Loading...
HomeMy WebLinkAboutWPO202200003 Bond Estimates 2022-03-02Project Name: WPO file number: WP02022-00003 TM P(s): 07500-00-00-06300 Date Estimate Completed: 3-2-2022, J. Anderson, baseed on TG values, 2-25-22 Erosion & Sediment Control Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed r stablization (PS, TS) 1.9 acres $5,000.00 $9,500.00 2 silt fence (SF) 600.0 it $5.00 $3,000.00 3 safety fence (SAF) 0.0 it $5.00 $0.00 3 Tree protection (TP) 0.0 it $5.00 $0.00 4 diversion (DID, FD, RWD) 0.0 it $13.00 $0.00 5 temporary slope drain (TSD) pipe length -ft pipe diameter 0 in $0.00 $0.00 26 silt fence inlet protection (IP) 4 $100.00 $400.00 27 stone inlet protection (IP) 7 $200.00 $1,400.00 28 outlet protection (OP) - incl. w/SWM length ft width 0 It 0 $0.00 $0.00 29 outlet protection (OP) length ft width 0 It 0 $0.00 $0.00 30 channel (SCC, malted) length ft oft width 0 It 0 $0.00 31 check dam depth in channel channel width 0 ft 0 $0.00 $0.00 32 construction entrance (CE) 0 $2,500.00 $0.00 33 wash rack 1 $2,000.00 $2,000.00 34 paved construction entrance 1 $3,500.00 $3,500.00 35 rip -rap, placed depth ft length -ft 36 width (tons) 0 tons $60.00 $0.00 37 38 survey and layout (price per 0.1 mi.) acres traps and basins $0.00 39 mobilization $2,500.00 cost sum $22,300.00 WP0202200003_Birdmod Golf Cart Path Proj 030222 contingency $2,230.00 Total $24,530 3/2/2022