 0 12 0 0 132 0 Heavy Vehicles (%) 0% 1 % 0% 0% 3% 4% 2% 2% 2% 4% 0% 0% Turn Type Perm NA NA Perm Split NA Split NA Protected Phases 2 2 4 4 3 3 Permitted Phases 2 2 Actuated Green, G (s) 30.6 30.6 30.6 30.6 0.9 9.3 Effective Green, g (s) 30.6 30.6 30.6 30.6 0.9 9.3 Actuated g/C Ratio 0.51 0.51 0.51 0.51 0.02 0.16 Clearance Time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 3.0 Lane Grp Cap (vph) 522 962 944 794 26 268 v/s Ratio Prot c0.36 0.20 c0.01 c0.08 v/s Ratio Perm 0.07 0.05 v/c Ratio 0.14 0.70 0.38 0.09 0.46 0.49 Uniform Delay, d1 7.7 11.2 8.9 7.5 29.2 23.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 2.5 0.4 0.1 4.7 1.4 Delay (s) 7.9 13.7 9.2 7.6 33.9 24.5 Level of Service A B A A C C Approach Delay (s) 13.1 8.8 33.9 24.5 Approach LOS B A C C Intersection Summary HCM 2000 Control Delay 13.6 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.65 Actuated Cycle Length (s) 59.8 Sum of lost time (s) 19.0 Intersection Capacity Utilization 70.7% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 7 Queuing and Blocking Report 2025 Background AM Peak 01/21/2022 Intersection: 1: Cantebury Road /Route 846 & Ivy Road Movement EB EB EB WB WB NB NB SB SB Directions Served L T R L TR LT R LT R Maximum Queue (ft) 456 420 29 199 638 90 41 213 76 Average Queue (ft) 231 159 3 33 540 29 12 185 73 95th Queue (ft) 387 313 17 131 750 71 31 250 81 Link Distance (ft) 882 882 586 575 201 Upstream Blk Time (%) 38 17 Queuing Penalty (veh) 0 115 Storage Bay Dist (ft) 450 200 180 75 Storage Blk Time (%) 0 0 51 23 27 Queuing Penalty (veh) 0 0 13 132 26 Intersection: 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road Movement EB WB NB SB Directions Served TR LT LTR LTR Maximum Queue (ft) 138 86 73 1164 Average Queue (ft) 51 34 19 1132 95th Queue (ft) 104 68 57 1159 Link Distance (ft) 394 299 201 1106 Upstream Bilk Time (%) 99 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Commercial Entrance/Faulconer Driver & Old Ivy Road Movement EB WB NB SB SB Directions Served LT LTR LTR LT R Maximum Queue (ft) 87 3 28 232 46 Average Queue (ft) 15 0 4 90 5 95th Queue (ft) 55 2 19 171 30 Link Distance (ft) 299 332 171 352 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 Storage Blk Time (%) 2 0 Queuing Penalty (veh) 0 0 Greystar Old Ivy Road TIA SimTraffic Report Timmons Group Page 1 Queuing and Blocking Report 2025 Background AM Peak 01/21/2022 Intersection: 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road Movement EB WB Directions Served LTR R Maximum Queue (ft) 160 38 Average Queue (ft) 67 13 95th Queue (ft) 132 40 Link Distance (ft) 332 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 50 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 5: Commerical Entrance/Old Ivy Road & Ivy Road Movement EB EB WB WB NB SB Directions Served L Maximum Queue (ft) 89 Average Queue (ft) 17 95th Queue (ft) 63 Link Distance (ft) Upstream Bilk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 90 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Network Summary Network wide Queuing Penalty: 291 T T R LTR LTR 254 158 77 50 185 92 77 31 11 93 197 138 63 35 154 1037 956 956 277 420 Greystar Old Ivy Road TIA SimTraffic Report Timmons Group Page 2 Queues 2025 Background PM Peak 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 --* f- ~ t 1 Lane Group EBL EBT EBR WBL WBT NBT NBR SBT SBR Lane Group Flow(vph) 460 686 22 43 751 27 37 87 617 v/c Ratio 0.90 0.60 0.02 0.11 1.04 0.23 0.12 0.59 0.91 Control Delay 55.4 19.5 0.0 10.8 80.9 58.1 0.7 68.8 41.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 55.4 19.5 0.0 10.8 80.9 58.1 0.7 68.8 41.3 Queue Length 50th (ft) 300 354 0 10 -631 20 0 66 250 Queue Length 95th (ft) #550 493 0 23 #872 51 0 119 #576 Internal Link Dist (ft) 843 543 551 203 Turn Bay Length (ft) 450 200 180 75 Base Capacity(vph) 513 1148 1045 394 722 139 337 187 680 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.90 0.60 0.02 0.11 1.04 0.19 0.11 0.47 0.91 Intersection Summary - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 1 HCM Signalized Intersection Capacity Analysis 2025 Background PM Peak 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 --* 4�- ~ T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SET SBR Lane Configurations t r T� r{ i" a r Traffic Volume (vph) 437 652 21 41 642 71 17 9 35 66 17 586 Future Volume (vph) 437 652 21 41 642 71 17 9 35 66 17 586 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.97 1.00 0.96 1.00 Satd. Flow (prot) 1752 1881 1615 1752 1855 1757 1524 1785 1583 Flt Permitted 0.08 1.00 1.00 0.40 1.00 0.97 1.00 0.96 1.00 Satd.Flow (perm) 139 1881 1615 746 1855 1757 1524 1785 1583 Peak -hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 460 686 22 43 676 75 18 9 37 69 18 617 RTOR Reduction (vph) 0 0 9 0 3 0 0 0 35 0 0 150 Lane Group Flow (vph) 460 686 13 43 748 0 0 27 2 0 87 467 Heavy Vehicles (%) 3% 1% 0% 3% 1% 0% 7% 0% 6% 3% 0% 2% Turn Type pm+pt NA Perm pm+pt NA Split NA Perm Split NA pm+ov Protected Phases 5 2 1 6 4 4 3 3 5 Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) 2 83.9 83.9 0.70 7.8 2.0 70.4 70.4 0.59 7.8 4.0 2 70.4 70.4 0.59 7.8 4.0 6 50.9 50.9 0.42 7.8 2.0 45.2 45.2 0.38 7.8 4.0 6.4 6.4 0.05 6.5 1.5 4 6.4 6.4 0.05 6.5 1.5 10.0 10.0 0.08 5.4 1.5 3 40.9 40.9 0.34 7.8 2.0 Lane Grp Cap (vph) 512 1103 947 364 698 93 81 148 539 v/s Ratio Prot cO.23 0.36 0.01 c0.40 c0.02 0.05 c0.22 v/s Ratio Perm 0.40 0.01 0.04 0.00 0.07 v/c Ratio 0.90 0.62 0.01 0.12 1.07 0.29 0.02 0.59 0.87 Uniform Delay, d1 35.9 16.1 10.3 20.4 37.4 54.6 53.8 53.0 37.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 17.9 2.6 0.0 0.1 54.8 0.6 0.0 3.8 13.2 Delay (s) 53.8 18.8 10.4 20.4 92.2 55.2 53.9 56.8 50.2 Level of Service D B B C F E D E D Approach Delay (s) 32.4 88.3 54.5 51.0 Approach LOS C F D D Intersection Summary HCM 2000 Control Delay 54.0 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.94 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 99.5% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 2 HCM Unsignalized Intersection Capacity Analysis 2025 Background PM Peak 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road 01/21/2022 --* 4\ T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + rT 44 44� Traffic Volume (veh/h) 0 36 22 57 57 0 30 0 478 9 606 15 Future Volume (Veh/h) 0 36 22 57 57 0 30 0 478 9 606 15 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 0 38 23 61 61 0 32 0 509 10 645 16 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 283 pX, platoon unblocked 0.85 0.85 0.85 0.85 0.85 0.85 vC, conflicting volume 1022 1246 653 1034 1000 254 661 509 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 939 1202 653 953 913 39 661 338 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 100 75 95 60 73 100 97 99 cM capacity (veh/h) 161 152 462 151 225 885 937 1051 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 61 122 541 671 Volume Left 0 61 32 10 Volume Right 23 0 509 16 cSH 203 181 937 1051 Volume to Capacity 0.30 0.67 0.03 0.01 Queue Length 95th (ft) 30 101 3 1 Control Delay (s) 30.1 58.5 0.9 0.3 Lane LOS D F A A Approach Delay (s) 30.1 58.5 0.9 0.3 Approach LOS D F Intersection Summary Average Delay 6.9 Intersection Capacity Utilization 69.2% ICU Level of Service C Analysis Period (min) 15 Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 3 HCM Unsignalized Intersection Capacity Analysis 2025 Background PM Peak 3: Commercial Entrance/Faulconer Driver & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations #1 r +T* 4* #1 r Traffic Volume (veh/h) 36 515 1 0 113 22 1 0 7 151 0 15 Future Volume (Veh/h) 36 515 1 0 113 22 1 0 7 151 0 15 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Hourly flow rate (vph) 38 536 1 0 118 23 1 0 7 157 0 16 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 8 Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 141 537 750 753 536 748 742 130 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 141 537 750 753 536 748 742 130 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 97 100 100 100 99 51 100 98 cM capacity (veh/h) 1455 1041 318 332 549 319 337 926 Direction, Lane # EB 1 EB 2 WB 1 NB 1 SIB 1 Volume Total 574 1 141 8 173 Volume Left 38 0 0 1 157 Volume Right 0 1 23 7 16 cSH 1455 1700 1041 503 351 Volume to Capacity 0.03 0.00 0.00 0.02 0.49 Queue Length 95th (ft) 2 0 0 1 65 Control Delay (s) 0.8 0.0 0.0 12.3 25.1 Lane LOS A B D Approach Delay (s) 0.8 0.0 12.3 25.1 Approach LOS i B D Intersection Summary Average Delay 5.4 Intersection Capacity Utilization 61.4% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 4 HCM Unsignalized Intersection Capacity Analysis 2025 Background PM Peak 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations rT* +T r Traffic Volume (veh/h) 477 161 0 0 130 232 0 1 0 0 0 0 Future Volume (Veh/h) 477 161 0 0 130 232 0 1 0 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 513 173 0 0 140 249 0 1 0 0 0 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 389 173 1339 1588 173 1340 1339 140 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 389 173 1339 1588 173 1340 1339 140 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 56 100 100 98 100 100 100 100 cM capacity (veh/h) 1170 1416 85 61 871 84 86 908 Direction, Lane # EB 1 WB 1 WB 2 NB 1 Volume Total 686 140 249 1 Volume Left 513 0 0 0 Volume Right 0 0 249 0 cSH 1170 1416 1700 61 Volume to Capacity 0.44 0.00 0.15 0.02 Queue Length 95th (ft) 57 0 0 1 Control Delay (s) 9.1 0.0 0.0 64.8 Lane LOS A F Approach Delay (s) 9.1 0.0 64.8 Approach LOS F Intersection Summary Average Delay 5.9 Intersection Capacity Utilization 62.6% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 5 Queues 2025 Background PM Peak 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t T 1 Lane Group EBL EBT WBT WBR NBT SBT Lane Group Flow (vph) 46 536 750 297 18 211 v/c Ratio 0.20 0.51 0.70 0.29 0.07 0.55 Control Delay 11.0 10.9 15.8 2.5 0.5 15.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 11.0 10.9 15.8 2.5 0.5 15.5 Queue Length 50th (ft) 5 78 129 1 0 22 Queue Length 95th (ft) 34 260 #481 41 0 83 Internal Link Dist (ft) 1062 920 247 459 Turn Bay Length (ft) 90 Base Capacity (vph) 233 1056 1066 1029 690 684 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.20 0.51 0.70 0.29 0.03 0.31 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 6 HCM Signalized Intersection Capacity Analysis 2025 Background PM Peak 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 --t T `► 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SET SBR Lane Configurations t t 1" 44 44 Traffic Volume (vph) 42 493 0 0 690 273 14 0 3 139 0 55 Future Volume (vph) 42 493 0 0 690 273 14 0 3 139 0 55 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 0.98 0.96 Flt Protected 0.95 1.00 1.00 1.00 0.96 0.97 Satd. Flow (prot) 1805 1863 1881 1599 1783 1764 Flt Permitted 0.22 1.00 1.00 1.00 0.96 0.97 Satd.Flow (perm) 412 1863 1881 1599 1783 1764 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 46 536 0 0 750 297 15 0 3 151 0 60 RTOR Reduction (vph) 0 0 0 0 0 137 0 18 0 0 110 0 Lane Group Flow (vph) 46 536 0 0 750 160 0 0 0 0 101 0 Heavy Vehicles (%) 0% 2% 0% 0% 1% 1% 0% 0% 0% 0% 0% 0% Turn Type Perm NA NA Perm Split NA Split NA Protected Phases 2 2 4 4 3 3 Permitted Phases 2 2 Actuated Green, G (s) 30.4 30.4 30.4 30.4 0.7 8.4 Effective Green, g (s) 30.4 30.4 30.4 30.4 0.7 8.4 Actuated g/C Ratio 0.52 0.52 0.52 0.52 0.01 0.14 Clearance Time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 3.0 Lane Grp Cap (vph) 214 968 977 830 21 253 v/s Ratio Prot 0.29 c0.40 c0.00 c0.06 v/s Ratio Perm 0.11 0.10 v/c Ratio 0.21 0.55 0.77 0.19 0.01 0.40 Uniform Delay, d1 7.6 9.5 11.2 7.5 28.6 22.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.7 0.9 3.9 0.2 0.1 1.0 Delay (s) 8.3 10.3 15.1 7.7 28.6 23.8 Level of Service A B B A C C Approach Delay (s) 10.2 13.0 28.6 23.8 Approach LOS B B C C Intersection Summary HCM 2000 Control Delay 13.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.68 Actuated Cycle Length (s) 58.5 Sum of lost time (s) 19.0 Intersection Capacity Utilization 61.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA Synchro 10 Report Timmons Group Page 7 Queuing and Blocking Report 2025 Background PM Peak 01/21/2022 Intersection: 1: Cantebury Road /Route 846 & Ivy Road Movement EB EB EB WB WB NB NB SB SB Directions Served L T R L TR LT R LT R Maximum Queue (ft) 609 415 31 200 620 82 66 214 76 Average Queue (ft) 302 175 4 49 561 24 17 201 74 95th Queue (ft) 575 373 20 164 727 60 44 226 77 Link Distance (ft) 882 882 586 575 201 Upstream Blk Time (%) 0 0 47 27 Queuing Penalty (veh) 0 0 0 185 Storage Bay Dist (ft) 450 200 180 75 Storage Blk Time (%) 0 55 25 37 Queuing Penalty (veh) 1 23 146 31 Intersection: 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road Movement EB WB NB SB Directions Served TR LT LTR LTR Maximum Queue (ft) 80 141 71 1147 Average Queue (ft) 32 55 19 1103 95th Queue (ft) 63 111 56 1277 Link Distance (ft) 394 299 201 1106 Upstream Bilk Time (%) 0 93 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Commercial Entrance/Faulconer Driver & Old Ivy Road Movement EB NB SB SB Directions Served LT LTR LT R Maximum Queue (ft) 58 28 138 47 Average Queue (ft) 6 6 54 13 95th Queue (ft) 31 23 102 42 Link Distance (ft) 299 171 352 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 Storage Blk Time (%) Queuing Penalty (veh) Greystar Old Ivy Road TIA SimTraffic Report Timmons Group Page 1 Queuing and Blocking Report 2025 Background PM Peak 01/21/2022 Intersection: 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road Movement EB WB NB Directions Served LTR R LTR Maximum Queue (ft) 310 44 17 Average Queue (ft) 121 29 1 95th Queue (ft) 235 50 9 Link Distance (ft) 332 193 Upstream Blk Time (%) 0 Queuing Penalty (veh) 1 Storage Bay Dist (ft) 50 Storage Blk Time (%) 1 Queuing Penalty (veh) 1 Intersection: 5: Commerical Entrance/Old Ivy Road & Ivy Road Movement EB EB WB WB NB SB Directions Served L Maximum Queue (ft) 78 Average Queue (ft) 13 95th Queue (ft) 50 Link Distance (ft) Upstream Bilk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 90 Storage Blk Time (%) 1 Queuing Penalty (veh) 4 Network Summary Network wide Queuing Penalty: 391 T T R LTR LTR 190 322 92 49 160 54 146 44 15 77 146 256 76 41 132 1037 956 956 277 420 Greystar Old Ivy Road TIA SimTraffic Report Timmons Group Page 2 February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Appendix D Synchro Analysis for 2025 Total Future Conditions February 2022 Old Ivy Residences Traffic Impact Analysis - Albemarle County, VA Queues 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 t --I, --* f- ~ T 1 Lane Group EBL EBT EBR WBL WBT NBT NBR SBT SBR Lane Group Flow (vph) 435 676 11 28 740 34 27 139 653 v/c Ratio 0.88 0.59 0.01 0.07 1.09 0.27 0.08 0.79 0.94 Control Delay 53.2 18.8 0.0 11.4 98.4 58.7 0.5 81.9 44.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 53.2 18.8 0.0 11.4 98.4 58.7 0.5 81.9 44.7 Queue Length 50th (ft) 282 362 0 7 -663 26 0 105 240 Queue Length 95th (ft) #498 499 0 18 #904 60 0 #196 #651 Internal Link Dist (ft) 843 543 551 203 Turn Bay Length (ft) 450 200 180 75 Base Capacity(vph) 496 1153 1066 377 677 147 338 199 692 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.88 0.59 0.01 0.07 1.09 0.23 0.08 0.70 0.94 Intersection Summary - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 1 HCM Signalized Intersection Capacity Analysis 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t IN ►j T+ +1 r +T IN Traffic Volume (vph) 400 622 10 26 565 116 13 18 25 114 14 601 Future Volume (vph) 400 622 10 26 565 116 13 18 25 114 14 601 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.97 1.00 0.85 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 0.98 1.00 0.96 1.00 Satd. Flow (prot) 1770 1845 1615 1736 1758 1862 1538 1756 1553 Fit Permitted 0.08 1.00 1.00 0.41 1.00 0.98 1.00 0.96 1.00 Satd.Flow (perm) 142 1845 1615 745 1758 1862 1538 1756 1553 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 435 676 11 28 614 126 14 20 27 124 15 653 RTOR Reduction (vph) 0 0 5 0 6 0 0 0 26 0 0 166 Lane Group Flow (vph) 435 676 6 28 734 0 0 34 1 0 139 487 Heavy Vehicles (%) 2% 3% 0% 4% 6% 2% 0% 0% 5% 4% 0% 4% Turn Type pm+pt NA Perm pm+pt NA Split NA Perm Split NA pm+ov Protected Phases 5 2 1 6 4 4 3 3 5 Permitted Phases 2 2 6 4 3 Actuated Green, G (s) 81.7 70.6 70.6 47.9 44.6 6.5 6.5 12.1 41.4 Effective Green, g (s) 81.7 70.6 70.6 47.9 44.6 6.5 6.5 12.1 41.4 Actuated g/C Ratio 0.68 0.59 0.59 0.40 0.37 0.05 0.05 0.10 0.34 Clearance Time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Vehicle Extension (s) 2.0 4.0 4.0 2.0 4.0 1.5 1.5 1.5 2.0 Lane Grp Cap (vph) 494 1085 950 324 653 100 83 177 535 v/s Ratio Prot 0.21 0.37 0.00 cO.42 cO.02 0.08 c0.22 v/s Ratio Perm 0.38 0.00 0.03 0.00 0.09 v/c Ratio 0.88 0.62 0.01 0.09 1.12 0.34 0.02 0.79 0.91 Uniform Delay, d1 35.9 16.1 10.2 22.0 37.7 54.7 53.7 52.7 37.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 16.2 2.7 0.0 0.0 74.4 0.7 0.0 18.7 19.4 Delay (s) 52.1 18.8 10.2 22.1 112.1 55.4 53.8 71.4 56.9 Level of Service D B B C F E D E E Approach Delay (s) 31.6 108.8 54.7 59.5 Approach LOS C F D E Intersection Summa HCM 2000 Control Delay 61.8 HCM 2000 Level of Service E HCM 2000 Volume to Capacity ratio 0.97 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 99.1% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 2 HCM Unsignalized Intersection Capacity Analysis 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + a 4+ *T+ Traffic Volume (veh/h) 0 68 34 97 18 0 21 0 513 54 607 41 Future Volume (Veh/h) 0 68 34 97 18 0 21 0 513 54 607 41 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 74 37 105 20 0 23 0 558 59 660 45 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 283 pX, platoon unblocked 0.87 0.87 0.87 0.87 0.87 0.87 vC, conflicting volume 1136 1404 682 1200 1148 279 705 558 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1079 1390 682 1153 1093 89 705 411 tC, single (s) 7.1 6.5 6.2 7.2 6.5 6.2 4.1 4.1 tC, 2 stage (s) IF (s) 3.5 4.0 3.3 3.6 4.0 3.3 2.2 2.2 p0 queue free % 100 35 92 0 88 100 97 94 cM capacity (veh/h) 146 114 453 60 171 843 902 1002 Direction, Lane# Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) EB1 WB1 NB SB1 111 125 581 764 0 105 23 59 37 0 558 45 152 67 902 1002 0.73 1.86 0.03 0.06 110 284 2 5 75.1 538.1 0.7 1.5 F F A A 75.1 538.1 0.7 1.5 F F 48.8 75.6% ICU Level of Service 15 D Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 3 HCM Unsignalized Intersection Capacity Analysis 3: Commercial Entrance/Faulconer Driver & Old Ivy Road 01/21/2022 --* --* f+-- , t `► 1 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + IN 4� 4* +T r Traffic Volume (veh/h) 122 512 11 0 108 39 3 1 0 239 4 4 Future Volume (Veh/h) 122 512 11 0 108 39 3 1 0 239 4 4 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 133 557 12 0 117 42 3 1 0 260 4 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 8 Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 159 569 965 982 557 962 973 138 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 159 569 965 982 557 962 973 138 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 91 100 99 100 100 0 98 100 cM capacity (veh/h) 1433 1013 216 228 534 217 231 916 Direction, Lane# EB 1 EB 2 WB 1 NB 1 SIB 1 Volume Total 690 12 159 4 268 Volume Left 133 0 0 3 260 Volume Right 0 12 42 0 4 cSH 1433 1700 1013 219 220 Volume to Capacity 0.09 0.01 0.00 0.02 1.22 Queue Length 95th (ft) 8 0 0 1 336 Control Delay (s) 2.4 0.0 0.0 21.8 176.1 Lane LOS A C F Approach Delay (s) 2.3 0.0 21.8 176.1 Approach LOS C F Intersection Summary Average Delay 43.2 Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 4 HCM Unsignalized Intersection Capacity Analysis 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� fi r 4+ Traffic Volume (veh/h) 438 311 1 0 147 165 0 0 0 0 0 0 Future Volume (Veh/h) 438 311 1 0 147 165 0 0 0 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 476 338 1 0 160 179 0 0 0 0 0 0 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 339 339 1450 1630 338 1450 1451 160 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 339 339 1450 1630 338 1450 1451 160 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 61 100 100 100 100 100 100 100 cM capacity (veh/h) 1220 1231 76 62 704 76 80 885 Direction, Lane# EB 1 WB 1 WB 2 NB 1 Volume Total 815 160 179 0 Volume Left 476 0 0 0 Volume Right 1 0 179 0 cSH 1220 1231 1700 1700 Volume to Capacity 0.39 0.00 0.11 0.00 Queue Length 95th (ft) 47 0 0 0 Control Delay (s) 7.7 0.0 0.0 0.0 Lane LOS A A Approach Delay (s) 7.7 0.0 0.0 Approach LOS A Intersection Summary Average Delay 5.5 Intersection Capacity Utilization 57.6% ICU Level of Service B Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 5 Queues 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--,, 4--- Lane Group EBL EBT WBT WBR NBT SBT Lane Group Flow (vph) 75 678 363 175 12 335 v/c Ratio 0.14 0.69 0.37 0.19 0.08 0.71 Control Delay 10.7 17.8 11.5 2.9 28.9 22.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 10.7 17.8 11.5 2.9 28.9 22.4 Queue Length 50th (ft) 11 144 61 0 4 60 Queue Length 95th (ft) 48 #475 189 34 21 166 Internal Link Dist (ft) 1062 920 247 459 Turn Bay Length (ft) 90 Base Capacity (vph) 523 988 969 898 561 632 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.14 0.69 0.37 0.19 0.02 0.53 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 6 HCM Signalized Intersection Capacity Analysis 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--I, l'r~ 1,-4\ T �' �► 1 d Movement EBL EBT EBR WBL WBT WEIR NBL NBT NBR SBL SBT SBR Lane Configurations t t r 41* 4+ Traffic Volume (vph) 69 624 0 0 334 161 10 1 0 274 0 34 Future Volume (vph) 69 624 0 0 334 161 10 1 0 274 0 34 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.99 Fit Protected 0.95 1.00 1.00 1.00 0.96 0.96 Satd. Flow (prot) 1805 1881 1845 1553 1781 1730 Fit Permitted 0.52 1.00 1.00 1.00 0.96 0.96 Satd.Flow (perm) 995 1881 1845 1553 1781 1730 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 75 678 0 0 363 175 11 1 0 298 0 37 RTOR Reduction (vph) 0 0 0 0 0 90 0 0 0 0 103 0 Lane Group Flow (vph) 75 678 0 0 363 85 0 12 0 0 232 0 Heavy Vehicles (%) 0% 1 % 0% 0% 3% 4% 2% 2% 2% 4% 0% 0% Turn Type Perm NA NA Perm Split NA Split NA Protected Phases 2 2 4 4 3 3 Permitted Phases 2 2 Actuated Green, G (s) 30.5 30.5 30.5 30.5 1.0 12.4 Effective Green, g (s) 30.5 30.5 30.5 30.5 1.0 12.4 Actuated g/C Ratio 0.48 0.48 0.48 0.48 0.02 0.20 Clearance Time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 3.0 Lane Grp Cap (vph) 482 912 894 753 28 341 v/s Ratio Prot c0.36 0.20 c0.01 cO.13 v/s Ratio Perm 0.08 0.05 v/c Ratio 0.16 0.74 0.41 0.11 0.43 0.68 Uniform Delay, d1 9.0 13.0 10.4 8.8 30.7 23.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 3.5 0.4 0.1 3.8 5.5 Delay (s) 9.2 16.6 10.8 8.9 34.5 28.9 Level of Service A B B A C C Approach Delay (s) 15.8 10.2 34.5 28.9 Approach LOS B B C C Intersection Summa HCM 2000 Control Delay 16.8 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.72 Actuated Cycle Length (s) 62.9 Sum of lost time (s) 19.0 Intersection Capacity Utilization 75.6% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 7 HCM Unsignalized Intersection Capacity Analysis 6: Old Ivy Road & Site Entrance 01/21/2022 ,,* --,, 4--- k, �. r Movement EBL EBT WBT WBR SBL SBR Lane Configurations t t if Y Traffic Volume (veh/h) 40 271 204 27 87 130 Future Volume (Veh/h) 40 271 204 27 87 130 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 43 295 222 29 95 141 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 251 603 222 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 251 603 222 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) IF (s) 2.2 3.5 3.3 p0 queue free % 97 79 83 cM capacity (veh/h) 1314 447 818 Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 43 295 222 29 236 Volume Left 43 0 0 0 95 Volume Right 0 0 0 29 141 cSH 1314 1700 1700 1700 613 Volume to Capacity 0.03 0.17 0.13 0.02 0.39 Queue Length 95th (ft) 3 0 0 0 45 Control Delay (s) 7.8 0.0 0.0 0.0 14.5 Lane LOS A B Approach Delay (s) 1.0 0.0 14.5 Approach LOS B Intersection Summary Average Delay 4.6 Intersection Capacity Utilization 36.9% ICU Level of Service A Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2025 Total AM Peak Synchro 10 Report Timmons Group Page 8 Queuing and Blocking Report 2025 Total AM Peak 01/21/2022 Intersection: 1: Cantebury Road /Route 846 & Ivy Road Movement EB EB EB WB WB NB NB SB SB Directions Served L T R L TR LT R LT R Maximum Queue (ft) 453 386 26 199 640 68 43 214 75 Average Queue (ft) 226 152 2 34 582 27 12 189 73 95th Queue (ft) 392 292 16 134 713 60 32 248 82 Link Distance (ft) 882 882 586 575 201 Upstream Blk Time (%) 51 22 Queuing Penalty (veh) 0 159 Storage Bay Dist (ft) 450 200 180 75 Storage Blk Time (%) 0 0 57 30 24 Queuing Penalty (veh) 0 0 15 180 31 Intersection: 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road Movement EB WB NB SB Directions Served TR LT LTR LTR Maximum Queue (ft) 117 149 69 1163 Average Queue (ft) 50 60 21 1129 95th Queue (ft) 99 116 60 1150 Link Distance (ft) 394 299 201 1106 Upstream Blk Time (°/u) 100 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Commercial Entrance/Faulconer Driver & Old Ivy Road Movement EB WB NB SB SB Directions Served LT LTR LTR LT R Maximum Queue (ft) 89 3 25 268 41 Average Queue (ft) 20 0 4 115 5 95th Queue (ft) 64 3 18 235 34 Link Distance (ft) 299 332 171 352 Upstream Blk Time (%) 2 Queuing Penalty (veh) 0 Storage Bay Dist (ft) 190 Storage Blk Time (%) 0 6 0 Queuing Penalty (veh) 0 0 0 Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 1 Queuing and Blocking Report 2025 Total AM Peak 01/21/2022 Intersection: 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road Movement EB WB Directions Served LTR R Maximum Queue (ft) 198 39 Average Queue (ft) 86 6 95th Queue (ft) 159 22 Link Distance (ft) 332 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 250 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Commerical Entrance/Old Ivy Road & Ivy Road Movement EB EB WB WB NB SIB Directions Served L Maximum Queue (ft) 85 Average Queue (ft) 16 95th Queue (ft) 59 Link Distance (ft) Upstream Blk Time (a/u) Queuing Penalty (veh) Storage Bay Dist (ft) 90 Storage Blk Time (°/a) 0 Queuing Penalty (veh) 0 T T R LTR LTR 320 206 71 40 238 107 82 35 11 126 241 151 61 34 207 1037 956 956 277 420 Intersection: 6: Old Ivy Road & Site Entrance Movement EB SB Directions Served L LR Maximum Queue (ft) 44 103 Average Queue (ft) 8 50 95th Queue (ft) 31 83 Link Distance (ft) 414 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 Storage Blk Time (%) Queuing Penalty (veh) Network Summ Network wide Queuing Penalty: 391 Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 2 Queues 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 Lane Group EBL EBT EBR WBL WBT NBT NBR SBT SBR Lane Group Flow (vph) 495 686 22 43 785 27 37 107 637 v/c Ratio 0.97 0.60 0.02 0.11 1.10 0.23 0.12 0.68 0.93 Control Delay 70.3 19.7 0.0 11.0 99.5 58.1 0.7 74.0 45.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 70.3 19.7 0.0 11.0 99.5 58.1 0.7 74.0 45.4 Queue Length 50th (ft) -376 358 0 10 -687 20 0 81 -267 Queue Length 95th (ft) #611 493 0 23 #930 51 0 141 #653 Internal Link Dist (ft) 843 543 551 203 Turn Bay Length (ft) 450 200 180 75 Base Capacity (vph) 508 1143 1041 387 714 139 337 186 682 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.97 0.60 0.02 0.11 1.10 0.19 0.11 0.58 0.93 Intersection Summary - Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 1 HCM Signalized Intersection Capacity Analysis 1: Cantebury Road /Route 846 & Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t if ►j 11� +T r +T IN Traffic Volume (vph) 470 652 21 41 642 104 17 9 35 85 17 605 Future Volume (vph) 470 652 21 41 642 104 17 9 35 85 17 605 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 0.97 1.00 0.96 1.00 Satd. Flow (prot) 1752 1881 1615 1752 1845 1757 1524 1780 1583 Fit Permitted 0.08 1.00 1.00 0.40 1.00 0.97 1.00 0.96 1.00 Satd.Flow (perm) 140 1881 1615 746 1845 1757 1524 1780 1583 Peak -hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 495 686 22 43 676 109 18 9 37 89 18 637 RTOR Reduction (vph) 0 0 9 0 5 0 0 0 35 0 0 149 Lane Group Flow (vph) 495 686 13 43 780 0 0 27 2 0 107 488 Heavy Vehicles(%) 3% 1% 0% 3% 1% 0% 7% 0% 6% 3% 0% 2% Turn Type pm+pt NA Perm pm+pt NA Split NA Perm Split NA pm+ov Protected Phases 5 2 1 6 4 4 3 3 5 Permitted Phases 2 2 6 4 3 Actuated Green, G (s) 83.2 70.1 70.1 50.2 44.9 6.4 6.4 10.7 41.2 Effective Green, g (s) 83.2 70.1 70.1 50.2 44.9 6.4 6.4 10.7 41.2 Actuated g/C Ratio 0.69 0.58 0.58 0.42 0.37 0.05 0.05 0.09 0.34 Clearance Time (s) 7.8 7.8 7.8 7.8 7.8 6.5 6.5 5.4 7.8 Vehicle Extension (s) 2.0 4.0 4.0 2.0 4.0 1.5 1.5 1.5 2.0 Lane Grp Cap (vph) 506 1098 943 356 690 93 81 158 543 v/s Ratio Prot cO.25 0.36 0.01 cO.42 cO.02 0.06 c0.23 v/s Ratio Perm 0.43 0.01 0.05 0.00 0.08 v/c Ratio 0.98 0.62 0.01 0.12 1.13 0.29 0.02 0.68 0.90 Uniform Delay, d1 37.7 16.3 10.5 20.8 37.5 54.6 53.8 53.0 37.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 33.9 2.7 0.0 0.1 76.1 0.6 0.0 8.7 17.1 Delay (s) 71.6 19.0 10.5 20.9 113.7 55.2 53.9 61.7 54.5 Level of Service E B B C F E D E D Approach Delay (s) 40.5 108.9 54.5 55.6 Approach LOS D F D E Intersection Summa HCM 2000 Control Delay 64.7 HCM 2000 Level of Service E HCM 2000 Volume to Capacity ratio 1.00 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 102.6% ICU Level of Service G Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 2 HCM Unsignalized Intersection Capacity Analysis 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '+ fi 4* +T* Traffic Volume (veh/h) 0 36 22 96 57 0 30 0 544 9 606 15 Future Volume (Veh/h) 0 36 22 96 57 0 30 0 544 9 606 15 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 0 38 23 102 61 0 32 0 579 10 645 16 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 283 pX, platoon unblocked 0.83 0.83 0.83 0.83 0.83 0.83 vC, conflicting volume 1057 1316 653 1068 1034 290 661 579 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 969 1280 653 983 942 50 661 397 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 100 72 95 25 71 100 97 99 cM capacity (veh/h) 147 134 462 136 211 855 937 979 Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) EB1 WB1 NB SIB 61 163 611 671 0 102 32 10 23 0 579 16 182 157 937 979 0.33 1.04 0.03 0.01 35 205 3 1 34.3 139.6 0.9 0.3 D F A A 34.3 139.6 0.9 0.3 D F 17.0 75.3% ICU Level of Service 15 D Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 3 HCM Unsignalized Intersection Capacity Analysis 3: Commercial Entrance/Faulconer Driver & Old Ivy Road 01/21/2022 --* --* -,;i, f+-- , t `► 1 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + IN 4� 4* +T IN Traffic Volume (veh/h) 36 592 1 0 152 22 1 0 7 217 0 15 Future Volume (Veh/h) 36 592 1 0 152 22 1 0 7 217 0 15 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Hourly flow rate (vph) 38 617 1 0 158 23 1 0 7 226 0 16 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 8 Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 181 618 870 874 617 870 864 170 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 181 618 870 874 617 870 864 170 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 97 100 100 100 99 14 100 98 cM capacity (veh/h) 1407 972 263 282 494 264 286 880 Direction, Lane# EB 1 EB 2 WB 1 NB 1 SIB 1 Volume Total 655 1 181 8 242 Volume Left 38 0 0 1 226 Volume Right 0 1 23 7 16 cSH 1407 1700 972 445 282 Volume to Capacity 0.03 0.00 0.00 0.02 0.86 Queue Length 95th (ft) 2 0 0 1 183 Control Delay (s) 0.7 0.0 0.0 13.2 62.1 Lane LOS A B F Approach Delay (s) 0.7 0.0 13.2 62.1 Approach LOS B F Intersection Summary Average Delay 14.4 Intersection Capacity Utilization 71.2% ICU Level of Service C Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 4 HCM Unsignalized Intersection Capacity Analysis 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road 01/21/2022 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T+ fi r 4� Traffic Volume (veh/h) 477 293 0 0 169 271 0 1 0 0 0 0 Future Volume (Veh/h) 477 293 0 0 169 271 0 1 0 0 0 0 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.92 0.93 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 513 315 0 0 182 291 0 1 0 0 0 0 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 473 315 1523 1814 315 1524 1523 182 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 473 315 1523 1814 315 1524 1523 182 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 53 100 100 98 100 100 100 100 cM capacity (veh/h) 1089 1257 61 42 725 60 62 861 Direction, Lane# EB 1 WB 1 WB 2 NB 1 Volume Total 828 182 291 1 Volume Left 513 0 0 0 Volume Right 0 0 291 0 cSH 1089 1257 1700 42 Volume to Capacity 0.47 0.00 0.17 0.02 Queue Length 95th (ft) 64 0 0 2 Control Delay (s) 9.4 0.0 0.0 93.1 Lane LOS A F Approach Delay (s) 9.4 0.0 93.1 Approach LOS F Intersection Summary Average Delay 6.1 Intersection Capacity Utilization 71.9% ICU Level of Service C Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 5 Queues 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--,, 4--- Lane Group EBL EBT WBT WBR NBT SBT Lane Group Flow (vph) 46 536 750 392 18 268 v/c Ratio 0.22 0.52 0.72 0.37 0.07 0.63 Control Delay 12.8 12.2 17.7 2.8 0.5 18.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.8 12.2 17.7 2.8 0.5 18.6 Queue Length 50th (ft) 6 87 145 2 0 39 Queue Length 95th (ft) 38 285 #519 50 0 117 Internal Link Dist (ft) 1062 920 247 459 Turn Bay Length (ft) 90 Base Capacity (vph) 212 1026 1035 1049 674 672 Starvation Cap Reductn 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 Reduced v/c Ratio 0.22 0.52 0.72 0.37 0.03 0.40 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 6 HCM Signalized Intersection Capacity Analysis 5: Commerical Entrance/Old Ivy Road & Ivy Road 01/21/2022 t--I, l'r~ 1,-4\ T �' �► 1 d Movement EBL EBT EBR WBL WBT WEIR NBL NBT NBR SBL SBT SBR Lane Configurations t t IN 414 4+ Traffic Volume (vph) 42 493 0 0 690 361 14 0 3 191 0 55 Future Volume (vph) 42 493 0 0 690 361 14 0 3 191 0 55 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 0.98 0.97 Fit Protected 0.95 1.00 1.00 1.00 0.96 0.96 Satd. Flow (prot) 1805 1863 1881 1599 1783 1774 Fit Permitted 0.20 1.00 1.00 1.00 0.96 0.96 Satd.Flow (perm) 386 1863 1881 1599 1783 1774 Peak -hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 46 536 0 0 750 392 15 0 3 208 0 60 RTOR Reduction (vph) 0 0 0 0 0 186 0 18 0 0 107 0 Lane Group Flow (vph) 46 536 0 0 750 206 0 0 0 0 161 0 Heavy Vehicles(%) 0% 2% 0% 0% 1% 1% 0% 0% 0% 0% 0% 0% Turn Type Perm NA NA Perm Split NA Split NA Protected Phases 2 2 4 4 3 3 Permitted Phases 2 2 Actuated Green, G (s) 30.5 30.5 30.5 30.5 0.7 10.0 Effective Green, g (s) 30.5 30.5 30.5 30.5 0.7 10.0 Actuated g/C Ratio 0.51 0.51 0.51 0.51 0.01 0.17 Clearance Time (s) 7.0 7.0 7.0 7.0 6.0 6.0 Vehicle Extension (s) 4.0 4.0 4.0 4.0 2.0 3.0 Lane Grp Cap (vph) 195 943 952 810 20 294 v/s Ratio Prot 0.29 c0.40 c0.00 xO.09 v/s Ratio Perm 0.12 0.13 v/c Ratio 0.24 0.57 0.79 0.25 0.01 0.55 Uniform Delay, d1 8.3 10.3 12.2 8.4 29.4 23.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.9 1.0 4.6 0.2 0.1 2.1 Delay (s) 9.2 11.2 16.8 8.6 29.5 25.1 Level of Service A B B A C C Approach Delay (s) 11.1 14.0 29.5 25.1 Approach LOS B B C C Intersection Summa HCM 2000 Control Delay 14.8 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.72 Actuated Cycle Length (s) 60.2 Sum of lost time (s) 19.0 Intersection Capacity Utilization 63.2% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 7 HCM Unsignalized Intersection Capacity Analysis 19: Old Ivy Road & Site Entrance 01/21/2022 --40. ~ t \10. r Movement EBL EBT WBT WBR SBL SBR Lane Configurations ►j + + r Y Traffic Volume (veh/h) 132 161 315 88 52 77 Future Volume (Veh/h) 132 161 315 88 52 77 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 143 175 342 96 57 84 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 438 803 342 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 438 803 342 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 87 81 88 cM capacity (veh/h) 1122 308 701 Direction, Lane# EB 1 EB 2 WB 1 WB 2 SIB 1 Volume Total 143 175 342 96 141 Volume Left 143 0 0 0 57 Volume Right 0 0 0 96 84 cSH 1122 1700 1700 1700 462 Volume to Capacity 0.13 0.10 0.20 0.06 0.31 Queue Length 95th (ft) 11 0 0 0 32 Control Delay (s) 8.7 0.0 0.0 0.0 16.2 Lane LOS A C Approach Delay (s) 3.9 0.0 16.2 Approach LOS C Intersection Summary Average Delay 3.9 Intersection Capacity Utilization 41.5% ICU Level of Service A Analysis Period (min) 15 Greystar Old Ivy Road TIA 05/06/2021 2025 Total Future PM Peak Synchro 10 Report Timmons Group Page 8 Queuing and Blocking Report 2025 Total Future PM Peak 01/21/2022 Intersection: 1: Cantebury Road /Route 846 & Ivy Road Movement EB EB EB WB WB NB NB SB SB Directions Served L T R L TR LT R LT R Maximum Queue (ft) 621 504 29 200 624 72 55 212 76 Average Queue (ft) 330 171 5 69 588 22 16 200 73 95th Queue (ft) 578 366 22 206 689 57 41 224 86 Link Distance (ft) 882 882 586 575 201 Upstream Blk Time (%) 0 0 59 27 Queuing Penalty (veh) 0 0 0 196 Storage Bay Dist (ft) 450 200 180 75 Storage Blk Time (%) 0 0 60 32 29 Queuing Penalty (veh) # 0 1 24 191 29 Intersection: 2: Route 846/Route 29 Off -Ramp & Old Garth Road/Old Ivy Road Movement EB WB NB SB Directions Served TR LT LTR LTR Maximum Queue (ft) 85 184 84 1150 Average Queue (ft) 33 76 25 1116 95th Queue (ft) 66 151 66 1210 Link Distance (ft) 394 299 201 1106 Upstream Blk Time (°/u) 0 98 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Commercial Entrance/Faulconer Driver & Old Ivy Road Movement EB WB NB SB SB Directions Served LT LTR LTR LT R Maximum Queue (ft) 90 5 30 218 76 Average Queue (ft) 10 0 6 97 16 95th Queue (ft) 51 5 24 182 53 Link Distance (ft) 299 332 171 352 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 190 Storage Blk Time (%) 0 2 0 Queuing Penalty (veh) 0 0 0 Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 1 Queuing and Blocking Report 2025 Total Future PM Peak 01/21/2022 Intersection: 4: Commercial Entrance/Route 29 On -Ramp & Old Ivy Road Movement EB WB NB Directions Served LTR R LTR Maximum Queue (ft) 324 47 16 Average Queue (ft) 148 12 1 95th Queue (ft) 273 33 10 Link Distance (ft) 332 194 Upstream Blk Time (%) 0 Queuing Penalty (veh) 2 Storage Bay Dist (ft) 250 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Commerical Entrance/Old Ivy Road & Ivy Road Movement EB EB WB WB NB SIB Directions Served L Maximum Queue (ft) 86 Average Queue (ft) 21 95th Queue (ft) 68 Link Distance (ft) Upstream Blk Time (°/u) Queuing Penalty (veh) Storage Bay Dist (ft) 90 Storage Blk Time (%) 4 Queuing Penalty (veh) 18 T T R LTR LTR 244 352 116 43 194 67 166 55 13 99 169 285 93 37 164 1037 956 956 277 420 Intersection: 19: Old Ivy Road & Site Entrance Movement EB WB SIB Directions Served L R LR Maximum Queue (ft) 70 12 96 Average Queue (ft) 29 1 43 95th Queue (ft) 61 7 74 Link Distance (ft) 592 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 150 150 Storage Blk Time (%) Queuing Penalty (veh) Network Summ Network wide Queuing Penalty: 464 Greystar Old Ivy Road TIA SimTraffc Report Timmons Group Page 2