HomeMy WebLinkAboutWPO200900065 Plan - Submittal (First) WPO VSMP 2022-02-08C1
COVER SHEET
Boundary and topographic information provided by Foresight Survey P.C. on October 10, 2021
Supplemental planimetric and topographic information for adjoining parcels provided by Albemarle County GIS .
SITE
BELVEDERE BLOCK 2
VSMP PLAN AMENDMENT
C1 COVER SHEET
C2 EXISTING CONDITIONS
C3 GRADING & UTILITY PLAN OVERVIEW
C4 GRADING & UTILITY PLAN
C5 EROSION NARRATIVE
C6 EROSION CONTROL PLAN - PHASE 1
C7 EROSION CONTROL PLAN - PHASE 2
C8 EROSION CONTROL DETAILS
SHEET INDEX (8 TOTAL)
VICINITY MAPOWNER SCALE : 1"=1000'
Map provided by Google.com
JE LIESFELD CONTRACTOR INC
1851 Bennington Rd
Rockville, VA 23146
ZONING
NMD - Neighborhood Model District
ZMA2004-07
Overlays: None
DISTRICT
Rio
SOURCE OF TITLE
DB 5215 PG 435
SOURCE OF BOUNDARY AND TOPOGRAPHY
FLOODZONE
According to FEMA Flood Insurance Rate Map, effective date February 4, 2005 (Community Panel 51003C0279D), this
property is not located within a Zone AE 100-year floodplain.
RESERVOIR WATERSHED
This site is within the Meadow Creek Watershed.
This site is a watershed of a public water supply.
HUC:020802040401
BENCHMARK
Datum for topography is NAD 83
GENERAL CONSTRUCTION NOTES
1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be
obtained from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of
the permit.Where any discrepancies occur the requirements of the permit shall govern.
2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise
noted.
3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be
installed prior to any clearing, grading or other construction.
4. All slopes and disturbed areas are to be fertilized, seeded and mulched.
5. The maximum allowable slope is 2:1 (horizontle:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to
be acheived.
6. Paved, rip-rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer or designee it is
deemed necessary in order to stabilize a drainage channel.
7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices.
8. Unless othrewise noted all concrete pipe shall be reinforced concrete pipe - Class III.
9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR
Part 1926).
1.The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are
based on information and data furnished to the owner and engineer by the owners of such underground facilities or others.
The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor
shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the
work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any
damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor
shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work.
2.When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to
protect structures from damage. Replacement of damaged structures shall be at the contractor's expense.
3.The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the
owner can make necessary arrangements to modify/protect existing structures from damages.
4.The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and
the Virginia Department of Transportation prior to completing any off-site work.
5.Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start
of construction.
6.Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and
engineer.
7.Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop
drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not
relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist.
8.All bare areas shall be scarified, limed, fertilized, seeded and mulched.
9.All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements.
10.Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.
11.Retaining walls require separate building permits.
12.All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building
Department from the main to the structure.
GENERAL NOTES
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
STEEP SLOPES
Steep slopes (managed & preserved) are not present on this property.
LEGEND
EXISTING NEW DESCRIPTION
BENCHMARK
SITE PROPERTY LINE
ADJACENT PROPERTY LINE
VACATED PROPERTY LINE
MFA/SFA BUILDING SETBACK
SFA BUILDING SETBACK
ACCESS EASEMENT
DEMOLITION
PARKING COUNT
DIMENIONS
GRADING EASEMENT
INDEX CONTOUR
INTERVAL CONTOUR
SPOT EVELVATION
TOP OF CURB ELEVATION
TOP OF WALL ELEVATION
BOTTOM OF WALL ELEVATION
RETAINING WALL
STAIRS
RAILING
BUILDING
ROAD-EDGE OF PAVEMENT
ROAD- CENTERLINE
ROAD-FRONT OF CURB
ROAD BACK OF CURB
CG-2 STANDARD 6" CURB
CG-6 STANDARD 6" CURB AND GUTTER
CG-12 STANDARD ACCESS RAMP
SIDEWALK
BIKE PARKING
PARKING SURFACE
CROSSWALK
HANDICAP ACCESSIBLE AISLE
HANDICAP PARKING
CONCRETE/PAVEMENT-SIDEWALK
RIPRAP
ASPHALT
GRASS
TREELINE
FENCE
UTILITY EASEMENT
UTILITY POLE
LIGHT POLE
OVERHEAD UTILITY
UNDERGROUND UTILITY
OVERHEAD UTILITY GUY
MANHOLE
STORM LINE
ROOF DRAIN
DRAIN INLET
DRAINAGE EASEMENT
STORM DRAINAGE EASEMENT
SANITARY SEWER PIPE
SANITARY SEWER LATERAL
WATER LINE
WATER SERVICE LINE
WATER METER
WATER VALVE AND BOX
FIRE DEPARTMENT CONNECTION
FIRE HYDRANT
ACSA EASEMENT
GAS LINE
GENERAL CONSTRUCTION NOTES FOR
EROSION AND SEDIMENT CONTROL PLANS
1. The plan approving authority must be notified one week prior to the pre-construction conference, one week prior to the
commencement of land disturbing activity, and one week prior to the final inspection.
2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and
specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and
Sediment Control Regulations.
3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing.
4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times.
5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to,
off-site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and
approval by the plan approving authority.
6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and
sedimentation as determined by the plan approving authority.
7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and
during site development until final stabilization is achieved.
8. During dewatering operations, water will be pumped into an approved filtering device.
9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any
necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately.
10. All fill material to be taken from an approved, designated borrow area.
11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps,
wood, rubbish, and other debris.
12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28.
13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle.
14. Borrow, fill or waste activity involving industrial-type power equipment shall be limited to the hours of 7:00am to 9:00pm.
15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any
hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides,
sinking, or collapse.
16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities
where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other
portion of the property.
17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 lbs/acre, and in the months of
September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist
of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives
are subject to approved by the County erosion control inspector.
18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be
applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of
a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue
and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject
to approved by the County erosion control inspector.
19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural
measures is to be repaired immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with
sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion
dykes which are collecting sediment to half their height must be cleaned and repaired immediately.
20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when
measures are no longer needed, subject to approval by the County erosion control inspector.
21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection
Ordinance section 17-204G.)
22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing
activity commenced. (Water Protection Ordinance section 17-207B)
AMENDMENT TO WPO200900065
TAX MAP 62G, PARCEL 2-22
ALBEMARLE COUNTY, VIRGINIA
LAND USE SCHEDULE
EXISTING AREA
SF AC %
Managed Turf 29,229 0.67 100.0%
Total 29,229 0.67 100.0%
PROPOSED Area
SF AC %
Building 4,377 0.10 15.0%
Pavement/Concrete 1,266 0.03 4.3%
Impervious 5,643 0.13 19.3%
Managed Turf 23,586 0.54 80.7%
Total 29,229 0.67 100.0%
BELVEDERE
BLVD
FREE STATE
ROAD (ROUTE
651)
RUSKIN
DR.
DEVELOPER
Craig Builders
338 Rio Road W
Charlottesville, CA 22901
EXISTING CONDITIONS
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
C2N
GRADING & UTILITY PLAN
OVERVIEW
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
C3N
+++
+
+++
+
+
+
+
+
+
+
+++++
+
+
+
++
++
+
+
+
++
+
++
+
++
++
+
++
++
++
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
++
++
++
++
++
++
+
++
++
+
+
++
+
+
+
+
+
+
+
GRADING & UTILITY PLAN
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
C4N
EROSION CONTROL
NARRATIVE
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION
C5
EROSION CONTROL PLAN -
PHASE 1
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
SOIL EROSION & SEDIMENT CONTROL SYMBOLS
C6N
EROSION CONTROL PLAN -
PHASE 2
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
SOIL EROSION & SEDIMENT CONTROL SYMBOLS
C7N
EROSION CONTROL
DETAILS
SUBMISSION:
2022.02.08
REVISION:
21.064
VSMP PLAN AMENDMENT FOR
ALBEMARLE COUNTY, VIRGINIA
912 E. HIGH ST.
CHARLOTTESVILLE VA, 22902
FILE NO.
BELVEDERE
BLOCK 2
434.227.5140
JUSTIN@SHIMP-ENGINEERING.COM
LAND PLANNING - PROJECT MANAGEMENT
CROSS SECTION OF OUTLET
OUTLET (PERSPECTIVE VIEW)
**COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5
SECTION A-A
PLAN VIEW
SIDE ELEVATION
ADHESIVES USED FOR DUST CONTROL
TABLE 3.39-A
Adhesive (Adhesive: Water)Nozzle Gallons/Acre
Application
RateType of
Water
Dilution
Anionic
Asphalt Emulsion
Latex Emulsion
Resin in Water
Acrylic Emulsion
(Non-Traffic)
Acrylic Emulsion
(Traffic)
7:1
12.5:1
4:1
7:1
3.5:1
Coarse Spray
Coarse Spray
Coarse Spray
Fine Spray
Fine Spray
1,200
235
300
450
350
PERSPECTIVE VIEW
PERSPECTIVE VIEW
PLASTIC FENCE
PERSPECTIVE VIEW
METAL FENCE
C8