Loading...
HomeMy WebLinkAboutSDP199500009 Review Comments 1995-02-07 To: Bill Fritz Cc: Jack Kelsey From: Don Franco Subject: Centel Cellular Date: 2/07/95 Time: 9:26a I have reviewed the two special use permits for the referenced applicant to construct communication towers at Carter's Mountain (SP 94-026) and Camp Holiday Trails (SP 94-037). I offer the following comments: 1. Attach a copy of the Albemarle County Engineering (ACE) Standard Notes for Site Plans. 2. Approval is subject to ACE approval of an Erosion Control Plan. 3. Revise the grading of the Camp Holiday Trails site to ensure that all constructed slopes are 2H:1V or flatter. In addition, I note the following observations: a. Generators are proposed on both sites. I would anticipate that some sort of fuel tank is associated with this equipment. No detail on the tanks is provided. The locations and sizes of these tanks, as well as the type of fuel to be stored, may be of interest to Building Inspections and Fire/Rescue Administration. b. The Camp Holiday Trails site appears visible from 1-64. I noticed ARB was not copied. Please contact me at your earliest convenience if you have questions or require additional information.