HomeMy WebLinkAboutSP201800023 Approval - County 2020-08-05 (3)RESOLUTION TO APPROVE
SP 201800023 RIVER'S EDGE
BE IT RESOLVED that, upon consideration of the staff reports prepared for SP 201800023 and all
of their attachments, the information presented at the public hearings, the additional data submitted by the
applicant, any written comments received, and the factors relevant to a special use permit in Albemarle
County Code §§ 18-30.7.1, 18-30.7.4(b)(2), and 18-33.40, the Albemarle County Board of Supervisors
hereby approves SP 201800023, subject to the conditions attached hereto.
I, Claudette K. Borgersen, do hereby certify that the foregoing writing is a true, correct copy of a Resolution
duly adopted by the Board of Supervisors of Albemarle County, Virginia, by a vote of to as
recorded below, at a regular meeting held on
Clerk, Board of County Supervisors
Ave Nay
Mr. Gallaway
Ms. LaPisto-Kirtley
Ms. Mallek
Ms. McKee)
Ms. Palmer
Ms. Price
SP2018-23 River's Edge Special Use Permit Conditions
1. The limits of disturbance within the Preserved Steep Slopes Overlay District are to be limited to the
sizes, locations, and extents of disturbance as proposed in the "River's Edge: Steep Slopes
Disturbance" application prepared by Shimp Engineering, P.C. and dated February 28, 2020.
2. Improvements related to stormwater, drainage, and grading shown on the final site plan and water
protection ordinance plan for River's Edge must be in general accord with the improvements and
grading shown on the exhibits "River's Edge: Road Grading + Profile" and "River's Edge:
Conceptual Stormwater" in the "River's Edge: Zoning Map Amendment Application Plan"
application prepared by Shimp Engineering, P.C. and dated February 28, 2020.
3. Any blasting of rock must be performed subject to a blasting plan reviewed and approved by the
County Engineer and other Authorities having jurisdiction, prior to commencing such activity.
4. Two -layer erosion and sediment control measures will be installed around the perimeter of the site,
where feasible, at the discretion of the County Engineer.
5. Erosion and sediment control basins and traps may not be located within the floodplain limits.