HomeMy WebLinkAboutSDP200100087 Correspondence 2001-09-20 •••=ici
�N OMi='ANY
County of Albemarle
Dept. Planning&Community Development
Attn:Margaret Doherty
401 McIntire Road
Charlottesville, VA 22901 09-2 0-2 0 01 P 01 4 7
Via: Delivery
September 20,2001
Re: Springridge Project 2.1-Final Site Plan Tentative Submittal
Dear Margaret,
Please find enclosed,two sets of Final site plans for the above referenced revised ina ccordance with the 27AUG01
comment letter. Copies of the plans along with this letter are concurrently submitted to Fire/Rescue and
Engineering. ACSA is being handled within project 1.0,while Zoning and 911 have no pertinent comments. The
landscape plan has been submitted separately.
A. Engineering Department
1. Road plans are included herein for the cross streets fronting the Townhomes.
2. Signage added to the Plan&Profile Sheets
3. ' labels and radii added to the Plan&Profile Sheets
4. Curve data added to the Plan&Profile Sheets
S. All storm sewer is to be constructed with phase 1 and has therefore been removed from the
drawings.
6. The onstreet parking areas are proposed without curbing and are permanent.
7. TheProject 3.0 building areas and linework, shown at the bottom of those sheets are not to
be included in this project. I have removed the linework from sheet 4. As there is limited
depiction on sheets 3 and 5,I see no reason to redraft those sheets.
8. Noted
B. Planning Department
1. Landscaping plan has been submitted separately
2. Project 3 linework has been removed.
3. Noted
4. Noted.
C. Fire and Rescue
1. Hydrant locations have been highlighted on sheet 4. My measurements show units 1-4 from
200 to 300 jt from the hydrant along Turnberry Circle(upper right of sheet 4);and units 5-8
from 230 to 400 ft.from the hydrant near the corner of Turnberry and Weatherwood(lower
left corner of sheet 4).
I look forward to your review.
W est re ds,
im T art,P.E.
for TCS Engineering Co.
P.O.Box 306 Nellysford,Virginia 22958
Ph.804/361-1215 Fax 804/361-1216 Email:JTagg2@AOL.com