HomeMy WebLinkAboutSDP199500009 Review Comments 1995-02-07 To: Bill Fritz
Cc: Jack Kelsey
From: Don Franco
Subject: Centel Cellular
Date: 2/07/95 Time: 9:26a
I have reviewed the two special use permits for the referenced applicant
to construct communication towers at Carter's Mountain (SP 94-026) and
Camp Holiday Trails (SP 94-037). I offer the following comments:
1. Attach a copy of the Albemarle County Engineering (ACE) Standard
Notes for Site Plans.
2. Approval is subject to ACE approval of an Erosion Control Plan.
3. Revise the grading of the Camp Holiday Trails site to ensure that all
constructed slopes are 2H:1V or flatter.
In addition, I note the following observations:
a. Generators are proposed on both sites. I would anticipate that some
sort of fuel tank is associated with this equipment. No detail on the
tanks is provided. The locations and sizes of these tanks, as well as
the type of fuel to be stored, may be of interest to Building Inspections
and Fire/Rescue Administration.
b. The Camp Holiday Trails site appears visible from 1-64. I noticed
ARB was not copied.
Please contact me at your earliest convenience if you have questions or
require additional information.