HomeMy WebLinkAboutWPO202000053-28919-Full Inspection ReportCOUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
(434)296-5832
WRITTEN WARNING
Hand delivered
Project: WP0202000053
PLEASANT GREEN PHASE II - VSMP - DIGITAL
Operator/Contractor: Contour Construction
STANLEY MARTIN COMPANIES LLC
Issued Date:3/7/2022
This is your Written Warning in accordance with § 17-900 of the Water Protection Ordinance of
Albemarle County and Section 62.1-44.15:37 of the Virginia Stormwater Management Act.
This Written Warning is being issued because of the following deficiencies:
Deficiency: Denuded area dormant longer than 14 days or at final grade have not been stabilized
Corrective Action: Denuded area dormant longer than 14 days or at final grade
Deficiency: Diversions to sediment basin D have ont been installed
Corrective Action: All diversions must be installed and diverting stormwater to sediments
Deficiency: Diversions to sediment basin D have ont been installed; dewatering device for sediment
basin A not installed
Corrective Action: Must install dewatering device for sediment basin A
Unless subsequently amended in writing by this office, it is expected all corrective
measures will be completed by
Failure to comply by the required date may subject the owner to penalties and remedies as listed
under § 17-900 et -al of the Water Protection Ordinance of the Albemarle County Code.
Should you have a legitimate reason you cannot complete your required corrections by the
above given date, you must immediately contact your erosion control inspector. Unless you
have contacted the inspector and agreed to alternative arrangements, all compliance work is
expected to be completed by the above date.
County Inspector Name: John Yerby
County Inspector Phone Number: (434) 296-5832
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
PLEASANT GREEN PHASE II - VSMP -
DIGITAL
ProjectlWPO Number:
WP0202000053
Project Address:
«projectAddress»
DEQ Permit Number (if
applicable):
VAR1OM834
Project Operator:
Contour Construction
Operator Telephone #:
(434) 244-0001
Project Contact:
STANLEY MARTIN COMPANIES LLC
Contact Telephone #:
Contact E-Mail:
@STANLEYMARTIN.COM
Qualified Personnel (QP):
Contourchase@gmail.com
Inspector:
John Yerby
Weather (Wet/Dry/Rain):
Partly cloudy
Disturbed Acreage:
Inspection Date & Time:
3/7/2022
Single -Family:
Stage of Construction: Grading
Re -Inspection: No
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
Yes
1
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
Yes
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
Yes
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Yes
Part II D.1 & 2)(9VAC25-870-54.G)
The SWPPP contains a signed copy of the registration statement?
Yes
5
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
Yes
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
Yes
7
construction activity, including the function of the project? (CGP Part II
A.1 A)
The SWPPP includes a legible site plan identifying all appropriate
Yes
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 6
9
The SWPPP contains the name, phone number and qualifications of
Yes
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
Yes
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
Yes
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
Yes
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
Yes
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
Yes
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
Yes
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? Yes
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
Yes
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
Yes
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
Yes
identified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
Yes
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
Yes
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
Yes
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
Yes
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
Yes
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in
Yes
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? Yes
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
Yes
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Yes
Part 11 F (3-4)? (CGP Part 11 F (3-4))
Page 2 of 6
27
Corrective actions are taken consistent with the requirements of the
Yes
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
Yes
plan?
Sequencing of the project is implemented in accordance with the
Yes
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
Denuded area dormant longer than 14 days or at final
been stabilized, and have stabilization requirements for impaired waters,
grade have not been stabilized
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
Yes
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
N/A
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
No
3 of the 5 sediment basin have been constructed
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
N/A
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
Diversions to sediment basin D have ont been
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
No
installed; dewatering device for sediment basin A not
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
installed
Are finished cut and fill slopes adequately stabilized to prevent or correct
Yes
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
Yes
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
N/A
38
(9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
Yes
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
N/A
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
N/A
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Page 3 of 6
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
N/A
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
Yes
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 6
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Occurrence
Observation/Recommended Corrective Action
Checklist #
Citation/Legal
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 6
Corrective Action Deadline:
Re -Inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Page 6 of 6
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory Citation/Legal
Occur.
Observation
Recommended Corrective
List #
Requirement*
Action
30
(9VAC 25-840-40.1)
Denuded area dormant longer
Denuded area dormant longer
(9VAC25-870-54.B)
than 14 days or at final grade
than 14 days or at final grade
(9VAC25-880-60) (CGP
have not been stabilized
Part I F.1(a)) (CGP Part
11 A.5.b(1)) (CGP Part 11
A.2.c (8)) (CGP 11 E(1-2))
35
(9VAC 25-840-40.6)
Diversions to sediment basin
All diversions must be
(CGP Part 11 A.2.c (9))
D have ont been installed
installed and diverting
(CGP Part 11 A.2(c))
stormwater to sediments
(CGP 11 E(1-2))
(9VAC25-870-54. B )
35
(9VAC 25-840-40.6)
Diversions to sediment basin
Must install dewatering device
(CGP Part 11 A.2.c (9))
D have ont been installed;
for sediment basin A
(CGP Part 11 A.2(c))
dewatering device for
(CGP 11 E(1-2))
sediment basin A not installed
(9VAC25-870-54. B )
Recommended 3/21/2022
Corrective Action
Deadline:
Targeted Re- 3/21/2022
Inspection Date:
Comments: Site has improved over last Inspection; Still need to install diversions leading to
sediment basins; Must add dewatering device to sediment and be stabilized.
Deficiencies must be corrected by 3-212022 to pass Inspection.
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control
Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from
Construction Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 1
TimePhoto_20220307_095527.jpg.jpg 411.52KB
mw 0v V 1 .
irginia stormwater Mai
Construction General
4.
-.44
i'
t i
Q
�—I
('omnunnrea6h ql Virginia
I IRGINIA DEPARTMENT OF ENVIRONMENTAL QUALIT)
1N1 ie lulu. mmmbn,l. vlralnw 2121P
R;mm d wrM(n(a2321e
t FAX F8 j084178
October o5. 2.1
Stanley Martin Compan
—Fd
f1no VA
D
svn k;aSA 2mnleyMa2n
Coverage under Me 2019 VPDES —crud- Gene21 Pe
DEO has reviewed your Permit motlificalion request reuived complete on November 24. 2020 and Ceterm,ned
at Me Proposed U 50 acre Iantl-diatufblng activity is covered untlel Me General VPDES Permit for Discharges
If St —1 fiom Construction Activities (VAR10). The efhc . d- of this I'— coverage motlifiwtioh,s Me
me of th, letter P ae nclWe a mpy of Mia leder In the Slorrrnvahr Pollutgn Prevention Planp(/SNPP7P). YVou
ar goav \ _ % l / /
_ a.._ _.d ninwdenina9/a9encY25/cnaPterB80lsecl�p ll_rinpral 7/ J�_Prtr��J:�.
TM1e general perms contains the conditions of coverage and StorPmwraler pr 11TrrVrf.�� ppp```���++++++f QF
requirements. P he 9enerai Permit and read d Drewry as you wi11 bb.!•. - �e parr Fo ��t� r
all peond mnddl nsSGcwerage under tors consVucbon general Permit does-b, ble fm'
with all 1—federal. state. or low, laws and regulations.
Our cobs indicate that your may
si y dlscharge to waters itl10fild as impared or eawptmnal. Please see i
b— m. adddmnai reemrememe�
,. — Mrs pmposetl bnd.dlS ., acYivlty d—. to a surface water w.M.atl of ,mjalr�\�1 � � =J rrl
TMDI. was —d allgwbon nas been established and approved pngr m gre term of the yen a1 permit for (1)
sediment or a zedlment-related Parameter or (Ih nutnentso Yea. if YES, Men the follow, general 1(Pad I B 4 a) and —FP requirements (Part B 51 must be implementetl for Me land -disturbing aaivily
porary soil arabil¢aoon 1ha11 be applied to denuded areas witr,, z f (n1(111 vr ftler
ell grade la0_hetl-any Dodion.1-sift cortlance wnnm 's Mefltlaebr�d.�M-
. (e edillaersl shall be applied in
Mov. nutnent management plan and shall not be apPlletl dunng anhlluevents.
anspenidns ana11 be —duq ar a frequency of 0, at least Once every bur 141 buamasa tlaye ar liil at \�
least onu e ry 15i bualneas days and no later Man 24 hours mlloxvn9 a measurable storm event. In tM
VV/-j`1J
Photos for Item 2
Photos for Item 4
Photo Description:
DEQ permit
Photo Description:
Photos for Item 10
Photo Description:
Photos for Item 30
..............................................................
TimePhoto_20220307_110024.jpg.jpg 826.31 KB
Photo Description: Full sire
Photos for Item 33
Ti mePhoto_20220307_104441.j pg.j pg 837.47KB
Photo Description: Sediment basin C
Photos for Item 35
Time Photo_20220307_110018.jpg.jpg 1004.39KB
Photo Description: Sediment basin A missing dewatering device
Photos for Item 47
TimePhoto_20220307_104433.jpg.jpg 1.08MB
Photo Description: Outfall for sediment basin C
MAW
County Inspector
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 3/10/2022