EROSION CONTROL PERFORMANCE BOND RELEASE
PROJECT NAME: o///er sf 49a2,/
PLAN/PERMITNO.: 440 Z-D/'/— CZ9I05-/1iVA 20l Z_ - 4-/q
DATE: 3/I ///1—
This project has been satisfactorily completed and the erosion control performance bond may be
released at this time if all re-inspection and annual maintenance fees invoiced have been paid.
Erosion Control Inspector
DEQ Termination Date 7i/1(o/Z _ or N/A
Community Development Department
All fees invoiced on the above project have been co ed.
Director of Community Develo ment County Engineer
11 l 2-7
Date
Cc: Ana Kilmer Revised:07/03/2018
4 pF A
11i
''‘Nrallt"/
trcm
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: i l'L/ C..po r NP(,v C-.-J-- cC
PLAN/PERMIT No.: (,4-)PO 20/42.000 tic,
DATE: 3/1/Z Z
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all re-inspection and annual maintenance fees invoiced have been paid.
Date As-built plan was approved by Engineering Division: 2-/22/2-2— or N/A
DEQ Termination Date 2-1I(' /ZZ or N/A
(-_ ..._ 6---) --s--A....7
Engineering Reviewer
Community Development Department
All fees invoiced on the above project have been collected Veete_,
Director of Community Development Court_ ne
)1 1 7"--2---
Date
Cc: Ana Kilmer Revised:07/03/2018
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES(VAR10)
NOTICE OF TERMINATION 2019
Permit Coverage Number(VAR10####)• V4fttO P Oil 6 — Ru`efh4.4 ✓,rAiOa- c,
Section I. Operator/Permittee Information.The person or entity that has active permit coverage approval and operational control
over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must
sign the certification in Section VII(per Part Ill.K.of the VAR10 Permit).
Construction Activity
Operator Name: M,'14,r 5chc-O/ o iQlix..rar/e Tr'r •
Contact Person: Chr;s Fnr}i r•
Address: !COO) S gong cl )1Ji, r LogA...------
City,State,Zip Code heel{: ,,,,;1/z VA 22103
Phone Number: y�GH
tiM o2t^ .11111ff
Primary Email: C turf;tr Q ftl:IL,- schew I. 6r5
CC Email:
Section II. Construction Activity Location Information. Project site information.
Construction Activity Name: /►j y(cr- Scher / En><✓aneL
Address: MVO 5AMN(I 44,'llu,- Loop
City and/or County and Zip Code: (/o,.•%rlcs vrljef Vi4- zAy03
Latitude and Longitude
(6-digit,decimal degrees format): 58.00535S —• 78. 703332
Section III. Reason for Terminating Coverage under the General Permit. The operator shall submit a Notice of Termination within
30 days after meeting one or more of the following conditions(select one or more):
�A.Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final
stabilization has been achieved on all portions of the site for which the operator is responsible.When applicable,long-term
responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records
prior to the submission of a Notice of Termination;
❑B.Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for
the ongoing discharge;
❑C.Coverage under an alternative VPDES or state permit has been obtained;or
❑D.For residential construction only,temporary soil stabilization has been completed,the operator has provided written
notification to the homeowner about the importance of final stabilization and incorporatinga copy of the notification and
signed certification statement into the SWPPP,and the residence has been transferred to the homeowner.
Rev 04/2019 PAGE 1 16
CONSTRUCTION GENERAL PERMIT(VAR10)NOTICE OF TERMINATION 2019
Section IV.Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater
management facility,provide information related to the regional stormwater management plan.Attach a separate list if discharging
to multiple regional facilities.
Regional Stormwater Management �/�
Facility Type:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit,decimal degrees format):
Total Acres Treated by Regional Facility
(report to one-hundredth of an acre):
Impervious Acres Treated by Regional Facility
(report to one-hundredth of an acre):
Section V.Perpetual Nutrient Credits. If your site is utilizing nutrient credits,provide information related to the perpetual nutrient
credits that were acquired in accordance with§62.1-44.15:35 of the Code of Virginia.Attach a separate list if needed.
Nonpoint Nutrient Credit Generating Entity ))
(Bank Name): �/l[
Perpetual Nutrient Credits Acquired
(pounds/acres/year):
Include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? DIES ONO
Section VI. Permanent Control Measures. If applicable,list the post-development stormwater management facilities or best
management practices(BMPs)that were constructed and installed as part of this activity to comply with the stormwater
management technical criteria(structural and nonstructural,on-site and off-site).Attach a separate list if needed.
If you have permanent control measures,the following items are required to be included with this form in order to complete your
Notice of Termination submittal:
❑A. Engineer s Certification Statement
((B. As-built plans(construction record drawings)—digital
❑C. As-built plans(construction record drawings)—full-sized,paper
❑D. Stormwater Management Plans—digital
CITE. BMP Maintenance agreement—notarized original,for public and private projects under DEQ's VSMP Authority
Stormwater Management Facility Types(please choose from the following bmp types)
Bioretention 1 Extended detention-enhanced Other IIC(manufactured Soil Amendments
Bioretention 2 Filtering Practice 1 treatment device,etc.) Urban Bioretention
Bioretention basin Filtering Practice 2 Permeable Pavement 1 Vegetated filter strip
641oretention filter) Grass Channel Permeable Pavement 2 Vegetated Roof 1
Constructed Wetland 1 Grassed swale Rainwater Harvesting Vegetated Roof 2
Constructed Wetland 2 Infiltration(1 x WQ Vol) Retention basin I(3 x WQ Vol) Wet Pond 1
Constructed wetlands Infiltration(2 x WQ Vol) Retention basin II(4 x WQ Vol) Wet Pond 2
Dry Swale 1 Infiltration 1 Retention basin III(4 x WQ Vol Wet Swale 1
Dry Swale 2 Infiltration 2 with aquatic bench) Wet Swale 2
Extended detention(2 x WQ Vol) Other IIB(manufactured Sand filter
Extended Detention Pond 1 treatment device,etc.) Sheetflow to Vegetated Filter or
Extended Detention Pond 2 Conserved Open Space 2
Rev 04/2019 PAGE 2 l 6
61- I,t.,r,„ 36 s+
DA !1. io ,4,c/es
6et44 — LI l ro
59 /v
-�ji1 cm,
CONSTRUCTION GENERAL PERMIT(VAR10)NOTICE OF TERMINATION 2019
Stormwater Management Facility#1
BMP Type: /36 A'the r
Date BMP Became Functional: A/oy IsY 20z?
Address(if available): icno M,ger Arm
City and/or County and Zip Code: Char(onbvll/r V.4 22(7 q
Latitude and Longitude
(6-digit,decimal degrees format): 3?.O05355 —7f• 70333Z
Receiving Water(s)
(outfall discharge): Arficr /3rctn./i Z .-4 , S
Total Acres Treated ,
(report to one-hundredth of an acre): O.'r y v Z
Impervious Acres Treated
(report to one-hundredth of an acre): o.3 4'(0 C in of U.4'12
Stormwater Management Facility#2
BMP Type: /j,o Al f•I,r 1444 1-
Date BMP Became Functional: A<oa l•* ,zp 2-1
Address(if available): ter J / 161.We-^
City and/or County and Zip Code: Cheffe het.4/ VA- 1)q o 3
Latitude and Longitude
(6-digit,decimal degrees format): 31, nO33 s5 —711.70 353z
Receiving Water(s)
(outfall discharge): NJ'H � praM�h
Total Acres Treated A(report to one-hundredth of an acre): 0,c 12 tH
Impervious Acres Treated
(report to one-hundredth of an acre): i. O.SS/, Csq%
Stormwater Management Facility#3
BMP Type:
Date BMP Became Functional:
Address(if available)
City and/or County and Zip Code:
Latitude and Longitude
(6-digit,decimal degrees format):
Receiving Water(s)
(outfall discharge):
Total Acres Treated
(report to one-hundredth of an acre):
Impervious Acres Treated
(report to one-hundredth of an acre):
Rev 04/2019 PAGE 3 6
CONSTRUCTION GENERAL PERMIT(VAR10)NOTICE OF TERMINATION 2019
Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I.and
meeting the requirements of 9VAC25-880-70 Part III K.
Certification: "I certify under penalty of law that I have read and understand this Notice of Termination and that this document and
all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted.Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the information,the information submitted is to the best of my knowledge and belief true,
accurate,and complete.I am aware that there are significant penalties for submitting false information including the possibility of
fine and imprisonment for knowing violations."
Printed Name: ;`r( , 3 C4 4- , C C v
Signature(signed in ink):
Date: \ / (( /Z Z
Section VIII.Submittal Instructions. Please submit this form to the Virginia Stormwater Management Program(VSMP)Authority
that has jurisdiction for your construction activity. If the locality is the VSMP Authority,please submit your form directly to the
locality;do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority,please send to: If the locality is the VSMP Authority,please send to:
Department of Environmental Quality The Local VSMP Authority(insert address below)
Office of Stormwater Management Suite 1400
PO Box 110E
Richmond VA 23218
constructionep@deq.virginia.gov
Permit terminations may be delayed if there are
outstanding annual permit maintenance fee balances due.
Rev 04/2019 PAGE 4 16