HomeMy WebLinkAboutWPO201200049 Correspondence 2013-04-17 BRIAN P . SMITH , PE
CIVIL ENGINEERING , INC .
4835 THREE CHOPT ROAD, TROY, VA 22974-3012
434 . 296 . 3644 ( c )
bpspeAembargmail . com
MEMORANDUM
To: JT Newberry and Michelle Roberge
From: Brian P. Smith, President
Date: April 17,2013
Re: The Miller School New Entrance
SWM Submittal
❑ Urgent ® For Review N Please Comment N Please Reply [X]As Requested
JT and Michelle,
Please find attached two (2)complete sets of final plans for your review. I believe all items
except for stormwater management have previously been approved. But you might want to
double check to make sure.
This package reflects the new SWD basin and bio-filters on sheets C9.0, C9.1 and C9.2. Also,
the sediment trap originally shown on the west side of the stream(inside the loop)has been
adjusted in location and grade to match the bio-filter to allow for a retrofit towards the end of the
project. This can be found on C7.1.
Please contact me if you have any questions.
Thank you.
Brian
Please note my new contact information above
Account ID.09-011-00/JT Newberry 2
GOLF COURSE DESIGN • ENGINEERING • SITE DESIGN • LAND PLANNING