Loading...
HomeMy WebLinkAboutSDP202100021 Review Comments Major Amendment, Final Site Plan 2022-02-24COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone(4341296-5832 Fax (434) 972-4126 May 5, 2021 Revised February 24, 2022 Justin Shimp 912 E High St. Charlottesville, VA 22902 justin@shimp-en ing eering com RE: SDP202100021 AMENDMENT TO 2017 MINOR SPA OR ORIGINAL 2009 SDP - MAJOR - DIGITAL — Major Site Plan Amendment (Animal Wellness Center) Dear Mr. Shimp: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Architectural Review Board (ARB) Albemarle County Building Inspections Albemarle County Engineering Services (Engineer) Virginia Department of Transportation (VDOT) Albemarle County Department of Fire Rescue Albemarle County Service Authority (ACSA) Rivanna Water and Sewer Authority (RWSA) Albemarle County Information Services (E911) Virginia Department of Health (VDH) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior approval of the major site plan amendment Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Kevin McCollum Senior Planner I Albemarle County Planning Services (Planner) —Kevin McCollum, kmccollum@albemarle.org —Required changes: [32.5.2(a)] Please update the site plan application number in the title to SDP202100021. Comment addressed. 2. [32.5.2(a)] Please update the Tax Map and Parcel reference to TMP 56A2-01-7 or 056A2-01-00-00700, to avoid confusion. Comment addressed. 3. [32.6.2(h)] Please include a signature panel on Sheet Cl. Comment addressed. 4. [32.5.2(a)] Please update the conditions pasted into Sheet C2 to reflect the Conditions approved alongside SE202000022 and SP202000015, both approved on February 3, 2021. Comment addressed. 5. [32.5.2(o)] The Site Plan and Concept Plan reflect a proposed property line that shows a portion of the property being dedicated to the Right of Way. In order to dedicate land to public right-of-way, a Special Lot Application must be submitted, reviewed, approved, and recorded prior to approval of the major amendment. This can be combined with the easement plat mentioned below in comment 6, provided that all applicable regulations for easement plats (Section 14-208.2) of the Subdivision Ordinance, and all applicable regulations for Special Lot applications (Section 14-207) are met. Comment stands. Application SUB202200030 has been received. This Plat must be approved and recorded prior to Site Plan approval. 6. [32.5.2(a) and 32.6.2(e)] Please see condition #4 of SP202000015. It appears that the existing public drainage easement will need to be relocated in order to install the rear parking lot. Planning staff have sent a copy of the major amendment to FES for review. Please address the following: a. Work with FES and Engineering to relocate the public drainage easement as shown on the concept plan and identified in Condition Number 4 of the Special Use Permit conditions. Comment addressed. The rear parking lot has been removed. b. The existing easement also needs to be shown on the existing conditions sheet with its recorded instrument number. Comment addressed. c. A new easement plat will likely be required in order to relocate the drainage channel and its corresponding easement. Once FES confirms where the drainage channel should be moved to, please update the grading and drainage plans as necessary. Show a new public easement over the drainage channel. Once the easement plat is recorded, state the new instrument number in the easement label/callout. Comment addressed. 7. [32.5.2(a)] Asper the conditions of the SP the plan is subject to ARB approval of the landscaping. ARB may additionally have comments on the proposed lighting plan. Comment addressed, see ARB comments below. 8. [32.5.2(a)] Please show and callout any proposed bicycle facilities as shown on the concept plan. Comment addressed. 9. [32.5.2(a)] Screening is shown on the south side of the property on the concept plan adjacent to the vehicular travel way and parking area. Pending ARB review/comment on this matter, a fence may need to be installed in accordance with the concept plan. a. If so, provide a construction detail of the fence in profile view that identifies the materials and dimensions of the proposed fence. b. Label the fence location on the site plan drawings. Comments addressed. See comment 14 below for further comments about necessary screening. 10. [32.6.2(k) and 4.171 Add the standard lighting comment below. a. Each outdoor luminaire equipped with a lamp that emits 3, 000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lightingfrom luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-halffootcandle. Comment addressed. 11. There is an outstanding notice fee of $435 due. Please see email to Applicant on 3-26-2021. Comment addressed. 12. [4.12.13 and 4.12.191 Per applicant comment response letter to the first Site Review Committee comments, no dumpster pads are shown because "totes will be sufficient." County Code 18-4.12.13 (e), "each site plan that depicts a commercial or industrial building of 4,000 gross square feet or more shall provide a dumpster pad that does not impede any required parking or loading spaces, nor any pedestrian or vehicular circulation aisles." a. Please provide a dumpster pad that meets the design and screening requirements of Section 4.12.19. Comment addressed. 13. [32.7.9.7(a)(2)] Provide screening along the southern property line adjacent to the five (5) parking spaces adjacent to TMP 56-11 as shown on the concept plan and as required by Section 32.7.9.7(a)(2). See ARB comment below. Comment addressed. Please contact Kevin McCollum at the Department of Community Development at kmccollum@albemarle.org or 296- 5832 eat. 3141 for further information. Comments From Other Reviewers: Albemarle County Architectural Review Board (ARB)—Margaret Maliszewski, MMaliszewski@albemarle.org—No objection (2/14/2022). Albemarle County Building Inspections — Betty Slough, bslou hg &albemarle.org—No objection (1/12/2022). Albemarle County Engineering Services (Engineer) — David James, diames a&albemarle.org — Requested changes, see below (2/21/2022). 1. (Rev.2) WPO plan approval prior to FSP approval. 2. (Rev.2) Easement plat and SWM & drainage deed approval/recordation prior to ESP approval. 3. (Rev.2) Drainage easements appears to be private (a deed would not be required). TBD with the WPO plan. Virginia Department of Transportation (VDOT) — Adam Moore, Adam.Moore@vdot.virginia.gov — No Objection (4/22/2021). Albemarle County Department of Fire Rescue —Howard Lagomarsino, hlagomarsino@albemarle.org—No objection (1/5/2022). Albemarle County Service Authority— Richard Nelson, melson@serviceauthority.org—No objection (2/23/2022). Rivanna Water and Sewer Authority — Victoria Fort, vfort@rivanna.org, 434-977-2970, ext. 205 — Review pending. Comments will be forwarded to the Applicant upon receipt. Albemarle County Information Services (E911)—Elise Kiewra, ekiewraCc�albemazle.org —No Objection (4/13/2021). Virginia Department of Health (VDH) — Alan Mazurowski, alan.mazurowski@vdh.vir ig nia.gov — No Objection (5/5/2021).