Loading...
HomeMy WebLinkAboutWPO201500047 Checklist - Project Closeout (Administrative) 2022-03-03 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND IMAGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form �cP.M''',_3I•o ; �' release;place the completed form in the WPO folder and forward to the Imaging into LaserFiche. Once items have been placed in LaserFi �� of project completion and/or bond che,Imaging Center staff will forw rd to Centralized closeout WPO# 9---0I5— � � �PROJECT TITLE � ` FULL NAME INSPECTOR: FINAL l���� FINAL ACTION DATE: CountyView_—_------------------------------1 I El Status/Status Date updated IIardcopy—File Folder Closeout: All items listed �_—~se chronological order(latest on top). ��� __ should be placed in project folder,in reverse Please check each item included in this folder. To indicate that an item is not a next to the check box. The Inspector/Management Analyst has the discretion to inc anydeitem d provide clarity to the file,please indicate that item on the"Other" pplic ble to this file,place an"N/A" lines provided. eemed necessary to Digital Closeout Instructions: Below each item please indicate if Imaging or;if the document is already in digital format,can be saved to LaserFiche, Please rovide the gm�Center is to scan the document; (path/name)of the document in the space provided. digital location ❑ Preconstruction Meeting Form ❑ Scan 0 Saved location ❑ Grading Permit I ❑ Scan 0 Saved locatio ❑ Inspection Requests ❑ Scan ❑ S• location ❑ Inspection Results(Includ- . 'y inspection tickets,memos,photos,etc.) ❑ Scan 0 Saved location 1 ❑ Bond R❑eductio and Release Notices from Inspector to Management Analyst can 0 Saved location y 1 ❑ Cons: ation Checklist ❑ Scan ❑ Saved location 1 • As-built/Construction Plans ❑ Scan ❑ Saved location JOther(Please explain) S Vie_ ❑ aved location P ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats I ❑ Scan may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be cle unapproved and contain a note clarifying why it was included. arly marked as ❑ Scan 0 Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the folio items are complete: 1) Checklist is completed and included in folder; p __ ���_� 2) Documents are Acco-fastened(except plats/plans),and in chronological orde (latest documents on to 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. p); If the above items are not complete,Imaging Center staff will circlemid return folder to the County Engineer for corrective action. the incomplete item tt Draft 12-5-2013