Loading...
HomeMy WebLinkAboutWPO202200003 Bond Estimates 2022-03-02 (2)Project Name: Birdwood Golf Cartpath Plan, VSMP Plan WPO 202200003 WPO file number: WP02022-00003 TM P(s): 07500-00-00-06300 Date Estimate Completed: 3-2-2022, J. Anderson, baseed on TG values, 2-25-22 Erosion & Sediment Control Plan Bond Estimate Item Item Number r stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 3 Tree protection (TP) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length 26 silt fence inlet protection (IP) 27 stone inlet protection (IP) 28 outlet protection (OP) - incl. w/SWM length 29 outlet protection (OP) length 30 channel (SCC, matted) length 31 check dam depth in channel 32 construction entrance (CE) 33 wash rack 34 paved construction entrance 35 rip -rap, placed depth 36 width 37 38 survey and layout (price per 0.1 mi.) acres 39 mobilization WP0202200003_Birdwood Golf Cart Path Pmj 030222 -ft pipe diameter M 0 in width 0 ft width 0 ft width 0 ft channel width 0 ft -ft length (tons) -ft 0 tons - traps and basins - No. Unit Unit Cost Cost (installed) 1.9 acres 600.0 ft 0.0 ft 0.0 ft 0.0 ft 4 7 0 0 0 0 0 1 1 $5,000.00 $5.00 $5.00 $5.00 $13.00 $0.00 $100.00 $200.00 $0.00 $0.00 $0.00 $2,500.00 $2,000.00 $3,500.00 $60.00 $9,500.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $400.00 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,000.00 $3,500.00 $0.00 $0.00 $2,500.00 cost sum $22,300.00 contingency $2,230.00 Total $24,530 3/2/2022