Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP202200009 Other 2022-02-10
WATER DATA SHEET Date (1) Project Name Rio Point (2) Project Location TMP 61-167C, 61-167 (3) Consultant Timmons Group (4) Primary Water Plant South Rivanna WTP (51 Design Population 327 units: 130(1 BD), 124(26D), 30(313D), 15(TH), 28 future units (6) Hydraulic Capacity (7) Pipe Material 6" DIP (8) Pipe Diameter (Inches) Length (Feet) 4" 6" 3271 8" 10" 12" (9) Total Pipe Length 3271 (10) Fire Hydrant Assemblies 4 (11) Blow -off Assemblies 1 (12) Air Relief Valves (13) Gate Valves (Inches) Quantity (Number) 4" 6" 29 8" 10" 12" (14) Minimum pressure at critical water meter Authority Provide: Booster Station Water Storage Tank Pressure Zone A-1 (Feet) (Number) (Number) (Number) (20 psi required) SEWER DATA SHEET Date (1) Project Name Rio Point (2) Project Location TM 61-167, 61-167 (3) Consultant Timmons Group (4) Wastewater Treatment Facility (5) Design Population (6) Industrial Waste NA (7) Pipe Material PVC, DIP (8) Pipe Diameter (Inches) DIP Length (Feet) PVC Length (Feet) 6" 8" 10" 12" 15" 18" 21" 24" (9) Total Pipe Length (Feet) (10) Manholes: (A) Standard (B) Drop (11) (A) Siphons & Pump Stations (B) Force Main (Size -Length) Authority Provide: Drainage Basin Sub Drainage Basin GWA (Number) (Number) (Number) (Inches -Feet)