HomeMy WebLinkAboutWPO201200049 Application 2012-05-25 J IV'-al
Albemarle t.,,unty Community Development Department
417413) 401 McIntire Road Charlottesville,VA 22902-4596
�� Voice • (434)296-5832 Fax (434)972-4126
Planning Application
PARCEL / OWNER INFORMATION
TMP 07200-00-00-03200 Owner(s):
Application # WP0201200049 MILLER SCHOOL OF ALBEMARLE THE
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. Samuel Miller Land Use Primary Semi-public
Current AFD Not in A/F District Current Zoning Primary Rural Areas
APPLICATION INFORMATION
Street Address 989 SAMUEL MILLER LOOP CHARLOTTESVILLE, 22903 Entered By
Jennifer Durrer
Application Type Water Protection Ordinances 05/30/2012
Project Miller School - New Entrance
Received Date 05/25/12 Received Date Final Submittal Date 05/29/12 Total Fees 300
Closing File Date Submittal Date Final Total Paid 300
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type Sub Applicati Comment
Erosion and Sediment Control Plan 05/29/12
APPLICANT / CONTACT INFORMATION
ContactType Name Address CityState Zip Phone PhoneCell
Owner/Applicant 1MILLER SCHOOL OF ALBEMARLE THE I WOO SAMUEL MILIFR LOOP ;CHARLOTTESVILL :22903
Primary Contact BRIAN P. SMITH 105 WEST HIGH STREET CHARLOTTESVILL 22902 :4342963644
Signature of Contractor or Authorized Agent Date
Z Coriel di Pirvs
application for Review of
Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & 4' 0 `
/Mil*�a
Stream Buffer Mitigation Plan
® Erosion & Sediment Control Plan ❑ Stormwater ManagementBMP Plan ❑ Stream Buffer Mitigation Plan
❑ E&S Plan Amendment ❑ SWM Plan Amendment
(Previous Plan# ) (Previous Plan # )
❑ E&S Plan with Variance ❑ Request for Exception
#of Variances ❑ SWM Plan Resubmittal
l E&S Plan Resubmittal WPO Application#
WPO Application#
Submit 2 opies each of applicable plans/narrative/computations
*When a WPO plan is reviewed,bu of approved,and a response to comments is not received within 6 months from the date of
county comments,the application will be deemed withdrawn.
Project Name: The Miller School - New Entrance
Tax map and parcel: TMP 72-32 Zoning: RA
Amount of Land Disturbance: 6•92 Acres
Location of property(landmarks,intersections,or other) South of Crozet, East side of Miller School Road (Rt. 635)
Contact Person(Who should we call/write concerning this project9) Brian P. Smith, PE
Address 105 West High Street City Charlottesville State VA zip 22902
Daytime Phone(434-296-3644 Fax#(434/-296-2041 E-mail bpspe@embarqmail.com
Owner of Record The Miller School of Albemarle
Address 1000 Samuel Miller Loop City Charlottesville State VA zip 22903
Daytime Phone( ) Fax#( ) E-mail
Contractor T.B.D.
Address City State Zip
Daytime Phone( ) Fax#( ) E-mail
Plan Preparer same as contact person
Address City State Zip
Daytime Phone( ) Fax#( ) E-mail
Owner/Applicant Must Read and Sign
By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater
Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and
development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure
compl'ance wit the approve n.
April 30, 2012
a ure of Owne , ontract Purchaser Date
Preston Stallings 981-1446
Print Name Daytime phone number of Signatory
FOR OFFICE USE ONLY WPO#
C,a
Fee Amount Date Paid5'25 (2 By who9 t((vY ,,y� Receipt# -t U Ck# 1d-I By.
([ �
i i Vft
f M 1 i akcit, Revised November 14,2011 Page 1 of 3
EROSION CONTROL PLAT` SUBMIT 2 COPIES)
Land disturbing activity pertaining to single family dwelling unit:
1. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
2 Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
3. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
4. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
Land disturbing activity pertaining to non-exempt agricultural land:
5. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
6. Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
7. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
8. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
All other land disturbing activity:
9. Plan Review,Disturbed Area Less Than One Acre $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
10. Permit and First Year Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
12. Plan Review,Disturbed Area One Acre or Larger $300 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
13. Permit and First Year Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
15. Each reinspection $250
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
16. Amendment to Approved Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
17. Variances $150/per request
(TO BE PAID AT TIME OF APPLICATION)
18. SUBTOTAL EROSION CONTROL PLAN s 300.00
Revised November 14,2011 Page 2 of 3
STORMWATER MANAGEMENT/BMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES)
19. Stormwater Management/BMP Plan... $300/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
20. Major Amendment of Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
21. Request for exception $240
(TO BE PAID AT TIME OF APPLICATION)
22.Request for development in a stream buffer or for reduction or modification of stream
buffer and mitigation plan(if not part of another document)—Single family dwelling unit
or accessory structure $85
(TO BE PAID AT TIME OF APPLICATION)
23.Each inspection or reinspection $60
(INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
24. Mitigation Plan $150
(TO BE PAID AT TIME OF APPLICATION)
25. SUBTOTAL SWMBMP PLAN s 0.00
TOTAL APPLICATION FEE: (Add lines 18 and 25) $ 300.00
THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL
FEES WHICH MAY BE CHARGED TO THIS PROJECT.
•
Revised November 14,2011 Page 3 of 3