Loading...
HomeMy WebLinkAboutWPO201800056 Correspondence 2022-03-22David James From: Mark Fontaine <MFontaine@renaudconsulting.net> Sent: Tuesday, March 22, 2022 10:19 AM To: Laserfiche; brook@digsinc.com; Jonney Otto; David James Subject: RE: Bond inspection 3/18/22 Wawa Proffit Rd Attachments: PRE-580555-060-STC450i - CON-A.PDF; Picture 3jpg; Picture 1.jpg; voicemail-4933.m4a; Picture 2jpg CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Gentlemen, There has been some clear confusion regarding the "plug" on the system. It is a "Drop-T" that is removeable but should remain in place during normal operation. This can me removed when the system is pumped orfor other maintenance related issues. It is to stay in place. I have attached the cut sheet. After our meeting on site, I alerted Wawa of the problem with "fuel' in the system. They dispatched a crew who arrived within an hour of my call. I have attached a voicemail from Wawa describing what the determination was. It appears that the system is doing exactly what it is designed and installed to do. Damion from Tri Sate Utility was also on site with us and went down into the manhole to take pictures of the STM A-1 to EX-A2 that was missing. These photos are attached. There was no silt, and everything was sealed and performing as designed with no issues. Mark Fontaine, CCIM Director of Real Estate Development ® RENAUD CONSULTING COMMERCIAL REAL ESTATS 8605 Westwood Center Drive, Suite 410, Vienna, Virginia 22182 D 571-765-4436 10 (703) 404-2346 C (703) 431-6938 1 F (571) 765-4443 mfontaineOrenaudconsultina.net I renaudconsultina.net From: Laserfiche@albemarle.org <Laserfiche@albemarle.org> Sent: Tuesday, March 22, 2022 9:52 AM To: btrapp@graybeale.com; Mark Fontaine <MFontaine@renaudconsulting.net>; brook@digsinc.com; jotto@albemarle.org Subject: Bond inspection 3/18/22 Wawa Proffit Rd Met with site operator to review corrective action list created during the stormwater as -built drawing review. Observed the remainding plug in the Stormceptor filter system and obtained photos of the missing section of camera footage. Oil was observed in the Stormceptor storage tank area. Inspection Report