Loading...
HomeMy WebLinkAboutWPO202000053-28919-Full Inspection ReportCOUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 (434)296-5832 WRITTEN WARNING Hand delivered Project: WP0202000053 PLEASANT GREEN PHASE II - VSMP - DIGITAL Operator/Contractor: Contour Construction STANLEY MARTIN COMPANIES LLC Issued Date:3/7/2022 This is your Written Warning in accordance with § 17-900 of the Water Protection Ordinance of Albemarle County and Section 62.1-44.15:37 of the Virginia Stormwater Management Act. This Written Warning is being issued because of the following deficiencies: Deficiency: Denuded area dormant longer than 14 days or at final grade have not been stabilized Corrective Action: Denuded area dormant longer than 14 days or at final grade Deficiency: Diversions to sediment basin D have ont been installed Corrective Action: All diversions must be installed and diverting stormwater to sediments Deficiency: Diversions to sediment basin D have ont been installed; dewatering device for sediment basin A not installed Corrective Action: Must install dewatering device for sediment basin A Unless subsequently amended in writing by this office, it is expected all corrective measures will be completed by Failure to comply by the required date may subject the owner to penalties and remedies as listed under § 17-900 et -al of the Water Protection Ordinance of the Albemarle County Code. Should you have a legitimate reason you cannot complete your required corrections by the above given date, you must immediately contact your erosion control inspector. Unless you have contacted the inspector and agreed to alternative arrangements, all compliance work is expected to be completed by the above date. County Inspector Name: John Yerby County Inspector Phone Number: (434) 296-5832 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: PLEASANT GREEN PHASE II - VSMP - DIGITAL ProjectlWPO Number: WP0202000053 Project Address: «projectAddress» DEQ Permit Number (if applicable): VAR1OM834 Project Operator: Contour Construction Operator Telephone #: (434) 244-0001 Project Contact: STANLEY MARTIN COMPANIES LLC Contact Telephone #: Contact E-Mail: @STANLEYMARTIN.COM Qualified Personnel (QP): Contourchase@gmail.com Inspector: John Yerby Weather (Wet/Dry/Rain): Partly cloudy Disturbed Acreage: Inspection Date & Time: 3/7/2022 Single -Family: Stage of Construction: Grading Re -Inspection: No COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? Yes Comments/Description Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) Yes 1 (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the Yes main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if Yes 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? Yes Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Yes Part II D.1 & 2)(9VAC25-870-54.G) The SWPPP contains a signed copy of the registration statement? Yes 5 (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage Yes letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the Yes 7 construction activity, including the function of the project? (CGP Part II A.1 A) The SWPPP includes a legible site plan identifying all appropriate Yes 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) Page 1 of 6 9 The SWPPP contains the name, phone number and qualifications of Yes "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? Yes (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that Yes ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- Yes 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of Yes 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III Yes K? (CGP Part 11 A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part Yes 11 A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? Yes Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the Yes discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that Yes existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are Yes identified? (CGP Part 11 B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major Yes 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part 11 B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? Yes (CGP Part 11 B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final Yes stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer Yes had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and Yes measures taken to prevent the recurrence of any prohibited discharge? (CGP Part 11 B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in Yes accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? Yes Comments/Description Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved Yes TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP Yes Part 11 F (3-4)? (CGP Part 11 F (3-4)) Page 2 of 6 27 Corrective actions are taken consistent with the requirements of the Yes CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the Yes plan? Sequencing of the project is implemented in accordance with the Yes 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization Denuded area dormant longer than 14 days or at final been stabilized, and have stabilization requirements for impaired waters, grade have not been stabilized 30 approved TMDL(s), pollutants of concern and exceptional waters, when No applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected Yes 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.B) A permanent vegetative cover has been established that is uniform, N/A 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land No 3 of the 5 sediment basin have been constructed 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? N/A 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.6) Are sediment traps and basins installed in accordance with MS-6 and the Diversions to sediment basin D have ont been 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II No installed; dewatering device for sediment basin A not A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) installed Are finished cut and fill slopes adequately stabilized to prevent or correct Yes 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate Yes 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? N/A 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? Yes 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Are stormwater conveyance channels adequately stabilized with channel N/A 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC N/A 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Are utility trench operations conducted and stabilized in accordance with N/A 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are soil and mud kept off paved or public roads to minimize the transport N/A 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Page 3 of 6 Have all temporary control structures that are no longer needed been 46 removed and disturbed soil resulting from their removal permanently N/A stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the Yes standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? N/A (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? No Comments/Description Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Page 4 of 6 Notes: CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT REQUEST FOR CORRECTIVE ACTION Project Name: Permit Number (if applicable): Date: Regulatory Occurrence Observation/Recommended Corrective Action Checklist # Citation/Legal requirement' Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: 1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Page 5 of 6 Corrective Action Deadline: Re -Inspection Date: Comments: The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for ensuring compliance on the above project. Page 6 of 6 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Citation/Legal Occur. Observation Recommended Corrective List # Requirement* Action 30 (9VAC 25-840-40.1) Denuded area dormant longer Denuded area dormant longer (9VAC25-870-54.B) than 14 days or at final grade than 14 days or at final grade (9VAC25-880-60) (CGP have not been stabilized Part I F.1(a)) (CGP Part 11 A.5.b(1)) (CGP Part 11 A.2.c (8)) (CGP 11 E(1-2)) 35 (9VAC 25-840-40.6) Diversions to sediment basin All diversions must be (CGP Part 11 A.2.c (9)) D have ont been installed installed and diverting (CGP Part 11 A.2(c)) stormwater to sediments (CGP 11 E(1-2)) (9VAC25-870-54. B ) 35 (9VAC 25-840-40.6) Diversions to sediment basin Must install dewatering device (CGP Part 11 A.2.c (9)) D have ont been installed; for sediment basin A (CGP Part 11 A.2(c)) dewatering device for (CGP 11 E(1-2)) sediment basin A not installed (9VAC25-870-54. B ) Recommended 3/21/2022 Corrective Action Deadline: Targeted Re- 3/21/2022 Inspection Date: Comments: Site has improved over last Inspection; Still need to install diversions leading to sediment basins; Must add dewatering device to sediment and be stabilized. Deficiencies must be corrected by 3-212022 to pass Inspection. *Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 1 TimePhoto_20220307_095527.jpg.jpg 411.52KB mw 0v V 1 . irginia stormwater Mai Construction General 4. -.44 i' t i Q �—I ('omnunnrea6h ql Virginia I IRGINIA DEPARTMENT OF ENVIRONMENTAL QUALIT) 1N1 ie lulu. mmmbn,l. vlralnw 2121P R;mm d wrM(n(a2321e t FAX F8 j084178 October o5. 2.1 Stanley Martin Compan —Fd f1no VA D svn k;aSA 2mnleyMa2n Coverage under Me 2019 VPDES —crud- Gene21 Pe DEO has reviewed your Permit motlificalion request reuived complete on November 24. 2020 and Ceterm,ned at Me Proposed U 50 acre Iantl-diatufblng activity is covered untlel Me General VPDES Permit for Discharges If St —1 fiom Construction Activities (VAR10). The efhc . d- of this I'— coverage motlifiwtioh,s Me me of th, letter P ae nclWe a mpy of Mia leder In the Slorrrnvahr Pollutgn Prevention Planp(/SNPP7P). YVou ar goav \ _ % l / / _ a.._ _.d ninwdenina9/a9encY25/cnaPterB80lsecl�p ll_rinpral 7/ J�_Prtr��J:�. TM1e general perms contains the conditions of coverage and StorPmwraler pr 11TrrVrf.�� ppp```���++++++f QF requirements. P he 9enerai Permit and read d Drewry as you wi11 bb.!•. - �e parr Fo ��t� r all peond mnddl nsSGcwerage under tors consVucbon general Permit does-b, ble fm' with all 1—federal. state. or low, laws and regulations. Our cobs indicate that your may si y dlscharge to waters itl10fild as impared or eawptmnal. Please see i b— m. adddmnai reemrememe� ,. — Mrs pmposetl bnd.dlS ., acYivlty d—­. to a surface water w.M.atl of ,mjalr�\�1 � � =J rrl TMDI. was —d allgwbon nas been established and approved pngr m gre term of the yen a1 permit for (1) sediment or a zedlment-related Parameter or (Ih nutnentso Yea. if YES, Men the follow, general ­1(Pad I B 4 a) and —FP requirements (Part B 51 must be implementetl for Me land -disturbing aaivily porary soil arabil¢aoon 1ha11 be applied to denuded areas witr,, z f (n1(111 vr ftler ell grade la0_hetl-any Dodion.1-sift cortlance wnnm 's Mefltlaebr�d.�M- . (e edillaersl shall be applied in Mov. nutnent management plan and shall not be apPlletl dunng anhlluevents. anspenidns ana11 be —duq ar a frequency of 0, at least Once every bur 141 buamasa tlaye ar liil at \� least onu e ry 15i bualneas days and no later Man 24 hours mlloxvn9 a measurable storm event. In tM VV/-j`1J Photos for Item 2 Photos for Item 4 Photo Description: DEQ permit Photo Description: Photos for Item 10 Photo Description: Photos for Item 30 .............................................................. TimePhoto_20220307_110024.jpg.jpg 826.31 KB Photo Description: Full sire Photos for Item 33 Ti mePhoto_20220307_104441.j pg.j pg 837.47KB Photo Description: Sediment basin C Photos for Item 35 Time Photo_20220307_110018.jpg.jpg 1004.39KB Photo Description: Sediment basin A missing dewatering device Photos for Item 47 TimePhoto_20220307_104433.jpg.jpg 1.08MB Photo Description: Outfall for sediment basin C MAW County Inspector COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Inspection Date: 3/10/2022