Loading...
HomeMy WebLinkAboutSDP199500005 Plan - Approved 1995-04-05co i i N13° 18' S0 Puke Keoidence �l GRAPHIC SCALE 1"=40' 0 10 40 100Feet parking (23) _peptic, Field --� r' r r' Ball Field NOTE: Required Parking 5paces For Club House, Pool and Tennis Courts Are 36. 63 Parking 5paceo Are Provided. NOTE: Setback Requirements: 30' Front 15' 5ide 30' Back 4 5edimen Tra �- Retaining Wall Volley Ball Court Parking (40) TQ G VILI-,& -w;0 e'vtlr.. Department of Planning and Community Development Department of Engineering Department of Zoning /lR Fire Officer Albemarle County Service Authority 17A Virginia Department of Health 41& 1. Topo datum reference is U5G5. 2. 5ource of topo and Survey is a composite plat prepared by William 5. Roudabush, Inc.. 3. Zoning - f PK 4. Variances - ZMA 80-03 . y., VICINITY ,jkN w TO t21CHt-�orv(a REVISIONS BY toE o> C _ a w c N 7 FM O M U €E �Q w 9) U-j ff J a r" JO(O a - C? r N J N N @ ` a- od v > o�� 3C) c 0 U � z ¢� L/j w� cq W ¢ rn Z � U �00 O > Z U w V Z w Z j co Q01, wo �N `o N O of U DATE G _� SCALE DRAWN T, A •�.?��•/1 JOB SHEET 1 3 OF SHEETS REVISIONS By � . 2 -2 �t•��q5 N O IC C T d C N c E �Q I U� J J O OP T � 0P - j U) N • oJ a a� (D in o c = 3m= O co U z �� vj' H g� U a 00 O 5 0 Ln z C7 V) w Q U z a CO N z 00 U DATE -7 , SCALE DRAW v Joll SHEET Of 2 SHEETS 0 O A Is _ I fArA / i i / •� T F-T,1-t! �--) S DETAIL I • P.P. ;s�t - tislk`; Mn 0 A la ?1,-ti-al • C i_vt > 5� SECTION 8-8 To P5 ki 301x%OI C .01 Fabric A Uw Typed Sedan shone on plans or normal tide slope, bottom rldth, and depth of channel, ditch or natural ground. NOTES Fa muni pie line IrVallalions Dhaansion DIs to it re me prolechon.0.1de the Channel widm(W1 On any Secondary Roads install ration rs Rulrine erosion cor,oi stone .ture no endnall a ends ecrrn is specBud on plane,constructbn Is so be In accordance ink D.I.11 2 sno.n above. Go ta,mlo Fabrk to be Installed under all arosion control Vona in occordaru .,In the sp—r—bons Dry Rip Rap MIN, DEPTH Rip Rap Class I 2' Class II 3' T/) 0815E 19 EI- L.-Ii" U, o p �Torl, ,L- fl-1144r) C?N Ott ,99, P� TABLE 41 GENERAL EROSION AND SE CONTMOL NOTES ES-1: -Unless otherwise indicated, all vegetative and structural erosion and \ sediment control practices will be constructed and maintained according to minitmrm standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 6'o-01-00 gas Ero ion and Sediment Control Re lations. ES-2: The plan approving authority must be notified one week prior to t_e pre- - construction conference, one week prior to the commencement of land disturbing activitt and one week prior to the fecal inspection. ES-3: All creston and dement control measures are to be placed prior to or at Fhe first step in caring. 5FES ffJJ: Arc py-of_Lhe pproved erosion and sediment control plan sail be maintained on a site at attthrses.— ES-S: Prior to co encing land disturbing activtti�saas othe_thaty� indicated on t se plans (including, but not limited to, off -site bor:aw or waste areas), [ e contractor shall subrnit a supplementary erosion control plan to the er for review and approval by the plan approving au`_:orily.% ES-6: The contract is responsible for installation of any additional e:wiohs control meas res necessary to prevent erosion and eedimenta�oo determined b the plan approving authority. ---------- _ ES-7: All disturbed «u are to drain to approved sediment control measrra at ---- all times dur' g land disturbing activities and during site developme:t until t final Lion is- achieved. 1 ES-8: During de tering operations, water well be mpen epo: owed 1 filtering de cc. ES-9: The contra or shall inspect all erosion control measures periDdicA.N and after each runoff -producing rainfall event. Any necessary repair or ' StTir �� d j►j� cleanup to ' ' he effectiveness of the erosion control devices shall be made i mediately. QEC T2E T\TON r �l CraUt D 1 67 0l no /"0kX ' 2 �tb 2 ^t 2eA 7r15T_11144-L 67 ra / raE I r . % 51 nuv.nol •scl KITE J.— con[ .—( .tE- cws 1 ewu, CROSS SECTION OF OUTLET a ss s m.• v 11. 04 IYii 2 At2E A NO. 1 7LA P �iS�.�'1 / F'OR I�1�EA "�'2. �Ti�1A1f Mo"_ - orwa�o.. noTx [.Uvu[u she / ••COARSC A ... I.ATF S1.1 BE loot 13, 1357 OR 15 'OUTLET (PERSPECTIVE VIEW) t�r2s�ecTty� 4 `5EDI MEET 7r�AP DETAI l_ rya xAl� 1. SET POSTS AND EXCAVATE A 4'X4' TRENCH UPSLOPE ALONG THE LINE OF POSTS, FLOW 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. VII 625-01-00. 1`110GI01I AND 15T_DI14M" C.?TUOL TIEGOLATIONS EFF•eCTIVE DATE: GErrusOER 13, 1080 1.5 Mini— Standards. 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabl ll zatlon shall be applied within seven days to dcnuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than 30 days. Pe rmancnt stabilization shall be applied to areas that arc to bo left: dormant for more than one year. �. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to reap sediment shall be constructed as a first step in any land -disturbing activity and shall be made functional before upslope land disturbance Lakes place. S. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 17. Where cons truction vehicle access routes intersect paved public road s, provisions shall 1 be made to mini P the transport of sediment by (Vehicular) Cracking onto the paveawedd surface.. Where sediment is translxlrtud onto a Publ lc rwd surface, Lhe road shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual subdivision lots as well as to larger land -disturbing activities. 18. All temporary erosion and sediment control measures shall be removed w lthin 30 da s af ter to final site s Y tabillzatfon ar after the Lein raa' rnca� s ures arc no to ['b Y nger needed, unless otherwise author- ized by the local program administrator: Trapped sediment -and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 1.7 Maintenance and Inspections A. All Os ion and sediment control structures and systems shall be maintained, inspected and repaired as needed to insure contin- ued performance of their intended function. A statement dcscrib- ing the maintenance responsibilities of the permitter shall be included in the approved erosion and sediment control plan. 1 70 91 1 2. STAPLE WIRE FENCING TO THE POSTS 4. BACKFILL AND COMPACT THE EXCAVATED SOIL FLOW / FI EXTENSION OF FABRIC AND WIRE INTO THE TRENCH FILTER FABRIC Illlil !11ll ARE I� r�t=t�TIVE SI I._T ff E 1_IC E t�10 I=+c:A,l. M ADDENDUM NOTE: The purpose of the March 15,1995 addendum: 1. Show additional erosion control meaBur6s 2. 5how new limits of clearing and erosion control measures 3. 5how the new limits of clearing and grading for the clubhouse and pool location. Compacted Soil IB' corn. • _ _FI­ 9iljli0111H� ililll� l 45 trim S1=LT I nf~ 1'1Q rji�,l_fc 2: 1 M4XI G 11 SjON C a4�1 tuy ATE P,�c.s E. � III SUP! P�.SE OIC SGI-rGT M kTERlv.l. T-We 1 OF-3 e P>Me0 ON crap_ a ID v. Q, O. T GAT. M - Mat NTAI NVt4 ti MAX, Iat,.�-oe - i G% 70' MIN A j FILTER CLOTH— 6' 111N.I Al / SIDE ELEVATION GROUND 70• MIN. 8 WASHRACK I (OPTIONAL) 12, MIN. • L VDOT al I I ~� POSITIVE DRAINAGE COURSE AGGREGATE B TO SEDIMENT TRAPPING DEVICE • MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS PL AN LAN VIEW EXISTING PA VENENT J' MOUNTABLE BERM (OPTIONAL) EXISTING PAVEMENT 10' MIN. 1-a-8� • •�110j*1� a • e e 1"LAt�t � SEGTIC�j�i STONE CCOt`15TQUCT10TIT. REVISIONS BY c_ N � � l !9 C � C ca J O mU (D m no C E 2 Q J r— _j ZS C! Din 7 OOi J U) its� m U f9 o a ai d N �20 C) U � I--1 tb •"r (-I-i N n G a Z V C3, 0 > Q 0 r--I Ln c-1.1 C6 U Z w Z CO > O a O Ov N Q 8 �Co -1 U DATE SCALE DRAWN JOB SHEET 5 OF SHEETS