Loading...
HomeMy WebLinkAboutSUB202100149 Other 2022-03-09APPENDIX Predicted Resiliency Factors, CBR and Soil Support Values Values may be used for preliminary pavement design only. Final designs must be based on soil tests. NOTE Appendix I shall not be used and SSV shall not exceed a value of 2 when the moisture content of the soil exceeds the plastic limit, approaching the liquid limit (e.g. high water table or other reasons). Regional Chart of Soil Resiliency Factors Table of Values by County County Code County RF CBR SSV 00 Arlington W. of Rte. 95 E. of Rte. 95 1.0 3.0 7 10 7 30 01 Accomack 3.0 7 21 02 Albemarle E. of Rte. 29 W. of Rte. 29 1.0 1.0 4 5 4 5 03 Alleghany 2.0 5 10 04 Amelia 1.5 1 6 9 05 Amherst 1.5 5 7.5 06 Appomattox 1.5 5 7.5 07 Augusta 2.0 6 12 08 Bath 2.0 5 10 09 Bedford 1.5 5 7.5 10 Bland 2.0 6 12 11 Botetourt. From the western base of the Blue Ridge Mountains to the east 1.5 4 6 Remainder of county. 2.0 4 8 Appendix II Nomograph for Determining Required Pavement Thickness Index (Note: M enlarged vasion of this nomograph isprovided on the last page of this reference.) Final pavement design must be based on the results of appropriate soil tests. Preliminary designs may be based on values established in Appendix I. (Nomograph omitted to save space.) To determine DR, project a line from the value for SSV through the value for the Design AADT. The nomograph depicted correlates the soil support value of the subgrade (SSV =Design CBR x RF), the traffic volume (Design AADT), and the minimum required pavement design thickness index (DR) for subdivision streets and secondary road pavement, based on AASHO design equations. The equation on which the nomograph is based is: DR = 3.48Ln (AADT)-1.48Ln (SSV) - 7.23, where Ln is the natural logarithm. This nomograph assumes the following: 1. Use of Design AADT for two way traffic, equally distributed, thereby deriving the thickness index (DR) required for any portion of the pavement to support one-half of the design AADT. 2. For DR greater than 20, staged consttuction providing an initial stage DR value of 20 may be permitted or the road can be designed using primary pavement methodology. 3. The District Materials Engineer may consider reducing the minimum DR value of 6.4 for secondary system facilities having a Design AADT <50. Computation from equation Road A Road B1 Road B2 AADT 303 227 124 CBR 6 6 6 RF 1 1 1 SSV 6 4 4 DR 10.0 9.6 7.5 HCV 3% 3% 3% APPENDIX III Paving Materials & Allowable Values Max. No. of Thickness Lift Thickness Lifts in a Equivalency ValueMin. Design Location Material Max. & Notation Material Notation inches inches Asphalt Concrete (SM-9.OA or D)l 1 1.5 Asphalt Concrete (SM-9.5A or D)l A.C. 1.67 * 1 1.5' 13 Surface at Asphalt Concrete (SM-12.5A or D)' 1.25 2 Prime & Double Seal or Class "C or D" ° D.S. 0.84 - - I Blotted Seal Coat Surface Treatments Intermediate Asphalt Concrete (IM-19.OA or D) A.C. 1.67 * 2 3 1 a Asphalt Concrete (BM-25.OA or D)1 A.C. 1.67 * 2.5 4 Multiple' Full Depth Asphalt Concrete (BM-25.OA or A.C. 2.15 ** 2.5 4 Multiple' D) over Subgrade Untreated Aggregate 5 Agg. 1.00 See Notes Cement Treated Aggregate' CTA 1.67 Cement Treated Select Material, Type II' Sel. Mat. C 1.50 Multiple' min. CBR = 20 Base a2 Select Material Type I & B, non -plastics, min. Sel. Mat. 0.84 CBR = 30 6 10 See Notes Select Material, Type II, non -plastics, min. Sel. Mat. 0.60 CBR = 20 Soil Cement' S.C. 1.00 Multiple' Cement Treated Select Material, Type II' Sel. Mat. C 1.17 Cement Treated Select Borrow' Sel. Bor. C 1.00 Open Graded Drainage Layer OGDL 0.60 2 3 1 Untreated Aggregate 5 Agg. 0.60 See Notes Cement Treated Aggregate' CTA 1.33 Multiple' Select Material Type I, non -plastics, min. CBR Sel. Mat. 0.50 4 10 = 30 See Notes Select Material Type II, non -plastics, min. Subbase a3 Sel. Mat. 0.40 CBR = 20 Soil Cement' S.C. 1.00 Soil Lime' S.L. 0.92 6 8 Multiple' Cement Treated Select Material, Type II a Sel. Mat. C 1.17 Cement Treated Select Borrow' I Sel. Bor. C 1.00 Appendix IV Flexible Pavement Design Worksheet for New Subdivision Streets This sheet is intended for use and submission in conjunction with VDOTs Secondary Street Acceptance Requirements Municipality Albemarle County Date: 3/8/2022 Subdivision Street Name HTC Area C Block H Roads A & B Design Engineer Justin Shimp Phone: 434.227.5140 AADT Projected traffic for the street segment considered, as defined in the Subdivision Street Requirements. CBRo Design CBR = Average of CBRT x 2/3 and modified only as discussed in the Pavement Design Guide. CBR, CBR value of the subgrade sample, taken and tested as specified in the Pavement Design Guide DME VDOT District Materials Engineer EPT Equivalent projected traffic HCV Number of Heavy Commercial Vehicles (e.g. trucks, buses, etc., with 2 or more axles and 6 or more tires). %HCV Percentage of the total traffic volume composed of Heavy Commercial Vehicles. RF Resiliency Factor = Relative value of the subgrade soil's ability to withstand repeated loading. SSV Soil support value of subgrade (SSV = CBRn x RF) Dp Thickness index of proposed pavement design computed by the Conventional Pavement Design Method DR Thickness index required, based on Design AADT and SSV, determined by Appendix II. Step 2: Determine Design Values Step 1: Determine Design AADT CBR, RF, and SSV AADT 303 Sample No. CBRT Resiliency Factor (RF) 1 6 Source Value %HCV = 100 (HCV / AADT) or 3.0% 2 Table 1 1 EPT = 20 x HCV Note: For 3 Appendix I 1.0 Note: For %HCV < 5%, use AADT %HCV>5%, DME approved RF EPT>AADT For preliminary designs, use the lowest RF value in the equation Design AADT 30 CBR, x RF = SSV Use greater of AADT or EPT (5.0) x (1.0) = 5.0 Step 3: Pavement Design (Check appropriate box and show proposed pavement design below.) ❑� (A) Limited to Design AADT < 400 - Show pavement material notations and thickness from Appendix IV Tables A and B. .______________________________________________________________________________________________________________ _ (B) Show pavement section as developed inthe Pavement Design Guide. DR = 10.3 (See Appendix IH for material notations and thickness equivalency values (a)). from Appendix 11 Description of Proposed Pavement Section Material Notation Thickness, IT a (a x h) Surface SM-9.5A 1.5 1.67 2.5 Base BM-25.OA 2.5 1.67 4.2 Subbase VDOT #21A 6 0.6 3.6 Dp must equal or exceed the value of DR. Dp = E(a x h) = 10.3