Loading...
HomeMy WebLinkAboutSUB202100079 Plan - Revision 2022-03-15 (2)f 608 Preston Avenue P 434.295.5624 Suite 200 IF434.295.1800 T I M M O N S GROUP Charlottesville, VA 22903 www.timmons.com March 10, 2022 Matt Wentland County of Albemarle Community Development 401 McIntire Rd. Charlottesville, VA 22903 RE: SUB-2021-00079 — Southwood, Blocks 11 & 12 — Road Plan Review Dear Mr. Wentland: We have reviewed your comments from (VDOT) January 12`^, 2022 Rev. 3 and made the necessary revisions. Please find our responses to the comments below in bold lettering. Planning— Rebecca Ragsdale dated 02-21-2022: No planning comments received for road plans. Engineering— Matt Wentland dated 02-21-2022: 1. Be aware that items outside of the road are not being reviewed on these plans (such as the parking lots). Acknowledged. VDOT — Doug McAvoy — Comments dated 01-13-2022: 2. Please remove all Structure and Bridge Standard Details from the plans. S&B standard details are to be referenced in plan notes. VDOT S&B details have been removed from the plans and referenced with a note. 3. Please show the mail boxes & cluster box units per RDM Appendix B(1)-56 The three apartment buildings include internal mail rooms, which is why mailboxes & cluster units are not included in this plan. 4. Profile view for Horizon Road does not appear to show the CG-11 requirements as described in the Road & Bridge standards. Please show a min. 5' extension of the Hickory street cross slope as a parabolic curve from the EP of Hickory Street to the Horizon Road entrance flow line. Water should not flow from Horizon Road across Hickory Street during a 10-yr storm. ENGINEERING I DESIGN I TECHNOLOGY The profile of Horizon Road has been updated to show a 20' extension into the cross slope of Hickory Street. See Sheet C4.2. 5. UFO HH Box should not be in the sidewalk or within maintenance area of the culvert. The UFO boxes on the plans have been updated and the field locations have been coordinated with Max Greene. 6. Water valve boxes should not be in the sidewalk. The water meter location has been coordinated with ACSA and moved outside of the sidewalk area. 7. Sanitary MH should not be in the sidewalk or CG-12 area. The proposed CG-12 has been moved to avoid conflicting with the existing sanitary MH. B. CG-12 alignment appears awkward in this location and should be adjusted or moved to meet ADA requirements. The proposed sidewalk from the Building 1 in Block 11 has been moved further plan south to avoid an awkward alignment with the CG-12. 9. The valve to fire hydrant should be moved from the curb into the grass area. The fire hydrant valve has been moved into the grassed area. ACSA—Alexander Morrison: Comments have been internally coordinated with ACSA. No objections from Fire Rescue, ARB, and GIS. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email at bryan.cichocki@timmons.com . Sincerely, Bryan Cichocki, PE Project Manager