HomeMy WebLinkAboutSDP199200079 Approval - County Preliminary Site Plan 1992-12-15 a
A4111
`%5%�® a'!R7
VI**717
COUNTY OF ALBEMARLE
Dept. of Planning & Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
(804) 296.5823
December 16, 1992
Embree Construction Group, Inc
ATTN: Allen Baron
8050 Airport Road
Georgetown, TX 78628
RE: Auto America Preliminary Site Plan
Tax Map 61M, Section 12 , Parcel 1D
Dear Mr. Baron:
The Albemarle County Planning Commission, at its meeting on
December 15, 1992 , unanimously approved the above-noted
prelimianry site plan. Please note that this approval is subject
to the following conditions:
1. The Planning department shall not accept submittal of the
final site plan for signature until tentative approvals for
the following conditions are obtained. The final site plan
shall not be signed until the following conditions are met:
a. Department of Engineering approval of grading and
drainage plans and calculations;
b. Department of Engineering approval of stormwater
detention plans and calculations;
c. Department of Engineering approval of an erosion
control plan;
d. Virginia Department of Transportation approval of
right-of-way improvements to include a commercial
entrance;
e. Albemarle County Service Authority approval of ten (10)
foot wide easement along the southwest border of the
property and water meter location;
f. Architectural Review Board issuance of a final
Certificate of Appropriateness;
• Allen Baron
Page 2
December 16, 1992
2 . Administrative approval of final site plan.
In order to be eligible for administrative approval by the agent,
a final site development plan shall be submitted on a submittal
deadline with the appropriate fee within six (6) months of
Planning Commission approval of the preliminary plan. In any
case, the final site development plan shall be submitted within
one (1) year of the Planning Commission's approval of the
preliminary plan or the approval shall expire.
During the above time period, the applicant shall work to satisfy
the conditions of preliminary site development plan approval.
The applicant shall have the appropriate agency notify this
Department in writing that the applicable conditions have been
met.
To obtain tentative approvals for the final site development plan
from the agencies represented on the Site Review Committee, the
applicant shall submit the appropriate plans and materials to
each agency, individually, for their review. Once the plans have
been tentatively approved by each agency, the applicant shall
have each agency notify the Planning Department in writing, that
tentative approval has been secured.
Once tentative approvals are secured, the final plan shall be
submitted to this Department, as stated above. The final plan
mylar can be signed at the scheduled Site Review Meeting if after
staff review, the final plan meets all ordinances and conditions
of approval .
If you should have any questions or comments regarding the above-
noted action, please do not hesitate to contact me.
Sincerely,
c
)„,,,._,c)Q,..4. ,
o Hipski
Planner
YH/jcw
cc: Amelia McCulley Jo Higgins
Jay Schlothauer John De Pasquale
Angela Tucker Pete Gorham
B. Aubrey Huffman & Associates
Joseph M. & David J. Wood