Loading...
HomeMy WebLinkAboutSDP202100092 Approval - County 2022-02-18$� oFAcs Ben Holt Senior Planner, Planning County of Albemarle bholt(d)albemarle.org Community Development Department Telephone: (434) 296-5832 ext. 3443 Memorandum To: Ammy George, ageorge(5roudabush.com Date: February 18, 2022 Re: SDP202100092 S.L. Williamson Asphalt Plant (at Red Hill Quarry) — Initial Site Plan The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan. The approval is conditional upon addressing all outstanding comments of the Initial Site Plan, as indicated below. Outstanding comments are organized by the reviewer of each applicable department or organization. A note has been included to identify any comments pertaining only to the Final Site Plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control. Albemarle County Planning Services (Planner) — Ben Holt, bholt(&albemarle.org 1. [32.5.2.A] — General info. Under Zoning notes, indicate that property includes steep slopes zoning overlay. 2. [32.5.2.A] — General info. Cover page: include previous approvals for the property: SP199700041, FDP202000005, SP201900009, SE202100036, SE202100037. 3. [32.5.2.J] — Sewer and drainage facilities. Show the location of any sewer facilities on the property. 4. [32.5.2.G] — Onsite sewage. If applicable, include location of onsite sewage setback lines from watercourses, intermittent streams and other bodies of water. Please contact Ben Holt in the Planning Division by using bholtno.albemarle.org or 434-296-5832 ext. 3443 for further information. Comments from Other Reviewers: Albemarle County Engineering Division — John Anderson, landerson2(5albemarle.org 1. Submit WPO plan application at earliest convenience. 2. Final site plan (FSP) approval requires WPO plan approval. 3. In anticipation, WPO plan should show, consider, or provide: a. Mitigation plan for improvements proposed within the landward 50' of stream buffer. Note: Mitigation plan must meet requirements of section 17-406. b. Identify runoff that reaches proposed settling basins located within the stream buffer. c. No petroleum or petroleum -contaminated rinse water or water -borne (emulsified) asphalt may drain to settling basins in the landward 50' of stream buffer. Solid, non -emulsified' asphalt material may drain, settle and be removed from settling basins in the landward 50' of stream 1rir1ri4rdA_14:1 :1 8V1_1 R 4 *01:ih 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579 buffer, if removed periodically. No discharge of solid asphalt material is permitted to drain from basins to streams, nor may industrial, quarry -related material enter a stream. Road grit, dust, debris, etc. may drain to settling basins provided these materials do not then discharge to streams. d. Provide tentative settling basin maintenance schedule (what is required, how often, etc.) e. Please provide narrative with WPO and FSP that describes or contextualizes what materials reach settling basins, via what route, and how materials are prevented from entering or contaminating streams. This is a feature of SWPPP template, section 6, PPP. f. Provide reference on WPO to approved SP201900009, with conditions, including approved critical slopes waiver approval anticipated to occur 1119/22. g. Please make ref. to FDP202000005, Approved 7/20/2021. Albemarle County Building Inspections — Betty Slough, bslough(cbalbemarle.org Add the following notes to the general notes page: 1. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. 2. Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition permit. 3. Asbestos removal permits are required if positive for such from Albemarle County and VDOLL Contact VDOLI for their additional requirements and permits for demolition projects at 540-562-3580 x131. Albemarle County Department of Fire & Rescue — Howard Lagomarsino, hlagomarsino0albemarle.org 1. Please provide a note on the plan identifying the location of the closest water source suitable for fire suppression operations. 2. During construction, the following fire prevention steps are required, so please note them on the plan: a. Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b. Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia Statewide Fire Prevention Code. c. Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction and demolition sites, provide access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting fire apparatus in all weather conditions. d. Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code e. An approved water supply for firefighting operations shall be in place and available as soon as combustible materials arrive on site. f. Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code g. Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special; hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code h. Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Fire Marshal's Office Virginia Department of Health (VDH) —Alan Mazurowski - alan.mazurowskiovdh.vir_qinia.gov 1. The plan does not include water or sewer service to the proposed facility, however, if does indicate 3-4 employees. Unless those employees will have access to restrooms elsewhere on that parcel, accommodations will need to be added to the plan to be in compliance with 12VAC5-610-80.C. of the Sewage Handling & Disposal Regulations which states that, "All buildings, residences, and structures designed for human occupancy, employment or habitation and other places where humans congregate shall be served by an approved sewerage system and/or treatment works". WWW.ALBEMARLE.ORG 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579