Loading...
HomeMy WebLinkAboutSDP202100016 Correspondence 2022-02-17® COLLINS ENGINEERING February 13, 2022 Cameron Langille Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Brookhill Blocks 9, 10, & 11— Final Site Plan (SDP 202100016) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated April 9, 2021 on the above referenced project. Below are our responses to the remaining comments on the site plan. Planning (Cameron Langille): 1. Comment addressed. 2. Comment addressed. 3. Comment addressed. 4. Comment addressed. 5. The Greenway parcel has been subdivided and the developer will dedicate the parcel to Albemarle County prior to the subdivision plat being recorded. 6. Comment addressed. 7. Comment addressed. 8. Comment addressed. 9. Comment addressed. 10. Comment addressed. 11. Regarding Upland Park: a. Comment addressed. b. Comment addressed. c. The boundary of the Upland Park has been labeled and hatched on Sheet 8— Layout & Utility Plan. The park meets the minimum 60,000 sq. ft. minimum; the park area is 666,780 sq. ft. and this area has been labeled on sheet 8. The details for the park along with the SF of each feature is shown on the site plan. d. Comment addressed. e. Comment addressed. f. Comment addressed. 12. Comment addressed. 13. Comment addressed. 14. The road plans have been approved and this street has been approved as a public street. 15. Comment addressed. 16. The easement plat has been recorded and the instrument number for the record plat has been added to the easements on the site plan. 17. Comment addressed. 18. Comment addressed. 19. Comment addressed. 20. Comment addressed. 21. Comment addressed. 22. The road plans have been approved. 23. Comment addressed. 24. Comment addressed. 25. Comment addressed. 26. Comment addressed. 27. Comment addressed. 28. The HOA documents were recorded with the easement plan for the project. Engineering (Emily Cox): 1. The road plans have been approved. 2. Comment addressed. 3. Comment addressed. 4. The deed book/pg has been added to the plan sheets for the recorded greenway easement. The DB/PG is actually D13.5512, pg.282. 5. Comment addressed. 6. The easement plat has been recorded and the easements have been updated and labeled with the instrument #. 7. Trees directly over storm pipes have been moved at least 5 ft from pipes. All trees and pipes have been checked for conflicts. Should you have any questions, please feel free to contact Scott Collins at scott(a7collins-eneineerine.com. Sincerely, Scott Collins, PE