Loading...
HomeMy WebLinkAboutSDP201200026 Application 2022-02-09 (2)Application for_'°`" Major or Minor Site Plan Amendments Existing Site Plan Name & Number: Belvedere Towncenter - Belvedere Block 2 B SDP201200026 Tax map and parcel(s): 62G-2-22 Zoning: NMD - ZMA2004-07 Contact (who should we contact about this project): Shimp Engineering ( Stephanie Paul) Street Address 912 E High St. CltyCharlottesville state VA Phone Number (434) 227-5140 Zip Code 22902 Email stephanie@shimp-engineering.com; CC: justin@shimp-engineering.com Owner of Record Je Liesfeld Contractor Inc Street Address 1851 Bennington Rd City Rockville State VA Phone Number (804) 749-3276 Zip Code 23146 Email Lbryant@liesfeld.com Applicant Shimp Engineering ( Stephanie Paul) Street Address 912 E High St. City Charlottesville State VA Phone Number (434) 227-5140 Zip Code 22902 Email stephanie@shimp-engineering.com; CC: justin@shimp-engineering.com FEES ® Major Amendment Zoning Fee = $1846 ❑ Minor Amendment (alterations to parking, circulation, building Application $1775+ Technology Surcharge $71.00 size, location) _ $615.68 Application $592 + Technology Surcharge $23.68 ❑ Major Amendment Fire Rescue Fee = $100 This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may 16 folded copies ofplan are required be required by the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal. 8 folded copies of plan are required Technology Surcharge 4% additional fee on each (does not apply to required notices fees) Notices required by Section 32.4.2.1 (f) Initial notice fee to be provided in conjunction with an application, for preparing and mailing notices and published notice = $448.00 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126 Major or Minor Site Plan Amendments REVISED 7/1/2021 (Fee Update) Page I oft GROUNDWATER ASSESSMENT (Required for all non-residential site plans not serviced by public water) Was a Groundwater Assessment conducted for the existing site plan? ❑ YES ❑ NO If NO and the new plans show a use using less than 2,000 gallons/day (average) ❑ Tier 3 Groundwater Review = $627.12 Fee $603 + Technology Surcharge $24.12 If NO and the new plans show a use using greater than 2,000 gallons/day (average) ❑ Tier 4 Groundwater Review = $1,354.08 Fee $1302 +Technology Surcharge S52.08 If YES and the use goes from using less than to more than 2,000 gallons/day (average) ❑ Tier 4 minus Tier 3 = $726.96 Fee $699 + Technology Surcharge $27.96 If YES and the use does not change from using less than to more than 2,000 gallons/day I ❑ No fee Comments/Attachments: Owner/Applicant Must Read and Sign ® Maior Amendment This major amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final Site Plan) of the Albemarle County Zoning Ordinance. I understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 as the case may be. ❑ Minor Amendment This minor amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final Site Plan) of the Albemarle County Zoning Ordinance. I hereby certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowle e. By signing this application, I am consenting to written comments, letters and or notifications regarding this application being provi ed tk me or my designated contact via fax and or email. This consent does not preclude such written communication from also being Jent vt first class mail. 02/08/2022 Signature of O n r; a ract Purchaser, Agent Date Justin Shimp P E. (434) 227-5140 Print Name VDaytime phone number of Signatory FOR OFFICE USE ONLY SDP # Fee Amount $ Date Paid By who? Receipt # Ck# By: Major or Minor Site Plan Amendments REVISED 7/1/2021 (Fee Update) Page 2 of 2