Loading...
HomeMy WebLinkAboutSP202200010 Checklist 2022-03-22SPECIAL USE PERMIT CHECKLIST for CL/MG PREAPP202100099 VIA Virginia Institute of Autism / 061W0-02-00-002A2 and 061W0-02-00-002A1 PreApp Number and Project Name / Tax Map Parcel Number After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with the official application Required for Provided with application? Staff) application SECTION 33.4(c) (County (Applicant) X X YES NO X X A narrative of the project proposal, including its public need or benefit; X A narrative of the proposed project's consistency with the comprehensive plan, X including the land use plan and the master plan for the applicable development area; X X A narrative of the proposed projects impacts on environmental features. X X A narrative that addresses the impacts of the proposed development on public transportation facilities, public safety facilities, public school facilities, and public parks. X X One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; X X A conceptual plan showing, as applicable: X 1) the street network, including circulation within the project and connections to existing and proposed or planned streets within and outside of the project; X 2) typical cross -sections to show proportions, scale and streetscape/cross- sections/ci rculation; X 3) the general location of pedestrian and bicycle facilities; X X 4) building envelopes; X X 5) parking envelopes; X X 6) public spaces and amenities; X 7) areas to be designated as conservation and/or preservation areas; SPECIAL USE PERMIT CHECKLIST 09-2020 Page 1 of 2 X 8) conceptual stormwater detention facility locations; X 9) conceptual grading; no grading activities were discussed during the meeting X X Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. • Estimated trip generation figures • Bus circulation pattern, including queuing and circulation between TMP 61W-2- 2A3 and TMP 61W-2-2A2 • Parking needs study (how many parking spaces does VIA anticipate needing between the two parcels) • Maximum number of anticipated buses, students, staff, and other aspects related to the operation of the proposed private school such as hours of operation and weekend/weeknight activities Additional Notes: • Please review the VDOT Traffic Calming Study - Greenbrier/ Hillsdale Intersection (contact Doug McAvoy for a copy) for additional context of traffic issues that should be considered related to site development and use. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. [ 1a&.z. ' a). .l -erZC� Signature of person completing this checklist Valerie W. Long, Williams Mullen Print Name 3-21-2022 Date 434-951-5700 Daytime phone number of Signatory SPECIAL USE PERMIT CHECKLIST 09-2020 Page 2 of 2