Loading...
HomeMy WebLinkAboutWPO201800033 Checklist - Project Closeout (Administrative) 2022-01-18 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND IMAGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form , 1i �:�,�,,i ,, • ,t R "P •f t •! project completion re ease;place the completed form in the WPO folder and forward to the Imafi g e Cen erfdigital and/or bond LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward to en closeout intoin WPO# �(��j� Centralized Filing, PROJECT TITLEf • ar FULL NAME INSPECTOR: FINAL ACTION DATE:___ _ CountyView ❑Status/Status Date updatedliardco PY—File Folder Closeout: All J placedproject `�_-� items listed should be in ro'ect folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not a N/A" next to the check box. The Inspector/Management Analyst has the discretion to inn1!de any item deemed e file,place necessarye to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imagm Center is to scan the document; � or, if the document is already in digital format,can be saved to LaserFiche. Please rovi s jthe (Path/name)of the document in the space provided. digital location ❑ Preconstruction Meeting Form ❑ Scan ❑ Saved location ❑ Grading Permit 0. Scan ❑ Saved location ❑ Inspection Requests ❑ Scan 0 Saved location ❑ Inspection Results(Include any inspection tickets,memos,phot t s,etc.) ❑ Scan ❑ Saved location ❑ Bond Reduction/Bond Release Notices from Inspector to : l a ement ❑ Scan ❑ Saved location g Analyst ❑ Conservation Checklist ❑ Scan ❑ Saved location ❑ As-built/Construction Plans ❑ Scan 0 Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved 1oc. on ❑ Other Plans - At the Inspector's disc tion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a la -r date. If such plans are included, the shoul � unapproved and contain a note arifying why it was included. d be clearly marked as ❑ Scan ❑ :aved location NOTES: WPO project folders will be accepted by the Imaging Center when the folio 1) Checklist is completed and included in folder; g items are complete:2) Documents are Acco-fastened(except plats/plans),and in chronological orde (latest documents on to 3) Documents are sufficiently identified as to which need to•be scanned or saved to LaserFiche. p); If the above items are not complete,Imaging Center staff will circle the incomplete item a d return folder to the Engineer for corrective action. County Draft 12-5-2013