HomeMy WebLinkAboutSUB201400193 Bond Reduction 2022-02-19Whittington Phase B (Phase 133) BOND REDUCTION Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201400193 Parcel ID 09000-00-00-00300 Item No. Unit Unit Cost (installed) Cottontail Way Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG-2 curb CG-6 sidewalk, concrete (6) ramp CG-12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (60 to 108') rip -rap, placed matting, EC-2 or 3 dear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) 10+12.00 37+89.00 road length 2777.0 ft 6.0 in d 2777.0ftL Mftw 2777.0 ft L ft W 3.0 in d 2777.0 ft L ft W 2.0 in d 2777.0 ft L ft W .Each ES @ 3000 15.0 in d ES-1,2 0 EC-1 18.0 in dIftlL ES-1,2 0 EC-1 24.0 in dES-1,2 0 EC-1 30.0 in dES-1,2 0 EC-1 36.0 in dES-1,2 0 EC-1 96.0 in dES-1, 2 0 EC-1 2.0ft d . ftW ftL 0.0 ftW ftL 40.0ftW 2777.0 ft L 0.52595 mi. 2777.0 ft L 0.52595 mi. 2777.0 ft L 5.554 inc of 500' 2777.0 ft L 5.554 inc of 500' 2777.0 ft L 5.554 inc of 500' 2777.0 ft L 5.554 inc of 500' 2777.0 ft L 5.554 inc of 500' 2777.0 ft L 0.52595 mi. 2777.0 ft L 0.52595 mi. 2777.0 ft L 0.52595 mi. Cost % compete cost remaining 1943.9 ton $35.00 $68,036.50 80% $13,607.30 0.0 sy $10.00 $0.00 80% $0.00 1020.5 tons $70.00 $71,438.33 80% $14,287.67 680.4 tons $120.00 $81,643.80 80% $16,328.76 0.0 ft $13.00 $0.00 80% $0.00 0.0 ft $15.00 $0.00 80% $0.00 0.0 ft $17.00 $0.00 80% $0.00 0 ft $350.00 $0.00 80% $0.00 1 each $200.00 $200.00 80% $40.00 10 each $200.00 $2,000.00 80% $400.00 0 each $275.00 $0.00 80% $0.00 1410.0 ft $17.00 $47,970.00 80% $9,594.00 8 each $3,500.00 $28,000.00 80% $5,600.00 5 each $500.00 $2,500.00 80% $500.00 131 ft $450.00 $58,950.00 80% $11,790.00 353.0 ft $35.00 $12,855.00 80% $2,571.00 198.0 ft $40.00 $7,920.00 83% $1,346.40 507.0 ft $50.00 $25,850.00 83% $4,394.50 53.0 ft $65.00 $3,945.00 83% $670.65 90.0 ft $70.00 $7,300.00 80% $1,460.00 0.0 ft $320.00 $0.00 80% $0.00 0.0 ton $60.00 $0.00 80% $0.00 0.0 sy $2.00 $0.00 80% $0.00 2.6 acre $24,000.00 $61,267.22 80% $12,253.44 7800.0 cy $4.00 $31,200.00 90% $3,120.00 22360.0 cy $9.00 $201,240.00 90% $20,124.00 61sum $2,000.00 $13,000.00 80% $2,600.00 61sum $2,000.00 $13,000.00 80% $2,600.00 __�AIsum $5,000.00 $5,000.00 100% $0.00 7 each $200.00 $1,320.00 0% $1,320.00 7 each $200.00 $1,320.00 0% $1,320.00 7 each $200.00 $1,320.00 0% $1,320.00 7 each $200.00 $1,320.00 0% $1,320.00 7 each $200.00 $1,320.00 0% $1,320.00 .88 0% 21,037.00 Lanes .ft 00.00 $2,000.00 21,03 $21,037.88 0% $21,037.88 88 Lanes $150.00 $1,577.84 0% $1,577.84 Lanes $100.00 $1,301.89 0% $1,301.89 DAwork\I-drive offload 102519 -TO DO to cloud\anderson\040918_bonds\reduction\SUB201400193_Whitlington RP -Phase B3_M_Wentland_081417_021922redux_JA.xlsx 2/19/2022 Whittington Phase B (Phase 133) BOND REDUCTION Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201400193 Parcel ID 09000-00-00-00300 Item No. Unit Unit Cost Cost installed % compete cost remaining Cottontail Way cost sum $775,034.46 $155,006.33 contingency $77,603.45 $15,500.63 Total $852,540 $170,510 SUB201400193_WhitM1ngton RP Phase 133_M_Wen9and_081417_021922red�_JA D:\work\I-drive offload 102519 -TO DO to cloud\anderson\040918_bonds\reduction\SUB201400193_Whittington RP —Phase B3_M_Wentland_081417_021922redux_JA.xlsx 2/19/2022