HomeMy WebLinkAboutSDP202100074 Correspondence 2022-02-14ALBEMARLE
COUNTY I VIRGINIA
Is this a new submission or a resubmission?
New Submission • Re -submission
or A4
I11t ��
The Community Development Department (CDD) now accepts the digital submission of development applications through
a new web -based form. This feature is being implemented in an effort to provide a user-friendly method to submit and
resubmit multiple development applications. Please click the New Submission button above to see the list of available
applications.
To guide you through the digital submission process, we have provided Submittal Instructions on how to use this
Submission Form and some General Submission Guidelines. Please review both of these documents before making your
submission.
Submittal Instructions
General Submission Guidelines
If you have questions about the correct submission method for your project, please email us at
cddsubmittal@albemade.org or call us at (434) 296-5832.
You have selected re -submission. If necessary, you will need to complete the appropriate PDF application form(s).
• For Road Plan re -submissions, an application and fee are required and can be found here.
• For Water Protection Ordinance re -submissions, an application and fee are required and can be found here.
• For Special Use Permit re -submissions, an application can be found here. A Fee will apply for all submittals
after the first free re -submittal.
• For Zoning Map Amendment re -submissions, an application can be found here. A Fee will apply for all
submittals after the first free re -submittal.
• For all other applications (SDP, SUB, CLE, etc.) there is no application or fee required to submit.
Once you have finished filling out any required application, save it to a location on your computer.
Please enter your project's application number in the field provided below, once completed, tab to the next field. The
application number you entered will reference the project's application number in Albemarle County Community
Development Department's development tracking system. Once referenced, the Project Name and Project Type fields will
be auto -populated. Please confirm the information referenced in these fields is correct. After confirmation, please enter
your name and email address for contact purposes and attach any associated files for resubmittal through the File Upload
button.
Submission Fees are determined by application type and are listed within each application.
Full Name*
Ex: John Doe
scoff collins
Email*
Ex: johndoe@gmail.com
scott@collins-engineering.com
Phone Number*
Ex: 434-973-9999
434-293-3719
Application Number`
Er: SDP201800005
SDP202100074
(Prefix + 4 digit year t 5 digit number
Is this an LOR7*
Yes
Project Name*
(No entry needed - must have correct Application Number above to submit)
PLEASANT GREEN - PHASE 2A- FINAL - DIGITAL
Project Type
(No entry needed)
SDP
File Upload
Only PDF and TIFF fletypes accepted
No
Alb Co Comment Response Letter - 3rd submission.pdf 154.31 KB
Pleasant Green Phase 2A Final Site Plan - 3rd Submission.pdf 14.24MB
Maximum size per file: 70MB