Loading...
HomeMy WebLinkAboutWPO201400084 Review Comments 2014-12-16 lv'lP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 VSMP Permit plan review Project: Glenmore Ground Storage Tank,Pump Station,and Water Main Project Plan preparer: Chip Votava,PE;Michael Baker,Jr.Inc[272 Bendix Road,Suite 400,Virginia Beach,VA 23452—cvotava@mbakerintl.com Owner or rep.: Jeremy M.Lynn,PE;Albemarle County Service Authority, 168 Spotnap Road, Charlottesville,VA 22911 [jlynn@serviceauthoritv.org Plan received date: 19 September 2014 (Rev. 1) 3 December 2014 Date of comments: 27 October 2014 (Rev. 1) 16 December 2014-Approved Reviewer: John Anderson County Code section 17-410 and Virginia Code§62.1-44.15:34 require the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This protect is approved. Comments below have been addressed. A.Stormwater Pollution Prevention Plan(SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain(1)a PPP, (2)an ESCP,(3)a SWMP,and(4)any TMDL measures necessary. (Rev. 1) Ref.notes at:#lf.,li..and 5. 1. SWPPP.dated September 2014,requires revision. a. Title pg.—RefWPO201400084 b. Rev.TOC to include specific reference to PPP(p.8)—Also.g,below c. Pg.3—bullet 11 inconsistent with p.7 Stormwater Runoff Consideration narrative. Please reconcile. d Pg 3—bullet 9:"Permanent rip-rap will be placed for stream and bank stabilization.,, Show on plans if riprap furnished Delete bullet, if not. e. Pg.5-2,d bullet—Furnish dewatering detail on plans;select from VDOT list of approved systems[image.last pg.]. f. Pg.6—Soil Characteristics table—include column for hydrologic soil group—ref attached. Neatly all site soils ate hydrologic soil group`D'—rev VaRRM -Section C,item#1. (Rev.1) Not furnished,but inessential. g. Pe.8—Include reference to Pollution Prevention Plan(subheading subtitle,for example). h. Pg.9—Text box lists items required to be shown schematically(plan view)on 11„x 17„ reduced plan sheets. Show proposed location of on-site sanitary facilities,dumpsters, vchicle wash and concrete truck washout,etc. Also,see section 6 of County SWPPP template for list of features required with SWPPP. These features do not need to be shown on ESCP/SWMPs,lust an 11,,x 17„SWPPP insert i. 11,,x 17„SWPPP insert—show rain gauge location. (Rev.1) Comment withdrawn. j Pg. 10—Top of page.Revise reference to removing ESC to include approv al of County inspector. k. Page 10—Temp Structural Practices reference PCE Revise ESCP to include PCE labels. 1. Page 12—Copy HUC/Receiv ing waters data to WPO Plan cover sheet, m. Page 12—Show stockpiles on ESCP. n Page 12—"GutterBuddy„inlet protection appears a mismatch with dew atering activities Engineering Review Comments Page 2 of 4 2. Replace term contractor with operator to reference General VPDES Permit holder Although a contractor may apply directly for VPDES permit coverage for this project by completing a General VPDES permit registration form,in this instance,ACSA(Owner)has registered as VPDES operator. VPDES permit will be issued to A.CSA(Operator) Permit may be transferred It is improper to reference an unnamed contractor in the SWPPP.unless contractor is VPDES operator SWPPP and VGP duties attach to the permit operator as a matter of law and administration. 3 Include plan sheets(VAR10.Part ILA.] e). -Also,sections 4,5,6 of CoL Nr5 of ALBFMARLE SWPPP TEMPLATE.-link-http//www.albemarle.orsgidepartment.a.sp?department=cdd 4. Amend p.8 subsection title to make clear that SWPPP contains Pollution Prevention Plan elements (PPP) -Also section 6 of County SWPPP template. Please call to discuss if any questions. 5. Furnish revrsedhlgned SWPPP certification statement to read exactly as found at VAR10 Part IIi.K.4. (Jeremy Lynn signature required.) (Rev.1) Certification not identical,but acceptable. 6. Include copy of VAR10(download from VDEQ website:attach 22-p.pdf to SWPPP) 7 Revise/delete reference to unrelated project.for example!".. installation of the new n avity sewer„ (p.5)."and be captured in the existing storm drain system.,(p 11.),and"to existing catch basin to the south of project and discharge to an onsite creek„(p. 11). 8. Page 12-Identify qualified individual.(RLD). Ref VAR10 Part 11.F.1.-Also.sec.8 of C ounty SWPPP template 9. Page 13-Tit 5FER AGREEMENT-If this statement is included,print conditions exactly as found at VARIO Part IIIY2 10. Maintenance of SWPPP-Delete reference to"someone empowered to implement modifications to this SWPPP,.,since qualified individuals must be named in SWPPP. Identification cannot be left indeterminate. For now,the qualified individual appears to be Jeremy Lynn,ACSA. 11.. Maintenance of SWPPP-identify contractor.or replace Contractor with VPDES Operator. -see 2,above:Also,VAR 10,Part II B.3 12. 4wareness-p 15-furnish specifics. VAR10 Part 11.4 f•"Describe procedures for providing pollution prevention awareness...,, 13. Specify plan for making SWPPP puhicly accessible-ref VAR I0 Part II.D.3. B. Pollution Prevention Plan)-Addressed under Stormwater Pollution Prevention Plan,above The PPP content requirements can be found in County Code section 17-404. C. Stormwater Management Plan(WPO201400084) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. Comments below have been addressed 1 \aRRM does not consider loss of forest due to lineal utility,or pros ide treatment for 1.57 acre area of disturbance. VaRRM includes 0 33 Ac. turf,0.10 Ac.impervious. .xls assigns these to soil group B. Please revise VaRRM(and SWM design)to address 1.57 acre area. Assign areas to soil group D.as appropriate. 2 Identify total area disturbed-should match 1.57 acre area on General VPDES Permit i egistratron statement. 3. Sheet 18-Show full length of bioretention facility outfall pipe,or dimension its length. 4. Sheet 18-Ref VA DEQ Stormwater Design Specification No.9,Level 1:6.4-Pretreatment required. Furnish pretreatment,per design table(grass swale conveyance,to bioretention facility). 5. Sheet 18-Plant and Composition schedule:ref.design table(item#4,above). Furnish note or details to assure vegetation achieves at least 75%surface area coverage within 2 years. Link. ling./Avw ,v. vrrr •t.edulsvc;documents/2013•DlO v20BMI";20Spec%20No%2n9 BIORETENTION FrnalDrafl I- 9 03012011 Ddf 6. Sheet 18-Dimension bioretention facility cross-sections(l,x W). 7 Sheet 18-Bioretention facility longitudinal cross-section appears to call for I'pea gravel layer, 1'stone layer,while bioretention basin data,sheet 19.references 1'total stone depth,reconcile data`x-section 8. Sheet 18-Delineate 18.731 SF area draining to SWM facility-show boundaries. 9 Minor,sheet 19-Correct RI,value in equation to read 0.37(formula/calc are correct). (Rev.1)Several values are incorrect,but calculation is correct. Comment inessential. Engmeering Review Comments Page 3 of 10. Minor.title pg.-Include WPO201400084. 11. Minor,sheet 5-Revise impervious area on-sue,proposed total impervious,to read 92,848 sf. 12. If proposed limits of clearing=proposed limits of disturbance.furnish notes/labels to this effect. 13. Demonstrate compliance with MS-19-ref 9VAC'25-870-66 (Rev.1) Review error;comment withdrawn. [Part II B criteria applies-9VAC25-870-66] 14. If.considering effects of forest clearing(conx eision of forest to permanently cleared utility easement),on- site water quality compliance proves untenable,off-site nutrient credit options exist:ref 9VAC25-870-69 (link:littps.//legl.state va us'egr-btn11ego504 exe??000+reg±9VAC25-870-69). Less than five acres of land will be disturbed The post-construction phosphorus control requirement is less than 10 pounds per year. Also: §66.1-44.15.35(link:https/;legl.state Na.us,cgt-binilegp504 exe?000-cod+62.1-44 15C35). - Also,#1,above (Rev.1) Comment discussed,resolved with Applicant. -Also,VDEQ recognizes that utility corridor projects may revert to post-developed forest/open space condition(12/15/14 CFB stormwater Management training/JEA). D.Erosion and Sediment Control Plan(ESCP-WPO201400084) Virginia Code§62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. Comments below have been addressed. 1. Sheet 14-Rer ise ESC legend to include 7 S,DC,MU-Ref Mgmt Strategies,#3,Sheet 16,also.SWPPP. 2 Sheet 14-Label construction entrances(CE)paved construction entrances(PCE) -Also SWPPP.p. 10. 3. Sheet 14-Show vehicle wash eaters draining to settling basin.-Also,sec 6/table,of County SWPPP template,and item#14.below 4 Sheet 14-Show stockpile location(initial location;location may change). 5. Sheet 14-Show staging area(initial location.location may change). 6. Sheet 14-Show/label LOD Provide LOD acreage. 7. Sheet 14-Label contours. 8. Sheet 14-Indicate flow lines. 9. Sheet 14-Label managed slopes 10. Sheet 1.4-Delineate area diaimng to bioretention facility 11. Sheet 14-Label stream. Label intermittent.if intennittent. 12. Sheet 16-Management Strategies-rex ise text,consistent with General VPDES Permit Operator responsibilities. Delete or revise reference to Job Superintendent,unless this individual is named,with qualifications listed in SWPPP-ref.Sec.A.above. 13 Sheet 16-Structural Practices,ref paved construction entrances./s. 14. Sheet 16-Structural Practices states that"Wash water must be carried away from the entrance to an approved settling area to remove sediment.,, Show approved settling areas on sheet 14. 15 Sheet 16-Sediment Conti of Piogram.Phase 1 -Note#2(Clear the site to no more than the limits shown on the construction plans)conflicts with Note 1 on sheets 7,8.9, 10,and 11."Contractor shall clear and grub the areas coincide with limits of permanent easements and/or public right-of-way or as designated on the drawings and portions of temporary easements as deemed necessary for the construction at no additional cost to the owner., This note is misleading,it would allow clearing that exceeds LOD reported elsewhere Revise or delete Note 1.plan sheets 7-11. Engineering plan review staff is available from 2-4 PM on Thursdays,should you require a meeting to discuss this review. Process: After approval,plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and Engineenng Review Comments Page 4 of 4 check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms,which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete,county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time,the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing,this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application,they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued,via the coverage letter,the County can hold a pre-construction conference.Applicants will need to complete the request for a pre-construction conference form,and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber,and the fee remaining to be paid. This will be checked by county staff,and upon approval,a pre-construction conference will be scheduled with the County inspector. At the pre-construction conference,should everything proceed satisfactorily,a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo