Loading...
HomeMy WebLinkAboutSUB202100113 Correspondence 2022-03-09SHIMP ENGINEERING, P.C. Design Focused Engineering March 8, 2022 Cameron Langille County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: Response Letter #2 for SUB2021-113 Proffit Road Townhomes South Dear Cameron, Thank you for your review of the subdivision plat for Proffit Road Townhomes South. This letter contains responses to County comments dated December 1, 2021.Our responses are as follows: 1. [ ZMA201800019] Per proffer # 2 of ZMA201800019, access easements must be provided to TMP 046134- 00-00-005AO and TMP 03200-00-00-029D0. These access easements should be provided where proposed private streets connect to these two adjacent parcels. a. Planning staff is working with the County Attorney's Office to obtain a template for the private access easement agreement. This may be a separate deed that will need to be recorded with the final plat, or it may be in some other form of instrument. The instrument template will be provided to the applicant at a later time once it has been drafted. Rev. 1: Comment stands. Staff correspondence with applicant via email on August 4th informed applicant that the County Attorney's Office has stated that the property owner is responsible for drafting private access easement agreement per the proffer. No draft of the easement agreement was submitted with the second submittal of the plat. Please provide a copy of the draft with the next plat submittal, and include a completed version of the attached checklist. Deed of Easement is attached with this submission. 3. 14- 302 ( B)( 1)] Please add a date of last revision. Rev. 1: Comment stands. The Plat contains the date of the last revision. 12. [14-311, 14-410, 14-412, 14-422] Prior to final plat approval, road plan application must be approved. Road plans are currently under review, application number SUB202100124. Rev. 1: Comment stands, road plans SUB202300124) not yet approved. See attached Engineering Division comments for further information. We understand that the Road Plan must be approved prior to Plat approval. 14. 1 14-317] Instruments evidencing maintenance of certain improvements required as part of the final plat approval. The instrument must address all requirements specified in subsections of Section 14- 317 of the Subdivision Ordinance. Features that require instruments identifying ownership and maintenance responsibilities are as follows: a. All open space parcels to be owned by the HOA. A copy of the HOA declaration is attached with this submission. 912 E. High Sr. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com b. All private easements, including the proposed private street easements. A copy of the HOA declaration is attached with this submission. c. If the applicant will provide a draft of HOA covenants to cover these items, the County Attorney's office has asked that the applicant complete the HOA Covenant checklist that is attached to this comment letter. Submit a copy of the completed checklist with the draft covenants, if applicable. Rev. 1: Comment stands. Applicant comment response letter states "Noted." In response to this comment. No drafts of deeds of easement or private improvement maintenance agreements were included with the submittal of the revised plat. A copy of the HOA declaration is attached with this submission. 17. [ 14-431] Please see attached Engineering Division comments. All proposed public stormwater and drainage easements will require a deed of dedication to be recorded with the plat. Deed templates will be drafted by Engineering Division staff and provided to the applicant once all substantive revisions to the plat have been addressed. Please contact the Engineering Division directly for questions related to stormwater and drainage easement deeds. Rev. 1: Comment stands, see attached Engineering Division comments for further information. We requested a draft of the deeds from engineering in the comment response letter. 18. [ 14-434 and 14-435] Prior to final plat approval, all on -site improvements required by the Subdivision Ordinance must be completed ( built) or bonded. This includes stormwater management facilities, drainage facilities, and streets. Rev. 1: Comment not fully addressed. See engineering comments for further information regarding approvals and bonding required prior to final plat approval. Comment noted. As soon as the Road Plan is approved by Engineering, the Road bond will be posted. If you have any questions or concerns about these revisions, please feel free to contact me at Justin anshimp-en ing eering com or by phone at 434-227-5140. Regards, Justin Shimp Shimp Engineering, P.C. 912 E. High 51. Charlottesville, VA 22902 1434.227.51401 shimp-engineering.com