Loading...
HomeMy WebLinkAboutSDP200100087 Review Comments 2001-08-27 411 COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 =AX(804)972-4126 TELEPHONE(804)296-5832 TTD(804)972-4012 August 27,2001 Jim Taggart,PE Post Office Box 306 Nellysford,VA 22958 RE: SDP 2001 —087 Springridge-Project 2.1 Final Site Plan Dear Mr.Taggart, Your tentative plan submission has been distributed to the reviewing agencies and the attached comments have been received. Please review the comments and revise the plan of the proposed development accordingly. Your revisions should be resubmitted directly to the commenting agency. If not previously submitted the landscaping and lighting plans should be submitted to both the Planning Department and the Building Code and Zoning Service Department. If not previously submitted your Erosion Control Plan should be submitted directly to the Engineering Depaitinent After all approvals have been received the final site plan may be submitted for signing. For final site plan submittal you will need to submit two mylar copies of the site plan(the original and a copy for County records) along with a$325 fee and completed application to the Planning Department. Submittals are received each Monday and the plan will be signed within one week of submittal. If you have any questions about the comments of a specific agency please contact that agency directly. If you have any questions about the review process please feel free to contact me Sincerely, William D. Fritz,AICP Development Process Manager Cc: Don Franco - • Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project 2.1 Final E-911 Mapping Final (Tentative) Site Plan revision 1 reviewer received reviewed decision patrick powell 8/2/01 8/2/01 approved 8/27/01 08.46 AM Page 1 of 7 • Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project 2.1 Final Engineering final site plan (1) revision 1 reviewer received reviewed decision Jeff Thomas 8/2/01 8/24/01 requested changes Project:Springridge Phase 2.1 (Townhomes at Springridge) Plan preparer:Jim Taggart, P.E. (fax 361-1216) Owner or rep.:Don Franco (fax 979-8055) Plan received date:03 August 2001 (final site plan, private road plan) Date of comments:24 August 2001 Lead Engineer:Jeff Thomas, Senior Engineer A. Final site plan, private road plan, and drainage computation comments: (Jeff) Private Roads References: (other than ordinances) (1) 1996 VDOT Subdivision Street Requirements (2) 1996 VDOT Pavement Design Guide for Subdivision and Secondary Roads in Virginia (3)VDOT Minimum Standards of Entrances to State Highways, 1998 ed. (4)VDOT Road Design Manual & supplements (5)VDOT Road and Bridge standards 1. Please show 50 foot stationing and label the 100 foot intervals. [Policy] 2. Show and label street name signs and traffic control signs (stop, speed limit). [Policy] 3. Label curbs and edge of pavement radii. [ref. 3] 4. Provide vertical curves for all grade transitions. Please label the following information for each curve: PVC, PVI, PVT, label sight distances (or K, smaller values may be allow at road ends due to stop conditions), lengths [ref. 1, 24 VAC 30-90-380 Table 1, ref. 4] Final Site Plan/Drainage Computations 5. It is unclear which storm sewers are to be constructed with this phase. Please indicate clearly which systems are proposed with this phase. It appears that storm systems 1, 3, and 4 should be constructed with the phase 1 loop road. Please eliminate any information for storm sewers that are not to be installed with this phase. 6. Clarify if curbing is proposed for the two on-street parking areas. If these parking bays are temporary, please indicate this on the plan. If this is the case, the required amount of parking f9r this phase must be maintained with any subsequent construction of future phases. 7. Please eliminate the parking and building line work at the bottom of sheets 3, 4, and 5 of 6. This area is not a part of phase 2.1. 8. All improvements must be built or bonded prior to approval of final plats. B. Stormwater management plan comments: (David Hirschman, Water Resource Manager) 9. A SWM plan has been approved for the entire Springridge project. C. Erosion and sediment control plan comments: (Jeff for Max Greene, E&SC Plan Reviewer) 10. An E&SC plan has been approved for the entire development. However, an addendum to that plan may be needed for phase 2.1 to prevent sediment transport and deposition in the loop roads and storm sewers. Please contact Max Greene or Kenny Thacker at 296-5861 for more information. 8/27/01 08:46 AM Page 2 of 7 Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project 2.1 Final Engineering final site plan (1) revision 1 reviewer received reviewed decision Jeff Thomas 8/2/01 8/24/01 requested changes Engineering Department approval of the construction plans will be given when "all comments have been addressed"for items A-C above. A grading permit will be issued when approvals have been granted from all applicable departments and agencies, and erosion control bond has been posted, and a pre- construction conference held with the contractor, owner and county staff. • 8/27/01 08:46 AM Page 3 of 7 • Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project2.1 Final Fire/Rescue Final Site Plan revision 1 reviewer received reviewed decision BRUCE CROW 8/2/01 8/8/01 requested changes Using 30 scale on page 4 of 5 of plan units 1- 8 are not within 400 feet of a required fire hydrant. Fire Hydrants should be added or relocated to insure all proposed units are within 400 feet of a fire hydrant measured by prepared travel way. (Albemarle County Subdivision Ordinance, Section 14-521) 8/27/01 08:46 AM Page 4 of 7 Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project 2.1 Final Planning Final Site Plan revision 1 reviewer received reviewed decision Margaret Doherty 8/2/01 8/23/01 requested changes The Department of Planning and Community Development will not approve the final site plan until all the following items have been satisfactorily addressed: 1. Please submit a landscape plan in conformance with Section 32.7.9.4 for our review and approval. On this landscape plan, please note sight easement. Also, all sidewalks must line up to adjoining sidewalks and may not be reduced to a width of less than 4'; 2. Why is a portion of"Future Project 3" shown on Sheets 3 -5? This was not a part of the Preliminary Site Plan Approval; 3. Provisions for ZMA-99-13 Proffers related to road improvements to Engineering Department's satisfaction; and 4. All other reviewing agency approvals. 8/27/01 08:46 AM Page 5 of 7 • Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project 2.1 Final Service Authority [description and date] revision 1 reviewer received reviewed decision Pete Gorham 8/2/01 8/24/01 under review Bill, We are in the process of winding up our final review of the construction drawings for the entire Springridge project(Phases 1 &2.1). We anticipate granting our final approval sometime next week, provided we get the appropriate sets from TCS Engineering and do the necessary fine tuning. Let us know if you have any questions. -Pete 8/27/01 08:46 AM Page 6 of 7 Albemarle County Development Departments SDP-2001-087 SPIN Submission and Comments Springridge-Project 2.1 Final Zoning [description and date] revision 1 reviewer received reviewed decision susan snead 8/2/01 8/14/01 requested changes FROM: Susan Carol Snead, Zoning Plans Reviewer DATE: August 14, 2001 RE: SDP 00-142 Springridge 2.1 Preliminary Site Plan Revised February 12, 2001 Revised April 23, 2001 Revised July 27, 2001 The Albemarle County Department of Building Code and Zoning Services can approve this preliminary site plan for zoning compliance. Final tentative approval from the Department of Building Code and Zoning Services will be subject to the following conditions: (The following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on further review.) 1. [Specific Condition for Area 19] The landscape plan must include the required bench seating to be provided in at least 4 locations in Area 19. 2. [ZMA 98-13, Proffer#7] The landscape plan must include the proposed tree planting for this phase, clearly indicating that the trees will be planted 50' apart as required by proffer. 8/27/01 08:46 AM Page 7 of 7