HomeMy WebLinkAboutZMA202100016 Review Comments Zoning Map Amendment 2022-01-17COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street
Commissioner Richmond, Virginia 23219
January 17, 2022
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Kevin McDermott
Re: North Fork Residences — Rezoning Request
ZMA-2021-00016
Review # 1
Dear Mr. McDermott:
(804) 7862701
Fax: (804) 7862940
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as prepared by Timmons Group, dated 13
December 2021, and offers the following comments:
Comments on the Traffic Impact Analysis:
a. Appendix A
i. Can you please provide signed copies of the pre scope of work meeting
documents?
ii. Can you please ensure internal allowance/capture is checked on the
scoping form?
b. General
i. Is there a reason why Berkmar Dr and Towncenter Dr were not included
as study intersections?
ii. Is there a reason why Connor Dr and Timberwood Blvd were not included
as study intersections?
iii. The agency has yet to adopt the 1 Ith edition of the ITE Trip Generation
Manual; latest approved edition is the loth edition. All trip generation
must use the loth edition.
iv. The agency has yet to adopt SIDRA 9 and thus SIDRA 8 is the currently
approved version for analysis. All round -a -bout analysis must be
compatible with SIDRA 8.
c. Page 13 - Towncenter Dr is 35mph between Dickerson Rd and Berkmar Dr and
25mph between Berkmar Dr and Route 29
d. Page 18 (Figure 2-2) - Brianwood Dr/Boulders Rd/Seminole Trail intersection
(intersection 5)
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
January 17, 2022
Attn: Kevin McDermott
e. Is there a reason for the storage lane reductions from the Existing to Total
scenarios?
f. Page 1-2, Data Collection — was there any adjustment made in the traffic volume
due to COVID-19 pandemic? Please add a sentence here to inform the readers. (I
saw in the later part of report, it was clarified that no adjustments were made for
pandemic. Still I would recommend clarifying it in the Executive Summary.)
g. Figure 2-1 — Per Google Earth, SB leg of Lewis and Clark Dr and Quail Run
intersection has two through lanes. However, Figure 2-1 shows only one through
lane on this approach. Please revise or confirm if there is only one through lane
currently in the field.
h. Figure 2-1 — Per Google Earth, SB leg of US 29 and Timberwood Blvd
intersection seems inconsistent to Google Earth. Please revise or confirm if the
lane configuration shows the current field condition.
i. Update the Synchro Models if there's any changes in lane configuration based on
the comments on Figure 2-1.
j. Exiting Condition Synchro Models: All conditions should be analyzed with the
provided signal timing details; optimized iterations can be recommended as
separate mitigation conditions. This process helps better gauge the extent of
impact in comparison with the submitted alternative
i. US 29 and Towncenter Dr: Per the signal timing plan, Phase 3 (WBTL)
has minimum green of 6 sec. But the model existing condition models
currently have 5 sec. Please revise. Yellow and All -Red time in the
existing condition models do not match with the timing plan for all phases.
Please revise to make sure all phases have correct Yellow and All -Red
times. Also revise the minimum splits accordingly.
ii. US 29 and Timberwood Blvd: Please make sure Yellow and All -Red
times in the existing condition models match with sign plan provided.
Revise the minimum splits accordingly, when applicable.
iii. US 29 and Lewis & Clark Dr: Please make sure minimum green, yellow,
and All -Red times in the models matches with the sign plan provided.
Revise the minimum splits accordingly, when applicable.
iv. US 29 and Boulders Rd: Please make sure Yellow and All -Red times in
the existing condition models match with sign plan provided. Revise the
minimum splits accordingly, when applicable.
k. Please make sure the models for background and total conditions are also updated
based on the above comments on existing condition models.
1. Table 3-3 — Should it be "HCM" 95th percentile queue length instead of "HCS"?
(This comment also applies to Table 5-1, Table 6-1, Table 7-1, Table 9-1, Table
10-1, and Table 11-1).
in In many cases, the 95th percentile queue lengths are significantly different than
the simulated maximum queue lengths. Please explain why? Which queue lengths
are more representative of the existing field conditions, 95th percentile queue
lengths or simulated maximum queue lengths?
n. The number of trips from the proposed development (when complete) appears to
be different on Page 1-1 and Page 8-1. Please revise or explain.
January 17, 2022
Attn: Kevin McDermott
o. Page 12-1, Section 12.1, Paragraph 1 states that "The intersections of US Route
29 with Airport Road/Proffit Road and with Boulders RoadBriarwood Drive
operate with significant delay during the PM peak hour and create operational
issues for adjacent intersections." Please clarify how it creates operational issues
to adjacent intersections.
2. Note that the final plan must show conformance with the VDOT Road Design Manual
Appendices B(1) and F, as well as any other applicable standards, regulations or other
requirements.
Please provide a digital copy in PDF format of the revised plan along with a comment response
letter. If further information is desired, please contact Doug McAvoy Jr. at (540) 718-6113.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
Doug McAvoy Jr., P.E.
Area Land Use Engineer
Charlottesville Residency