Loading...
HomeMy WebLinkAboutWPO202100068 Review Comments WPO VSMP 2022-02-25f•� OF AL8 County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT VSMP Permit Plan Review Project title: Nystrom Driveway Project file number: WPO202100068 Plan preparer: Dustin Greene, PE [dgreene@roudabush.com] Owner or rep.: Jonathan Nystrom [JgNystrom@nycominc.com] Plan received date: 12/02/21 02/14/22 Date of comments: 12/30/21 02/25/22 Reviewer: Frank Pohl, PE 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is disapproved. The rationale is given in the comments below. The application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code §17-405. A SWPPP is required even though a SWM plan is not. https://www.a I bema rle.org/home/showpubl isheddocu ment/2662/637539044923470000 (Rev. 1) Addressed. B. Pollution Prevention Plan (PPP) A PPP is required even though a SWM plan is not required. PPP content requirements can be found in County Code §17-404. 1. PPP not submitted. Include PPP requirements on the plan sheets. (Rev1) - A PPP was submitted; however, storage of fuel and chemicals are not allowed to occur within the floodplain. Please show the fuel and chemical storage outside of the floodplain limits. C. Stormwater Management Plan (SWMP) VSMP Regulation §9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. A SWIM plan is not required for this project because the land disturbing activity is for the purpose of establishing a single-family dwelling and the Administrator has determined an agreement in lieu of a stormwater management plan is not required [§17-403.B]. Engineering Review Comments Page 2 of 4 https://www.a I bema rle.org/home/showpubl isheddocu ment/2710/637539045240170000 (Rev. 1) - Addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for the reasons noted below. The erosion control plan content requirements can be found in County Code §17-402. 1. Re9 se Awe on Sheet f ' stag ; "Limits if Dist- to of Par ...... Alse, -add- to the end of "Qualifies fer a nt in lie. � of plan fer S A/AA plan" the following: "her -a -Use the driveway is being ee Astrueted for the AUrAese of establishing the first single family dwelling on the subjeet A erty G.17 403 07 ^ (Rev. 1) Addressed. 2. She.., the area. for each a of dirt. �rbaRre Cilt fence drainage areas Est not exceed .«ately 1/ aere F 100 ft of SF (VESCH)Sediment traps FRay he s ed ...here dFaiRage e e earl deriee rtand..rdr e at disrhaFge e iets to the stye-.. (Rev. 1) Addressed. 3. Gilt feere she..ld he iestalled ..a .anal with reete. as (VESCH) Deplaee At fenee with .Ji.,.....i.........L..._. a iate ..ed add a t.,eieal diye.riee detail to the plan set. (Rev. 1) Addressed. 4. Add TG -.Ad DG s mbels o olaR where dirturh;oee ecrum and add the TG detail to the el..... ,.4. (Rev. 1) Addressed. 5. Driveway Typical rertiee on cheat o indir#p,; 2.1 ride rlepes fer the dr-aiRage rhaRRels NA the detail ee cheat A iedir-ates 2:1 ride slopes Please r cile. (Rev. 1) Addressed. 6. She.., the slepe of the driveway on the plan and Areyide n Aete that the drive.. ay eannet exeeed 1 6% [§10-4c6] (Rev. 1) Addressed. 7. It is suggested to eenfirm that the heme site is laFge a .eh Dreyide a gh aFea fer the actual horne that the no.gnermoots to build' including eutdoer areaS, dr.. ie.. ay pad etc. If the _aFea of land list, ffhaRee a eds 1 SWN4 At in I'ie u of a plan Fnay still he aIle ed s side g the purpeof this disturbancp is for the stablishm et of single family heme [§17_1/13137 It is rere......eeded to ere.Ade as Fn Leh area as is eeeded fe.F the hee.e site se that add Yie.nal Aradieg of the hillside i.. get Fe A. Bred later. The VSAAO fee is the same far '-P.A.,; - Ader 5 a s if fer the AUFpese of establishing a Single family heme 1 8� (Rev. 1) Addressed. 8. Add "Relatedapprovak- FD!22 100003" to the fleedplaie Bete AA cheat 1 (Rev. 1) Addressed. 9. Dre..ide erne of each bridge to clearly sho and oete that A odk is to A ,ithio theme (Rev. 1) Addressed. 10. Explain how construction of the bridges will be completed without having to drive through the streams. Submit a copy of the ACC E permit with this application. If access will be provided by some other means, indicate this on the drawings. (Rev. 1) Not addressed, or I cannot find it. Please confirm there is a note on the plans showing how/where access will be provided to install the bridges, that driving through the Engineering Review Comments Page 3 of 4 streams is not allowed unless the contractor receives written permission from the US Army Corp of Engineers. 11. /"en fi........ atchlbRes aFe -} nn-.}..I.,liAP OR SIIP .} 7 ..,F.._....FF1; SIRP .} 2 SIRRI Ild the upper'WiRd w F..F........._e the .1eyi r'window', and }hL......�'...i...J....: ...F........ CL.....} � the Fight side eF the plan? Sheet 2 deeece'} .. .. h...., rnatrhr.,,, (Rev. 1) Addressed. 12 Just fe..:.,f.......},.,, there types .... are in th, tes; „ Sheet—' (Rev. 1) Addressed. 13. She.., the r...l}. of the stream buffer on Sheet � (Rev. 1) Addressed. 14. Add "WPO202100068" to the cover sheet. (Rev. 1) Not addressed. E. Mitigation Plan (MP) 1. Combine the mitigation plan with the ESC plan set. Add the mitigation sheets to the sheet list and update sheet numbers accordingly. Revise the title of this drawing set to be "Erosion & Sediment Control Plan and Mitigation Plan." This makes it easier for inspectors to have one set of drawings in the field to use for inspections and recordkeeping. (Rev. 1) Addressed. 2. Add a column to the tables on Sheet 2 identifying which plants are canopy trees, understory trees, and shrubs. Provide a table/calculation showing that the ratio of these plants meets the ratio as noted in Appendix D of the Riparian Buffers Guidance Manual. (Rev. 1) Addressed. 3. Include page C-1 from Appendix C of the Riparian Buffers Guidance Manual in the plan set. Link to the manual: (Rev. 1) Addressed. https://www.vbgov.com/govern ment/departments/planning/boards-commissions- com mittees/Documents/CB PA/CB PA% 20Appl ications/ Riparian%20Buffers%20M od ifica tion%20and%20Mitigation%20Guidance%20Manual.pdf The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form or submit all documents online. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements and proposed mitigation plantings must be bonded. The bonding process begins when the plan is approved and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to Engineering Review Comments Page 4 of 4 be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. After bonding is complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/com munity-development/apply-for/engi neering-applications