Loading...
HomeMy WebLinkAboutSDP201800040 Correspondence 2022-03-04 (3)SHIMP ENGINEERING, P.C. Design Focused Engineering March 4, 2022 Alan Mazurowski Virginia Department of Health Office of Drinking Water 131 Walker St. Lexington, VA 24450 RE: Response Letter #4 for SDP201800040 Hunters Way — Major Site Plan Amendment Dear Alan, Thank you for your review of the major site plan amendment for Hunters Way. This letter contains responses to your comments provided by Albemarle County on Sept 22, 2021. Our responses are as follows: 1. There has been no change on our end. We have not received engineered septic plans to verify those shown on the site plan, and it does not appear the existing well has been approved by the Office of Drinking Water. My concern regarding the well is that if the existing well cannot be approved by ODW as a transient waterworks, they would possibly be looking at drilling a new well, the location of which would need to be shown on the site plan. RESPONSE: Inboden Environmental Services is working to complete both the septic permit and the well permitting. On November 10, 2021 ODW issued a tentative approval letter for the existing well to be utilized as a public drinking water supply, Inboden Environmental is working to complete the required yield and drawdown test and will provide the results of that test upon completion. If you have any questions or concerns about these revisions, please feel free to contact me at Kelsey@shimp-en ig neering com or by phone at 434-227-5140. Regards, Kelsey Schlein Shimp Engineering, P.C. 912 E. High Sr. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com