HomeMy WebLinkAboutWPO202100035 Bond Estimates 2022-02-22Project Name: Construction Drawings for Airport Road Pump Station Project for Rivanna Water 8r Sewer Authority, Albemarle County, Virginia RFB No. 383 WPO file number: WP02021-00035 TM P(s): 03200-00-00-041 A2 Date Estimate Completed: 2-22-2022, J. Anderson Stormwater Management Plan Bond Estimate Item Item Number z 3 4 5 6 7 8 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 No. Unit Unit Cost Cost (installed) permanent diversion or ditch ft $13.00 $0.00 standard manhole frame top (not inlet) ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0.0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48")Min inES-1,2 ECA 0.0 ft $35.00 $0.00 12", assume cost= 15' DIA Pipein ES-1,2 ECA 0.0 ft $35.00 $0.00 in ES-1,2 ECA 0.0 ft $50.00 $0.00 NES-1,2 NEC-1 0.0 ft $70.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 0 ea $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 0 ft $50.00 $0.00 np-rap, placed depth ft length _ft (only Outfall Rip -Rap from BMP met width (tons) 0 $60.00 $0.00 survey and layout (once per 0.1 mi.) acres basins_ $0.00 F12" spreaders (typ.) ; 170 LF, per design Materials concrete, CUP 170 LF $5.00 $850.00 ELS estimate based on sidewalk unit price ($5 LF) washed #57 stone 13 TON $35.00 $468.56 6" concrete lip / 9" x 36" triangular 957 stone prism Labor ( see below) mobilization $2,500.00 as -built drawings (per facility) ea $2,000.00 $2,000.00 materials testing (per facility) ea $2,000.00 $0.00 compaction testing (per dam) ea $3,000.00 $0.00 Survey and platting of Open Space mea $2,500.00 $0.00 Engineering estimate: LABOR =2 x concrete /stone price, 2/22/2022 1.0 LS $2,637.13 $2,637.13 cost sum $8,455.69 " Note: SWplan bond is likely a slight underestimate (inflation /pandemic) confingency $845.57 WP0202100035 RWSA Airport Rd pump station_ SVMA_bond_022222ja Total $9,310 2/22/2022