HomeMy WebLinkAboutWPO200600073 Plan - Stormwater 2006-12-11EROSION & SEDIMENT CONTROL NOTES -Ile- ,% : / - - - �� NOTE: ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND : ' j- / f „ _ - ;• CONTRACTOR TO PROVIDE A CERTIFIED / / �.. �.. SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO RESPONSIBLE LAND DISTURBER UPON PERMIT �� _ MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT _ REQUEST FROM LINTY E SC ADMINISTRATOR. CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT %/ � -=� - CONTROL REGULATIONS. (1996 REVISIONS) - �J 1� j _.., y - - - vEAR FLOODPLAI N CRLD FOR THIS PROJECT IS. ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE x PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND "- -- - NAME DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 1� \ ---------------------- rY -- / a , \ ES-3: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND ANY � � '' "'" -1 ,`' \••\�'`' '' y OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST a 7 ,' CERT.#---------------------- -'---/ / �- "...-�._ �.�-.�:`:::��-. MIDDLE STEP IN ANY LAND DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE i.t BRANCH UPSLOPE LAND DISTURBANCES TAKE PLACE. \ ��ER = ��•� _ NOTE: _ ------------------ ES ->T -4: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS re JF j/po -_ Fl�'� -.'\ FOR THE PURPOSES OF PLAN REVIEW AND APPRO qR DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.N ES-5: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN INCLUDING EDMOND H. BLACKWELL, P.E. IS THE CERTIFIED ' ��-'\.. RESPONSIBLE LAND DISTURBER (CRLD). � I , � � - _. -, -- �,.•- - -L. THE NARRATIVE SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. I _�-' ,THE CONTRACTOR SHALL PROVIDE REPLACEMENT R ES-6: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN t II' �I 1 RTIFICATE TO THE COUNTY E&SC ADMINISTRATOR INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR I _ _ '- �- "� -- "F,6ZRE LAND DISTURBING ACTIVITIES BEGIN. WASTE AREAS) , THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL Il,t � ' '- '�'' 1 PLAN TO THEOWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. r S ES-7: THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF ANY ADDITIONAL `;t TA. 10+60 j -,' J -----' :- 4E ' �.� =`\�, r ISTING 42" CNM� - -t '' / \ \�. EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS 4r ( LOT 2 -- ,, I • t EXTEND PIPE 8' DETERMINED BY THE PLAN APPROVING AUTHORITY. LOT 1 21.00 _ Lr 21.17 ACRES LOT 5 3.01 , , �7 ` ACRES LOT 6 6:3a, ES-8: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL ,r 4 ACRES -'"\ MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE Y,', ACRES 1 ' 1 LOT 4 3.01 : `�� T•> DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. t �: _ I LOT 3 f r 21.02 1 ACRES ES-9: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 14. ACRES ES-10: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES 1 EXISTING 't3.52 t , LOT 7 3.5 PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY I I STA 14+30 „ \ �o ' BARN 1 r.�.._- A18 ;' ACRES �p�a0 REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL �� , PROPOSED v +Q STA 19+50 EXISTING r t 15 CMP DEVICES SHALL BE MADE IMMEDIATELY. UTE PROPOSED cx_. BUILDING ES-1 1: PERMANENT OR TEMPORARY SOIL STABILIZATIONS SHALL BE APPLIED TO 'E :1 EXISTING 15" CMP ;`=`- a BE REM D i STA 28+3 SAID DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION _,,�,� ; GRAVEL ! PROPOSED ��- �- / LOT 11 / �•I R OF THE SITE TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO '"� ROAD r '�. - �- 15 CMP 6.64 ACRES LOT 8 3.58 DENUDED AREAS THAT MAY NOT BE A FINAL GRADE BUT WILL REMAIN DORMANT ' -`� to' 1 ACRES (UNDISTURBED FOR LONGER THAN 30 DAYS). PERMANENT STABILIZATION SHALL BE `, t, ( _ __ - _ - 1-r- - I -' / j _ __ • r:r � � - ... _ ._ _ APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. - ---- t ,.S T-AI $Tff 3 CLASS 1=Ae. 4 ES-12: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS 7,- . =r ' r -- '� _ j - f 1 O_ - r I LOT 12 NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE �� j -' _' `' ,.� c s ,j ------ j 1 CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, ; I i J `� d - '* 7-45� ''"%�- ' f W' 2� f; ``• ` 7.53 ACRES MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. �~ �. d, 1. _ STA 33+13 1 '''/ ; �`�•.•i,,`'ti: r ► - ;` - - PROPOSED - a ---- - LOT 9 3 9 LOT 10 I �' ACRES ; 3.49 ACRES ES-13: DURING CONSTRUCTION OF THE PROJECT SOIL STOCK PILES SHALL BE ----------- STABILIZED - 15" CMP A OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. ;I p ; 1) ----, ------ " �+o ES-14: CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL I - t Gt�1S5 11 ,-_- ,, ,l � � ,� • `�_ - _.......~ - � STA 35+60 MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE �. PROPOSED 1S./p •+ YEAR OR PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE % \, r'� 1 W=7 25"" T 24" CMP { STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. , 4 ' LOT 17 / +� STA 39+70 21.29 ES-15: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION `••. ' � � � ACRES r �' - � PROPOSED'A" _ SHALL BE PROTECTED SO THAT SEDIMENT WATER CANNOT ENTER THE CONVEYANCE I i �;. 18" CMP �', tD - `' LOT 13 SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. \ ( / L SS 1 "r 21.00 --_._-, La=1 z 4 ACRES ES-16: BEFORE NEWLY CONSTRUCTED STORM WATER CONVEYANCE CHANNELS OR PIPES ° 1g ; / W=14 I ST#6 y _ j ARE MADE OPERATIONS, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE ' l ,'� ► _ _ CHANNEL AND RECEIVING CHANNEL. '/ .. .�yR �; • ' f / PROPOSED ES-17: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE DETENTIO W.= J '� LOT 16 7.91 POND 12' POND 5 - I TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE �' ACRES / ; 4 S �� ACCESS ROAR d,41 / WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION NONERODIBLE Nr I WITH 4" OF MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. GRAVEL ° �~ EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE LOT 14 " \ COVER MATERIALS t _ -- - --- 11.47., j ACRES \ •, •, I , ES-18: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES ; f _ _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ - \ - - - - -- MORE THAN TWICE IN A SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING +- -""- / CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. f _ --- -- g ES-19: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETE. " \ / LOT 15 o - 6.32 ACRES ES-20: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE 6' MAX / _ CONSTRUCTIOIN ENTRANCE-- FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. EXCAVATED SOIL �' 1 \ - EXCAVATE 4" X 4" TRENCH ' - COMPACTED SOIL UPSLOPE OF STAKELINE. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 24" WIDE x 9" DEEP , C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED 24" WIDE x 9" HIGH ATTACH FENCE MATERIAL THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE OR BOTH, AND DISCHARGED IN FLOW r AND EXTEND INTO AND A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OF OFF -SITE ALONG BOTTOM OF TRENCH. PROPERTY. \� - BACKFILL AND COMPACT D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN 18" MIN. ��/ COMPACTED SOIL SEDIMENT TRAP TABLE W * W EXCAVATED SOIL. ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. FLOW E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. ES-21: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY I VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED DIVERSION DIKE AT I - AT 4.5' MIN. -I ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY SEDIMENT FROM THE SHOVELING OR SWEEPING AND TRANSPOR TRANSPORTED TO A SEDIMENT CONTROL DIOSPOSAL AREA, CONSTRUCTION ENTRANCE DIVERSION DIKE STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS NTS NTS MANNER. ES-22: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MAINTENANCE In general, all erosion and sediment control measures will be checked daily and after each significant rainfall. The following items will be checked in particular: 1. The seeded areas will be checked regularly to ensure that a good stand is maintained. Areas should be fertilized and reseeded as needed. 2. The gravel Construction Entrance shall be maintained in a condition, which will prevent tracking or flow of mud onto public right-of-ways. Periodic top dressing with additional stone or the washing and reworking of existing stone will be required when the stone is covered or has been pushed into the soil. It will be returned to its original depth of 6" (min.). 3. The Silt Fence barrier will be checked regularly for undermining of deterioration of the fabric. Sediment shall be removed when the level of sediment deposition reaches half way to the top of the barrier. 4. The outlet protection filter system will be checked regularly for sediment buildup that will prevent drainage. If the stone filter is clogged by sediment, it shall be removed and cleaned or replaced. Riprop should be inspected periodically to determine if high flows have caused scour beneath the riprap or filter fabric dislodged any of the stone. Care must be taken to properly control sediment -laden construction runoff, which may drain to the point of the new installation. 5. The culvert inlet protection filter system will be checked regularly for sediment buildup that will prevent drainage. If the stone filter is clogged by sediment, it shall be removed and cleaned or replaced. Sediment shall be removed and the impoundment restored to its original dimensions when sediment has accumulated to one-half the design depth. 6. The temporary diversion dike should be inspected after every storm and repairs made if necessary. Once every two weeks whether a storm has occurred or not, the measure shall be inspected and repairs made if needed. Damages made by construction traffic or other activity must be repaired before the end of the working day. 7. Maintenance of the Sediment Trap will include mowing and repair of the Sediment trap berms, spillways, and grass areas; cleaning out sedment buildup; clearing of debris and trash from the outlet system. As well as the removing of sediment when it reaches the cleanout level. ESC NOTES AND SCHEDULE: 1. CONSTRUCTION ENTRANCE, SILT FENCE, DIVERSION DIKES AND SEDIMENT TRAPS (SILT FENCE IS TO BE INSTALLED ON DOWNSTREAM SIDE OF SEDIMENT TRAP BANKS)- THESE MEARSURES ARE TO BE IN PLACE PRIOR TO START OF ANY EARTH MOVING CONSTRUCTION. 2. GRADING AND FILLING MAY BEGIN ONLY AFTER THE ABOVE MEASURES ARE COMPLETE. 3. UPON RELEASE BY COUNTY ESC ADMINISTRATOR THE SEDIMENT TRAPS MAY BE FILLED IN. WET STORAGE FROM SEDIMENT TRAPS SHOULD BE PASSED THROUGH A FILTER BAG OR OTHER FILTER DEVICE. WET SEDIMENT SHOULD BE REMOVED AND DRIED. SEDIMENT BASIN SHOULD BE BACKFILLED WITH SELECT FILL. ENTIRE SITE SHOULD BE SEEDED IMMEDIATELY AFTER REACHING FINAL GRADE SEEDING & MULCHING TABLE ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH TEMPORARY OR PERMANENT SEEDING WITHIN 7 DAYS FOLLOWING FINISH GRADING. SEEDING SHALL BE DONE ACCORDING TC STANDARD & SPECIFICATION 3.31 TEMPORARY OR 3.32 PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. SEEDING MIXTURE SHALL BE AS INDICATED BELOW. TEMPORARY PERMANENT SPECIES LBS/ACRE SPECIES LBS/ACRE ANNUAL RYEGRASS & CEREAL RYE 50-100 KENTUCKY 31 FESCUE 128 ANNUAL RYE GRASS 60-100 RED TOP GRASS 2 GERMAN MILLET 50 SEASONAL NURSE CROP* 20 TOTAL 160-250 TOTAL 150 *USE SEASONAL NURSE CROP AS INDICATED BELOW ❑ SEPT. 1st - FEB. 15th ANNUAL RYE & CEREAL RYE ❑ MAR. - MAY 15th ANNUAL RYE ❑ FEB. 16th - APR. 30th ANNUAL RYEGRASS ❑ MAY 16th - AUG. 15th FOXTAIL MILLET ❑ MAY 1 st - AUG. 31 st GERMAN MILLET ❑ AUG. 16th - OCT. ANNUAL RYE ❑ NOV. - FEB. WINTER RYE ORGANIC MULCH MATERIALS AND APPLICATION RATES VESCH TABLE 3.35-A RATES MULCHES PER ACRE PER 1000 SF NOTES: 1j - 2 TONS 70 - 90 lbs. FREE FROM WEEDS AND COARSE MATTER. MUST BE ANCHORED. STRAW OR HAY (MIN. 2 TONS FOR SPREAD WITH MULCH BLOWER OR BY HAND WINTER COVER) FIBER MULCH MINIMUM 35 lbs. DO NOT USE AS MULCH FOR WINTER COVER OR DURING HOT, DRY 1500 lbs. PERIODS. APPLY AS SLURRY CORN STALKS 4 - 6 tons 185 - 275 lbs. CUT OR SHREDDED IN 4-6" LENGTHS. AIR DRIED. DO NOT USE IN FINE TURF AREAS. APPLY WITH MULCH BLOWER OR BY HAND. FREE OF COARSE MATTER, AIR-DRIED. TREAT WITH 12 lbs. WOOD CHIPS 4 - 6 tons 185 - 275 lbs. NITROGEN PER TON. DO NOT USE IN FINE TURF AREAS. APPLY WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND. BARK CHIPS OR 50 - 70 1 - 2 FREE OF COARSE MATTER. AIR-DRIED. DO NOT USE IN FINE TURF SHREDDED BARK c.y. c.y• AREAS. APPLY WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND * WHEN FIBER MULCH IS THE ONLY AVAILABLE MULCH DURING PERIODS WHEN STRAW SHOULD BE USED, APPLY AT A MINIMUM RATE OF 2000 lbs./ac. OR 45 lbs./1000 sq. ft. ST1 ST2 ST3 ST4 ST5 ST6 ST7 DRAINAGE AREA AC 2,00 2.50 1.50 3.00 2.90 0.80 1.50 OUTLET LENGTH 12.0' 15.0' 9.0' 18.0' 17.4' 4.8' 9.0' WIDTH WET STORAGE 30' 40' 30' 35' 40' 50' 40' LENGTH WET STORAGE 80' 1 80' 70' 110' 1 100' 70' 80' VOLUME WET STORAGE 3,618 4,523 2,714 5,427 5,246 1,447 2,714 DEPTH WET STORAGE 1.8' 1.7' 1. 6' 1.7' 1.6' 0.5' 1.0' WIDTH DRY STORAGE 37.2' 4 6.4' 41.8' 46.4' S 44.0' DRY 7 11 4 7 4. ' .LENGTH VOLUME DRY STORAGE 3,618 4,523 2 714 5,427 5,246 1,447 2,714 W W W + .Y y W •Y �,• y W W H FLOW �' �" y ' W 3" MIN. W W W SIL T FENCE EXISTING (SHEET FL 0 W PR 0 TE CTION� GROUND NTS - - / -- ---- 12' MIN. A A VICINITY MAP 1 "=1500' ESC LEGEND - - • - - EXISTING PROPERTY LINE 42 EXISTING CONTOURS 1284 PROPOSED CONTOURS 1284 TEMPORARY SEDIMENT BASIN COUNTERS CONSTRUCTION ENTRANCE (3.02) SF SILT FENCE (3.05) cIP CULVERT INLET PROTECTION (3.08) DO DIVERSION DIKE (3.09) RWD TEMPORARY RIGHT OF WAY DIVERSION (3.11) ST SEDIMENT TRAP (3.13) oP OUTLET PROTECTION (3.18) O DUST CONTROL (3.39) DISTURBED AREA - - SOIL TYPE SEPARATION 19B SOIL TYPE 4____ DRAINAGE DIRECTION (NUMBERS IN PARENTHESES REFER TO SECTION NUMBERS IN VESCH, LATEST EDITION) EDGE OF PAVEMENT :RT I TOE OF FILL GRAVEL --► ;� 1 s ! *DISTANCE IS 6' MIN. ` IF FLOW IS TOWARD EMBANKMENT i� GRA VEL C UL VER T INLET PROTECTION XA-CIP NTS 70' MIN. _ - + EXISTING ' �� PAVEMENT 1- } 16" MIN. FILTER CLOTH 410' MIN. 70' MIN. 2.0' j - *MUST EXTEND FULL 1.0'� o do ! WIDTH OF INGRESS ( I AND EGRESS AREA VARIABLE ORIGINAL GROUND ELEV. PIPE OUTLET TO WELL f TOP OF DRY STORAGE XXX 1 I DEFINED CHANNEL - f 2:1 ? X' VDOT # 1 COARSE 10' MIN. AGGREGATE -1 y 10' MIN. XXX CIF MIN. 21 I CLEANOUT ��___- ----- STONE CONSTRUCTION ENTRANCE TOP OF WET STORAGE XXX 11 LEVEL PLAN S2103 1'0� NTS } I CLASS I I f I XXX CF MIN. K'RIPRAP -' / COARSE- I \- FILTER ORIGINAL) La XXX AGGREGATE CLOTH GROUND d CROSS-SECTION AT OUTLET o% FLOW v> 2.5' X' WIDE / KEY IN 6"-9"; CLASS I RIPRAP FILTER CLOTH RECOMMENDED FOR ENTIRE PERIMETER SECTION A -A VDOT #3, #357, #5, #56 OR #57 COARSE / FILTER CLASS I NOTES: AGGREGATE TO REPLACE SILT FENCE IN DIVERSION DIKE 1. APRON LINING MAY BE RIPRAP, GROUTED FABRIC RIPRAP RIPRAP, GABION BASKET, OR CONCRETE. "HORSESHOE" WHEN HIGH VELOCITY OF FLOW 2. La IS THE LENGTH OF THE RIPRAP APRON AS IS EXPECTED 3 CALCULATED = 1 .5 TIMESINTHE MAX MAXIMUM STONE S TONENDDIAMETER C UL VER T INLET PROTECTION STONE FILTER CLOTH BUT NOT LESS THAN 6 INCHES. COMBINA TION EXCAVATED AREA AGGREGATE OUTLET PROTECTION NTS NTS OUTLET (PERSPECTIVE VIEW) COARSE AGGREGATE SHALL BE VDOT #3, #357, OR #5 TEMPORARY SEDIMENT TRAP NTS APPROVED by the Albemarle County Community Development Department Date ithi 2oo6 File 14,P o info Se(20 -7 3 Eby d Swl(M Date: 8/ 16/06 Scale: 1 "=200' Designed by: ELS Drawn by: ELS Checked by: EHB 0 p i E W + 00 ° WAN 0 a N 0,11 x rn w a > �i 3 LEI w m OLD o o - f-1 w 0 � a w I = Z w 0 Revision Dates 10/13/06 PER COUNTY 11/9/06 PER ESC 11/22/06 PER ESC Z 0 M _ O M p) > W N Z o z5Q Q m � (� > J =) p (,/) J p Li CL Q J U m _ 0 Q � W O� �Y � �U O O = 0 �0 V) Drawing No. of 2 Sheets Job No. 1774 SEDIMENT TRAP #1 106� INV ..' 692 T0E 0�93 y SEDIMENT TRAP #5 SEDIMENT TRAP TABLE ST1 ST2 ST3 ST4 ST5 ST6 ST7 DRAINAGE AREA AC 2.00 1.43 1.50 3.00 2.90 0,80 1.50 VOLUME WET STORAGE 3,6187 1,447 2,714 ELEV. WET STORAGE 635.68 648.89 691.86 706.07 694.57 688.34 699.09 VOLUME DRY STORAGE 3,618 4,523 2 714 5,427 5,246 1,447 2,714 ELEV. DRY STORAGE 637.46 650.95 693.24 707.56 696.39 689.36 700.12 TRAP INVERT ELEV. 632.0 644.0 688.0 704.0 692.0 686.0 698.0 MIN TOP BERM ELEV. 638.5 652.0 694.3 708.6 697.4 690.4 701.2 �4 ,TOE i 11` \ T INV J 44 T N, , NN SEDIMENT TRAP #2 SEDIMENT TRAP 74,6 -- 2.0' --- 1.0' IGINAL GROUND ELEV. VARIABLE TOP OF DRY STORAGE XXX 1 2:1 2:1� X' XXX CF MIN. CLEANOUT TOP OF WET STORAGE XXX 1✓r'y LEVEL -- I CLASS I I / XXX CF MIN. X' RIPRAP -j COARSEi FILTER ORIGINAL' XXX AGGREGATE CLOTH GROUND CROSS-SECTION AT OUTLET X' WIDE CLASS I RIPRAP DIVERSION DIKE FILTER CLOTH EXCAVATED AREA COARSEAGGREGATE OUTLET (PERSPECTIVE VIEW) COARSE AGGREGATE SHALL BE VDOT #3, #357, OR #5 TEMPORARY SEDIMENT TRAP 1" SEDIMENT TRAP A3 T# 4 92' 35' INV 698 +p��rr�� SEDIMENT TRAP #7 SEDIMENT TRAP �4 RFPAA T(1P - 674.0 _LWAY MATTING IN NY AND DOWN 4BANKMENT. = 670 ESC LEGEND - - • - - EXISTING PROPERTY LINE 42 EXISTING CONTOURS 1284 PROPOSED CONTOURS 1284 TEMPORARY SEDIMENT BASIN COUNTERS CONSTRUCTION ENTRANCE (3.02) sF SILT FENCE (3.05) cia CULVERT INLET PROTECTION (3.08) DD DIVERSION DIKE (3.09) "D TEMPORARY RIGHT OF WAY DIVERSION (3.11) sT SEDIMENT TRAP (3.13) op OUTLET PROTECTION (3.18) O DUST CONTROL (3.39) DISTURBED AREA SOIL TYPE SEPARATION 198 SOIL TYPE 4*__ DRAINAGE DIRECTION (NUMBERS IN PARENTHESES REFER TO SECTION NUMBERS IN VESCH, LATEST EDITION) DETENTION POND & WATER QUALITY POND 1 "=30' Date: 8/16/06 Scale: 1 "=30' Designed by: ELS Drawn by: ELS Checked by: EHB O � £ W + 00 M OU � N W N 0 c 41 'd-� L L L W fn N m W M C `r m co ' Wes` LC% L '2 W = z 0 a Revision Dates 10/13/06 PER COUNTY 11/9/06 PER ESC 11/22/06 PER ESC Z :� z 0 4')� - O LLI N - 1- Z� Q m 0 > � o _j w mch - 0 Q (> 0 Ld LLJ LA_ Y C� U O C):� O = 0 � U CIO CL CL Q F- Z Q Z O U V) LLJ J Drawing No. 2 of 2 Sheets NTS DETENTION ,/ WATER QUALITY POND N. T. S. Job No. 1774