HomeMy WebLinkAboutSUB202100197 Checklist - Project Closeout (Administrative) 2022-02-11 SUBDIVISION/SITE PLAN
FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS.
CHECKLIST
Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC
and status label. CDA will forward to the Imaging•Center for digital closeout.
SDP/SUB# 6 ° Oa!97 PROJECT TITLE hi 4 os /Z /.3
FULL NAME OF LEAD REVIEWER.g) V/`4- / ' " 1 FINAL , , 5�
Con tyView—
[]Application,Page 2 Data Entered
iffiNtaff Report,Ground Water Assessment,or other documents placed in"Docs&Pics"
Hardcopy.-File Folder Closeout: All items listed should be placed in project folder,in reverse
chronological order(latest on top).
Please check each item included in this:folder. To indicate that an item is not applicable to this file,place.an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any'item deemed necessary to provide
clarity to the file,please indicate that item on the"Other"lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the•digital ocation(path/name)of the document in the space provided •
.
Engineering Folder Information/documentation
❑ Scan ❑ Saved location
Application(signature copy)
❑ Scan ❑ Saved.location
&Public Notification records/Abutting Owner correspondence
O Scan ❑ Saved location
❑ Applicant orrespondence•(to/from,memos/entails) •
Scan ❑ Saved location •
Compl e set of printed Review Comments � r •
Scan ❑ Saved location. /v' eJ fr 7vr L,( ).-2, 31/3.6.- A•rU�rl-t611r .i
Approved plan/plat(signed,or stamped"Approved"with Planner/Engineer name) <towAi s ��
❑ Scan ❑ Saved location
1 ] Action Letter(Administrative Approval)
❑. Scan ❑ Saved location
White Envelope-PC/BOS Meeting Package-'Staff Report(include presented,plan/plat❑ P d,PC/BOS Action Letter)
ScanP P
❑ Saved.location
kr Ground Water Assessments`
❑ Scan ❑ Saved location
�'+ �� • ••• - . • —_.e.Studies.
•
1] Scan • Saved ocation
N;'LJ Other(Please explain-i.e.Studies)
❑. Scan ❑ Saved location •
❑ At the planner's discretion,copies of'unapproved plans/plats may be placed in the file if it is referenced in the
staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be
clearly marked as unapproved and contain a note clarifying why it was included. •
❑ Scan ❑ Saved location
Additional Information on.this project:
• • Planning Commission Minutes-may be obtained online or by contacting PC Recording Secretary .
•
♦ •Board of Supervisor Minutes-maybe obtained online or by contacting the Clerk of BOS
♦• Construction Documents-will be added to this folder after completion of project. Prior to completion, . •
documents may be obtained by contacting the County Engineer..
•
NOTES: SDP/SUB project folders will be accepted by the Imaging Centet when the following items are complete:
1) Checklist is completed and included in folder;
•
2) Folder has a typed status label(same font&label color as project label)placed under the project label to •
;reflect current project status and date;
• 3) Documents areAcco-fastened(except.plats/plans),and in chronological.order.(latest.documents on top);. -
4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. , '
If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief'of.
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012 ,