Loading...
HomeMy WebLinkAboutSDP202200009 Application 2022-02-10Application for Initial Site Plan or Final Site Plan or Site Plan Exception ProjectName: Rio Point Tax map and parcel(s): 06100-00-00-167CO3 06100-00-00-16700 Contact (who should we contact about this project) Craig Kotarski Street Address 608 Preston Avenue, Suite 200 City Charlottesville State Virginia Phone Number 434.295.5624 Owner of Record Rio Point LLC Zoning: R4 22903 Street Address 123 East Main Street, 5th Floor City Charlottesville State Virginia Zip code 22902 Phone Number 703-967-1298 Email kmiller@stonypointdg.com Applicant Rio Point LLC Go Stony Point Development Group, LLC 200 Garrett Street, Suite O Street Address City Charlottesville State Virginia Zip Code 22902 Phone Number 703-967-1298 Email kmiller@stonypointdg.com W Residential Type of unit(s): Townhomes, low rise apartment buildings # of building(s): (11)Apartment, (3)Townhouse, (2)Amenity Sq. ft. of building(s): 139,468 # of units per building: 24 on average Total # of units: 327 Resulting density: 12 dulac Acreage of site: 27.31 acres Acreage in open space: 16.52 acres Acreage in roads: 4.55 acres Average gallons of water used per day: 88,290 Non-residential ❑ Commercial ❑ Industrial ❑ Quasi -Public Sq. ft. of building(s): Acreage of site: Acreage in open space: Acreage in roads: Average gallons of water used per day: 3SK FOR OFFICE USE ONLY SDP # Fee Amount $ Date Paid By who? Receipt # Ck# By: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 REVISED 7/1/2021 (Fee Update) 1 of 2 Intended use or justification for request: This project proposes the construction of 327 residential units Comments/Attachments: FEES SITE DEVELOPMENT PLAN SITE PLAN Exception to drav of site plan under ❑ $861.12 Fee $828+ Technology Surcharge ❑ $1,476.80 Fee $1,420+ Technology Surcharge ❑ $11846 ❑ $1,846 $33.12 $58.80 Fee $1,775 + Fee $1,775 r Plus Plus Technology Technology # of dwellings X $16 = $ X .04 = # of dwellings X $16 = $ X .04 = Surcharge $71.00 Surcharge $71.00 $ $ +Fire Rescue +Fire Rescue Plus Plus Fee of $100 Fee of $100 Nonresidential square feet X .016 = Nonresidential square feet X 0.016 = $ X.04= $ X.04= TOTAL TOTAL $ plus an additional 6 copies if within an Entrance Corridor submittal will be noted plan with your initial approval ❑ Site plan has a parking structure. Included are revised architectural elevations, drawings, photographs or other visual materials submitted with the initial Notices required by Section 32.4.2.1 (f) GROUNDWATER ASSESSMENT (Required for all non-residential site plans not serviced by public water) ❑ If the plans show a use using less than 2,000 gallons/day (average) Tier 3 Groundwater Review = $627.12 Fee $603 + Technology Surcharge $24.12 ❑ If the plans show a use using greater than 2,000 gallons/day (average) Tier 4 Groundwater Review = $1,354.08 Fee S1302+Technology Surcharee $52.08 Special Exception = $523.12 Fee $503 + Technology Surcharge This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be Owner/Applicant Must Read and Sign This site plan as submitted contains all of the information required by Section 32.5 (Initial Site Plan) or Section 32.6 (Final Site Plan) of Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 of Chapter 18 of the Code as the case may be. By signing this application I am consenting to written comments, letters and or notifications regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such written communication from also being sent via first class mail. Contract Purchaser, Agent 02-07-2022 Date 540-353-0183 Daytime phone number of Signatory Site Plan Application REVISED 7/1/2021 (Fee update) Page 2 of 2