Loading...
HomeMy WebLinkAboutWPO202100007 Plan - VSMP 2022-03-23VICINITY MAP: SCALE: 1" = 29 GENERAL NOTES OWNERS: TMPo4600-oo-oo-oi9B8 CROCKETT CORPORATION C/O HAUGH & HELVIN 435 PARK ST CHARLOTTESVILLE,VA229oi TMP 04600-o-oo-oigB9 BROOKHILL MASTER ASSOCIATION INC 455 SECOND ST SUITE 201 CHARLOTTESVILLE, VA 22902 DEVELOPER: RIVERBEND DEVELOPMENT, INC. 455 SECOND STREET SE, SUITE 400 CHARLOTTESVILLE,VA 22903 ENGINEER: COLLINS ENGINEERING zoo GARRETT ST, SUITE K CHARLOTTESVILLE,VA 22902 TAX MAP: 04600-oo-oo-oi9B8 D.B.5346, PG. 256 ug.69 ACRES (PORTION OF) 04600-oo-oo-oigbg D.B.5512, PG. 303 50.72 ACRES (PORTION OF) ZONING: NEIGHBORHOOD MODEL DEVELOPMENT DISTRICT (ZMA20280003.1 WITH PROFFERS - APPROVED BY THE BOARD OF SUPERVISORS ON JULY 27, 2029) THE CODE OF DEVELOPMENT AND AND APPLICATION PLAN FROM ZMA202500007 ARE STILL VALID AND STILL APPLY TO THE BROOKHILL PROJECT. ENTRANCE CORRIDOR OVERLAY (EC), AIRPORT IMPACT OVERLAY (AIA), MANAGED AND PRESERVED SLOPES OVERLAY DISTRICT AND FLOOD HAZARD OVERLAY FH ( ) ZONING DISTRICT. NOTE: A SPECIAL USE PERMIT APPLICATION (SP202500025) WAS APPROVED TO ALLOW THE GRADING ACTIVITIES IN THE FLOOD HAZARD OVERLAY DISTRICT (FH). THE SP WAS APPROVED ON NOVEMBER 9, 2o26 BY BOIS WITH CONDITIONS. TOTAL PROJECT AREA: 04600-oo-oo-o2gB8 - 23.9.69 AC. (PORTION OF) BLOCK 26 -13.84 AC BLOCK 27 - 3.6.15 AC TOTAL = 29.99 AC PROPOSED USE: 134 TOTAL DWELLING UNITS (53 SINGLE-FAMILY DETACHED UNITS, 28 SINGLE-FAMILY ATTACHED VILLA UNITS, & 53TOWNHOUSE UNITS) ALLOWABLE DENSITY: BLOCK3.6: 19UNITS (MIN.)TO58UNITS (MAX.) BLOCK 17: 32 UNITS (MIN.) TO 94 UNITS (MAX.) PROPOSED DENSITY: BLOCK 25: 57 UNITS BLOCK 27: 77 UNITS REQUIRED SPACE: CIVIC PARK GREEN WAY OPEN SPACE BUFFERS TOTALGREEN SPACE OPEN SPACE PROVIDED: Bib Biz TOTAL BLOCK i6 & 17 GREEN SPACE PROVIDED: io.6 ACRES BUILDING HEIGHTS: NO MINIMUM HEIGHT REQUIREMENT. MAXIMUM - 3 STORIES / 4o FEET SETBACKS: NEIGHBORHOOD DENSITY RESIDENTIAL- BLOCK 5 TO BLOCK ig FRONT SETBACK: 8' MIN. & 25' MAX. PORCH SETBACK: S MIN & 25' MAX. SIDE SETBACK: 5' MIN & NO MAX. SIDE, CORNER LOT SETBACK: 5' MIN. & NO MAX. REAR SETBACK: io' MIN. & NO MAX. GARAGE SETBACKS: 18' MIN. SUBDIVISION STREETS: CURB & GUTTER WATERSHED: SOUTH FORK RIVANNA RIVER AGRICULTURAL/FORESTAL DISTRICT: NONE TOPOGRAPHY & SURVEY: TOPOGRAPHY WAS COMPILED FROM SURVEY BY LINCOLN SURVEYING AND BELL LAND SURVEYS, JANUARY 2025. BOUNDARY INFORMATION WAS COMPILED BY LINCOLN SURVEYING ON MARCH 7, 2025. FIELD VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER OF 2020. DATUM: NAVD 2988 EXISTING VEGETATION: MOSTLY WOODED. PRESERVED/MANAGED SLOPES: PRESERVED AND MANAGED STEEP SLOPES ARE SHOWN WITHIN THE LIMITS OF THE PROPERTY. SEE EXISTING CONDITIONS SHEET FOR LOCATIONS. LIGHTING: NO LIGHTING IS PROPOSED. PHASING: THESE BLOCKS SHALL BE DEVELOPED EITHER AS ONE (2) PHASE OR A TOTAL OF (2) SEPARATE PHASES. RECREATION: TRAIL CONNECTION TO THE GREENWAY TRAILS PARKING: PARKING REQUIRED: TWO (2) OFF-STREET PARKING SPACES FOR EACH DWELLING UNIT ONE (i) ON -STREET PARKING SPACE PER EVERY 4 TOWNHOUSE UNITS = 82 ATTACHED UNITS / 4 = 20.25 SPACES REQUIRED PARKING PROVIDED: TWO (2) OFF-STREET PARKING SPACES PROVIDED FOR EACH DWELLING UNIT TWENTY ONE(22)ON-STREET PARKING SPACES PROVIDEDALONG ROADWAYS BUILDING SITES: EACH LOT CONTAINS A BUILDING SITE THAT COMPLIES WITH THE REQUIREMENTS OF SECTION 4.2.2 OF THE ALBEMARLE COUNTY ZONING ORDINANCE. BURIAL SITES: NO CEMETERIES WERE FOUND DURING FIELD INVESTIGATION OF THESE (3) BLOCK AREAS, FLOODPLAIN: THERE IS A FLOODPLAIN LOCATED ON THIS SITE. FEMA MAP ID 51003Co28oD DATED FEBRUARY 4, 2005. IN ADDITION, A DAM BREACH INUNDATION ZONE EXISTS ON THE PROPERTY FOR THE SOUTH RIVANNA DAM, WHICH IS A FEDERAL DAM LOCATED UPSTREAM OF THE PROPERTY. LANDSCAPING: A LANDSCAPING PLAN WILL BE PROVIDED WITH THE FINAL SITE PLAN IN ACCORDANCE WITH ALBEMARLE COUNTY ORDINANCE SECTION 32.7.9. STREET TREES ARE INCLUDED WITH THE LANDSCAPING DESIGN TO INCORPORATE STREET TREES EVERY 50' ALONG THE ROADWAYS. LAND AREAS: OPEN SPACE: 2o.6o ACRES (35.34%) LOTS: 12.93 ACRES (43.21%) ROW DEDICATION: 7.61ACRES (25.38%) PROPOSED IMPERVIOUS AREAS: ROADS & SIDEWALKS: 245,7255f BUILDINGS, WALKWAYS & PATIOS / DECKS: 276,690 sf DRIVEWAYS: 4&600 sf TOTAL IMPERVIOUS AREAS: 468,015sf (10-74ac.) RETAINING WALLS: RETAINING WALLS ARE PROPOSED WITH THIS PROJECT. SEE GRADING & DRAINAGE PLAN FOR WALL LOCATIONS. TRASH: EACH LOT SHALL HAVE AN INDIVIDUALTRASH CONTAINER. UTILITIES: ALBEMARLE COUNTY WATER & SEWER AFFORDABLE HOUSING: AFFORDABLE HOUSING TO BE PROVIDED IN ACCORDANCE WITH THE APPROVED BROOKHILL PROFFERS. SEESHEETiA. TOTAL PROPOSED UNITS:135 TOTAL PROPOSED AFFORDABLE UNITS: 20 UNITS OR CASH IN -LIEU OF AFFORDABLE UNITS NOTE: LOCATION OF AFFORDABLE UNITS TO BE DETERMINED WITH THE FINAL SITE PLAN OR CASH IN -LIEU OPTION. !CIVIC/PARK GREEN WAY OPEN SPACE BUFFERS TOTALGREEN SPACE o i. ACRES uACRES i.i ACRES 6 ACRES 0 0. ACRES .o ACRES oa ACRES 6.o ACRES 7No.035791,1, r�l _ SCS� Z) Li BROOKHILL BLOCKS 16 & 17ABL 0 '00O�ONAL VSMP PLAN ,h� SITES (WPO 202100007) RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA t l® 00 ® ® PROJECT BbUNDARY - ''1 I III � �_._�.�.:..' :� . �`.,�• _ . _ � �' _ \\� \ �. T ® i : `• , . • '�` • FUTURE ROAD EXTENSI0. ON / p ® /:_:'.::: • ' I OPEN . \.. SPACE (UNDER DIFFERENT SET OF PLANS) ® . • 1 LOT \ .• .• I` co ) 00 �•/ � _ _`__ // �'` / for '�' ` - Goo o ® I \ r LOT rl rll • •' •� ••'••� . ,. \ y ; ®®®- �/ I I � ®®® :J• �. A � , � Lor �_�) r \ � ,r '3 � r � � � ' ^J �_..//.... ®®® ?: ' i `: 1 BLOCK 16 ® 1 ./ ® -L'r / �. .�� Lor '�. �MARCF ,�11r�n ® .� \`` J r Lor CC 5 ®® / / \1��� ',y r - I - �/ \ ® ��®� /iJ • -_��' �'� '1,, /%. LOT \` _- - 's � �` ' �\__ r (/ ® 98 % { OT8 it i LT �vv l I - I /0 �� OPEN/ /._-j / 1 - .:i��.. SPACE r \1� / �\ '�/ ® / / //® •l '�. `� "" '\ / ors �r / ®® \) 4VCYS o / o . \`.\ LOT' / .0 ®®® I j/.. 45 4 Lor / T ® \ / ®��_.. BLOCK 17 i ® Lore t ! / / \ �' ' (,�� y' C `•-'J� ® ® / i ` L ' ! z9`I -�� COMP ® � 0 9 i O � LOT ns � ��P /14 ✓ /, C r= / OPEN ® '.._� l �.'. /r I i •.:I SPACE ® / ".�I �• I _____ 'I _ - N LOT 66 /' _ G , 6 Lq / ® 1 r , LT '� L 49 ` ® '` -A \ / / -/� ��{-.�� v 6 \` --- / o / ® OPEN\ ''-\ J j \ 21 o / SPACE �`/I- _- -'' L s I ( ( o -� d ® 0°°ova ' NATURAL BUFFERALONG BOUNDARY 6;®_� NOTES: i. HALSEY AVENUE WILL BE DESIGNED TO THE "FIGURE 9: CONNECTOR ROAD - PUBLIC VDOT ROADS" CROSS-SECTION AND STANDARDS SPECIFIED IN SECTION 2.8 OF THE ZMA202500007 CODE OF DEVELOPMENT. 2. SABLEWOOD DRIVE, LACONIA LANE, MARCELLA STREET, AND MARCELLA COURT WILL BE DESIGNED TO THE "NEIGHBORHOOD STREETS - PUBLIC VDOT ROADS" CROSS-SECTION AND STANDARDS SPECIFIED IN SECTION 2.8 OF THE ZMA202500007 CODE OF DEVELOPMENT. PROPERTY's PERIMETER L SHEET LAYOUT SCALE: 1" = 100' APPROVED by the Albemarle County Commu31tv2DEvgllorent Department Date // i // 1 File WP0202100007 • Sheet List Table Sheet Number Sheet Title 2 COVER 2 EXISTING CONDITIONS 3 EROSION & SEDIMENT CONTROL NOTES, NARRATIVE & DETAILS 4 PHASE I EROSION & SEDIMENT PLAN 5 PHASE I EROSION & SEDIMENT PLAN 6 PHASE I EROSION & SEDIMENT PLAN 7 PHASE II EROSION & SEDIMENT PLAN 8 PHASE II EROSION & SEDIMENT PLAN 9 PHASE II EROSION & SEDIMENT PLAN io PHASE III EROSION & SEDIMENT PLAN 12 PHASE III EROSION & SEDIMENT PLAN 12 PHASE III EROSION & SEDIMENT PLAN 13 EROSION & SEDIMENT CONTROL DETAILS 24 PRE -DEVELOPMENT STORMWATER MANAGEMENT PLAN 15 POST -DEVELOPMENT STORMWATER MANAGEMENT PLAN i6A WATER QUALITY STORMWATER MANAGEMENT PLAN 16B STORMWATER MANAGEMENT DETAILS i7 STORMWATER MANAGEMENT DETAILS 28 STORMWATER MANAGEMENT DETAILS 19A UNDERGROUND DETENTION SYSTEM STANDARD NOTES & DETAILS ig6 STORMWATER MANAGEMENT STANDARD NOTES & DETAILS 20 STORMWATER MANAGEMENT GENERAL NOTES & DETAILS 22 GRADING & DRAINAGE PLAN 22 GRADING & DRAINAGE PLAN 23 GRADING & DRAINAGE PLAN F c L Z F I Z F O F U Z O e ¢ Z k O C U W ED Z = .< J = J ¢ O o ¢ w N w F Z m L ¢ c a. e a L o � e / � c W �_ L '-' .47.1 -I \ O N .\-I CA 'D ^ O N 0 Cy) M ZM Cn N M N O Qz J WCr) 11211- N � Q RI 25 TOTAL SHEETS W ' ^ w > _J *THE GRADING &DRAINAGE PLAN SHEETS HAVE BEEN ADDED TO THIS SET FOR J INFORMATIONAL PURPOSES ONLY. THESE SHEETS DEMONSTRATE THAT POSIT7VE z r*�N DRAINAGE HAS BEEN PROVIDED AWAY FROM THE HOUSES FOR A MINIMUM OF 10'. rI THESE SHEETS ALSO SHOW THE TOP & BOTTOM ELEVA77ONS OF THE RETAINING WALLS. LEGEND: LU H 66 EROSION CONTROL k VIRGINIA EROSION & SEDIMENT CONTROL O 1.40 HANDBOOK SPECIRCAPON NUMBER J CE CONSTRUCTION ENTRANCE 3.02 W CR CR CONS7RUC77ON ROAD 3.03 = v / Q STABILIZA77ON U U SF �E �( )F SILT FENCE 3.05 , ` ST SEDIMENT TRAP 3.13 v O Yo SB SEDIMENT BASIN 3.14 LLI co I- OP OUTLET PR07ECT70N 3.18 J RR RIPRAP 3.19 U) J �1 CD ' Ln CHECK DAM 3.20 W Zw TS 77�TS TEMPORARY SEEDING 3.31 O O PS PS PERMANENT SEEDING 3.32 � (n OTREE PR07EC77ON 3.38 ~ DC --&- DC DUST CONTROL 3.39 w ca 01-1 SI TE PLAN � EDGE OF PAVEMENT Q CURB (D - - - - PROPOSED ASPHALT PAVEMENT O O EXISTING VEGETATIVf/LANDSCAPE BUFFER O - - - - - - - GREEN WAY BUFFER N - - - - - - - PROPOSED EASEMENT DROP INLET ® DRAINAGE PIPE LU ----------- 200----------- EXISTING CONTOUR F 200 PROPOSED CONTOUR LU 1 506.71 TC PROPOSED SPOT ELEVA7ION p LU 506.21 EP TC DEN07ES TOP/BACK OF CURB ce T/B DENOTES TOP OF BOX JOB NO. 508.00 TW PROPOSED SPOT ELEVATION 502.00 BG TW DEN07ES TOP OF WALL 182150 500.67 BW BG DENOTES BOTTOM GRADE AT WALL BW DENOTES BOTTOM OF WALL SCALE PRESERVED STEEP SLOPES 1 it TOOT MANAGED STEEP SLOPES PROPOSED CONCRETE SHEET NO. PROPOSED GEO-GRID FOR RETAINING WALL O0 CO 0 OO 100 YR. FLOODPLAIN 1 I \\ \ \ \ \\\ \\\ \\�\\\\\\\\ \\\ �, \� --� 1 \ /. L \ \ / / / I I \ —\ �\ — —11--- --- ` /i \\�l \ \� \ \ \ \ \\ \ \ \ 1 \ k \ \ t - / / ' /• I � I \ \ A \ - - a_ ; � i,��- � ji 7 - - _ NOTE: " / \ \ _ - - / I //� I 1 I I A\ VA��\�� ��- ��� �� - \ AVM / N / / =�_ Y A A V A v_ _-�'e`- �- //-_// AV A ��a A I \� \ v ► / �_I / / ._t II ��L�� _ - _� -� %,%! /'ice ��_ v vv�/ I I l 11 / THE CONSTRUCTION OF THE PHASE II POLO GROUNDS ROAD I 1 � - y` / / \ \ /�/ IMPROVEMENTS PROVIDED UNDER A SEPARATE PLAN IS IEw) I // /� - - — I / / I I I 1` 1 1A - / /� 1 1 <; v I ' 3 - - - Y /0 1 I / / // /i --- // l I llllll `II v A v // A / / ,! .... ��.. _vvv�v I III // // / _ / / / / / / I I'lI �.\( ) - ���w j v v -I/ :>••.1' v=--T�-- __--�.• / / v I v �\ v :' E': v •'•'•'•'•'_ _ r / ' —/'i vll � v - /�/ I I' I REQUIRED PRIOR TO THE ISSUANCE OF CERTIFICATE OF \ II // / /// / / / �fi� / �� �. , r I \ 11 \, `, // ( `\ .:::.:;:;.> . = , _ _ = _ / / // -- - \�\�\ � �- \ � \ \ OCCUPANCIES FOR BLOCKS 16 & 17 OF BROOKHILL. \ I I ///( _a3 o-ti /i/ //// ////Z/\�7?'�� —\� \__ \ �� / I \ � T _ ••�"���, _- i '. � j //// / // -- \\�'\ _l I III { I I -_ ;_ - -0 L i \ 43 / �- - / - / 0 B � .� . / / _ \ - \ \ 1 I / j / / / / / i /i L 1 \ \ \ / OP E.. r ,.v" � r\ �i / � �. %`-`, : - -., I.- ' / / / / / / _ \ � \J ) / //// / / / \ \ - -- _ - \ /llllll \\1\I \l< / l // /G - `-=-\l -- �\ \ - / l ASSOIATION"IN� ���1_. �I J = //l/�/ / // \ \I \ /// /j, ) / \ _ // \\ Cc _ � � \ / \ '' ✓ / D.B. 5512„' PC/ 30 " y �' %�' ii i %%,- . : � '_ �'. / // / / / \\ \- / / // / // / / / / \ \ /,//� \\ \.\y/ \\� \ �\ EXISTING STREAM �BLzz�/ 50.7 ACRES _, - j - .� /�/ / / \ _ � \- / I / // // / \ //j/// l \ \\ \-\\ �� ; � -\ \ 1\ \ \�\ \ - .,ice- / \ / � y `'0'. ij y,� //'- - / / / l / /_ - -- = ) 11I // / / // - \ \\ 1 / // / / / / \ _ 1 1 T i i // FUTURE PUBLIC GREENWAY TO BE DEDICATED TO - -J \ �# I I / \-// \\ \ `< < _ _ _- ` _ �_ -�\�\ a-.`1'.-. L\�/(( / ��0 // \/\ ALBEMARLE COUNTY AT TIME OF FINAL SUBDIVISION PLAT,/-\___--�\\\\ � / 1 ( I I ) / //11 / - � / I 1___-- -c s / / '/ \\ \\\ \ - - \ \ \ \ /,- \� - - / • r i`I / I l - / / / / / - / / PER PROFFER_ #z OF ZMAzoi8000ii _ \ / \\�\�� /- % \ \ \ \ \ \ \ \ \ )\ -=-, `--\\ . . . ♦/ J / - / // l" / /-� - i i i --- �/� I I I / / / / \\ \\\\� \ \ \ , \ \ \ \���C�- \ \ . . . ..\.`.t.\ / / / / / l ll � /////// // le -, / /i/ � — / / / // / / / / / / \- x \ AAA \ / \ — - � o% I / / / / / // // / / / ' / / ,\ \ \ \ \ \ - \ ^\ \ \ \ - - \ \ �\� • � : � �� ,�,',T,,•� � / /�/// / // //�j// / �/ ,�, ­�,,- �' � llllll // / l � � \ // 1 / / SCOTT/R. CbLLINSZ Lic. No. 035791 � Pow 2�4�22w4 �s �� s Inr,nr E B OCKi \\\ \\ �- _ — .BLO \ \ \ 0 - / / ---- - -*-BLO�CKi / _ _ _ \ \ \ �\�\ \ \ \ -*. -1 • *-III LIMITS OF OPEN SPACE % / / / //// � , '� / / - - - - -� / / // // // � / / / _ � \ / , $ / / / / p / \ 11\ \ \\ - - _ _ \\ \ 3 \ \\ LIMITS OF FEMA APPROVED` \ \ \ 0, ):.: / / / - / _ - - / / / z / \ _ - _ -_- = \\ \\\ ioo YR FLOODPLAIN_ \\ \ \ \ 1' '1 / / / // % / / / / / / / AMP 46 19B - -/ / / f �v _ �� b /. I GREENWAY PARCEL / //� / / I - / / , / // // - / / / / / / / v - - �- / 1 / / / / \ / / - -� / 0 _ \\ \\\\\\ \\ \ \_ \ \\ \. \ 't'- `.`./.` %s / //III // / / ///// / / �/ / --- // // / - _ -- / / / /// / // � o `\ / - \\\ \\ \\ �___-� \ \ \ °'' \ t`. /1 I ll / / // / // / / / / / / ---- / // / / 5346 PG 256 i / - _ / /�,_ / / / z \) I \�v�AvvvAvvvvv A - — _IT \ \ V LIMITS OF SUNNY � '� � .l'.`f (� II)(I III I I I I // /l�l/l// / ,l 1 / /--- // i- / // -- ///\ / / / / �� v 1 v 1 / / KI / / - / / � o vv� vv vv vvvv ) A DAY DAM BREACH ®, l I *-�I.*q. I• //I / / / / — / / / / / - _�/ / / / \ \ \\ \ ) I \ /"o / / - - / I \ , \ \\\\\\ \ \ l l l ` \ ` li l S), III I / ( I I / / / / / r i ,e �,�- 0 a ,xr u / �\\\\ \\\\ I /I / / / / / / EXISTING SANITARY SEWER AND { •:;; ��1 / / //// / / /� a / / / / CO / V-- A\ \ V / / 1 / ) / // // / / / - _ {_. / / �— / / / \ w J zo' SANITARY SEWER EASEMENT \ I I I / / ,✓ � / / / / \ o (n � / vy3v'V A _� / /l�// I IIII/�I II-y l�IIIIII Il% ///� / / �/ / i I, / // �l Al x �// f ,1 � / / l / /� / , ��II I v IIII I I // // /i//�// / / / / \ / / // / // 1_-� vv\ i 0 0 . w I )1111 / ? o f / //// l lIAI I �,I�� �. / I //// // / / / / / �- in I- co / / �/ , //'/) ll l v �_/ / / l / / / �/ / / / / PROJECT BOUNDARY (TYP.) I. I I / I I l I I III I I / / I / // / / / / / / _ - / // - i A I \ H z / / / // / �' / / l / // l l v I I l / / I I I I/ I l / ----- --- / // / /// / / / / I� / \ ) // / / / I I / 11 / / I _ -_-_ '/ i// --, \ \ 11 � 1) m /i// / / ///��l Il ��l l 111 ll I I l I/ l l l / / , / / / / / / / 9 / \ v ALBEMARLE COUNT / / i - -' - - - - / I , / / // / v / /BLOCK / �. / / I / / / � ( / // w // //// - �C �// ��j� �� vA. lA/ �� / / / �� / Av , — — // /,/7//// � ---/Z/ / / // / //// / /, // \ / / �// _ v l I ( - -- //// /v V11 1v m / // ///// / / ��\ / / I -_ / A _ > / ii%/////i/i/� , — �/ "/ / / l l ,/ / / / v III / v v / \ W _ / / / , � / / / / �' / / / %i • '' l l I / 'MANAGED STEEP SLOPES I / — — / / 1� \ w _ ---- / / / , /° / .- // I v /�-- -/ -/ v \ _ \ I I �— �� -/ \\ \ __/// //////�//// , - �c / 111 ///' /i/ a p I J „ /� X \\\ l l I I I I 1 I 1 ( I I / / / // / I I l — -_- / \\ _ \ // /////�j / ////// - / I / / / / / l l / /� X // /` , = , y \\\ \\ \ \\\\ l \\ \ \ \ \ 1 1 / / / / / / / / / I I GENERAL NOTES: / / \ \ \` / �l l ll / ///�// / \ / / / jl �l l / / //� / / "I i \\ \\ \ \, \ 1 1 1 J / / / // I I 1. THERE IS A FLOODPLAIN LOCATED ON THIS SITE. FEMA MAP ID L � \ �ll ll///////�// � / / //l/l/ �%T''� / �.:� /-/� -�►:� >)s\\ \\\\\\ \ \\\\\11 I I \ \ / / \ // / / III ( / C =sq � / \ \ III//I/lI ll I // - - -' /' / / / % / / i ! / `// \\\ \ \ \ \\ \\ \ ll '� \ / / / / / / - 1 \ -- -'; _ 51003CO280D DATED FEBRUARY 4, 2005. IN ADDITION, A DAM \ \ _ _ sum / v I IIIII — BUCK z' - _ - - - / r ��l/ �� [ i/// / -�� 1 I BLOCK LINE TYP. / / I - / - V / I I I \ � __ A i / v v I II� III \ \ - / / / / ! f//� / / - - . T � -� \ V A \ V\ V v, / / / // / / / \ I I �/ I I I l/ V / BREACH INUNDATION ZONE EXISTS ON THE PROPERTY FOR THE \ \ v AA \ I - _� � 1 V/ l l I � l/// / �/ j y - /// / /jam - , T �\ \\ �l//// I ) 1 U \ / / / / , A SOUTH RIVANNA DAM, WHICH IS A FEDERAL DAM LOCATED / - - - V - � � � / /// o p / /�/./ / / �/ / , - - / (1 / / � - - UPSTREAM OF THE PROPERTY. / ' / v/ AV _ //, /// / ) `> � � / / //�// // / // // /// / // // 1(� 1 1 i V vA \ / � - / / / /�/// i / / ,�' - - / / O� // i / // _- // / / / / / / - /�- / A 2• A PROPOSED GREENWAY IS SHOWN ON THE SUBJECT PROPERTY. / BLOCK 3 \ �°\ �\\ V - _ /V111/' % / / / _ i-/ / � / I / / - / / - / // � / // I I l V � � _ - 3. BEFORE BEGINNING SITE WORK, THE CONTRACTOR SHALL , � / // v C V\ �" j �� V / / / / /�//// / , // // - � - - _ = 4 / / / '/ / V / // I A \ - - - INVESTIGATE AND VERIFY THE EXISTENCE AND LOCATION OF v v / / / A\ / ` � // / us / ( /// / / / / // - _ - /// I � / / _ - - - - UNDERGROUND UTILITIES MECHANICAL AND ELECTRICAL SYSTEMS \ —/ A. / //// A / /— -—I' / / Oo J — / / // �/ — •- _ '/i/j // l I � / i / / A / l it \ \ �—/ _� r , \ / �/ i / / / / / / / - - _ % /// / / / / // / \ } I / / / I \ V A - AND OTHER CONSTRUCTION AFFECTING THE WORK. BEFORE _ _ v / //////� vI 2'r v\ 1 / IIII // // �/ /// - v v / / //� AA\ \\ \ V / / I /I / / /' / / // - _ �/ // / / / /� / / / // / / A // I I I V A \ \ / �/ CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE LOCATION vv / // v \ # / o \ �I II //// // / / / / / / �� ') A v / / vv A V V A , V / / 1 { / / / / / / - / / I 1 V A - -- -- / / AND INVERT ELEVATIONS AT POINTS OF CONNECTION OF SANITARY ��� v A v v // \ v vv�� �� VA V \ \•_��- _ � / I A \� IIII/ ( \�\\ \Vl 1 /�/// / / / / / / / / / /// /// A�\ A V v � /// -� _�_ _-- \ \ // ( \ \ \ \ - / \ \\ J _ / SEWER STORM SEWER AND WATER SERVICE PIPING \ / \� \ \1 \ \\ -� / /di�'. I / /, /l \ \\ � . \ � \ /i �/ / / / // / ( \ � / j/ // // \ \ \ II Z \ - \\ \ \ ) / \ 1 �)J J f- " \ // / t\ \ \ \ \ \ \ALBEMARLE COUNTY \ / // /%/ J� // ` ) / \ \ \ \ - / UNDERGROUND ELECTRICAL SERVICES, AND OTHER UTILITIES. THE -� y \\� \\ �\ \ / \ \ /'/ �/ / j j j' \ �i - _ - 1 \ i / / / I 'I \ 1 \ \ \ PRESERVED STEEP SLOPES / \ / - ' / / / " 1� / / / ) I I r \ \ \ ` - - _ CONTRACTOR SHALL FURNISH LOCATION DATA FOR WORK RELATED `\\\ \ / / / \ / , / , � / Y / \ 6 / I I / / ' / / / / / / / / l \ -- - � /, TO PROJECT THAT MUST BE PERFORMED BY PUBLIC UTILITIES \ / \\ L , \ \ / \ \ I / / / / - \ N i k I - \ \ / 1 \ \ / j /// / / / / - ) y / J / \ \ - / / /�/ / / / j / I \ - - - - / _ - SERVING THE PROJECT SITE. \V vv �v v / / // / / / A I I 0\ / / I / // / / // /I \ k\# \ \ _ / /- �` \ \ / 1 / / // // / / /// / / /// \ (/ / / 1 \ - - - - - / / / / // / // - \ - / 4. CONTRACTOR SHALL VERIFY SIZE TYPE &LOCATION OF EXISTING �\ - \ / / j // / \ \ %,OKi -_ _----// / '� / // 1 I / WATER LINES ON THE SITE. / I // /i / // I y� /�/ - / �, v _ - - `� v // ) /�////// // // /�//// ) A \ c, /� // / // // / I I I A \� - / / // //// � 1�111 V A - , / \ / /�/ /� II vv, - -- - - _i _ �' -'I // /////�////i/// V� I VI , 0 / / / / II\�� / / // A v --------�-;/// ///� �r \ //// / / /// /�% �// /\ I 1/ / I � / 0 I. 1 I l / /EXISTING LIMITS / // / / I I I l>__� - - �\ ` ' // //l/� ///////�// /j, / // / : II I//// / // / OFTREELINE I - _-,38-- -- / /'/ / / \ - / �/ / / / / v v / �_ ; � /�// /�/ // /� � / // o) , / I / / / / , / / / - / / o �.FIII///// / / / / /// / / / / / / \ - / //, / / / i - / I ,el ,'// NDS(TYP.) o // / /I II (I I / / / / �/ / / J ti _/ / --'� / / //// /�/ A�� -__ �/ ' l / / - / w� EXISTING ll 1 u - i / / // /' v /I /l / / \ /// /// IIIIIIII IIII / / 0 LLVI / l // / _ / / // \ ' _ 0 - / / / 0 / / / I / / \\ _-- - - / --/' // /�///� I \\ �� '- - v / /i/ �_/J 0 / / �� \0 I I I III \Iv / / / I / i — '-� / /i/ /�/% / 1\A vv \ K / n / I I I 11 0 /I I / / - ✓ - - - _ _ / BLO 6 \ �k � / I \ y / \� /'�/ = � �\\\ 1, / r - / / / "' _ - _ j / / / \ / // // ! - / \\ o e. FUTURE PUBLIC GREENWAY TO BE DEDICATED TO - / - - -- `/ j // // / / / \\� - / �� - TMP 46D-B I I \ / �/ - �I \\ �\ 0 / / co) I I I ALBEMARLE COUNTY ATTIME OF FINAL SUBDIVISION PLAT - - - / / / //J (/ _ �, - " - \ / / / / /� ` - - I �// I � / - - / ' - / /' / / / \ \ MONTGOMERY RIDGE OWNERS ASSOCIATION - _ \ // I / 0 1/ I I PER PROFFER #z OF ZMAzol8000ii / - \ - / / / j / // \ \ / =� v � __ / I I / 1 / / -v / / a 6 // // �ti / I I / / / / / �f \ DB 3433 PG 132 -3a2 //�/ I� / / III I III - / //// // /// Kv� �-,-/ - - , �� : /, , / /� / / l / V I �/ / / - / �/ / / I / / \\ /�/ / _ / L / I I I v v BLOCi7� — I //� /�— /�- __ ` / / A \11 —3Ba q A I 1 I A - — //// //- , / \ \ /' �� / — /' / / / /l'` // / ROJECTBOUNDARY(TYP.) �/ / / / ---- - -- / -� /� v / �/ I� u I 7M �s d �'oo=01-0 1 — /' / / �— / / / // / // -- — vv v / / / / \ 1 I -- / ;' I I � III _ ,�- / _- ' „ ,,,,i'' -- /, ;-� �/�/ � `� / ' — ` l 1 1 I I / I 1 1 1 \ \ A I I >::: \ \ \ \ \ \ V A 7C$ C COhPORATIO)1! / // / // / / / // / /— / / / \ \ I \ \V - / -- / / // /� 1 / // / / I / 1111\V A\V�\VA, v \ 61/ l \ I 0, $. 46.'. }'C�_7�5� _, / - - / ///l////l/ / /// / I I I��\\\V A�Avvv�' 9�I( I �_.•::� I \\\�\ v _ // - //// ////////// /j/// ` / \\ \,\\- \\ r l 1\1\\\\\ \1��\9ACRES \. -, / /C/ \ _ _ _ \ / I V A �A vvvv �Q� ����p �` / I I �, - 0 \tH 1 \\ \\V v / / / /i///////// / ///// // / / V / I I \ \ \ \ \\ \ X\\\\ v, �,; -0® / \\\\ \ 11 I \ \ \ - / // / / /�/// \ / / \ l I I �V vv v vV A �..>.. 0 A __ - � //////////// ,_a ////// / /i/�//� �- I I v v v v v 0 \ -.,.-- _/ / / // �, llllll / / / \ \ / / r �f - \\\\ \ - _ �// / /// I= I 1 / -, \VA\VAvv�vvvA� \\\Vwvvvw�w\v v -,,/�, A �\ 1II I v- / / // // / //: // / //' I I 1 r / \ \ \\\\ \\\ \ \\ \ \ ��_-\\ l �.� \ 0 \\\\ \ \ - / / // li//i/ice // / // / c / / \ -- --- i V A \ v A\ \ VAVA\ \ vv�vvyy�vy�Avv V\ V v \/�I I ° VAVA\VA\vv vv v� \, � v -' - I A/j/i/ //jig / / /// /�/ // / )) I I I /( \� �� A / \ V A V A\ \ \V A \ V/ //�� r > V Ate- '' - \� \ \ V A \ \ V-�\�\ V A A\ VA 6 \ %I IU A\ \\ \ VAA V v A v v � / / / (/ /// /// /:�/ / / o'NATURALBUFFERALONG I I / I ( (\.�'r \ i/— V 1 VA. (\A_A�\ ��AV� \vvv.AAVA� I�AA�,AA,�I/I \ C AA�VAVAAVAAV A\v � /— /,�i�/��//i/�/ /�/ �/i �VAVAA\ / �.'� �\� V � � >Z,�, , /_ / PROPERTY'S PERIMETER \ / , , - i \ \ � . — / /--\ ` \ ` ` \ ' \ I ' \ \ ` ' \ \ \\ %EXISTING SANITARY SEWER AND� l T� _/i \ ` 1 , \ ` —�� -- / '// //' / / ' , )))// / / / ' ' // ' / \ \ \` - j/ - -` \ \ \ \ \ \ \ I I I 1 \ \�\\ \\�\ \ \\`. 12o'SANITARYSEWEREASEMENT \ // I /��I\\ \\\ \\\\ \\\\\ \ \ -'- / /// // //// /' //////// // //// / _ S // // \ — \ \ \ I I I \ \ \` \ \ \\\� \\\ i \\ \ \ / / / / // /� / /f/ /// // // 45, 33 \ \ / // / \\\ - I ,- \\1\\\1\ \\ E F l \ Ik \ \ �� \'\ \ \ \� � ®I /,v, D.B.i o `l. i 1 ✓. \\\ \1 \ \ \ --; _- I/ / ////,//i/ /. �/�// i// /%/// \\ � -j, \\ \ \ �\� 1 0 \ __ / // / // r/ / // / / v I A A \ v v A \ i i�� al .fi 1I 1 A --- - / /// // /i/ / i /// / // // / \ - / \ \ 1 0 / *i J I / / // / )l/// // / \-, --/i/ 1 \\ I I \\\\\ \ \ \�\\ \I I 1 //1^ II I II. 'f //I )I IIII\ \\ N - / /// �i /�/ / - // //�\ III\ \\\ \ \ \ \ \\ \\ \IIIII I 10;O1/ /// I //�/ // - \\\ - #- -// \ I I I I \ \ \ \ \ � \ \\ \ \ I I I I I I / 0 1 -�,//\ \ I I II ( I I I I ((_ \I I I I I \ \ //j // / /// /////// ✓/// y>, ////// // / /\ I \ \ \ \ \ \BLOCK7\ \ \ \ \ \\\\ � . 0 1. /_ \ II I \ \ - -----/ // /j //I �� j /l/////////\////\///// \ '/- /i - \ 1 I I \ \ \ \ \ \ \ \ \ \ \ \ I I X'MP 04600 00-0199�$ I I I LIMITS OF OPEN SPACE \ / / / �/�/ //// ///////; , //` //, \ \ ��/ \ I 1 \ \ \ I ✓ \ \ \ \ � \Th{, g4\¢OQ-bO-%Jd �11\ 10 OPEN SPACE G WAY PARCEL I I I I ( GREENWAY PARCEL \ � � - _ _ // /� %/ ////// / /// // / ' 1� p \ / / /// / // / / / /i/ I / \ \ \ / - - / / /// ////// / / /// / /' / / / \ -// �- I \ I \ I \ \ C ARLES\ E'4Z�1�IT1111ANN ) ROOKHILL MASTER, ASSOCIATION INC 1 I - // / / //� // // // / / / //�/ I I11 � \\ I I \�---� I I I �I \ I \\\\ _ - V //l l / // /�/// /// / \ 1 QG �S YI h�91 \ \ I 0 D.B. 55 PG. 303 k I 1 �\ �'/' VA1 1\ I IIIA \ 1 \ VA II 0.2ACRES // A \ \ �// lti� l ////////// / / ////'/X -� -'// I v D .I1�3 3 API I1 �� 0 �v I v v v v -/ �� %/ h /// /// / / / \ I ) I I I 1 I 1 1 \ \ I \\ - \fl \- � / I ) / 29.g2 G E`S { I\ 6 0 1 :j> .\\\I\\ I I I I 1 \ \ \ \ / - //, , // /// / .// / / \� IIII I\\ \ I \ \ I \ -- /�" / / / )� I I I I \ }80 I ::N`\\\\\\I I \ 1 11 I \ \ __l _� /�/ .) h %�/i///// /////� //ii///�/iiii i/ \ 11\ 1 II I \ \ \ \—'*✓ \ ``—/ / EXISTINGSTREAM—t3 0 / I :,...)w \ \\ \\ \ \ EXISTINGSTREA / l L //�/�,, ///////// llllll //// //////`� // // / \ \ II \ \III \ \ \ \ / I ' / IIIII I I I \ \ - - /� / / �'/ �% //////// /// //// ////// / // / \III 1\ \ I I \ \ \ /�✓/ \ \ — / 1 I l l l III / 0 / / I \ 1 \I \ } --- '� ;'- 0- /$�// ///;////// /// // /�c J \ \ / I I 0 ...;;.;... 111 I \ I I { ) \ / -- / . / / / // // �<// / / / / / � � / j8s III / I I I I i 1 \\ \\\ _ _ 9 i Ir - - - / /,/ / / ,/ ,/ 1 II I o � \ (. .. :... J /)�I XISTING THE LINEE(TYPJ. // /j / +i f //// //// /%/'/// / / /. / / / / / . j II // -/ / \j / a / /// JYy / / l \ I I I I I, \\ \ �\ -- /-EX STINGiooYEARFLOODPLAIN(TYP.) \i y./lll ll // ! \ _x / '/�/' �// %/////%///////�// /j////// ,/ // l///(/ / \ �l Dill I I I\ \ \\ �-- "Al- - \\ --- / / / / 4 I 0� / ( C /, , / / //// // / - —o I I I I \\ \ \ / /- \ - // / / / / / \ \ .I // // )/ I 4 \ PORTION OF EXISTING R/W TO BE /ii XISTING PROPERTY LINE (TYP )// / // / I / I I I I 1 \ \ \ \ \ ` - - ///^\\\ \\ // / / / / / J � f/ i � I o 3o' LANDSCAPE/REFORESTED / / I / \ \ VACATED WITH THE IMPROVEMENTS TO- / /// /// /, i c/ i/ j / / `III I I \ \ I // \ i / / / _ - - I I I 1 \\ \\ \ _ _ —/// — \ \\ \ / / / / � / / )) I , 0 BUFFER AREA { POLO GROUNDS ROAD (SUBzoi7oou7) XISTING ioo-YEAR FLOODPLAIN (TYP.) / / ( I \ ,- \ \ \\ \\ �_ ' // \\,EXISTING12"SANITARYSEWERTOREMAI OO � �'I I I I 1 � � / / / // / /l// /////////lk////`/�/�y/ l / - \ \ \\�� \\\\ \\\ \ —m✓///ice\ \ \ � -_— / --/ i EXISTINGPROPERTYILINE(ITYP.) \ ( / I ii \_ // f�//// %llllll/ ///ll///� 111 llllll I I // // / 7 1 / / / / // \ \ - \\\\\\\ - � //// EXISTING 3o' PRIVATE LANDSCAPE BUFFER EASEMENT / ' / o �, % / h \ - � / / / //// /// / / / / //I / I I I I \ /( Z \ \ \\�� \\\ _ �i// '1 D.B. izi PG.6 6 / o ' \\\ I / ///j// 11 /IIIII I (\ /(///I I I l \ r \ \ \ \ate\�\ - /j '_ \ , - - - - 5 - 44 75 \ XISTING R/W (TYPJ / // / llll / 111 I I I \ \� ,� _ iii1� 1 I I -- // ��/� / o I I I/ \\ \ ,,, ,� / // ." l (l Ill/ lull l 111 ) 1 1 I \ \ \ \ \ \ \ \� IIIII -'// % \\ // /r:•:•.�\ \\ \ \ \ \ EXISTING EDGE OF PAVEMENT TO BE REMOVED_ / / - / / , 0 . \ \ `\ / � 1 I \ \ \�,-,\ \ \ \ - / / 0 z / / / EXISTING zo" DIP SANITARY SEWER \ \ \ - \\\ \ & REPLACED WITH THE IMPROVEMENTS TO - II 0 _\ \ \ \ \ 0 I \ \ \ /\JJJ\ ���\CCC \ \ \ POLO GROUNDS ROAD SUBzoi oou - - - _ 0 \ \ �o o, /I // fl: \ �ffiPI I \ 1 \ \ \ \ \ \ \ \ \ ��\ \ \t \ \ \ \ \I \_ \\ \ '--_ - _ _� _ �- �� _ -- I ° � -rt � � / / :•:•: I I/I // 1 j I I I \\\\\ \I\\\ \ \ \ \ \ \\ I\ - -- \\� —_== = _-_= 3ao j_ _� ,,I_ -- - - �.= �- \ /� lllll111 l I I \ \\\\\� \\\ \\-, \\ \ \\ _- >:: I I I III \ \ \ \ \ \\\ \ \ \ \ ` �= J \ — \ \ \\1 \ \_` - \ /1 I I �\� \ \,\1 \\, \ \ \ - - \ POLO - fix e / , (�� \ \\ EXISTING EDGE OF PAVEMENT TO BE REMOVED` - - _ - - \ / \ _ ' GROUNDS ROAD `/_ �\ \tPOLO GROUNDITH THE S ROAD (SUBzoi7ooiIMPROVEMENTS TO \ f - — � _ _ - - - - (VARIABLE WIDTH)u \ \ \ \ / _ _ \ _ — _ — EXISTING 7z" CMP \ \ \ ,X' \ ,� �� \\ \ `\� �� �� � �I� � / _ `____` \\ �\ \ �M �6 4 -i ` '' EXISTING GUARDRAIL — CULVERT &HEADWALLS- \ - / -\\ \ \ \ / _ i \\\ � ,\ \ \ \ � I ERIiG� `AW _ _ TO REMAIN \ \ // \ \ TGQ �S S OCIAT�l - i - _ EXISTING GUARDRAIL, \EXISTING GUARDRAIL / \ \ _ � \ \ \ ` i \)� _- - - EXISTING EDGE OF CROCKETT CORPORATION TO BE REMOVED TO REMAIN / / EXIST NI Gh8" CMP CULVERT \@ice, �-- �� \� \ i, �i \ _ -- = �\ �r = _ _ _ - TMP 04600-00-00-018C0 4 �, \ \� �� _ - _ _ PAVEMENT TO REMAIN / � - _ \� / - _ _ _ - 79.50 ACRES SEE PHASE z POLO GROUNDS ROAD (SUBzoi7ooii7) / I EXISTING GUARDRAIL \\\ \ ��_ EXISTING EDGE OF \ �\ , � \' _ // - _ - DB 624, PG 193 EXPANSION PLAN FOR ENTRANCE DETAILS- TO REMAIN \�\ , 'o� PAVEMENTTO REMAIN' /// � / \ \ ///////i1/' //ii// / \ \ \ 1i i /ij////i/// \x - /J ///-\ \ `\ -, \ \ y -/i///Tij//// j j/ I r // /- \i � /i/ / /� \ ' - - _ \ l / / - \ \ \ 11 /l /I / / // ////%///% % ///i/�/i/i ` --� /- / / // // /, MON/!'GO fE Y �l /W �d // ///// (/ / 7 j J I �} , /-) \ / / / / // /,/ �// // /////// /// , 3 --­/ \ \ /, /�� `,/ / j/////////j/// j//,%//////j% (( ' ` //i-'/-/i' ,'i/ \ ` // / / / // /// / / // 1 / / /i - -/ / / / / /111 /jam///j///%// llllll/I\ X ///d///% - __ =//// -/ / `� /�// / /� ///� // ,- /////// ` I//////////// - - / / v l / / Y / ///// ll / / - - / ` / � y \ ////i�//ii/ y / 11/l//////k \ ,�%//%/%%/////l//"////,__ _,\ /�/ I -/�//. //i/i/i/� iii/i,l// llllll/ //l//�// / .. / „�I / -/// //'/ ,///l/// " ////j// %i/////i///l//l/ll/�l//"'// //- - //mil/Tl// \/ -/ �i/i//_, i/j//ii /lll//j/< \ q/ //i�////////////// l/ // /////_ - / y /j \) / / ////l///�/4/ //;//ii : i � llll,/ /�i/iiii/i/////////////l/�/� l/ ///' /i 1 j l 11//lllllllllll�l ,/ < /////i,'/ %`i%/ i�llllll 9''///%////%/ ///// ////// /////'7% 41 /) - / Jy- I I 111///llllll//llllll 111i /�C ' // ' 1 / / /// / d / /// / // / // // - -� _ I / / / 1 Y/l�//� ///%//(\ 'llllll\/`,/%,/%/////////////////////%///l //////-- - / // I 1 / l 4411 i/lll/lull/lull111111r /,/ / /� /J \ \;///l /,//////// / ////// // //l l/// l / 1 / l / l ull// /17�///,/- l//ll llll /- _ -'/ // //// // \ , \ /// /l/////// l /// // /// //// /// l /I 11 I I / ll ///llllll ll l II - _ // �% //// �i \\X\ /�,////% /llllll///j///// �//////,/// /// )/ I I 1 III i , \ /l l /l l /lll// 111///ll/l// llll l /) l /�i/ii/// i) \\ / /,/,//,/ jlil ///////''/////////llllll/// /ll I \\/ / / /J/(Iglu/l/l/(\ll(\\\\T\ -- -�/ llllll/%/ j//f //.///////( I (//I/ ///// /// // /// / -DTI trl (\\\\�\\\\\\\\�\\\ 11 - / O\ / %// /l l \ / j/j/((IIIIIIIIII(/(I/// // - /tT%/ -I-I (\ , `\\\ \\ \ \\\ \ \\\\\I\ \ / 1, // /// / // Il K I S 'L�1 .E/ / I / 1 �/ \ \ \ �\\ \\\\ \\\\\ \\ \1 / 5 /i // / 'A //(/I (I I IIII III �I I I I (� / / 1 \ \ \ \ I` _ \\\\\\��\\�\\\,\ \\ \\\ 1\ 1 - , /// r "b III I I 1 \ I "o \\\\ \\\,\ y \ \ \ 1 _ - - ),A/1I I I I i 1 l d III i °� I \ \ \ l%/ \ 1 1 \\\\\ \ \\\\�1`\\�\ �\\ \\ \\ \\ \ \ \, \ / / / /IIII \ - - -- % -� � , I� J � \\ \\\\\\ \\\\\\\\\\ \\\\\ \ \\ �—� I(I 11\\\\\\I \\ \\\\\\ \\\ \\\\\\\\\��\\\\�\\\ \\\'\ / \ I \\\\ \\\\\\ \ \\\ \\\\\\\\\\1`�'Y \h\r\\WQ,4 \`--_- / j%/ \I �\\\\\\ \ \ ��\\\\\\\\\\\\\\\\\\\\\\\ y\ ����\ AAA .A\��,A\A,AVAAAVA\\VAA\\\VA\\\\���=-�z---, %/\�A\I\�AAA�\VA,� \vI V A/\VA�\\ ��,A���\��\\�A��,,Aw . N M N .' ' ' .--I N_ N c ate' rn � v ti - O N N/ W W 2 u1i Lu ul z a) ti M cM 0) N M N O (N N II Lu __J __J U) Lu - 0 Q C) ( `1 Lu U) Lu Lu Lu O N z Q 0- cn > r1 06 TI V I U 0 W 1--I 0 CID (/) O 0 O z U) Lu W W ce U) JOB NO. 182150 SCALE 1 "=100' SHEET NO. 2 CONTRACTOR MAY SELECT A EROSION CONTROL NOTES & NARRATIVE: RETAINING WALL MATERIAL/ EROSION & SEDIMENT CONTROL MEASURES: EROSION CONTROL NOTES: DESCRIPTION OF EROSION & SEDIMENT DESIGN EQUIVALENT TO ANCHOR DIAMOND 1 O.F PROJECT DESCRIPTION: ll STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL TU IN ACCORDANCE WITH 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO 774E CONTROL MEASURES: THE PURPOSE OF THIS LAND DISTURBANCE ACTIVITY IS TO CONSTRUCT A RESIDENTIAL SUBDIVISION. THIS PLAN PROPOSES 26.25 cc. OF LAND Q`� l THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL PRACTICES USED PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND EROSION AND SEDIMENT CONTROL MEASURES. DISTURBANCE. THE PROJECT WILL BEGIN ITS CONSTRUCTION WITH THE PROPOSED ESC MEASURES FOLLOWING PLAN APPROVAL, WHICH IS I� IN THIS SECTION CONSIST OF THE FOLLOWING: DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. � 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED IT IS ANTICIPATED TO USE A CONSTRUCTION ENTRANCE, RIPRAP, OUTLET PROTECTION, ANTICIPATED TO BE IN THE SUMMER OF 2021. THE WORK IS ANTICIPATED TO BE COMPLETED WITHIN 24 MONTHS AND TO CONCLUDE IN THE BeWLEO N SCOTT R. LINSZ 3.01 SAFETY FENCE., DIVERSIONS, TWO SEDIMENT BASINS, A SEDIMENT TRAP AND SILT FENCES TO CONTROL SUMMER OF 2023. 0 " ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND L-) Lic. No. 035791,E A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SURFACE DRAINAGE TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL EXISTING S/TE CONDITIONS. , _„„°,.„„°,�„°, D PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY 7HE PUBLIC. APPLICABLE SEDIMENT CONTROL REGULATIONS. LAND DISTURBANCE ACTIVWES. TEMPORARY STOCKPILE AREAS SHALL BE DISCUSSED WITH THE PROPOSED DEVELOPMENT IS LOCATED ON A PARCEL KI7H EXISTING WOODS AND GRASSY LAWNS. THIS S17E /S GENERALLY WELL SLOPED WITH •0 2�4�22 �4• TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED UNSAFE BY A RIDGE RUNNING NORTHEAST THROUGH THE PROPERTY, WITH POLO GROUNDS ROAD TO THE SOUTH AND THE STREAM TO THE WEST BEING THE .„, 10 VIRTUE OF P07EN77AL ACCESS BY THE PUBLIC. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE THE ESC INSPECTOR AHEAD OF 77ME & WILL NEED TO BE MAINTAINED AND STORED FOR --" ��y 1t� FIRST STEP IN CLEARING LOWER AREAS �� A n",TMDI�o a® SS ayG LATER SPREADING STOCKPILE LOCATIONS SHALL BE ON SITE AND SHALL BE STABILIZED x REINFDRCEMEN ANNecrloN ZONAL E 302 CONSTRUCTION ENTRANCE., 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON ADJACENT AREAS, __ Marro sc.�.el ""�ECTI` I A STABILIZED CONSTRUCTION ENTRANCE LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS THE SITE AT ALL TIMES. WITH A TEMPORARY VEGETATIVE COVER. PERMANENT SEEDING WILL BE PERFORMED FOR THIS SITE IS SURROUNDED TO THE NOR774 BY OPEN SPACES WITH TREES AND LIGHT UNDERBRUSH. TO THE WEST OF THE PROPERTY IS A STREAM. ON A CONSTRUCTION SITE TO REDUCE 774E AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUCTION ACTIVITIES THE SOUTHERN PORTION OF THE SITE IS BORDERED BY POLO GROUNDS ROAD, AND THE RESIDEN77AL SUBDIVISION MONTGOMERY RIDGE IS LOCATED ROADS BY MOTOR VEHICLES OR RUNOFF. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED TO THE EAST. SILT FENCE WITH WIRE BACKING, DIVERSIONS, TWO SEDIMENT BASINS, A SEDIMENT 7RAP, INLET CONTROLS AND VARIOUS 07HER ESC � I SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT 7RANSPOR7ED ONTO PUBLIC ROADWAYS CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SEED MEASURES ARE PROPOSED TO LIMIT THE P07EN77AL FOR CONTAMINATION OF THESE ADJACENT PROPER77ES AND WATERWAYS. I 303 CONSTRUCTION ROAD STABILIZATION' REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. MIXTURE WILL DEPEND ON THE 77ME OF YEAR APPLIED. TEMPORARY SEEDING WILL BE OFFS17E LAND DISTURBANCE, FINISHED «�MRa "N"I 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL OFFS17E LAND DISTURBANCE /S L/Ml7ED TO PUBLIC RIGHT-OF-WAY AND EASEMENTS. THE TEMPORARY STABIUZAT70N OF ACCESS ROADS SUBDIVISION ROADS, PARKING AREAS AND PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN `"" ` I MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN SEVEN DAYS THESE AREAS SHALL BE SEEDED WI7N FAST GERMINATING VEGETATION _ OTHER Sl7E VEHICLE TRANSPORTA770N ROUTES Wl7H STONE IMMEDIATELY AFTER GRADING TO SOILS.- „..,„,,„ ,� REDUCE EROSION OF TEMPORARY ROADBEDS BY CONSTRUCTION TRAFFIC DURING WET WEATHER AND APPROVING AUTHORITY SEE SOIL DESCRIPTIONS ON THIS PAGE, AND THE PHASE l ESC PLAN FOR THE BOUNDARIES. " � � TO REDUCE EROSION AND SUBSEQUENT REGRADING OF PERMANENT ROADBEDS BETWEEN THE TIME 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL IMMEDIATELY FOLLOWING GRADING OF 7HOSE AREAS. SELECTION OF SEED MIXTURE WILL m CRI FICAL AREAS o N OF INITIAL GRADING AND FINAL STABILIZATION USE WHEREVER STONE -BASE ROADS OR PARKING TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL DEPEND ON THE TIME OF YEAR APPLIED. THESE MEASURES, AND THE FOLLOWING ARE _F..� N � N AREAS ARE CONSTRUCTED, WHETHER PERMANENT OR TEMPORARY, FOR USE BY CONSTRUCTION STABILIZATION IS ACHIEVED. EXISTING STEEP SLOPES, A STREAM AND A GREENWAY ARE LOCATED AROUND THE PERIMETER OF THIS SITE. THE STEEP SLOPES ARE A MIXTURE _ � 00 � PROPOSED: a � a D°:. .a z OF PRESERVED AND MANAGED STEEP SLOPES THESE AREAS ARE CONSIDERED TO BE CRITICAL AREAS THE CONTRACTOR SHALL GIVE EXTRA NV-, oo.„°.�..�.„ISEND nro.c TRAFFIC. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING I!) p z DEVICE. ATTENTION AND CAUTION IN AND AROUND THESE AREAS TO ENSURE SEDIMENT IS NOT DEPOS17ED ON THEM OUTSIDE THE SCOPE OF THE w -�°•IX°•°•,µ no„ z w O O 305 SILT FENCE & SUPER SILT FENCE 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER 3.01 SAFETY FENCE- TO DISCOURAGE ACCESS TO A PAR77CULAR AREA. PROPOSED PLAN. TREE PR07ECTION FENCING, SILT FENCING, DIVERSIONS AND SEDIMENT TRAPPING DEVICES SHALL ALSO BE INSTALLED AS A FIRST w w ¢ z z A TEMPORARY SEDIMENT BARRIER CONSIS77NG OF A SYNTHE77C FILTER FABRIC STRETCHED ACROSS EACH RUNOFF -PRODUCING RAINFALL EVENT ANY NECESSARY REPAIRS OR CLEANUP TO 3.02 CONSTRUCTION ENTRANCE - TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO STEP IN LAND DISTURBANCE TO ENSURE THESE CRITICAL AREAS ARE MAINTAINED. A"°nD�-D'a'°"a° � 0 w w AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, TO INTERCEPT AND DETAIN SMALL x la EXCAVATIONovBR86Wc f ,B VI m MAINTAIN THE EFFEC77VENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. SEQUENCE OF CONSTRUCTION: R'x ISc..I,a•-1'-0'I----""-W "" O I- m AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONS7RUCT7ON OPERATIONS IN ORDER TO V � PREVENT SEDIMENT FROM LEAVING THE SITE, AND TO DECREASE 774E VELOCITY OF SHEET FLOWS 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 3.03 CONSTRUCTION ROAD STABILIZATION - TO REDUCE THE EROSION OF TEMPORARY 1. CONTRACTOR SHALL N077FY THE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO SCHEDULE A zz w w z AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS: THE SILT FENCE BARRIERS SHALL BE INSTALLED 11• ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE PRE-CONS7RUCTlON MEETING J w INERT MATERIALS ONLY FREE OF R007S STUMPS WOOD RUBBISH AND OTHER DEBRIS. ROADBEDS BY CONSTRUCTION TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT ¢ z E FDOWNLOW SLOPE OF AREAS W1TH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET 2. PRIOR TO DISTURBANCES, THE LIMITS OF DISTURBANCE SHALL BE FLAGGED AND THE TREE PROTECTION FENCING SHALL BE INSTALLED. FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING REGRADING OF PERMANENT ROADBEDS BETWEEN THE TIME OF INITIAL GRADING AND FINAL U) O O o ADDITIONALLY, THE PRESERVED SLOPES & GREENWAY SHALL BE FLAGGED OR MARKED BEFORE LAND DISTURBANCE CAN START. �/� V V O MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION &SEDIMENT CONTROL HANDBOOK ORDINANCE SECTION 5.1.28. STABILIZATION CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED 70 THE 3. NO EROSION CON7ROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE APPROVAL FROM THE INSPECTOR ON V Do V (VESCH). 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF 774E CONTRACTOR PARKING & STAGING AREAS AS NEEDED. THE PROJECT. z L � -1 z r r CODE OF ALBEMARLE. 3.05 SILT FENCE- SILT FENCE IS PROPOSED, WHERE SHOWN ON THE PLANS. 4. INSTALLAT70N OF THE PROPOSED CONS7RUCTION ENTRANCE SHALL OCCUR NEXT. THE CON7RACTOR SHALL MODIFY THE EXISTING PAVED a to ¢ � z z 3.07 STORM DRAIN INLET PROTECTION: 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POKER EQUIPMENT SHALL BE ENTRANCE TO MEET 774E MINIMUM CONS7RUC7/ON ENTRANCE REQUIREMENTS SHOWiV ON THE 774E DETAIL ON THIS SHEET. 774E CONTRACTOR °" °""I a O z _1 g O 7) � A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR 3.07 STORM DRAIN INLET PROTECTION- INLET PROTECTION IS PROPOSED ON INLETS, "_"� . �,� O w O LIMITED TO THE HOURS OF 7:00 AM TO 9.00 PM. SHALL ALSO GRADE, WITH THE APPLICATION OF C0NS7RUC77ON ROAD STABILIZATION, IMMEDIATELY BEYOND THE CONSTRUCTION ENTRANCE TO `"`^�.� F m w V V CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO 15. BORROW, FILL OR WASTE AC77VITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS WHERE SHOWN ON THE PLANS. �`_ „�_ - �.�� z J J J w PERMANENT STABILIZATION OF 774E DISTURBED AREA. INLET PROTECTION APPLIES WHERE STORM _ MITIGATE THE SHARP INCLINE IMMEDIATELY BEHIND THE EXISTING ENTRANCE BEING MODIFIED. 774E CONTRACTOR SHALL ALSO PROVIDE / > ,-, ¢ J DRAIN INLETS ARE ZA 7O MADE OPERATIONAL BEFORE PERMANENT PR07EC77ON APPLIES OF THE LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO 3.09 DIVERSION PERIMETER DIVERSIONS ARE PROPOSED WHERE SHOWN ON THE PLANS TO CONS7RUCTION ROAD STABILIZATION TO THE SURROUNDING AREA ENVISIONED FOR THE CON7RACTOR PARKING & STAGING AREA. CONTRACTOR � � ADJACENT LAND AND IMPROVEMENTS AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, DIRECT RUNOFF INTO A SEDIMENT TRAPPING DEVICE. " a CORRESPONDING DISTURBED DRAINAGE AREA. SHALL ENSURE 774E CONSTRUCTION ENTRANCE AND PARKING AREA ARE PROPERLY GRADED AND DRAIN 70 AN ADEQUATE E&S MEASURE 774E .M„,M°„�.•� o_ al g SINKING, OR COLLAPSE. 3.11 RIGHT OF WAY DIVERSION- A RIGHT OF WAY DIVERSION IS PROPOSED AT THE .a N Co w w CONTRACTOR SHALL INSTALL A SMALL NEARBY SEDIMENT TRAP FOR VEHICULAR FLASH WASH OFF, WITH A PAVED RIGHT-OF-WAY DIVERSION .-- 0 J DO 309 TEMPORARY DIVERSION DIKE 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOTE OR CONVERT TO """ - -"mac, I \ LU ¢ a m CONSTRUCT/ON ENTRANCE. DISCHARGING INTO IT. CONS7RUC770N ENTRANCES ARE TO BE INSTALLED WHERE CONS7RUC770N VEHICLE ROUTES INTERSECT PAVED PUBLIC / A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL "" ¢ DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR 3.13 SEDIMENT TRAP- A SEDIMENT TRAP IS PROPOSED WHERE SHOWN ON THE PLANS. ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. > w CI: II WHERE SEDIMENT IS 7RANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. x no°norTM p��°.„w W w a C_ LU UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET TO DIVERT OTHER PORTION OF THE PROPERTY 3.14 SEDIMENT BASIN- 7W0 SEDIMENT BASINS ARE PROPOSED WHERE SHOWN ON THE TYPICAL BASE PREPARATON � 0 C_ SEDIMENT LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT-7RAPPING FACILITY SUCH AS SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPOR77NG TO A SEDIMENT CONTROL DISPOSAL AREA. u_X Mo*roecebel •-"""""-"`"""'"` w 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE PLANS. ut w A SEDIMENT 7RAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER RUNOFF MUST BE STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. AT 75 LBS/ACRE, AND IN 774E MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX J. OUTLET PROTECTION -OUTLET PROTECTION IS PROPOSED AT THE OUTLET OF PIPES. w > In LU TEMPORARILY DIVERTED TO PROTECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON SITE 5. 774E INITIAL ESC CONS7RUC7/ON MEASURES, AS SHOWN ON THE PHASE l EROSION &SEDIMENT CONTROL PLAN, SHALL BE INSTALLED NEXT. OF ANNUAL RYGRASS AND CEREAL WINTER C OR IN MARCH AND APRT TO CONSIST OF DURING CONSTRUCTION. THESE STRUCTURES GENERALLY HAVE A LIFE EXPECTANCY OF 18 MONTHS 3.19 RIPRAP- RIPRAP IS PROPOSED AT 774E OUTLET OF PIPES 774E CONTRACTOR SHALL BEGIN BY INSTALLING THE PERIMETER SILT FENCE. PERIMETER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE PurEa rAawc � � w OR LESS WHICH CAN BE PROLONGED WI7H PROPER MANTENANCE.. ANNUAL RYE T MAY THROUGH AUGUST TO CONSIST E T TO A MILLET. STRAW MULCH IS TO 3.32 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED WITH THIS CONS7RUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND ENTRENCHED 6- � BE APPLIED AT BOLBS/100SF. ALTERNAT7lES ARE SUBJECT TO APPROVAL BY THE EROSION w�Acrao yDa � s tmtmy 311 TEMPORARY RIGHT-OF-WAY DIVERSION: CONTROL INSPECTOR. PLAN. DISTURBANCE TAKES PLACE. I A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED I& PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. 3.38 TREE PRESERVATION AND PROTECTION- TREE PR07EC77ON IS PROPOSED WITH THIS 6. ONCE THE PERIMETER EROSION CONTROL MEASURES HAVE BEEN INSTALLED, AND THE COUNTY INSPECTOR HAS APPROVED THESE MEASURES, ='-li l - I=1 � I11I-I�-1I - RIGH7S-OF-WAY AND SIMILAR SLOPING AREAS. TO SHORTEN THE FLOW LENGTH W97HIN A SLOPING THE CONTRACTOR SHALL PROCEED TO LIGHT CLEARING OF THE SITE. 774E CONTRACTOR SHALL BEGIN BY CLEARING THE AREAS REQUIRED 70 II I1=111=1I IIIII Il II II II IT AGR/CULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS11000SF, INCORPORATED INTO PLAN. SEE 774E ESC PLAN FOR THE REQUIRED LOCATIONS. le• tit. RIGHT-OF-WAY, THEREBY REDUCING THE EROSION POTENTIAL BY DIVERTING STORM RUNOFF TO A ACCESS THE LOCA770NS OF SEDIMENT BASIN 'A; SEDIMENT BASIN B' AND THE AREAS DESIGNATED AND OR APPROVED BY THE INSPECTOR = _ _ ��_ - _�� THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST 3.39 DUST CONTROL -OUST CONTROL IS REQUIRED AND PROPOSED WITH THIS PLAN. / -II-III-III-II-III-u T TI II-III-III-Iu-III-I1 STABILIZED OUTLET. GENERALLY, EARTHEN DIVERSIONS ARE APPLICABLE EL STRUCTURES THERE WILL BE FOR CUT REQUIRED FOR 774E BASINS' INSTALLATIONS INSTALLATION OF SEDIMENT BASIN A' &SEDIMENT BASIN B' SHALL IMMEDIATELY = II�1) Q-IIII= - OF A )0-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS ACRE AND I_ III1ITI11 11Illi II II- - Ll77LE OR NO CONSTRUCTION TRAFFIC WITHIN 774E RIGHT-OF-WAY. GRAVEL STRUCTURES ARE / FOLLOW 774E SELECTIVE CLEARING FOLLOWING THE INSTALLA770N OF THESE MEASURES, 174E CONTRACTOR SHALL INSTALL 774E DIVERSIONS THE 1= L-III=1 -I - 1= 1=11= - A40RE APPLICABLE TO ROADS AND 07HER RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYGRASS OR KENTUCKY IT 1=�1= - TRAFFIC TRAFFIC. BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/)OOSF. ALTERNA77VES ARE SUBJECT TO MAINTENANCE, DIVERSIONS SHALL MAINTAIN POSITIVE DRAINAGE TO THE SEDIMENT TRAPPING DEVICES AT ALL TIMES 7HROUGHOUT CONS7RUCTION. ANY =I : - - e U1111I � � , REMAINING EROSION CONTROL I7EMS AS SHOWN ON 774E PHASE I EROSION CONTROL PLAN SHALL ALSO BE CONSTRUCTED AT THIS TIME. --- w N rN N N N APPROVAL BY THE EROSION CONTROL INSPECTOR. IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK ALL 7 ONCE ALL 774E PHASE I EROSION CONTROL ITEMS HAVE BEEN INSTALLED &ARE OPERATIONAL, DRAINAGE IS PROPERLY CONVEYED TO THESE � �. � o I\^ rN 313 TEMPORARY SEDIMENT TRAP: 19. MAINTENANCE.• ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT DO ¢ [V M A TEMPORARY PONDING AREA FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WI774 A STONE MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, THE CONTRACTOR CAN BEGIN CLEARING THE REMAINDER OF 774E SITE. O TEMPORARY 18" DIVERSION BERM o � Lo � o N OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG ENOUGH TO DAMAGE OR CLOGGING TO S7RUC7URAL MEASURES lS TO BE REPAIRED IMMEDIATELY. SILT TRAPS RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD lF NEEDED. SPECIFIC TEMPORARY SEEDING, PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. `' ARE TO BE CLEANED WHEN 5O% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. USE BELOW DISTURBED AREAS WHERE 8. AFTER CLEARING 774E PROPOSED AREAS, THE CONTRACTOR CAN PROCEED TO PHASE ll OF 774E EROSION &SEDIMENT CONTROL PLAN. UPON SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD AL STAND HEIGHT GRASS. a. SEDIMENT THE BASINS AND OR TRAPS WILL BE CLEANED AND MAINTAINED /N ACCORDANCE INSPECTOR APPROVAL, 774E CON7RACTOR SHALL BEGIN ROUGH GRADING THE SI7E TO THE CONTOURS SHOWN ON THE PHASE // EROSION & THE TOTAL CONTRIBUTING DRAINAGE AREA IS LESS THAN 3 ACRES, WHERE THE SEDIMENT TRAP SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT WITH THE VIRGINIA EROSION &SEDIMENT CONTROL HANDBOOK. WILL BE USED NO LONGER THAN 18 MONTHS, AND IT MAY IV COON DIKE. EITHER MUST BE CLEANED AND REPAIRED IMMEDIATELY. &ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT WILL SEDIMENT CONTROL PLAN. ANY RETAINING WALL CONSTRUCTION THAT OCCURS IN ESC PHASE ll WITH 774E GRADING OPERATIONS SHALL FILL 774E AREAS GENERAL SLOPE 31 OR LESS INDEPENDENTLY OR IN CONJUNCTION W77H A TEMPORARY DIVERSION DIKE. SURROUNDING THE RETAINING WALLS IN A MANNER THAT ENSURES 774E FILL LOCA77ONS ARE LEVEL 1ER77CALLY AT 771E END OF EACH WORK DAY. SUCH A (' ) PER ACRE 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE E BE REMOVED SUBJECT 30 PREVENT PROPER DRAINAGE IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL PRAC77CE KILL LIMIT CHANNEL FLOW AND PROM07E SHEET FLOW. WORK ASSOCIATED WI774 ANY RETAINING WALLS NEAR A GREENWAY SHALL OCCUR ON 7HE TOTAL LBS 374 TEMPORARY SEDIMENT BASH: DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO WILL BE REMOVED AND CLEANED, OR IT WILL BE REPLACED. KENTUCKY 31 FESCUE 128 LBS. A TEMPORARY BARRIER OR DAM K1774 A CONTROLLED STORMWATER RELEASE STRUCTURE FORMED APPROVAL BY 774E EROSION CONTROL INSPECTOR. c. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR TOP SIDE TO REDUCE P07EN77AL IMPACTS TO 774E DOKNSTREAM AREA. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A RED TOP GRASS 2 LBS. BY CONS7RUC77NG AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. TO DETAIL 21. THE E&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS AS NECESSARY IN DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 2G LBS. SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN "WET" AND 'DRY" STORAGE LONG ENOUGH THE FIELD AS SITE CONDIT70NS CHANGE. IN ADDITION, NO SEDIMENT BASIN OR TRAP CAN BE REMOVED WIZEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO THE TOP 9. THE CONTRACTOR SHALL INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE ll EROSION CONTROL PLAN. TEMPORARY SEASONAL NURSE CROP FOR THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE REMOVED WITHOUT WRITTEN AUTHORIZATION. OF THE BARRIER. SEEDING, PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. SEASONAL NURSE CROP 150 LBS THE TOTAL CONTRIBUTING DRAINAGE AREA IS EQUAL TO OR GREATER THAN THREE ACRES. THERE d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE 7HAT A GOOD STAND /S 10. ONCE ALL 774E PHASE // EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, THE SITE /S ROUGH GRADED, DRAINAGE IS MUST BE SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCTION OF A SOIL DESCRIPTION: MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. PROPERLY CONVEYED TO THESE MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, 774E CON7RACTOR CAN BEGIN PHASE Ill OF FEBRUARY 16 THROUGH APRIL ANNUAL RYE 0 7- TEMPORARY IMPOUNDMENT. /N CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD OR THE EROSION & SEDIMENT CON7ROL PLAN. MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET M V) SOILS ON -SITE ARE CURRENTLY AS FOLLOWS: CON7RACTOR ON -SITE. THE RLD's CONTACT INFORMATION CAN BE FOUND IN THE SWPPP, 12. 7HE CONTRACTOR CAN BEGIN INSTALLATION OF 774E UTILITIES, CURB AND GUTTER, AND PAVED ROADS. INLET PROTECTION SHALL ALSO BE AUGUST 16 THROUGH OCTOBER ANNUAL RYE 318 OUTLET PROTECTION: WHICH IS TO BE LOCATED ONS17E AT ALL 77MES DURING CONSTRUCTION. IN ADDITION, 774E INSTALLED AS 774E STORM SEWER IS CONSTRUCTED. INLET PR07ECTION SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS NOVEMBER THROUGH FEBRUARY 15 WINTER RYE I,'�'� STRUCTURALLY LINED APRONS E OTHER ACCEPTABLE ENERGY VENT SCOUR DEVICES PLACED AT 16-CODORFF SILT LOAM-2 TO 2U% SLOPES. SOIL IS SOMEWHAT POORLY DRAINED WITH A VERY HIGH OWNER MAY BE CONTACTED. UPON COMPLETION OF THE PROJECT, THE OWNER WILL BE SHALL BE MADE AS NEEDED. IF 774E STONE FILTER BECOMES CLOGGED WI774 SEDIMENT SO 774AT IT NO LONGER ADEQUATELY PERFORMS ITS Z0 THE OUTLETS OF PIPES OR PAVED CHANNEL SEC770NS. TO PREVENT SCOUR AT STORMWATER RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY SILT LOAM AND ABOUT 0-8" THICK NOTES: OUTLETS, TO PROTECT 774E OUTLET STRUCTURE, AND TO MINIMIZE 774E POTENTIAL FOR RESPONSIBLE FOR SI7F MAINTENANCE. FUNCTION, THE STONE MUST BE PULLED AWAY AND CLEANED AND/OR REPLACED. TO PROLONG 774E LIFE OF TEMPORARY SEDIMENT BASIN A', N DOWNSTHE DEPTH TO THE WATER TABLE IS GENERALLY 9-78". FLOWS. REAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMWATER THE FINAL CONSTRUCTION OF LOTS 123-127 & UNDERGROUND DETEN7ON SYSTEM A' SHALL BE DELAYED. TO FURTHER PROLONG THE LIFE 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL 28D3THE D K CLAY LOAM-15AT TO 25L SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A HIGH FLOWS. APPLICABLE TO THE OURE7S OF ALL PIPES AND ENGINEERED CHANNEL SECTIONS.ASIN TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. t (C0 Q RUNOFF CLASSIFICATION. WA SURFACE LAYER IS TYPICALLY CLAY LOAM AND ABOUT 0-8" THICK. EROSION CONTROL NOTES: UUNDERGROUND DEF SEDIMENT ITENTION SYSTEMS (AND GITS NEARBTHE LIFE Y MANHOLES) F SEDIMENT SHALL BE TEMPORARILNY MODIFIED ENT MTOEDIRECT UPLAND RUNOFWER OUTFALLING INTO FINTOTHE 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION � 319 RIPRAP: THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". OF SEED APPLICATION IN ACCORDANCE W VESCH STD 3.35. A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE NTH 27B-ELIOAK LOAM-2 TO 79 SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF BASINS VIA THE TEMPORARY OUTFACES SHOWN ON THE ESC PHASE 111 SHEETS. SEE SHEETS 10 & 12's N07ES FOR ADDITIONAL GUIDANCE. / FILTER FABRIC OR GRANULAR UNDERLINING. TO PR07ECT THE SOIL FROM THE EROSIVE FORCES OF CLASSIFICATION, SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE DEPTH TO ES-1: UNLESS 07HERKISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND IT AFTER ALL OTHER PHASE N ESC MEASURES HAVE BEEN INSTALLED, THE CONTRACTOR SHALL COORDINATE THE TIMING OF THE FINAL STORM SEWER I % 06 CONCENTRATED RUNOFF, SLOW 774E VELOCITY OF CONCENTRATED RUNOFF WHILE ENHANCING THE THE WATER TABLE IS GENERALLY MORE THAN 80". SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MODIFICATIONS TO PERMANENT STRUCTURES, THE FINAL GRADING OF L07S 123-127 & THE INSTALLATION OF THE TWO UNDERGROUND PERMANENT SEEDING SCHEDULE N < W POTENTIAL FOR INFILTRATION, AND TO STABILIZE SLOPES WITH SEEPAGE PROBLEMS, AND/OR 27C-ELIOAK LOAM-7 TO 157 SLOPES. SOIL /S TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF MINIMUM STANDARDS AND SPECIFICATIONS OF 774E VIRGINIA EROSION AND SEDIMENT DETENTION SYSTEMS WITH THE ESC INSPECTOR. AT THIS 77ME SEDIMENT BASINS A' AND 'B' SHALL BE CONVERTED TO PERMANENT SMW PS NON -COHESIVE SOILS USE WHEREVER SOIL AND WATER INTERFACE AND 7HE SOIL CONDITIONS, CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND ONO SCALE O _J > WATER TURBULENCE AND VELOCITY, EXPECTED VEGETATIVE COVER, ETC., ARE SUCH THAT THE SOIL CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE DEPTH TO SEDIMENT CONTROL REGULATIONS. FACILITIES AND THE RETAINING WALLS ADJACENT TO SWM FACILITIES A' SHALL BE INSTALLED. PRIOR TO CONVER77NG SEDIMENT BASINS A' 0') MAY ERODE UNDER 774E DESIGN FLOW CONDITIONS THE WATER TABLE IS GENERALLY MORE THAN 80". ES-2: 7HE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE AND 'B' 774E CONTRACTOR SHALL ENSURE THE UPLAND WATERSHEDS ARE STABILIZED. THE CONTRACTOR SHALL ALSO OBTAIN APPROVALS (STD. & SPEC. 3.32 OF VIRGINIA EROSION & N 0 - 34B-GLENELG LOAM-2 TO 79 SLOPES. SOIL /S TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND FROM THE INSPECTOR TO INSTALL 774E TWO UNDERGROUND DE7EN77ON SYSTEMS AND FINALIZE THE CONSTRUCTION OF 7HE PERMANENT STORMWATER SEDIMENT CONTROL HANDBOOK, 3RD ED.) W N 3.31 TEMPORARY SEEDING. CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE DEPTH TO DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. MANAGEMENT FACILITIES AT 7HE 77ME OF THE BASINS' CONVERSIONS, 774E CONTRACTOR SHALL REMOVE SEDIMENT LADEN MATERIAL & BACKFILL 7HE AREAS 0- Q 774E ESTABLISHMENT OF A TEMPORARY WGETA77VE COVER ON DISTURBED AREAS BY SEEDING WITH THE WATER TABLE IS GENERALLY MORE THAN 80 ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS WITH STRUCTURAL FILL TO 774E GRADES SHOWN ON THE STORMWATER MANAGEMENT SHEETS 774E CONTRACTOR SHALL PAY SPECIAL ATTEN77ON TO THE C APPROPRIA IF RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SEDIMENTA 77ON BY 34C-GLENELG LOAM-7 TO 159 SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A MEDIUM RUNOFF THE FIRST STEP IN CLEARING. SILT FENCE BENEATH 774ESE AREAS AT 774IS TIME AND ENSURE THE FENCING CONTINUES TO BE EFFECTIVE. THE CONVERSIONS OF SEDIMENT Q G ^�^// STABILIZING DISTURBED AREAS THAT KILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE DEPTH TO ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE BASINS A' & B' SHALL ONLY OCCUR AFTER ESC INSPECTOR APPROVAL. W > L I_ MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNS7REAM OR THE WATER TABLE IS GENERALLY MORE THAN 80". MAINTAINED ON 774E SITE AT ALL TIMES. V / OFF -SITE AREAS, AND TO PROVIDE PR07EC77ON TO BARE SOILS EXPOSED DURING CONS7RUCT70N 14. FOLLOWING THE CONVERSIONS OF 774E SEDIMENT BASINS TO PERMANENT SWM FACILITIES, AND THE INSTALLATION OF UNDERGROUND DETENTION TABLE 331-A - UNTIL PERMANENT VEGETAT70N OR 07HER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 34D-GLENELG LOAM-15 TO 259 SLOPES. SOIL IS TYPICALLY WELL DRAINED WITH A HIGH RUNOFF ES -&:PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS 07HER THAN INDICATED L.I SYSTEMS A' AND B; 774E CONTRACTOR CAN REMOVE THE REMAINDER OF 774E EROSION & SEDIMENT CONTROL MEASURES. NO ITEM SHALL BE CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-6" THICK. THE DEPTH TO ON 774ESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE J REMOVED, THROUGHOUT ALL PHASES OF CONSTRUCTION, UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES LIMING REQUIREMENTS Z 3.32 PERMANENT STABILIZATION., THE WATER TABLE IS GENERALLY MORE THAN 80" AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN J PERMISSION. FOR TEMPORARY SITES 1� _ THE ESTABLISHMENT A PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY O PERMANENTLY SEED. 39D-HAZEL LOAM-15 TO 259 SLOPES. SOIL /S TYPICALLY EXCESSIVELY DRAINED WITH A MEDIUM TO 774E OWNER FOR REVIEW AND APPROVAL BY 774E PLAN APPROVING AUTHORITY. > ' TO REDUCE EROSION AND DECREASE SEDIMENT T IS FROM DISTURBED AREAS TO PERMANENTLY ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION 15. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED Ur^) RUNOFF CLASSIFICATION. SURFACE LAYER lS TYPICALLY LOAM AND ABOUT 0-10" THICK. THE ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT Recommended Application > rI vJ STABILIZE DISTURBED AREAS 74 A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CODLIFE NS, CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS pP AND ALLOWS SELECTION A THE MOST APPROPRIATE PLANT MATERIALS. TO IMPROVE WILDLIFE -DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". DETERMINED BY THE PLAN APPROVING AUTHORITY. BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZA77ON SHALL BE APPLIED pH Test of AWcultural limestone L w W HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPL£770N OF CONSTRUCTION ACTIVITIES, ALL 39E HAZEL LOAM-25 TO 459 SLOPES. SOIL /S TYPICALLY EXCESSIVELY DRAINED WITH A MEDIUM ES-7.ALL DISTURBED AREAS ARE TO GRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. AREAS WILL RECEIVE A PERMANENT VEGETATIVE COVER. RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALY LOAM AND ABOUT 0-10" THICK. THE ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL 16. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL �__ DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". below 4.2 3 tons per acre 3.38 TREE PRESERVA77ON AND PROTECTION. 95-HATBORO SILT LOAM-0 TO 2% SLOPES. SOIL /S TYPICALLY POORLY DRAINED WITH A VERY HIGH FINAL STABILIZATION IS ACHIEVED. HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND 0 n PR07EC77ON OF DESIRABLE 7REES FROM MECHANICAL OR 07HER INJURY DURING LAND DISTURBING ES-8: DURING G DEVICE. OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER SEDIMENT CONTROL HANDBOOK. 4.2 to 5.2 2 tom per acre _ / RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY SILT LOAM AND ABOUT 0-10" THICK. FILTERING DEVICE. 17. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR0 J - BE CONSTRUCTION ACTIVITY. TO ENSURE THE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL THE DEPTH TO THE WATER TABLE IS GENERALLY 0-30". ES-9: THE CON7RACTOR SHALL INSPECT ALL EROSION CON7ROL MEASURES PERIODICALLY AND AFTER 774E TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS 0774ERMSE AU774ORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. 0� T� BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, WATERSHED PROTECTION LANDSCAPE 52 to 6 1 ton per acre L-I- J BEAUTIFICATION DUST AND POLLUTION CONTROL, NO/SE REDUC770N, SHADE AND OTHER AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE D/SPOS/T/ON OF TEMPORARY MEASURES SHALL BE PERMANENTLY ' ^ O ENVIRONMENTAL BENEFITS WHILE THE LAND /S BEING CONVERTED FROM FOREST TO URBAN -TYPE REFERENCE: WEB SOIL SURVEY ONLINE DATABASE, FOUND AT CLEANUP TO MAINTAIN THE EFFEC77VENESS OF THE EROSION CONTROL DEVICES SHALL STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. Q V , USES. APPLIES IN TREE -INHABITED AREAS SUBJECT TO LAND DISTURBING ACTIVITIES http://websoilsurvey.nres.usda.gov/appIWebSoilSurvey.aspx BE MADE IMMEDIATELY. Source: Va. DSWC z = �z Of 3.39 DUST CONTROL: 1992 3.05 1992 3.11 Paved construction entrance for erosion control plans 1992 3.38 C) � REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSMUC77ON ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED I U Z SOIL SURFACES AND REDUCE 7HE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT CONSTRUCTION OF A SILT FENCE sro�L TD• MIN. FENCING AND ARMORING Y HEALTH HAZARDS TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. DUST CONTROL O MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING (WITHOUT WIRE SUPPORT) TEMPORARY RIGHT-OF-WAY CONSTRUCTION CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE WITH THE VESCH. ACCESS 3" SM-2A ASPHALT TOP W M U 1. SET THE STAKES. 2. EXCAVATE A 47X 4" TRENCH DIVERSIONS COURSE EXISTING �__ LJJ UPSLOPE ALONG THE LINE OF 27G �Tx / SEDIMENT BASIN BAFFLE DETAIL STAKES. ry PAVEMENT `//fir NO SCALE NOTE.- • " BAFFLES SHALL EXTEND FROM THE 6'MI VDOT #1 `) J Z SHEETS OF 4'x8 x}' EXTERIOR Borrow TO 6' ABOVE THE OVERFLOW. _ MtN' vJ PLYWOOD OR EQUIVALENT �% COARSE AGGREGATE tg 6-MN. TIA AGGREGATE BASE I V1�1 W III, 1. SET POSTS AND EXCAVATE A 4 X4" 2. STAPLE WIRE FENCING TO '- ppJ��� IT RISER CREST TRENCH UPSLOPE ALONG THE LINE THE POSTS. �� f O _ �� O LRon ORP NE I LJ I I I I I 1 �ELEVA77ON OF POSTS. i-- -- `-- /� /'� - I I I 4 I I I POSTS MIN SIZE J/I---���� j / I z w 4' SQUARE OR 5" - / �� / _ ,_ �' -70' MIN. I 0 W 8, ROUND. SET AT / FLDIr - SUNt ASPHALT PAVED III III 1, Ar CEOS l O `WASHRACK O LEAST 3' INTO THE O CONS tYUUIOV SNOW FENCE I `^ U) GROUND � / V J v J /' 1 �_ _ I , ° 6, MINIMUM _ _ _ , / ~ � (6 I ) 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT a EXISTING sasai w TABLE 331•B / �_ / I TO STAKES AND EXTEND THE EXCAVATED SOIL. ,l; i 41E PAVEMENT IIMI Ar Z O O o IT INTO THE TRENCH. 2x 12 INN - rl ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS / - / ; I III utgi�t r w I so I � IIIII'' TYPICAL GRAVEL STRUCTURE rt +�" O - - - 'QUICK REFERENCE FOR ALL REGIONS' / IIII - _ III- - �I� r^ Flow„III ;,III - j - O -MUST EXTEND FULL WIDTH TO SEDIMENT +"I �! PCI ITNE DRAINAGE BOARD FENCE /� AXM Q v J OF INGRESS AND EGRESS I CORD FENCE Rate 4 _ - s : - � OPERATION 7 TRAPPING DEVICE O J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE IIII II O ^^// Planting Dates ,species THE WIRE FENCE AND EXTEND EXCAVATED SOIL. �% O 1 e� vu C FENCE O 0. COMPACTED SOIL Pl.G7L7 N lT INTO THE TRENCH. = Fcolr O CORRECT METHODS OF TREE FENCING0 W Sept 1 -Feb. 15 Annual Mix of - III "' - III -- - -- ` _ 12' Mm rl wE ORAINACE Annual Ryegrass / (Lolium multi-florum) `�,` �- SHEET FLOW INSTALLATION i- .. -- _�- TO 5E01MfNT I '/ V--z{ J & 50 - 100 O g• MIN. _ - 1RAPPaNG DEVICE I1"q / 1' (PERSPECTIVE VIEW) t 1U � u � %' Cereal (Winter) Rye �� O _ -_ O w H (Secale cereale) - I �- 'v I _ p w ' O - ~. 111 A e,x. A FILTER CLOTW / �f III �/ -IIII Flan s ��� SECTION A -A lO6 NO. Feb. 16 - Apr. 30 Annual Ryegrass 60 - 1p0 FLOW I - - - - - - �� -III- , (Lolium multi-florum) -� -III-III- �� I 1 I - \ g, MtN[MUM A novas Mmi N•ala lap Of l sith tllll,l he u0alled with a Illulantull 1 ulrh l"Ilhoc 182150 IT I IIII1 - - - -1 L- �����/ IIII �� 4ndof vaha xullphwtt a wash hu.c tcnh a 16au1tiel ul I ` 914,1j : Io1 31ACAI Ne r /7 - 0000 11 III "I" - LOILHIud piftstse. Wash wales intiA be L.uued ateaT hula The enhance to ul pop SCALE May I - Aug 31 German Millet 50 EXTENSION OF FABRIC AND WIRE INTO THE TRENCH POINTS A SHOULD BE HIGHER THAN POINT B. approt'ed.4eltlu�aealotauot•eseduuetd .all, luuetd�hallbeptevadeLlholu r CORRECT TRUNK ARMORING UPER SILT FEN TYPICAL EARTHEN STRUCTURE eutamtzstOnML6al„5.datthesO,wate,LOLM,e r N/A (Setaria italics) DRAINAGEWAY INSTALLATION M0 ssF ,WITH WIRE -BACK 05-2 (FRONT ELEVATION) PAVED WASH RACK TRIANGULAR BOARD FENCE SHEET NO. NO SCALE Source: Adapted from Installation of Straw and Fabric Filter Source; Va DSWC wooanSource: Va. DSWC Plate 3.11-1 3 Barriers for Sediment Control. Sherd d W Plate 3.05-2 Source: Va. DSWC Plate 3.38-2 yant NOTE: OUTLET PROTECTIONS SHALL BE INSTALLED WHERE DIVERSIONS ENTER THE TEMPORARY SEDIMENT TH �� �\ \ \ ♦ BASINS. ALL TEMPORARY OUTLET PROTECTIONS SHALL BE \ \ / / / / 5 / / / / III 4'Wx10'Lx2'D & SHALL CONSIST OF VDOT CL. AI STONE. , _ (Kic PROPOSED i8"DIVERSION. T5 i,MATCHLINE -SEE SHEET5 �yCONTRACTOR SHALL ENSURE ' � / OTT R. L]POSITIVE SLOPE IS MAINTAINED. \ ; � � r/ /. No. 035'BERM SHALL BE STABILIZED AS A �'FIRSTST PINDISTURBANCE. y �2�4�22TEMPO P ASEIVS ON,ED `�SIONAL EMI U,SROTECT Oi E �i- I / �� \ DA .24 ac.� \ � SOIL TYPE /� PHASE I V \ SOIL BOUNDARY, , 34C f / DI DA 1O2. ,9 ac. A SOILTYPE \ \ DC �L� ✓ / �_ — ��� / -/ /.� / /. // /._ / /..�� / V\ \ \ 39D I _ V A / DIVERSION, PHASE I / , DA=3.69 ac. / / / / I I I / _. / / / /♦ I I I �� \ I I \ �-- TEMPORARY UPPER �� / / / /S PHASEDA=3.55 ac. / /. /.. / ...../ / /.. ....... ..-! I / Z w H I / / / �, F / / / ♦ / I �� I I _ \ \ , SEDIMENT BASIN B / / / / // // / I I I I I I�� // /l .. - ////�/I -I \ \ I II— �II' II I-I�"""111III II I I I I I I I II Tr♦ II 1 I I I �\ II II I II I I DA=14.00 ac. �litoU op zZ /POSE u:/ ➢0 M zOTTu / SOIPE OC STREAM L TYU)L LIMITS, TYP. 39D CO Lu F Lu #*PROPOSED 18" DIVERSION. / / / /,.. / / �. . r / f/ / / Z CONTRACTOR SHALL ENSURE ... .../.. ///j. ............ /I / / O 00 a w U C POSITIVE SLOPE IS MAINTAINED. WIRE I IN I I , \ ' BERM SHALL BE STABILIZED AS _ - - r� > / 1 PROPOSED 18" DIVERSION. / / l J J u ROPO$ED SF WITH S \ CONTRACTOR SHALL ENSURE _ I /) / / A FIRST STEP IN -DISTURBANCE . --- - / - .. �j / / / / / Lu " �. Q < BACKIN D POSITIVE SLOPE IS MAINTAINED.I _ j �/ \ / u w BERM SHALL BE STABILIZED AS ( , \ // \ — - __- / / / / / / / ji ^ m a J \• \ '^ I — I I 1 I \ A FIRST STEP IN DISTU BANCE. \ \ / I. Lu <Lu < / / �\ Lu / \ \ \ / i / / / iPROP SED / GR'EENW�AY, T�'P. I / _ / a / / /v I I ■ \ \ /� / � III iII ■\ \ � 1 � � � ROJE TLIMI S, I V \ — / '� / / / TYP. / / , / �• / / PRESERVED STEEP / /-/ / SLOPES, TYP. P w N N N N �, I W W W W W\ \\� \ I I I .I I I ' I \ \ \ \ —\� '__ / `' ♦ / //N-i W, m z N \\I ' t �00�Cp DRAINAGEDIVIDE, \ I I ' ' ' ' ' . •. ' I I I II ' I . / \ \ PR / EDLIMITS OF I / .W I I\ I � . / I ♦ \ \ � � DISTURBANCE, CE, 26.25 ac. TOTAL. /ii��'� W W W W � I I \ PROPOSED TEMPORARY 15" CMP [ PROPOS GREENWAY, TYP. W W W W CULVERT TO BE USED DURING - - (� I _ -mow ( B TRAFFIC /CROSSING I III _ . I' .�\ J.PHASE I FOR CONSTRUCTION / / I _ / / rJ / / / / / / / / C6 � / - � ,�V /// N I I II . PROPOSED SAFETY FENCE //" OP / \ INSTALL SIGNS "WARNING SAF QUICK SAND, KEEP OUT" \ / M 37 OP / \ \ WWW I I I ■ / �� i i i / l WETLANDS TO REMAIN P D BAFFLE S STREAM LIMITS, TYP. f \\ ` UNDISTURBED, TYP. / / // /, / N S / 1 — SFAS S F . PROPOSED SF WITH / / /// / � Z ISF WIRE BACKING / / // N LL.LL 3o NATURAL BUFFER TER. PROPERTY'S PERIME > o U U DIVERSION ACROSS THE ST ONEwW / Lu 06 1 � NSTRllCTI'z .0 /GAD..... / .. /... ' ^ Lu / .. / /' / / / / / / / / O VJ F OOOPI 10TYP. a I 11 / � I • �1 �i�/J//// l / // l 11 / � / � � '-' o . / PROPOSEb LIMITS of w '., - // -� - - l / l / l / I I I / / I U oZS DISTURBANCE, TYP. N \ -fi S PROPOSED CONTRAC OR PARKING& TAGIN AREA I � L CAfION OFi�Y DUMER/ ( i IMLS I. PE D - PROPOSED 18" VERSION, - ,•,.�..,.,�... / I / I PROPOSEDSF�I� S I CONTRACTOR SHALL ENSURE - / �„ / l l / I I / I / I I I I I I I I I -1� Lu WIRE BACKIN I \ BM - _POSITIVE SLOPE IS MAINTAINED / / / I I I I / I �a �.L-�. � co BERM SHALL BE STABILIZED AS LI EXISTING TREELINE. TREES &VEGETATION IN THE \ \ R P SED r A. FIRST STEP IN D STURBANC�E VICINITY OF SEDIMENT BASIN 'B' SHALL BE CONSTRUCTION RS LOCATION OF PORTA POTTIES' f, CLEARED. DURING THE EARLY STAGES OF ESe CCESS ` - I I / rnp -1� Un ,j Lu PHASE I, CLEARING & GRADING ACTIVITIES SHALL V �� / LOCATION OF yELING ARE�ji. / BE LIMITED TO THOSE NECESSARY FOR THE C I / INSTALLATION OF THE ESC PHASE I MEASURES. '�. � PROPOS D � THE FUELIN�TANK SHALL BEE - COMPLETEL URROUNDED Lu Lu BY � . .. (����bbb S \WAS OUTAR z' DEEP, z' WIDE EARTHEN BERM WITH A HEAVY MIL � I I \ \ \ \ \ POLYETHYLENE LINING, OR BE PLACED IN AN IMPERVIOUS OPEN -TOP DUMPSTER. THE PROPOSED BERM OR DUMPSTER WXI SHALL CONTAIN FUEL IN THE EVENT OF A SPILL. CONTRACTOR \ \ \ \ � Z 3q0' V /\ SOIL �PE V �� / BM SHALL ENSURE VOLUME CAPACITY IS io%LARGER THAN THE (� - 16 \y rAXIMUM VOLUME OF ST ED FUEL. _ _ _ W W W W Q�) I \ \ \ v�v �\� ILu s 5 / CONTRACTOft SHALL INSTALL AZz _ W DIVERSION ACROSS TH D W W W ^� CONSTRU ION ENTRANCE -- W W W W W W W �5 5—'1 I �' _ s I\ �\ T / / J W W .... �� I I I I I I I I I I \ \ \ \ \\� \ \\ < --- _ - _ / / WW WW --- - I / WI W W W \ \ \ \ \ CD PRO 0 ED PAV D CONSTRUCTION ENTRA CE _` -� J / I \ I 1 \ I \ \ \ \ \ CNA W WW`-I.W.W-WWWW l I I \ \ \ NG 7z" CMP CULVERT 1 EXISTING � \ zz x7o MIN.) w/WASH RACK &DOWN GRADIENT - / j- \ CE SEDIMENT TRAPPING DEVICE TO TREAT FLASH OFF FROM VEHICULAR W HOFF V W �i L_ o / I I \ \ GRAPHIC Al \ v >� // I I \\ V A \I I J \ 8 / / I— / \ s 3 \ \ \ I \ \ \ JOB NO. �� s= IN FE1�T � \ \ \ � 182150 \ \ \ POLOGRO D \ �\ / I \ \ \ I \ ` 1 inch 30 ft. (VARiAB ENIy,pROAO _ �sT \ \ SLOPES STEEPER THAN 3:1 SHALL BE PLANTED WITH A NATIVE SCALE H) `sue \ \ \ \ \ \ \ \� SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST CONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE, OR i I "=30' LB. PER i,000 sf, UNLESS OTHERWISE SPECIFIED. THESE AREAS \\� \ \ \ \ o \\ XISTINGgB"CMPCUL RT ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO SHEET NO. \ \ \�� \ \REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH STD. & SPEC. 3.36. SLOPES SHALL NOT EXCEED 2:1, AS SHOWN. 4 PRO/SED S WITH / // / // '. ■ ■ _ • \ - _ / /.-. /I` / / / / I _ ♦�� I / / / / / / / / // / WIRE BACK S / ♦♦♦• i♦♦ MATCHLINE - SEE SHEE 6 / ♦♦y���■../ , I ♦♦♦� ; / - / / / ♦ F / / /j i ■■■■■ ■i00�■ PROPOSED 18 DIVERSION. Q / ♦♦� _ / \ S _ -' / i / / ♦ I I{* ` _ / / /♦ CONTRACTOR SHALL ENSURE / ♦� • F F\ j / / / ♦ I / �� / / / / / ♦ / POSITIVE SLOPE IS D ♦ I / / . F / ♦ DRRAINAGE 00 / II MAINTAINED. BERM SHALL BE _ .♦ / / ■�' \S F ♦ r \ DIVIDE,TYP. I LIMITS 6F FEM� / STABILIZED AS A FIRST STEP IN I = / ■ • \ / '� FLO ROVED ioo N, TY R / DISTURBANCE. / 5 • `••• \ 1 / / / / / / / • F \ / ♦ / \'' \ .� I/ / / E •• \ \ \ �/ ■' / / / / l •��.� F\ F SSF �y/♦♦♦ J \x00 / / / / / /♦ / PRESERVED STEEP / / \ \ \ \ �■ / / / / / . `/ , SLOPES, TYP. /. ♦ \ \ --/� / _ / / ( I . •� / Imo'' \ � � � ��� � ��� 1 �\ / � ���� / / / /MANAGED STEEP / / ♦ \ 00 � / / SLOPES, TYP. SCOTT/R. CbLLINS'Z Lic. No. 035791,E 2/4/22 .,vrj SOIL TYPI: / / % / / / / - z 41* \ - \ \ ) / / / I �, ` / / SOIL TYPE / / ♦' g l I'" l �I 'I /... _ / /� / / / ♦ l ) I \ T �5027B PE / \, / / / / / / / / / / O r PRO\ POSED STOCKPILE \ \ � �t- i�j �' � � i 0 �� � \' \ / / / � /V/ / / / / / / ♦ a k O IL PROJ Cli �J URROUNDED B SILT FENCE �r V _ r LI MITS, TYP.i / / / ^ n / / \k-'F _ _ _ _ ` �'\' \ / / / \ \ I �j l / / ♦/ a�0 W PROPOSED ,- / O z < � GREENWAY, TYP. / / •�C`�' / r dt SOIL TYPE / / H m \ \ ' �� /. / / / / ♦•'/ J U �,/ "v > I \ . \ 1 1 1 1 I \ 27C , \ , / / �/ " '� ~ w z _ cn Lu �TR E�M //4j,k /I SOIL BO PNDARY, / �' \ ' / / / �/ / / /: l ,__-\♦ I♦�/ T-�I� W PROPOSED TREE PROPOSED i8ADI RONE CONTRACTOR LPROTENSUR DCO)POSITIVE SLOPE IS/� MAINTAINED. BERM SHALL BE / / / / ( q�� � / / \ / / • / / // STABILIZED ASA FIRST STEP IN / DISTURBANCE. �IIso I DIVERSIONrPHASEI PROPOSED DISTUURBAN DISTURBANCE, TYPTS . ♦ I I I i / / ( / '' DA=3l69 ac. ♦ / \ I I SOIL TYPE / — I SEDIMENT BASIN 'B' Ijig I I I I I 39P / DA=14.9fac. / _ / / ♦ / / /� \ A TEMPORARY UPPER / / ♦� / / / / / WIR EA SF WITH ♦ -� / WIRESBACKIPHASE I DIVERSION NG S ♦ I I I I I I I DIVERSION / DA=3.55-ac./ 1♦ W TLANDS TO REMAIN ♦ I I I I I / / ) \ I I I 1 1 / / j" / / J 4 / / /r / ♦ ' / E / S PROP �BACKING H L / lI SOIL TYPE / UNDISTURBED, TYP. - Air ♦I I I I I I IJ / 1 / I I I I , / 34B h2� / / \ DIVDIVIDE, TYP./ DRAINAU// / I I TEMPORARY UPPER � � _I.-_ ♦ I I I PHASE I DIVERSION, / j - / / /♦ IPA-31.24 ac.>�/ DII ERSION, PHASEII I I I I � '\ �� � / / / /' _�. / /, � / / / ♦� // '/ / � � / .. DA 2.891ac. I PROPOSED 18"DIVERSION. ' , / / / -• / / /�..// / (////. \ /( / / / % HALL ENSURE - -POSIT VEE SLOPE CONTRACTOR SIS MAINTAINED. D / I BERM SHALL BE STABILIZED AS / / / / ♦ / / ,/_. ./ . _. / A FIRST STEP IN DISTURBANCE. RE E li II W�W� � I I I I 1 \ 1 I I I I I I 1 _ .- ♦ � / / ♦♦ / // / ` / �T / � � \ —PIt 40 �— ,/ �� //, ,�v /�� �/ ♦1/�/ / // / \ — � _4 — �i ��/I �/ / ii w _ WW r 1 1 \ (4��11 DIVERSION. \ i P \ \ 1 1 I \ \ \ \ \ I \ \ \ \ \ _, \ 1 {T / ,�� ' , / / ♦♦♦ // DISTURBANCE, D 6 SITS DOTAL. CONTRACTOR POSIT POSITIVESHALL E IS / �\ \ MAINTAINED. BERM SHALL BE , \ / / ♦ STABILIZED AS A FIRST STEP IN N \ \ \ , I / / ♦ / �' / / / DISTURBANCE. I ` I ' .-... ` \ \ I 1 I I I I I 1 I I \ ~ 1 / / SOIL 034C PE 3°' NATURAL BUFFER ALONG. I II I I l I I I \ \ \ \ — \ \ / / , / /♦ / / PROPERTY'S PERIMETER / I IV I� \ \ \ \ \ 1 v v \ / / /♦ /�/� /�/��l/ //////�/� / // / A 1 \ \ V A \\ •\ \ v �1 v v / w ' /♦ / / / / / / l / / r f v1 �vv v v� vv �v v �� � � / � :♦ / / RAPHIC S Li310) v / / II I ■ \ \ \ \ \ \ / MATCHLI�IE -SEE SHEET 4 /♦♦ //�5 / / j j / 11 / \ I I / / / / / / / c � FEET > \ 10 RE I IW I \� \ \ \ TS 1 1Ar \ / ♦ .. ..-. /.. .. - . ,/. / I / / / / / 1 inch = 30 ft.lz C O UJ C-1 N 'DD r14 M \ O '4 N N O U 0 a E C Lu J � m (` z N N CY) 3 V z N N ° a n Q; J z o N J OLU o > L.L c ° J > O ° ,--I U � w � oZS z n - w o Q0cGu N Q 0 E _ Lf) U U 6 ° 0 p z Y J O w CD ° T ___I O Lu ° 0 U) J w 20 w w = w cn w z z Q _ co p a z JO CD ° mow/ " LL N 0 Q ° a rn V — O C:) N x N t W J ti ° � F C 0 W u d U JOB NO. 182150 0 N ° SCALE ° 1"=30' ° 0 :9CI44d01P)! In � 5�� W HERE DIVERSIONS ENTER THE TEMPORARY SEDIMENT / / ASINS. ALL TEMPORARY OUTLET PROTECTIONS SHALL BE - _ / "" / / / / / / / / / F �♦ LLJ / ! i / / / / / / / — i' — _ I /j SSF SF f� SOIL Ty Z Lu / / / y� / / / / / / / �. 5F / ■ ■ I 28D3 J / / �F / - - -� / / / -/ / ./ PROPOSED SWM.FOREST& /- i - ' �/ S W / - / _ /. / / / / �6PEN SPACI EASEMENj SSF' �� \ I I � . / i �. / / ✓. / p w �♦� l-% / PROPOSE EE;ASWM FOREST &OPEN / �f - / / �l - i / / / PROPOSED TREE TV :� / . �-- / _ PROTECTION ui - / EM IN UNDISTURBED, TYR. '�- / ✓ - -� /��- /,�. / ���/�/SSF � / / / T / ♦�/ L \ / PROJECT LIMITS; �. U /. !. / �.��� KJ / �i / // // /-fsgF ' ■- ■-■-■; VS Tv l / /� J^� l� j j / / / / i _ J F sF /55�■■■■ / / SOIL TYPE /v / / / / ♦� / / ' PROPOSED 18 DIVERSION. "� -/ / / / % _ \ / ,( 11 / CONTRACTOR SHALL ENSURE � . j Q,�P7 /.. / -/ / / �...�� �/ /.�� j / / 39E POSITIVE SLOPE IS MAINTAINED.- �(J'"'l/ / /BERM SHALL BE STABILIZED AS Z PRESERVED STEEP A FIRST STEP IN DISTURBANCE. SLOPES, TYP. \ / PRO SED �. '�% _. / / _./ /./._ PROPOSED SF WITH $. / / j._.. _ ... S F� .�� / / / / / / / / / •. / GREWAY 6 WIRE BACKING / / .. AS �.���/ / / / / / / / / / \ /•� SSSF F—'SSF, S /.. /� nPi ./ / / S `■� /\40 � I / � SF ���■1■mot-■■m■■f♦• 0 1 T♦ S SSF F / \ / / / / / / / / FSSFSSF ■ N / / / / / jo /sl ON, �ASE I � ` (ti/ / / ,\/ / % DIVE RSI DA=:/4)5 ac. / � V / / /� / / ' / 1 N �- � ♦ � 11 I ' / / / / / / / / � / s�ICTYPE 9E / / �`` 1y / 3, / / OP� I / / / / / / / I / v' XIS ING TREELINE. TREES& VEGETATION IN THE VICINITY OF SEDIMENT / \BASIN W SHALL BE CLEARED. DURING THE EARLY STAGES OF ESC PHASE I, CLEARING & GRADING ACTIVITIES SHALL BE LIMITED TO THOSE / / / SOIL BOUNDARY, W I I ♦ NECESSARY FOR THE INSTALLATION OF THE ESC PHASE I MEASURES. / / TYP T 1 I I � Lic. No. 035791,E 2/4/22 J Ln z w f O z O J d 0 o U ZLuCO o =W In z J a O ti w u m z a Lu w w N � I W Lu ti O N I \\ �■ I A / / A �) �� / // / // / — 1 / / TPLu I� W W I \ 4 I ;■ 1�I \� M I I / `♦ \ \i t ` I / / / / / / / vv PROPOSEDTREE V? Il ■ I �� / / �� / / / / " PROTECTION � v+ I \ SOIL TYPE / 27B100 / to cy) WETLAND T REMATN \ PRO D �\ I / / - �� 0 UNDISTURdBED, TYP. I �� BAFF4 V POSEDIAF ENCE, m m I / �/ /INSTALL SIGNS "WARNING A �� �� / "�' I I / / / / / / I n QUICK SAND, KEEP OUT" 'A' / / 0- \ \ I / §EDIMENT BASfN N 'A' / �� / / J DA=8/.56 4f ♦ R��♦ ♦ �v I DISTURBANCE, TYP.PDLIMT d SOF \ �, / I ♦• ♦ Lu MANAGED STEEP / SLOPES, TY F A�\ i i / I �� SOILTYPE PE ■ E �ROPOSED 30'WIDEV OT CL. AI� Fa /1� / TS 4 ■ O RIPRAP LINED EMERGENCY V I / / PS - I / J ♦ �� m �1 U SPILLWAY W/ 4a SIDE SLOPES & W \ FABRICDERLAYMENT. SPILLWAY CREST ELEV.=3 i,6j. �� I N�� ` / / / l I I I I / / / ' ■ur --- LL] l l I I I l I�. \ 4# / y, Q a \ --LIMITS,TYP. �� .: ySS �' ! -- / I _ / / ♦ / U) DIVERSION, PHASE 1 AV U 0-6 w _X 4f / /ARMOSIITS OD m o / POSED SF WITH O V A\ \\ I I OIL TYP A - I I I I A \\ DISTURBANCE. D J WIRE 7C ® U) J LuL / ul �-f P>OPROPOSE TREE Lu Lu / w \, / \w ...... ✓S PROTECTION _ S\ �\ \ \ \ \ \ \ \ \\ \ \ \ \ \ I / \ I / 1 , / 0/ `Z \ / / PROPOSED 18" DIVERSION. /J / LJ- Q / PROPOSED 18 DIVEERSION. 1 J\ ` CONTRACTOR SHALL ENSURE / O = � CONTRACTOR SHALL ENSURE \ "1 \ \ \ \ \ \ \ �\ \ \ I \ I , \ \ \ \ / I / POSITIVE SLOPE S MAINTAINED. D- / / (n O POSITIVE SLOPE IS MAINTAINED \ BERM SHALL BE STABILIZED AS BERM SHALL BE STABILIZED AS E. A FIRST STEP IN DISTURBA CE A FIRST STEP IN DISTURBANCE. \ /// / / - � �_� ♦ \ \ \ V A \ / I I / I �� � - / / / / Lu I I I % I I \ <�VSOILTYPE SEDIMENT BASIN B' 4D ■�♦,// % / \ \ / DA=14.00 ac. / n S PROPOSEDSFWITH 0 DRAINAGE ) \ ♦ / --- ♦ _ WIRE BACKING l'V J / DIVIDE, TYP. .# ♦' / �� A , ASS / ♦� / l _ / v+ w SLOPES STEEPER THAN 3a SHALL BE PLANTED WITH A NAoeo TIVE i .T > ��� " ' / _ / ■ ■ ■ A# ) ♦� _ / / / / 0 x / / 7 SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST \ ' /� \ / / / / / ♦ - / / / / . / \ ! / CONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE, OR i / �..� �. r T J LL rp / Y I ♦ / / \ JOB NO. �. /. LB. PER T,000sf,UNLESS OTHERWISE SPECIFIED. THESE AREAS \ .� �..— =.�. �� - / �j i^n / _ % ♦ /� / / / G APHI SCAN / / / 182150 ARE HATCHED ON THIS SHEET WITH ABM'SYMBOL AND ALSO / - J` ` =� / \ / / l / / l / REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH STD. & SPEC. 6. SLOPES SHALL NOT EXCEED 2:1AS SHOWN. / T / / ' Imo\ / / / 30 �5 30 / e° / SCALE / ♦ - / / / ( IN EET ) / / �� V / SHEET NO. F MATCHLINE - SEE SHEE 5 / / / / ' 1 inch 30/ft. / / \� I / / RSIO--ILN`�/IW�S — �ENTER N�T/� E\R T/\H\ E WTE�_ \MVWWO-I\WTRI,I YIW I SSEDIMENT EI\ID iI 8`I" �IVEI I IRSEiIII I II�I/II I SI I FN" I�""I" WW,W W II III II5III�I �I1m� I. ;/l.. /�+ M I II }\I5\I \\ \ I I\ \/ \\ / '/ 1)s` ' I\ I I�V�� II IDRI qB�' I�O� .O, SII aI¢I .< ,g'1. �\I ,/ I�'� �'�� (I I, �I I I�\��/PSJ HIHI \/ OI AWE�I\NI\\�IMI \ I IM\ \\ I \�S �III-II`ITI\III\III I \ H� \\' \E�\ \ I I1 A /I \I � \�\ \ !\ \ I\ �♦\I _I1 I \/\\�I \I\` I /I \I \'� \\\I� I\ ��\9\/\\ \LI' _'\\ �/ :\ � �\ ' \ \- /\\ I\ �\� I� ` \P\S� \d8I�4 I_� —�vINa\Tc. '.L �,//_/_ /—�/9 .�.� _./ // / ./.�e /��� 9♦ �yr ♦ �/ L.,_.,_-/ //'//�/.. ,�/' l/-/./ •..._ �..J /-- _ ���� �. /. /..^./..�. /^// ' �_r%/../ r. . /\/////�J � ///—//// �/J''� _.�/ 5�/_. / / /��/If/ / /l�1 / f�/'///- .. "/ �//� /-.. �y�/ ///// .. //���//�..'�/'. /\... ////'./ '� . �// //////: .. ./-/ /.�/�./h%I�1/ /��I�//./I./ ..I��/.�.,j.I///-./ /..I . � ..1/ / ' qTr 0TEMPORRY OUTLET PROTECTIONS SHALL � ERMEDIATE RI DE( 0CNIDINGWITHI PROPOSED BERM) LIMITS THE DRAINAGE AREAS ATCHLINE EE S P�TOOION. TO DIVERSIONS TO A MAXIMUM OF 5 ac. SCE FE\,NZOzzanO� i N� tZFzarnaw�SNp4�" Z NSURE CONR --�POSITIVE SLOPE IS MAINTAINED. Llc. NO. 035791 BERM SHALL BE STABILIZEDASA FIRSTST PIN DISTURBANCE 2/4/22)D)IONA PROPOSEDrE CTO SED T BAS PROTEIN B' D 3.96 ac. I DIERSIO\ DC ITE's ROUGH DING. ' o PROPOSEDi8'DI RSION. O DIVERSION DA- 4 ac. OSH ZZwNZyT-LENSURE OSIT VESLOPEAINTANED. Nr, re) ABILIZEDASA FIRSTST P I ISTURBANCE.D I/ wPHASE IIO LU Nw O Z U PRTRE 0 P Z� OOSTREAM W0u00 � L Lf) U LIMITS, . Q 0 o > O$ED SF— w WIRE BACKINGw aco o Lu Lu P�ED�Ln o w >GFEENjAYTP. PHASE AVERSION � SHOWN MIMICS THE ITE's ROUGH GRADING. DIVERSION DA=4.45 �ROJE�T LIMNS YP. RSERVED STEP�NSLOPES, YP. w r: r _C krl o N O mnnnod`003n I/ /I I I\I I/ I�1S 1�— � l� \IIo \I�\/\I�\ /,'r^� G\'/v\/��\ �I"\ /I v\I/\ \ \ 1A \ - \ / I I-1 �I\// \I —� , \�/\h\// I \ / ✓ \I\I / —\ =`\'I/VI\ �\ , I IA/\ �- \��/ _ \// \�� I /\II j-JI - /-.I �/`WW?-/Rn—I.�\i / )WW� W.WWWh _�A .WW` Wwv`WWWWS�/;�SWF\�W`8 S\ Wv_p \ WW\l� W.� WW\F S /WW.— ��W \\�t/\ L�/9—�IIIISv\/�/ 1I/S'ICITl SI \\ /�/\\I� \ F yI s SII\�LI /FI/ /\l IVI II\ AV\I "`\III\(((�I,,,/ I \ /I � N I \IIV II �,I \vLL�I��I �\� NV�\ - I I � �: ■■■■ \-'`■-r ��\♦ `W. ' I�OI P /v '.♦..�`�`\\r �\;\;;�I \ 9 C\ �OSN_STsR/Uy\Cs ♦TO C ♦II I I ♦♦ ��.r �\' \�♦`"� \\ A� II F `_ . r/\\7-ao�� o T, / �;`r j,yH ./ / ® /S/ �/ �i��/,'1� //- /- -- //''-�/L ��°(� j� _: � / j � /�,_N /v -./> �../i�/- . �/ -./ .� �. / //���/'--_� .--..:h- �_�.: i/.// ./�/ /�.. � ��/%/-j_,•//I�W-I/ ,/ ., , �/WWW�/ //y.,/ �_ �WWW _ WyW�/-- ', / 111 D,/ II IRAIII II. I/N/ !I IAGIIvIEIDI// VI/ / I/D/,/I I � / / PHASE I�EPROPOSED LIMITS O DISTURBANCE, z6.z5 ac.T�L. DA-2ac. /V V � Lu POPSDRENWAYT�P.0/ //! coPROPOSED SAFETY FENCE, INSTALL SIGNS "WARNING QUICK SAND, OUT'CONTR ORSHALLINSTALA TOREMAIN ■ S, TPl'V_ F-Vz0ZcG(o) n ,TY .3_�owwz�n UNDISTUR -� DIVERSION -ACROSS THE `oOa3EoonUn>: CONSTgll2FION ACCESS$6A0 c/ � OOSSir) BACKING V B Lu >3o NATURAL BUFFER ALONG OP PROPERTY s PERIMETER U w ozw MA O ,V^ / 0 __V \OOPL P. _Q3 LU MITSbFPROPOSED DISTURBANCE, TYP. PROPOSED CONTRACTOR PARKING&TAGIN�AREA 00 o L CATION OFi�YUMPSTER/ 0 PROPOSED\SwS WIRE BA ♦ ZI OC TIOFPORTAPTTIE S5 ul U) LU LOCATION OF FUELING ARE i\ \\ ♦Iq,I � �PROP SE THE rUELIN6'TANK SHALL BE COMPIL TIE�Z I / / l/ w AUT AR A z'DEEP, z'WIDE EARTHEN BERM WITH A HEAVY MIL 9J LJ POLYETHYLENE LINING, OR BE PLACED IN AN IMPERVI OPEN-TOP DUMPSTER. THE PROPOSED BERM OR DUM05 w OPUSTIER SHALL ENSURE VOLUME CAPACITY IS io6 LARGER THAN THE z XIMUMVO/UMEOFSTQEDFUELy W W WSHALL CONTAIN FUEL IN THE SPILL. CONTRACTOR 34 o / w/ CON" SHALL IN\A R/W DIVERSION ACROSS TH D CONSTRU ON ENTRANCEv (DPRO 0 ED PAV D CONSTUCTIONENTRA CE EXISTIN jz'CMPCULVERT (iYx7oMIN.) w/WASH RACK&DOWN GRADIENT Ll CIESEDIMENT TRAPPING DEVICE TO TREAT FLASH ws RUNOFF FROM VEHICULAR W HOFF JGRAPHIC SCAL b F- o JOB No. DIVE SILL B uj /ANSAA- - .i \ \ \ POLO ND E ` �j \ \ I s \ \ 5 \ \ \ \ I ` ( IN FE�T 11 \ \ \ I82150 o GROUNDS \ �� 7�� \ \ 1 inch 30 ft. y _ \ (VARIABLE w, '10)AD _ s� \ \ SLOPES STEEPER THAN 3:1 SHALL BE PLANTED WITH A NATIVE SCALE �___ g �'E— `s\ �5 ���_ _ \ \ \ \ \ \ \ SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST j it ���� ` of EX Eo643 s CONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE, OR 1 �� �® / \ \ \ \ \ \ \ \ cp \ \ LB. PER 2,000 sf, UNLESS OTHERWISE SPECIFIED. THESE AREAS o L®G\� \ \ a o\� \\ ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO SHEET NO. n _® xISTING48"CMPCUL RT \\ \ \� --.,REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH N STD. & SPEC. 3.36. SLOPES SHALL NOT EXCEED 2:1, AS SHOWN. 7 F PROPOSED S WITH / �/ _� u / l I�E IRE BACKIMATCHLINE -SEE SHEET coNT�APOL is DIVERSION.is 45 ■ ■ ■■ SCOTT R. LLINS� OR SHALL ENSUREMAINTAINED.BRPOSITIVE SL-PEE ISM SHBE D _S -/ ,FSF /.1 DRAINAGE2/4/22 STABILIZED AS A FIRST STEP IN ry u\DIVIDE, TYP. / �pLIMIM� � / - APPROVED ioo YR ./. - / DISTURBANCE. / SF / / \ F\ / . / / / / �� / �SSIONAL E�Ol l I FLOODPLAIN, P. / .. S ,�- / PRESEREEP / r Q� -1� i / / V ... SLOPES, TYP. I / I \ , / / MANAGED/EEr / ,SLOPES, TYP. rJJ M CN PROPOSED STOCK 3LE 1 \ �2 �- Cti v / / / / / ' / �p O Q Z g f w /PROJECT / c\�,1 (� LIMITS, TYP I / / o j` SURROUNDED BY SILT FENCE raj 1 / / / / / / / / U) p U l l / I l / l / l hco ♦ 1 \ \ O `��+\U��l < z z PROPOSED I -/ j . %� �t \ 1 I I \ _ / / / / / / O �_ ¢ w 0 =p \ GREENWAY,TYP. / / �$\\ \ INTERMEDIATE RIDGE / / / .� / / • / co w w V / B ) I \ \ \ \ I 1 I 1 1 \ \ (COINCIDING MITS THE DRAINAGE) f / /,.,j ,~ w Z. < Q Lu _j -AREAS TO DIVERSIONS' 2 __ ._- / / / / • :. / Lu 0- m m w AINAXIMUNFOF G / / /,♦ •/ �� /W/ o 0 / w / / I 30 / / / / / / ,� m ST �AM 11 II (.-.. ♦ ' (�/I � pl I/LIMITS, TjR I I -II ' -��✓U� ' / �'/ / / �i N N dll H- crz RO'PO SEDTREE ♦ / / , PROTECTION T -� �: / �: .ti o N ..� �i J /42IMENT,BASIN `g' (DA=13.96 ac. _ ( II / /I / 430 OSED LIMITS OF /- / i / I cr? I I I DISTURBANCE, TYP. / , BM I / / I / / / S "1a / / N PROPOSED SF WITH �^J; ,/ II WIRE BACKING 5 I \ ` I f / DC N /♦ / O / / / /. �. / / / I ® M I It I M 1 I / — I / ♦ / / / / / / \ \ \NT 5 FIR OPOSED SF I H `� I lJ WETLANDS TO REMAIN 1 WIREBACKING (V / I UIN DISTURBED, TYP. _ / I I I / , - DRAINAG�� / / / / / / �, 1 - I / I % DIVIDE,TYP.� / / A � J PROPO 18" DIVERSION. / / / 1 \ N 0- C TRACTOR SHALL ENSURE D POSI SLOPE IS MAINTAINED. / / Q STABILIZED AS I / - / / / / > 0 STST NDISTURBANCE. '� / / ♦ / / / Lu > z O II \ 'III ory / w W\ s / v I I \ / L9 0 110 2: / INTERMEDIATE I / 1 / (COINCIDING WITH LQT 4 / /. .. .. .... ./... ..... )1 I Q (%1 w \ W II I I I I LIMITS THE DRAINAGE 2 / _ - _ _ / 1 _ \v,� REAS TO DIVERSIONS TO / � ��/ _ � W W I I , AMA M OF S aC. - / - - / - - W AI / / ✓ l r. j U 03 I / / j A10-6 r I U z 1 / � Co o INTERMEDIATE RID COINCIDING WITH / / �S /. % �. J PRO SEDBERM)LIMITSTHE INAGEAREAS / / ..,./ ✓ ... .. .... ..... ... / U) J w DIVERSIONS TO AMA UM OF 5 ac. a / / , y�i - - /' - / / _ P-11 FI U) LLJ Lu ASE II DIVERSION � � Z ♦'� / , � � / / �/ / � � � - � � w IrI\ \ �WN MIMICS THE /� / /.- n/ SITE's ROUGkF GRADIN / ♦ / �iSS / / / .. / W O Q I..I\... \ \ \ \ -,DIVERSION DA=4.14 ac. / / - / r / / / / _/./...... .... ..... _ U) \ �\ \ \ \ / �>c / �� - PROPOSEDLIMIl'SOF_ /,'� I CII P�OPOS� i8 I� RSION. - r 0 JV �. CONTRACTOR SHALL ENSURE - ' \ T iv / i /. DISTURBANCE, 26.25 ac. TOTAL. �- - �� POSITIVE SLOPE IS DIVERSION, PHAS II 1 \ \ '` / / / -/ / /.. Jam/ _ _ i J w MAINTAINED. BERM SHALL BE - DA=2.05 ac. n/ STABILIZED AS A FIRST STEP INLI- \/�� o \ I !I \ \'� 1 / / / /.� 3o NATURAL BUFFER ALONG / / / / / N PROPERTY s PERIMETER �, / / / T I LL T / /�/y� � {��� T ry �� I L �I ( _\ \ \ _ a �� ` \ \ /� \ ° / PH E II DIVERSION 4 / / �'/ /. / / / / / ��,. - VS4T. 1-�E11X� /C+ SCALE V F I `\ O O /2� SHO MIMICS THE / / / SCALL H � SITE'S RO HGRADING. /'^� / / / �.- �/. / / �/ / / / /Lu DIV N - / / -/ -/ / / 30 15 30 60 00 W \ \ \ _ I � JOB NO. IN�FE7 I 1pch — o t. \ \ 182150 SLOPES STEEPER THAN 3:2 SHALL BE PLANTED WITH A NATIVE SCALE / ✓ SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST 1 nCONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE, OR 1 1 = 3O � � � f l 1 / / / / LB. PER T,000 sf, UNLESS OTHERWISE SPECIFIED. THESE AREAS INTERMEDIATE RIDGE OINCIDIN6WITH / ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO SHEET N0. SIGN l� WSW IW �� \ TS'� '� i \ PROPOSED BERM) LIMITS THE DRAINAGE AREAS MA C H L I E - S E S H E ET 7� .' / �yy/ / / '�_ '. J I I / l I I l / / REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH TO DIVERSIONS TO A MAXIMUM OF 5 ac. NSURE I \ \ �✓ \ -. / / STD. & SPEC. 3.36. SLOPES SHALL NOT EXCEED 2:1, AS SHOWN. W HERE DIVERSIONS ENTER THE TEMPORARY SEDIMENT // / / IC C L w r ASINS. ALL TEMPORARY OUTLET PROTECTIONS SHALL BE �/ r \ �� / / / / / / ' / / /�� / 30 /G HI 3°A ElWxlQ'Lx2'D & SHAI I CONSIST OF \lDQT CI AT qTONF / WJ . IN FEET ) / PROPOSED SE EASE EST & ' i U = /z / / -' , / i.. �/.. / /.. � ---OPEN SPACEEASEMENT� � SSF / � / 1 �h = 30 ft. w/ / PROPOSE SWM FOREST&OPEN / / -/. / / / r / / / / -/ / / / "i �,-.PR6POSEDTREE Tp �,30 / / / / .. —! ' PROTECTION Q / SPA EASEMENT AREA TO/ s LU I REM IN UNDISTURBED, TYP. / PROJECT LIMIT p PROPOSED 18" DIVERSION. /../�" .. / \ / �. _-,. ..,., SF CONTRACTOR SHALL ENSURE � -� Z- POSITIVE SLOPE IS MAINTAINED. y / -./ / - /.-. f� / 'PRESERVEDSTEEP / /AFIRST�TEPBNDSTURBANCE. / _� � �J� r�/ y SLO ES, TYP. � - / PRO,9,�V,^,ED / �,.-�......- / -. � / J / PROPOSEDSFWITH S. //... SSF/ / GREENWAY /.. �... �". /..n/WIRE BACKIN j'.. / - _55F/. • � / / ♦ \ % J _ ' SSF S j/00 4-14 Ll 420 00.0 ftft BM o / 1 / / /I / / T 1 / / ;COTT/R. CI INS'Z Lic. No. 035791,E 2/4/22 F z w f f O O z O Z a � (n o "_� Z a z z J O a W o Ln F— m w Lu � w � `H w W W tE CD In CN ti �0 O N INTERMEDIATE RIDGE (COINCIDING WITH 1 � PROPOSED BERM) LIMITS THE DRAINAGE AREAS 1 INTERMEDIATE (COINCIDING WITH LORIDGE f A� / TO DIVERSIONS TO A MAXIMUM OF 5 ac. " / vim, / T) &Y 1 L9 LIMITS THE DRAINAGE \ I r / REAS TO IVERSIONS TO % / / / A MAXIMIM OF 5 ac. III��J ___ /,... T P•POSED TREE M 1412 I / 1 \ { / M / / /01 / / / 1 % PROTECTION N co i WETLAND T REMA7IJ /; RO D \\ I I I ' / SEDIMENT BASIN �A� / / 1 N z UNDISTURBED, TYP. / _ i T N �//�-{�� / BAFFI / / DA-$� c. / / / 1 C) _j Q `YKVPOSEDIAF ENCE, / o I { / m /INSTALL SIGNS "WARNING A I �� / { I / / / I / -- N N J QUICK SAND, KEEP OUT" B'A' I ��� I o I � I i I � � ��/� 0 D15iUK LIM SOFA A '',� / I I I / I / �. �_ V / DISTURBANCE, TYP. � � � I I MANAGED STEE��� A , SLOPES, TYP. ',`. ,�V� ,••� So I F V I O / PR RIP LINED EMERGENCY PS I I I I TS I ♦ w TI SPILLWAYw/4:1 SIDE SLOPES&.y. `16 z FILTER FABRIC AYMENT. / !p I I I I I I I I I / / /Lu SPILLWAY CRESTST ELEVELEV.=31.6T. \ \ / bcy IVERA= N7 pac. E II / I Vry�" I I I I I `� I I I I I I / / ♦ �' / � Q Q w \ STREAM U ,J( —LIMITS, TYP. w O z // /` /36& X I I I 1 l / j/ •/// / w m U) / P OPOSED SF WITH S { \ I I PROPOSED r / / \ \ \ w' I I 1 \ I / / I I / / / . / DISTURBANCE, � J w WIRE B�ING \yS \ N I 1 1 1 \ \ \ ' 26.25 ac. TOTAL. ul —��,, s ♦� A 1 �� / / w 2 w PROPOS TREE ��7 �.... w Q 6, PROPOSED 18"1�ION. N CONTRACTOR SHALL ENSURE W .. ... \ I �1 INTERMEDIATE RIDGE POSITIVE SLOPE IS MAINTAINED.\� � � \ \ � \ \ � BERM SHALL BE STABILIZED AS FIRST STEP IN DISTURBANCE. -..\ \ \ \ \ \�� I �' CLiMIiS THE DR,4 NAGT) AREAS 40 DIVERSIONS% \ / / / / // / // /I /.- / \- \ ) ♦.. <.. k�o \ \ \ \ I I I MAXIMUM OF Sac. ' r / / 00 / o x / S PROPOSED SF WITH N WIRE BACKING / / s �o ■ W _ DIVIDE, TYP. r ■ ■ ■ ■ ■ * ui / / Lu 3: D WITH A NATIVE _ dss y0 5 T F- SLOPE MIX W TH ANNUAL RY GRASS BY RN / CONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE, OR 1 // LB. PER i,000 sf, UNLESS OTHERWISE SPECIFIED. THESE AREAS \ — i /�� { { I : / / / JOB No. / r ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO — REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH 182150 —= �� = / / / / \ STD. & SPEC. 3.36. SLOPES SHALL NOT EXCEED 2:1, AS SHOWN. / �_/ / . / 1♦ / / " 1 ( SCALE // / / / / / / / / / / = �_— /. / i N ♦♦ �� ♦ SED�IENT BASIN B 1 =30 - / I / � / / / / / � / � � � ♦� � � I ♦ DA=13.96 ac. � / / 1 \ � SHEET NO. - MATCHLINE SEE SHEE / ♦ / 9 HERE DIVERSIONS ENTER THE TEMPORARY SEDIMENT ASINS. ALL TEMPORARY OUTLET PROTECTIONS SHALL W y i I PkOPOSED1B DI ERSIONII � IW W I I \�\ W° 1 T5 v \ 5 \ fl S _ ��5/ SIC R. LLINSZ I� O - CONTRACTOR SHALL ENSURE Lic. No. 035791� POSITIVE SLOPE IS MAINTAINED. \ \ — 3 / BERM FI FIRST STEP IN DISTURBANCE. A \ STR. zg • \ \\ \ J_ / �y 2�4�22 j CONTRACTORS ALL S AT M ORARYI F,�Os PROPOSED TREE W I 6o" MH AT THE OUTLET OF STR. zg IP \ •, y a `�'9g ° ONAL y R I (INV.INTO TEMP.MH=379-25 PROTECTp INV. OUT OF TEMP. M H=379.15) ✓// 1 I / All I / I D C , W � a� I / PR OSED izS.00 OF TEM ORARV zr,'CP. / \\\ _ 3 - f .. / /. /../ / �. / /. j / j / N N\- BETWEEN TEMP. MH &STR. BBzz (II= 7g.z 10=37z.87) i 9� , co y zwoo z Lu Lu Lu PRO�POSE TREE. / / / - / O J w w / s , .. ... �/... / F Q Z r / PROT TIO / / / / a o g �+ / /// / � o � — ( \ STREAM`j DA=13.96 ac. r / /`\ s // /. / / /� / la� 0 0 V } IN II DIV RD , PHA E III 1 s \ \ / \ g. ♦ .. / .. j / / / z p j Z Z L LIMITS, TYP. / f M L O p o ST�1{. , �.\\v j- j. / O O z m w UO i U PROPOSED SF WITH I + f Lu Z Q �• J WIRE BACKIN S 'I I / \ I I I 9 6 n6-- /.// 3 O s 3 / / /../ _,../ / /.. W w a w o 0 4 w / IPROP,OSED, I s w w / Gf�EENWAY, TYP. h / �.. \\ \ \ // _ ..- / / w w �ROJE(T LIMIIIS, I I I I ■ \ \ / / \ \ / / ♦ PRESERVED STEEP / / / / / / �/ SLOPES, TYP. ... // w cli Rl N N M \ N 40000 I I / W W W W . W .\\ \ \ I I ■ l `' \ / . .. DRAI NA EDIVIDE.. \ I / W .WWWWWWWWW PROPOSED LIMITS OF W DISTURBANCE, z6cTOTAL. � I I,I / WW,W ,.„.,., I \\� III ■� � � / I L , � J \ IP �J 3$ • �-'�� �/. �. J�'� ,/�.//.���_. / / /�/l l l/ /f / / � � •/ I / I I / —��W W . W W W W W W / I I 1 \ NII s ■ s \ s s _�.. ROPOSt_�GR P. // / / M 1 ^ L9 382 P EENWAY, TY / / cyi INSTALL � SAND, KEEP OUT" • •%O / // PROPOSED ASPHALT b ',\\ \ \ ` � ,. W W , W ,. wj/ / I ■ / C �/ WW DIVERSION \ \ W W W WETLANDSTO REMAIN I I 37 '' ■ PROPOSED BAFFLES - STREAM LIMITS, TYP., \\ ` UNDISTURBED, TY=55F O z 1 \ \ SF F / / I ♦ w / S PROPOSED KI WITH / f N rn \ , I / E Q \' p / ■ / WIRE BACKING / / ® j /jam J I �\ \� I SF/ F 4 . o /. / / // // // // / // / / / / > 0 B' I c / ' Lu �- \3o NATURALBUFFER LONG -/ / / / / / f / /\ / / J /UY O 1 \\ SSF OF I ra PROPERTYsPERIMETER/ / ._ / w � z / I I \ ♦ 360 / / .. / . / / / / / / / / / / / ld Lu ASS \ l �_, IIIo �PPROVE 400YR 11 ..: \ ♦ //� ,. - / .. / _ . Lp�/I / / / / / / / f / / / / / / .. F OOPPL TYP. a ✓ a ., / /. / J T� Q v ,� �I ♦ / / PROPOSED LIMITS F I - \ � —__ w DISTURBANCE, TYP. LLI IP PROPOSED CONTRAC OR W / W / f r , / � � / � � � \ V I � ■ \ � �. �;� ARKING�TAGIN�iAREA� � \ / I �IJ � Z ■ L CATION OF iS CY DUMPSTER PROPOSEDSF�I� S I �� �i - j / �. / l l / / I I 1 WIRE BACK NC I \ l / �� W I I / I \ -IP �A LU LU c O ` \ \\ R OD ' I l I l l l I I I / / \ \ 3s \ \ I Lu CONSICUSS ION.0 / .'. OCAATIONOFPORTA-POTTIES' S' .. f .... lam. I I / / I I l I I \ U� J LOCATION OFFUELING AREA/ �/ / _t \ \ N ROPOSE CONC. THE FUELING`TANK SHALL BE COMPLETE L URROul UNDED B�YA \Lu / \': WASH UTAR A _ - z' DEEP, Y WIDE EARTHEN BERM WITH A HEAVY MIL �g� I / / `w ' \ \ \ \ \ L u ^� 344 34 —M ` /,/\ I S \ \ - / POLYETHYLENE LINING, OR BE PLACED IN AN IMPERVIOUS W W Wes" . W I ` I I I / r l "(�lWv ^` \ \ \ \ \ \ \ \ \ \ � / A? _ o WI E PD LANTED/ R FOR STED s \ OPEN -TOP DUMPSTER. THE PROPOSED BERM OR DUMPSTER\`� \ \ LL O 3 dg $ SHALL CONTAIN FUEL IN THE EVENT OFA SPILL CONTRACTOR \I / / I BUFFER A ONG POLO ROUNDS R �\\ \ 1(\ )1' \ \ �.' - SHALL ENSURE VOLUME CAPACITY IS zo%LARGER THAN THE \ ,.`. / �J \y IMUM VOLUME OF ST ED FUEL. � � w m 34 —352 S / vJy \\ \ O 3 \ / � W W W W W W W W W W W W \ \\ s — 354 IWWWWWwWWWWWW W \l I I I I I I I I \ \ \ \ \ \ \ \ \\ j 35 W W I I I \\ \ \ Q 354 .o s�, \� — � \ // W � W � W � W � W . W . \ \ \ � \ � \ \ \ \ � _ I w \ / W ° / // 5 w W WIW •W I� 1 / I I I I \ \ \ \ \\ o 5 U ON ENT CV _ _ PRO 0' ED PAV D N TR 12'x70' MIN.) w/ WASH RACK &DOWN GRADIENT SEDIMENTTRAPPING DEVICE TO TREAT FLASH RUNOFF FROM EHI U A W y f \ 1 I \ \ \ \ \ w _ I J w GRALn �H� ------ \ �yw cryPocE� —I— \ \ \ I I ( IN FE T \ \ .....� JOB NO. zzzCa _ \ \ POLO (� I \ s� �— \ \ \ I ` 1 inch = �30 182150 GRO / VARIABLE ROAD '� I TiL s s \ ABLE bylpTH °� � \ , s �o! � \_ SLOPES STEEPER THAN 3a SHALL BE PLANTED WITH A NATIVE SCALE 5z344� TAiRBRtIL g �e' 3 ��� \ \ \ \ \ \ \ \ w SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST 1 it CONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE OR i /(1 4 643®� j(y���� \ \ \ \ \ \ \ ��cp \ \ LB. PER i,000 sf, UNLESS OTHERWISE SPECIFIED. THESE AREAS ®�p®�\ ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO — SHEET NO. oG \\ REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH t o � �� \ \ �� \ STD. &SPEC. 3.36. SLOPES SHALL NOT EXCEED 2:1, AS SHOWN. PROPOSED ZWITH—,"' ♦� WIRE BACKING / I I L I �� / I I// /._/,.,�./ ./ ./P' E/S,ma,/ xT/Y/P/. �r'/�.I l // B(E . S / P \ S/ / �`i 5 / /�// .i�Fce � /� \/`V♦ N • \ r�� F I // // // / \ /• ��p �/ / �� // F MAFT�. CH�FLINEF —i SEF�E SL/ H •/•�. � ♦ /PROPOSED 18 DIVERSION. CONTRACTOR HLLENSURSS D MAINTAINED. BERM SHALL IMI/�IFFEM44 STABILIZED ASA FIRST STEP IN APPROVED iooYR DISTURBANCE FLOODPLAIN,TY. /'00 PRESERVEDTEEP W 00 SLO♦ I ' / AS maw 430 r �t CNo. jj�LINSZ791DRAINAG / 4'YP. � -• y / w �'O1 N M V) 00 z z y z � �/A 1 t�� \ / /� \ � 3 3 O Lu 0 L w / GPROJ€CT / o / v �" / / — P / / v"� 0 0 0 x i�LIM�TS, TYP.I V �: O o = z Z PROPOSED / / /� \ / e _ 1 1 _ 1 I _ V p U O \/ 0 \ �GREENWAY,TYP. - / - /f % \� \ / 3 IP / / O H m w U U Lu ` # . e J J w a Q �mww co Q / W wdw ; vwi Lu Lu IIIfI� /LIMITS, TYP. I - / / / I \ ° - -., (mil I I 1 / .. �..'.'....... / I f — / / \ a / I N N N / PROPOSED TREE \ .• / _� TS / a / /xI� O O t i PROTECTION I III I I _ I j j " b� <•; / /� I �I - ' I R CISEDLIMITSOF EDIMEPVI BASI �B� M I DISTURBANCE, TYP. 1 Ip I I ° / / DA=13.96 ac. / I / / / C•M I IIOPOSED SF WITH I _. -3 / / / / � � / O � •° `' \ \ \ / . / / � S / // I N I I WIRE BACKING S / \ I / / DC / IP \ N ;-. ._,. / / / / / / r 1 . 04 \ W TLANDSTOREMAINO - I _ N \ / \ / /. DRAINAGE �/ / % �, I J z UNDISTURBED, TYP. I 3 / I/ \ \ \ / \ IP DIVIDE, TYP. ^ Q W W W • ° � � 1Lu J > T� U Lu lot C;6 4 W I IVERSION�IPHASE III � w ••• 1\ .^ ,.•'° j/ I I I I I I \ / \ / 3 /. / /..... �/ . / \ O N I --I w U Z a 3.0Q o w ___I F cn _ co ul° 41/ 1 I PLO OS� 18"DIVERSION. i— / / PROPOSED LIMITS OF - / - CONTRACTOR SHALL ENSURE ` 1 : \ � � d� c \ . • � - �° � .DISTURBANCE, 6 z5 ac. TOTAL. JJJ___ ' � .. .. T ! TA> POSITIVE SLOPE IS _�y/ MAINTAINED. BERM SHALL BE � N \� - � w STABILIZED ASAFIRST STEP IN ' \ -_ .• 1 \ \ `- .ia \ \� DISTURBANCE.\ I 41mmj Q O o NATURAL BUFFER ALONG '�PROPERTYSPERIMETER / II r V \ s PoSCALELu / 10 s O JOB NO. 1_ E> \ \ 182150 1 1 ipch �30 t. 1 �; 5 / A / 55 SLOPES STEEPER THAN 3:1 SHALL BE PLANTED WITH A NATIVE 1 AI\ SCALE � \ \ V - 1 =30 \� / SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST n CONSERVATION SEEDS AT A RATE OF 6o LBS PER ACRE OR i LB. PER i,000 sf, UNLESS OTHERWISE SPECIFIED. THESE AREAS ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO SHEET N0. II I I \� �� e MAC LINE REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH 11 $ION. TS �� STD. & SPEC. 3.36. SLOPES SHALL NOT EXCEED z:i, AS SHOWN. NSURE I ---- ESC PHASE III NOTE: - - - 5 N TE: UTLET PR TE TI N HALL BE INSTALL __ _ RA�HIC S ALE / WHERE DIVERSIONS ENTER TH E TEMPORARY SEDIMENT THE CONSTRUCTION NLOTS YSTE7& / !�/ / j. / / / _ / / / H ' BASINS. ALL TEMPORARY OUTLET PROTECTIONS SHALL BE 'vNDERGROUND DETENTION SYSTEM'A' SHALL i ✓ / / / / / / — / / \ / o / o ,5 0 / eoT �F� r 1 / 'WX BE DELAYED AS LONG AS POSSIBLE TO PROLONG THE LIFE OF TEMPORARILY SEDIMENT BASIN'A'. / % /. / / w/ c/ / \ �, / �� I /�.,�_/ �... j \� / /.... PROPOSED SWM_FOREST& ...� � �� � � �55F ( IN k'EET) �SCOTT R. LINS'_Z i w s / /J - _ /, / / / / / - /- - --OPEN SPAC1= EASEMENT ! / _SSF . �, \ / 1 in = 30 Ft\ / O Lic. No. 035791 ,a i ° woo/ V PRO PASS EASEMENT AREA TO/ /.PROPOSED TREE55F_/SSF. 43 2�4�22 _ / 3 / / / PROTECTION / 4i4 /A�O��4' cs LIJ I \ REM NDISTURBED,,�1'P.LIJ %... •1 \ .. /.._ �../ ..._./ _ j /�_./ j..i /. /� /ii ' /_.. ✓... //SW �SF / / �SSIONAL EEO` V PROJECTLIMITS� PROP �� -5�f7, / _/ /. /. �i .// / .. _ _ SCI�-F � /\ 1 CID TY%. \ / J_� SF r, o NN / / .. -PROPOSED 18" DIVERSION. �. .. / . ✓ ., i_ .. i� 42 / T , / / w 00, /CONTRACTOR SHALL ENSURE - POSITIVE SLOPE IS MAINTAINED. BERM SHALL BE STABILIZED AS - /� - Z PRESERVED STEEP A FIRST STEP IN DISTURBANCE. / /J q - SLOPES, TYP. �-` �_ / ti 1 PROPOSED... i �� ../ �,.-:� / � PROP SF WITH �. 5F i 44 \ 'D : N ' .. - .. y �� JJJ""" 6 .. WIRE BACKING S`rT N � a GREENWAY \ / DIVERSION, PHASEIII n/ / .. —SSF 412 ... ^ m L)A_ (D /. ./ /' SF - ---_ - - - ZO o _ _ S - y� F S \ / J — SSF— .y /-. /.� i / ,v--" ♦ Z V Z H Ln LU ' SF �`SSF� F �� \ l/ ♦♦ s / 3 r O J w w / �/ " o U o s ca 5 / �W Z J Q O �O O W V O Lu Lu W yo BM / 4 I a w g ° —L -_- I ( � � '�" s •i`'� / � � `� / / '^ � � Q `° m I \ ^ W W 126* �I/ j ��♦414, _6/ s w/W P T / > w > Lu � w U W N �■ I V / V / / ��4 / / s w 52 RAT RS ALL N T S RM SEWER AN• OLF�, / / s w - 1 •.. 4 / -° I INLET BASES WITH SEGMENTAL RINGS. STRUCTURE RIM TOP W ■ �' I ELEVATIONS SHALL BE FIELD FITTED DURING "CONSTRUCTION W 't W N I✓ TO MATCH THE INTERIM FILL GRADES, UNTIL THE FINAL / +'. e %' -- • W o / 9- / / / / r � GRADES ARE ACHIEVED, TYP. THIS PROCESS WILL PROLONG THE LIFE OF SEDIMENT BASINA& WILLALLOW FOR THE/ IP / ND STORM SEWER RUNOFF TO DISCHARGE INTO THE u I UPLAND A IN DURI G QN TRUCTI NFORT I1 � � �� I II � LOT I � W W W W W W �"' IP , - ,: — / ♦ / C � � � � o W I II 1 o C / I / o W I V ,' LOT � •, � � — ti I I \ Lu - 124t* \ I I TP M cyi \ _ _ P PROTECTION E PR o 04 0 ��3k 41O y _ _ / \ L / F .s WETLAND T REMA / `+ S _ . UNDISTUR!B�EyD�, TYP. � / /. / BAFFI, \ Y / � / .^ • (V < z n `YRVPOSEDIAFE FENCE, • / / I, h I I I / I / / / / 3 3 0 J ' Id I I BA / I o /INSTALL SIGNS' WARNING A I / / / I / �/ / I.. N Q QUICKSAND, KEEP OUT" y / ' _ -�' � � o / ' I � � _ � N — � • N � a- \ v 1 S DTM N ASIN Q J 3 \ d �PRbP05 LIM750E- — DA=8.30 dC. vi O DISTURBANCE, TYP. ` �/ %I — — V o 4 MANAGED STEE� /W / / S / I / I I / 3 I 1p • z � J s 0 ! A,SLOPES, TYP. \ / s ko / h F I ■ ■ ■ J ^ O PROPOSED 30'WIDEV OT CL. AT\ RIPRAP LINED EMERGENCY 1 \ `� SPILLW WWI SIDE SLOPES&y \\ \ o // �" ° �� / \ \ ✓/I — II FILTER FABRIC UNDERLAYMENT. '� \ \ a �' L P (o SPILLWAY CREST ELEV.=3 i;67'. .PRO SEDT M O A \TO OUTFALL THE UPLAND STORM w%�-SEDIMENT BASINA I J �CJJ N h \ r UNTILTHE BASIN IS CONVERTED & THE UNDERGROUND DETENTION I A S I \ F Cl I IS IN TAIL Er) STREAM LIMITS, TYP. / / I /y y I r /PR_0POSED SF WIRE BACKING V // 377E \ ysS �� v �� F �' / �0IN - -- PROPOSE TREE W \ < PROTECTION - W� \ iw0 ERSION,PHAS III \ i, <�.• / \ 1 \ 1 / �_ ( 3 D AIIN G 3 / • DIVIDE, TYP. I :-:/ �:-/:./�\ // SLOPES STEEPER THAN 3:1 SHALL BE PLANTED WITH A NATIVE f SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST CONSERi TIION SEEDS ATA S OTHERWISE OF 6o LB SPECIFIED. THESE AREAS / � — � / / 3 SE IME DA- / ARE HATCHED ON THIS SHEET WITH A'BM' SYMBOL AND ALSO d REQUIRE BLANKET MATTING IN ACCORDANCE WITH THE VESCH / If STD. & SPEC. 3.36. SLOPES SHALL NOT EXCEED 2:1, AS SHOWN. F MATCHLINE SEE SHEET 11 3II r^ 0 in vJ `o ® � 06 ur 0 Lu t,0 L v . X J I T Q° IOf s Q LLI � s V / / V / x w Y / 0 3 0 3 pp o LLI PROPOSED 1 LIMITS OF 1 W / DISTURBANCE, J / 26.25 ac. TOTAL. ul J If / / z LLI LLI w LLI z o' • / 0� O Q w I c> �I� n T / O O x / U X •_. � / S PROPOSED SF WITH N °' WIRE BACKING s / W � /A U y / 3 T b C Q I W P Of 0 JOB NO. 3C. / 1 182150 0 U 11 1 SCALE ° \ \/ 1„=30' C O SHEET NO. n 12 N � v SEDIMENT BASIN 'A' DETAIL, SCALE 1"=30' •� W PROPOSED 030" OUTFALL SYSTEM. SEE W SHEET 16 FOR DESIGN INFORMATION - PERTAINING TO STRUCTURES A4, A6, A7, A9, A10 & Au. STRUCTURES A4, A6, A7, AS, Aio & Au SHALL BE UTILIZED DURING \ THE ESC PHASES. 1 R f- 1 LIMITS OF FEMA APPROVED2oo YR FLOODPLAIN, TYP. _n PROPOSED RIPRAP LINED OUTLET PROTECTION. SEE SHEETI6B FOR ' 1992 3.14 ANTI -SEEP COLLAR REQUIREMENTS: i. THE SEDIMENT BASIN W OUTFALL PIPE BELOW THE RISER REQUIRES THREE 4.31 x 4.3'W COLLARS. e 2. THE SEDIMENT BASIN'B'OUTFALL PIPE BELOW THE RISER REQUIRES TWO 5.31x5.3'W COLLARS. 3. THE MAXIMUM SPACING OF THE COLLARS SHALL BE 14 TIMES THE PROJECTION OF THE COLLARS ABOVE ANTI -SEEP COLLAR THE BARREL. 4. COLLARS SHALL NOT BE LOCATED CLOSER THAN 2' TO A PIPE JOINT. 5. COLLARS SHALL BE SUFFICIENTLY FAR APARTTO ALLOW SPACE FOR HAULING AND COMPACTING EQUIPMENT. 6. 95%COMPACTION SHALL BE ACHIEVED IN THE AREAS SURROUNDING THE COLLARS. 7 CONNECTIONS BETWEEN THE COLLARDS AND THE BARREL SHALL BE WATERTIGHT Sediment Basin Design A MIN. 1' WI SPILLWAY CREST OF EMERGEM 2'WITHOUT SPILLWAY drainage area (acres) 8.59 DESIGN HIGH WATER basin volumes: (using 2' contour intervals) '(25-YR. STORM E".) elevation (ft) contour area (so volume(cy) O.V MIN1.0' 7f RISER CREST 364.00 2992.0 0 om sroRAGE OEWATEPoNG 366.00 4129.0 263 of GE 368.00 5447.0 616 WE�E DESIGN INFORMATION. / W N \ ` 370.00 6962.0 1075 `' W ri SEDIMENT * CLFAI10E POINT (1] v- Source: Va. DSWC Plate 3.14-4 372.00 8693.0 1653 (• WET • STAGE REWCED �� STR. AST ti To }• C.Y./ILRE) ' * rn / 373.00 10090.0 2001 W I U w A wet storage: f / / / / / wet storage required (cy) (67*DA) 576 design high water 371.67 2: dewatering orifice elevation (ft) 367.77 top of dam (ft) 373.00 F wet storage provided at this elevation (cy) 576 top width of dam (ft) 10.0 ` ^ W1* W N \ \ I I / // / available volume before cleanout (cy) (34*DA) 292 bottom of basin (ft) 364.0 / / / cleanout elevation (ft) 366.14 approx. bottom dimensions: 50'x114' distance from cleanout to orifice (ft) (> 1) 1.6 upstream face slope: 2:1 v downstream face slope: 3:1 d storage: W S� * * * �^ ) dry storage required (cy) (67*DA) 576 baffles: YES �I principle spillway crest (ft) 370.67 length of flow, L (ft) 78 dry storage provided at this elevation (cy) 693 effective width, We (ft) 96 diameter of dewatering orifice (in) 6.0 L / We (baffles required if < 2) 0.8 • •� �I diameter of flexible tubing (in) (orifice+2^) 8.0 collars: YES runoff. depth of water at spillway crest (ft) 6.67 C (use 0.45 for bare earth) 0.45 slope of upstream face (Z1) 2 XIS NG TREELINE. TREES '& VEGETATION IN THE VICINITY OF SEDIMENT tc (min) 8 slope of barrel (Sb) 7.72% BASIN 'A' SHALL BE CLEARED. DURING THE EARLY STAGES OF ESC PHASE STR. A6 // 1 I, CLEARING & GRADING ACTIVITIES SHALL BE LIMITED TO THOSE 12yr 4.5 Q 2yr 17.4 length of barrel in saturated zone (Ls) 40.14 \�✓J NECESSARY FOR THE INSTALLATION OF THE ESC PHASE I MEASURES. 125yr 6.5 Q 25yr 27.6 number collars required 3 dimension of collars 4.3k4.3' TO PREVENT FI,OTATJ ON THE RISER `n I BASE SHALL BE FIRMLY EMBEDDED 6" principle splllWay: ` 1 \ INTO AN18"THICK R REINFORCED available head (ft) 1.00 emergency spillway: YES 1 % CONCRETE FO NDATION THAT IS E \\ / \ } diameter riser (in) 60 required capacity (Q25 Qp) (cfs) 0.0 2 'x2o' AND BURIED BELOW GROUND'. spillway capacity,Q cfs 48.0 bottom width ft 30 � P Y P (cfs) ( ) diameter trash rack (in) 90 slope of exist channel (ft/ft) 33% CONTRACTOR SHALL INSTALL THE SWM FACILITY 06o" barrel length (ft) 60.4 minimun length of exit channel (ft) 25 RISER & CONCRETE FOUNDATION (STR. A8, RIM=370.67') 1 ,��, I 1, head on barrel through embankment (ft) 11.8 crest of spillway (ft) 371.67 AND SHALL UTILIZE THIS DURING CONSTRUCTION. 1 I \ I diameter of barrel (in) 30 I I CONTRACTOR SHALL ALSO INSTALL THE LARGER/UPPER 1 1 I \ '\ I NOTE: THE RISER FOR SEDIMENT BASIN W SHALL INCLUDE A 06" DEWATERING ORIFICE WITH AN INVERT ELEVATION OF 367.77. THE DEWATERING ORIFICE 030" OUTFALL PIPES (STR. A2, A2, Al A4, A5, A6, & A7) AND I I '1 \ I SHALL BE PERMANENTLY PLUGGED WATERTIGHT AT THE TIME OF THE BASIN's CONVERSION TO A SWM FACILITY. ALTERNATIVELY, THE CONTRACTOR MAY USE THESE DURING CONSTRUCTION. CONTRACTOR SHALL \ I \ I ELECT TO REMOVE THE UPPER RINGS OF THE RISER HOUSING THE DEWATERING ORIFICE & INSTALL NEW RINGS MEETING THE SPECIFICATIONS OF THE TEMPORARILY BLOCK THE SMALLER/LOWER OPENINGS I FOR STR. Ag & THE STUB PIPE DURING CONSTRUCTION. I S/ T . A „ RO D PERMANENT SWM FACILITY'S RISER. f (I 11 THE CONSTRUCTION OF THE LEVEL SPREADER, THE STUB PIPE AND STR. Ag SHALL BE DELAYED UNTIL THE BAFF4 \). I SEDIMENT BASIN IS CONVERTED TOAPERMANENT SWM POSEDIAFE ENCE, / I � SEDIMENT BASIN 'B' DETAIL, SCALE 1 "=30'/ FACILITY. CONTRACTOR SHALL WORK CLOSELY WITH THE /INSTALL SIGNS "WARNING A I I I So / ESC INSPECTOR REGARDING THE TIMING OF WHEN THE QUICK 1 AND, KEEP OUT" y al '21 I LEVEL SPREADER, STUB PIPE & STR. AS, ARE ACTIVATED. ' I \PROPD1o'WID OP \ \ OF D\ELEV.=373 0q' \ s S ERRI OSED 30' WIDE V T CL. A RIPRAP LINED EMERGENCY SPILLWAY W/4:1 SIDE SLOPES&� ' \ FILTER FABRIC UNDERLAYMENT. \ SPILLWAY CREST ELEV.-31,67'. \ ySs 1992 GRAVEL CURB INLET SEDIMENT FIL TER GRAVEL FILTER RUNOFF WATER �S SEDIMENT CONCRETE GUTTER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT q3, #357 OR 5 COARSE AGGREGATE. Source: Va. DSWC NC PROPOSED DIVERSION 3.07 1992 Plate 3.07-6 3.01 2 T4�•iib�.�•i•4ii• 1 • • • • • • I•dd.444••••4•d• ��•�•!^�•!•���c!•�.;•j� • • • • • • • • r �•.•• I•i 44�•�d•�•�abb�•4� • • • • 1 • • • • • • • • ••L.•d••1 44•••dA•4•••••Ad • • • I•••••••••••••••••••••• ••••� • 1••••••1 .••••••�••••��••••••••. OAK Source: Adapted from Conwed Plastics and Plate 3.01-1 VDOT Road and Bridge Standards Sediment Basin Design B MIN. 1' WI SPILLWAY 2'WITHOUT CREST OF EMERGENCY SPILLWAY drainage area (acres) 14.00 DESIGN HIGH WATER basin volumes: (using 2' contour intervals) (�-Y" STORM a".) elevation (ft) contour area (sf) volume(cy) °'s' MN. 1.0. _ _ _ RISER CREST 352.00 3,816 0 d sOWE OEWATERING 354.00 5,127 330WET. soRAGE� 356.00 6,609 764 358.00 8,268 1,313 360.00 10,105 1,993 SEDIMENT'WET CLEANOLSTORAGE PONT (• WET • STORAGE REWCF° TO }/ C.Y./ ACRE) 362.00 12,089 2,814 364.00 14,178 3,786 wet storage: wet storage required (cy) (67*DA) 938 design high water 362.33 dewatering orifice elevation (ft) 357.00 top of dam (ft) 364.00 wet storage provided at this elevation (cy) 1039 top width of dam (ft) 10.0 available volume before cleanout (cy) (34*DA) 476 bottom of basin (ft) 352.0 cleanout elevation (ft) 355.1 approx bottom dimensions: 51'x72' distance from cleanout to orifice (ft) (> 1') 1.9 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67*DA) 938 baffles: YES principle spillway crest (ft) 361.33 length of flow, L (ft) 53 dry storage provided at this elevation (cy) 1200 effective width, We (ft) 215 diameter of dewatering orifice (in) 6.0 L / We (baffles required if < 2) 0.2 diameter of flexible tubing (in) (orifice+2") 8.0 collars: YES runoff: depth of water at spillway crest (ft) 9.33 C (use 0.45 for bare earth) 0.45 slope of upstream face (Z: 1) 2 tc (min) 8 slope of barrel (Sb) 2.4% 1 2yr 4.5 0 2yr 28.4 length of barrel in saturated zone (Ls) 61.87 1 25yr 6.5 Q 25yr 45.0 number of permanent collars required 2 dimension of collars 6.1W.1' principle spillway: available head (ft) 1.00 emergency spillway: YES diameter riser (in) 60 required capacity (Q25-Qp) (cfs) 0.0 spillway capacity, Qp (cfs) 48.0 bottom width (ft) 50 diameter trash rack (in) 90 slope of exist channel (ft(ft) 33% barrel length (ft) 136 minimun length of exit channel (ft) 7 head on barrel through embankment (ft) 15.8 crest of spillway (ft) 362.33 i. W-�WWWwWwWWWWWWW,\ ,�i i iu i PROPOSED PERMANENT SWM FACILITY STRUCTURES Bel, BB2, BB3, B64, BBS & THE RISER BB6 SHALL BE I INSTALLED WITH TEMP. SEDIMENT BASIN'B'&SHALL SERVE AS THE OUTFALL FOR THE BASIN. I�I S / F PROPOSED SAFETY FENCE, \ / INSTALLSIGNS SA\ 1 �\ \ QUICK SAND, KEEP OUT" \ PROPOSED RIPRAP LINED OUTLET SS, ; ST BB2' PROTECTION. SEE SHEET 17 FOR DESIGN INFORMATION. SF �S _-.7 / TR . BB4 �I I PROPOSED 5o'WIDEVDOTCL.AI RIPR \ 9 STR � BB6 AP LINE I' I EMERGENCY SPILLWAY W/ 4:2 SIDE SLOPES & FILTER I 1 FABRIC UNDERLAYMENT. SPILLWAY CREST ELEV =362.33') I N I I \ / p PIMilF MA J r \35S \ V �PP'ROVE ooYR F�OO�PL� TYP. CONTRACTOR SHALL INSTALL STR. BB6 (06o" RCP SWM RISER WITH A RIM ELEV =361.33) & ITS FOUNDATION. CONTRACTOR SHALL SEAL THE PERMANENT SWM LOW -FLOW ORIFICE WATERTIGHT DURING CONSTRUCTION. AT THE TIME OF THE SEDIMENT BASIN's CONVERSION, THE PERMANENT LOW -FLOW ORIFICE SHALL BE LLI / ACTIVATED & THE SEDIMENT BASIN's TEMPORARY DEWATERING ORIFICE SHALL BE COVERED WITH A METAL PLATE. SEE SHEET 19B FOR DETAILS. ALTERNATIVELY, STR. BB6 MAY BE INSTALLED WITH SEGMENTAL RINGS AND THE UPPER PORTION OF THE MH MAY BE REMOVED & REBUILT IN ACCORDANCE WITH THE SWM PLANS AT THE TIME OF THE TEMPORARY BASIN's CONVERSION TO A PERMANENT FACILITY. PRSF WIRE BAIN S \ / / EXISTING TREELINE. TREES & VEGETATION IN THE VICINITY OF SEDIMENT BASIN 'B' SHALL BE CLEARED. DURING THE EARLY STAGES OF ESC / PHASE I, CLEARING & GRADING ACTIVITIES SFOR HALL \\ \ THOSE NECESSA INSTALLATION OFBE LIMITEDOTHE SC PHASE I MEASUR THE A S TO PREVENT FLOTATION THEi RISER BASE SHALL BE 343 FIRMLY EMBEDDED 6" INTO AN 36 THICKREINFORCED �\ CONCRETE FOUNDATION THAT IS io'x LO', AS SHOWN` CONTRACTORSHALL INSTALL A - \ 5 d. R/W DIVERSION ACROSS TH D S s i CONSTRUQTION ENTRANCE s \�__ P EXISTING Y' �CMP CULVERT 7 ll" A//// NTR / PROPOSED CONTRACTOR PARKING & STAGING AREA PROPOSED / /Y�//\� / / CONSTRUCTION ii/ ACCESS J \ s iCOTT/R. C!'LLINS'? Lic. No. 035791,E 2/4/22 ,0J F c z M H w 0 O U F U Z Or e ° ¢ z a O C US ED U LU Z 0 e J¢ 0 o ? W u) F m u LU Z J ¢ o w `u a ° o w < (n ° LU W u Lu N N N N N N rj to ^ CD N .1 L i` ZM N cM r Z Q W N N J/ W< ��/•� V / Lu IN � it Aii 5;^> ' 0 LU F- 0ZS Z O O W U �--I _ LU v U2: _ r W Y O LU w CO 06 Ulu) ___I O f-� ~ LU 0 LU ci� Z O' 0 LU t^) CO � VJ J F- r- LU m < _ V () () N w J H 0 w Ln JOB NO. 182150 SCALE AS SHOWN SHEET NO. 13 LIM S F EMA PPROVED o Y FLO�DPLAIN TYP\ \ \ �` / / = = � �j \V�\�� �I yam/ / / �/ _ / POINT OFANALYSIS 'A' \ / /( // /� / i' I. (AT CONCENTRATEDOUTFALL) 16Sirs. —"— — \ \ /� / / / / / I ( // // 100' OF OVERLAND FLOW w/ A ELEV.=T \ \\ 1 ® & 650' OF CONC. FLOW w/ A ELEV.=90' ■ ■ / ��:/ �s WETLANDS TO REMAIN' ■ ■ / �AREA OF APPROVED\�\� \\ // / I UNDISTURBED% TYPi I I 1 I I 1 I I I I I \ I rT // /�/ / �•� ■ ■ �••' / / / ( ♦ ■ ■ \ m / SECTION 1 MASS GRADING \11�) //�� I III 1 I j� j /l // �- / / ♦ / / ••■■ ♦� / A / (WPO 201700037 AMENDMENT #2)ll _/ / /� y /, , l/, l l I I II / rr/ / / \� / • / /Qg, LOCATION OF PROPOSED DRY DETENTIONBASIN'A'& UGD SYSTEM 'A' //�/�// / / / STREAM LIMITS, TYP. I / ■ ■ ■ ■ ■ ■(� --- // jREA PROPL EDi� I / Q �E DEVEL�P,ED/ I f — � _ _ J ��� _ /:; vV A \\V� \�- • % ��E u ��R� B�oc 18T0 �€ / \ �/ /////vA v — / / / //// // > �\ \ \ = ROUTED I�R�POSED BLOCK 1�&�- � _ �IIIIII � \\V� \ �I�l � I � �� ; • _ = I V � �/ \ \ / ♦ 4f# J / \ / // / l n PROJECT LIMITS, TYP. 1 0o I (�` \ // \ o -100 OF OVERLAND FL W w/ A ELEV.=4' oo n lIlI �I I�IIIIIi�II I1 II III v c 1,15-0' OF, CiO/NC/. FLOW -w/ /A ,E'L�EV.=r8/0' R�AB 1¢ac.,/ APPROVED / / POND #4 7� c _-444 \ v _ - _ 446 / / �k V I I I : I I I I I I �// .448 980 o ooUl III \ \ V vvv vvv v vvv�v�' �i�0 0 v � / , � 1 v vv vv vvvvvvv vv v v � ► I � �,;. 00 �W,'' \1 �II \ I 1 \ \ ✓et/� POINT OFANALYSIS 'B' o ' \\ ✓eL i\\ (AT CONCENTRATED OUTFACE) I o \ I11 A�_/// \I ,ice </ o 3 ' NATURAL BUFFER ALONGN/1 PROERTY� PERIMETE>=X�////// / // MONTGOMERY RIDGE SUBDIVISION WATERSHED SUMMARY FOR SUBAREA A �// Area, 1-year Flow, 2-year Flow, 10-Year Flow, CN // /// %< ac. cfs cfs cfs / / / /DA A (Pre-Dev.) 55 6.37 0.82 2.14 9.48 \� 1 � \ �� .fir, ■� J ,\ ✓� ' / /// // �� //// // // / / � / / // WATERSHED SUMMARY FOR SUBAREA B Area, 1-year Flow, 2-year Flow, 10-year Flow, �/ /�/ / _) CN ac. cfs cfs cfs DA B (Pre-Dev.) 55 12.16 1.30 3.34 15.17 LOCATION OF PROPOSEDDRY / ETENTION BASIN 'B' & / / �/ /% // // / WATERSHED SUMMARY FOR SUBAREA C P /1] ERGROUND DETENTION SYSTEM' g' / �� / //� ////// /// Area, 1-year Flow, 2-year Flow, 10-year Flow, CN ac. cfs cfs cfs Pre-Dev. C DA 72 1.87 2.02 3.03 6.69 i ■/ i �� /IIII//IIIII1g\ v�vvvv _ v/'/����/�/��/ll�l�l� ( ) SUMMARY OF CHANNEL PROTECTION COMPLIANCE 100' OF OVERLAND FLOW w/ A ELEV.=9', 1 \\ \ 1� x \\_\ Pre-Dev. Subarea Post-Dev. Subarea Method of 9VAC25-870-66 Method of 9VAC25-870-66 v--425 OFCCH ANNEOWL /N A ELEV.=15 & (p ' oint of Analysis) (Point of Analysis) Channel Protection Compliance Limits of Analysis for Channel Protection ICA A A Section 13.3.a (Energy Balance) N/A (Energy Balance Satisified) B B Section B.3.a (Energy Balance) N/A (Energy Balance Satisified) C C Section B.1.a (2-yr Peak Flow is nonerosive in Pipes and Manmade Riprap) Section B.4.a (Subarea < 1% of Overall Watershed) o o " — -�\ o- • ■ ■ sell •' \\ �l \\ \\�\ \\�\\ / /� SUMMARY OF FLOOD PROTECTION COMPLIANCE - - - POINT OF AN SSM'C'� / � ®■fly (RIPRAP-LINED / \ - ■■ • \�_�— \\ \ \\\ %/ \� \ -_ ■\ d��,\ \\ Pre-Dev. Subarea Post-Dev. Subarea Method of 9VAC25-870-66 PROPOSED-CONLENTRATED-OUT�L) \ a ■ ■ \ \\ \ v / ESTR / @ ■ ® \\\\\_ (Point of Analysis) (Point of Analysis) Flood Protection Compliance \ L - ■ ■ ■ v� CONCENTRATED OUTFALL T NEL \ VA �o l \ \\ SUBAREA 1.87 ac., N=72, Tc=0.13 hrs. \ -- Method of 9VAC25-870-66 Limits of Analysis for Flood Protection A A Section C.2.a (10-yr Peak Flow is Confined within pipes and SWIM facility) Section C.3.c (Outfalls to mapped Floodplain) B B Section C.2.a (10-yr Peak Flow is Confined within pipes and SWIM facility) Section C.3.c (Outfalls to mapped Floodplain) C C Section C.2.a (10-yr Peak Flow is Confined within pipes) Section C.3.c (Outfalls to mapped Floodplain) ►AP SCOTT/R. CD'LLINSZ Lic. No. 035791 D p 2/4/22 zL i Luw �( F U z z w z F Q co U U Lu i Z Lu N�zl O J i 0 Q W U i _a= Q Q H a m Lu w J .Q� LUw Wo a '-I `� N N w N � - N ti k6 ^ O N L9 z W Ul z J J 0 U M M O) N N 0 N N W J J U) LU LU Y U) w clf LU Q 0 0 N z a a z LU w � a 06 Q LU Q O � J U4) m ~ z LU H� a O J LU O w C2 o Co LU CL JOB NO. 182150 SCALE 1"=100' SHEET NO. 14 \\ \ LIM S F P STORMWATER MANAGEMENT NARRATIVE: � � �\ � 1 \ 1 1 � ✓� ��/ —/ / ,� '`' �O(i\Y FLO�DPL �TYP\� "�_�- �5-/ // / � � / �/ / � ��"� / �_ \ \ \ IOVERVIEW � I � / THIS PROJECT IS PART OF THE BROOKHILL DEVELOPMENT, AND STORMWATER TREATMENT IS PROVIDED TO \� „e / 1 \ 1 \ \ / / 1 {tea s�- //�/� /_ �/_ I\ \ \ .:":: \�� FUTURE SWM FACILITY (/ MITIGATE THE IMPACTS FROM THE PROPOSED IMPROVEMENTS. THE STORMWATER MANAGEMENT PLAN � \ �' -\ / ,�'�;�;• � s • • / / � /�j//�� / COMPLIES WITH PART IIB SWIM REQUIREMENTS. \ WATER QUALITY SUMMARY THIS DEVELOPMENT REQUIRES THE REMOVAL OF 17.72 Ibs/yr OF PHOSPHOROUS. THIS PHOSPHOROUS \ REMOVAL RATE IS MET THROUGH THREE BEST MANAGEMENT PRACTICES. A DOWNSTREAM LEVEL SPREADER \\� / / , . z .. 1 - -". ._, \ - / // // �� / �// _L -✓ �\ 1 - _ _ w —' �_ / / \ CONSERVEDDISCHARGING TO A SWIM DOWNSTREAM FROM HE BULK OF THE PROPO ED ITHIS BMP IS BLOCK 16 DEVELOPMENT AND PROVIDES q \\� \l \ J I _ - - � _ _ •fie /- ` / /���%// ��/ / // - \ I / / _ / PHOSPHOROUS REMOVAL RATE OF 6.89 Ibs/yr. A SECOND BEST MANAGEMENT PRACTICE OF PRESERVING OPEN SPACES WILL BE IMPLEMENTED. A RECORDED SWIM FOREST & OPEN SPACE EASEMENT WILL BE PROVIDED PROTECTING THESE AREAS PRIOR TO THE ISSUANCE OF A LAND DISTURBANCE PERMIT FOR THIS PROJECT. AFTER THE IMPLEMENTATION OF THESE TWO BMPs, THE THIRD BEST MANAGEMENT PRACTICE OF PURCHASING NUTRIENT CREDITS WILL BE IMPLEMENTED. A PHOSPHOROUS REMOVAL RATE OF 10.83 Ibs/yr\�� �\ \ \ \ ���� "' ��� / ��"j9.� /i •'°/ / -: -- - _ \ SUBAREA A .- �/ ` \ \ REMAINS FOR THE PROPOSED PLAN's WATER QUALITY COMPLIANCE. PLEASE NOTE HOWEVER, THE OVERALL BROOKHILL DEVELOPMENT CURRENTLY HAS A SURPLUS OF PHOSPHOROUS REMOVAL CREDIT THAT CAN BE Q v APPLIED TO THIS PROJECT, LOWERING THE REQUIRED PHOSPHOROUS REMOVAL RATE TO 6.02 Ibs/ r. WITH i -- - A NUTRIENT CREDIT PURCHASE OF 6.02 Ibs/yr, THE OVERALL BROOKHILL DEVELOPMENT WILL MEET THE FAS SCOTT/R. CD'LLINSZ Lic. No. 035791,E p 2/4/22 MINIMUM REQUIRED REMOVAL RATES. PLEASE ALSO NOTE, THE LEVEL SPREADER DISCHARGING TO A / \-� \� \� - - - '" CN-$3 '"` 1 _ ' 'i r CONSERVATION AREA EASEMENT WAS DESIGNED FOR THIS PLAN AND THE FINAL BUILDOUT, WHICH \�TC-0.12 hr5. � � ' � r _ �a INCLUDES ADDITIONAL AREAS UPLAND OF BLOCKS 16 & 17 WHICH WILL LIKELY DISCHARGE TO THIS BMP. \ _ POINT OF ANALYSIS " -__� ' ,-,-,- / J ctO., r PLEASE SEE THE ATTACHED STORMWATER MANAGEMENT CALCULATIONS PACKET FOR ADDITIONAL DETAILS. \ \ _ AT CONCENTRATED OUTFACE) -- \� / \ F- c WATER QUANTITY SUMMARY \ �\® ' SUBAREAA / _ LU THE PROPOSED DEVELOPMENT CREATES TWO (2) CONCENTRATED OUTFALLS AND DISCHARGES INTO AN \ \ \ �, \�` �,.':} I -, MARCELLA -". F --- __ ..1,. / / /I I/_ a `u _. EXISTING THIRD CONCENTRATED OUTFALL. ,\ _ \� \\ �\ \\� \�., \ N. / - STREET - 6.37. dC. _ -�'- ;� �I - �- O ( U _ U Z THE TWO PROPOSED CONCENTRATED OUTFALLS FOR SUBAREAS A & B DISCHARGE TO THE POINTS OF _ _ \ I : ' - �. _ TC=0.12 hr5: \ 'I - �. I •'' �' > z w ANALYSIS A & B, RESPECTFULLY. CHANNEL PROTECTION IS MET FOR THESE TWO SUBAREAS VIA 9 VAC \ QOi:- , "\, I ? ( 1 �� I _ Cr / 25-870-66 SUBSECTION B.3.a ENERGY BALANCE). THE LIMITS OF ANALYSES FOR SUBAREAS A & B ' 'T"-T" - -- c _ -� �s I I I H' a z TERMINATE AT THE OUTFALLS SINCESUBSECTION / ��� - _ OU LS S C B.3.a IS SATISFIED. FLOOD PROTECTION FOR THESE TWO % WETLANDS TO REMAIN I, ,-' - /, V / I 3 . -- ' I " < -- -I �" r I, I ��' - k 0 p C ( ) / / A PORTION OF - U c SUBAREAS IS MET VIA 9 VAC 25-870-66, SUBSECTION C.2.a (CONFINES THE 10-yr PEAK FLOW WITHIN THE UNDISTURBED I ... , 7 - r �' ` ' Ln m w ED TYP. � � I _� �/ / % � ; , , � I � .. 1 � FUTURE BLOCK - rp _ ] ; , '` 7 Z w � � � � DETENTION FACILITIES). THE LIMITS OF ANALYSES FOR THE FLOOD PROTECTION END AT THEIR OUTFACES, \ � R / / / / / ' I I / - SINCE THEY DISCHARGE INTO A MAPPED FLOODPLAIN.(SUBSECTION C.3.c). PLEASE NOTE, THE BULK OF THE / ' /' // / I p I : - - -��I J.=' _ �, "� I ,. \ - ,. �' �� 0 U) Q 5 \ PROPOSED DEVELOPMENT IS CAPTURED IN SUBAREAS A & B AND ITS RUNOFF IS ATTENUATED. ALSO, THE \ /" �* , / l l l l l l l ll, II I I / 'I `� 3 I '" 1H WILL BE -- ` '":- �/ i Z Q � O 0 DRY BASIN 'A', UNDERGROUND DETENTION SYSTEM 'A', DRY BASIN WAND UNDERGROUND DETENTION / LOCATION OF PROPOSED DRY DETENTION • r ROUTED TO \ %. �� O m w c SYSTEM 'B'TREATING SUBAREAS A & B WERE DESIGNED FOR THIS PLAN AS WELL AS THE FINAL BUILDOUT, "'- _ . • d y d. -1 I / _ w�� j z Q u / \ / /� BASIN W & UGD SYSTEM 'A' I I a —BL K 16 & 17 - ~ - WHICH INCLUDES ADDITIONAL AREAS UPLAND OF BLOCKS 16 & 17 WHICH WILL LIKELY DISCHARGE TO / _ ��� , : / I w Q / THESE BMPs. // / // / % s// / I ® \,/r\ z I / _ 3 - 'i _ �' I� _� d m u / - I '' AA V / THE THIRD CONCENTRATED OUTFALL DISCHARGES INTO A MANMADE STORM SEWER SYSTEM ASSOCIATED / / / /�"j'`" / I I, \-( s / ' " = �I - -- ri U/ -I �- c cc / _ \ " \� ~ w Q WITH POLO GROUNDS ROAD. THIS SYSTEM RELEASES ITS RUNOFF DIRECTLY INTO THE RIPRAP LINED �// I 'r:, I I / ? I - _ _ , \ > STREAM LIMITS TYP. OUTLET PROTECTION IN THE STREAM'S BED ASSOCIATED WITH THE 60"x60" DOUBLE CULVERT. THE \ � / / / / /� / � ' I ,�` c; � ._ � �� I ' I 3 r .; i \ _ �.�, � 5 _� � _ � ` W w a PROPOSED & EXISTING STORM SEWER NETWORK s HYDRAULIC GRADE LINE CALCULATIONS WERE ANALYZEDI'�1� ,\ \ WITH THIS PLAN FOR ADEQUACY. CHANNEL PROTECTION IS MET FOR THIS THIRD CONCENTRATED OUTFALL \ - -� -� - i / / /� , \ \ u /i / I d i i (CONVEYING PROPOSED SUBAREA C) VIA 9 VAC 25-870-66, SUBSECTION B.l.a (2-YR PEAK FLOW IS NOT \� / � • - -- %. � - �.. . .,_ _ ' - '.... ' _ : _ \ ., � �, _ > / / s 7 EROSIVE IN MANMADE PIPES AND RIPRAP). THE LIMITS OF ANALYSIS FOR THE CHANNEL PROTECTION \ \ / / / / � / � - - 1 - _' °' �`... ` 50 OF OVERLAND FLOW ��.-• � I _-r � _ TERMINATES AT THE STREAM's RIPRAP LINED BED IMMEDIATELY DOWNSTREAM FROM THE 60 x60 CULVERT / //`�c-� / 'I '--�I -\" - / / b / \ , w/ A ELEV.=2 & ;_ f _ \ C SINCE THE CULVERT's DRAINAGE AREA IS 100 TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA / R POS /�j \ - - - \ �. _ c 690` OF CHANNEL FLOW E OF SUBAREA C. THIS SUBSECTION IS B.4.a. FLOOD PROTECTION IS MET FOR SUBAREA C VIA 9 VAC _ �� / / ��Q, REEN�, 25-870-66, SUBSECTION C.2.a (CONFINES THE 10-yr PEAK FLOW WITHIN THE MANMADE CHANNELS). THE \ / / / / /P / /� / / �� ` ! / IP - If �• �.V. �� :%v` • / c FLOOD PROTECTION ANALYSIS TERMINATES AT THE STORM SEWER OUTFALL SINCE THE EXISTING STORM SEWER DISCHARGES INTO A MAPPED FLOODPLAIN. THIS SUBSECTION IS C.3. C. PLEASE SEE THE ATTACHED / STORMWATER MANAGEMENT CALCULATIONS PACKET FOR ADDITIONAL DETAILS.,�� S WHERE PROPOSED IMPROVEMENTS & LAND COVER CHANGES OCCUR OUTSIDE OF SUBAREAS A, B & C, FOR y �/ c - - EXAMPLE THE REAR PORTIONS OF THE SINGLE FAMILY DETACHED LOTS ALONG MARCELLA ST., MARCELLA / A� / / ? ' / / _ -_ I El � CT., SABLEWOOD TRAIL & LACONIA LANE, THE PERVIOUS & DISCONNECTED IMPERVIOUS AREAS SHALL BE " = RELEASED IN A SHEET FLOW MANNER THAT IS NOT CONCENTRATED OR DETAINED. HOUSES ON THESE LOTS V- / / �� / - - / / = r / ` r G ��i p N M c SHALL HAVE SPLASH BLOCKS AT THE OUTLETS OF THEIR DOWNSPOUTS TO PREVENT EROSION, SEDIMENTATION OR FLOODING OF DOWN GRADIENT PROPERTIES. THE DOWNSPOUT OUTLETS & SPLASH �\ V PROJECT LIMITS, TYP. BLOCKS SHALL BE INSTALLED UPLAND OF THE STEEPER TIE-IN GRADES, CLOSER TO THE HOUSES. ALSO, THE STEEPER TIE-IN GRADES SHALL BE STABILIZED PRIOR TO THE INSTALLATION OF THE DOWNSPOUTS AND SPLASH BLOCKS. SEE SHEET 19B FOR A DETAIL OF THE SPLASH BLOCK, ORE DIVALENT. WHERE PROPOSED SINGLE FAMILY ATTACHED LOTS ARE PROPOSED, FOR EXAMPLE THE LOTS LOCATED \ �'- ' ® -`.. a / / - / ' ''�j� Q -� q V A / / `C ALONG LACONIA LANE, THESE HOMES' DOWNSPOUTS SHALL OUTFACE INTO THE PROPOSED ROOF AND YARD �,� _ `� �/" '-.., . -„ \\ DRAIN SYSTEMS & WILL ULTIMATELY BE ATTENUATED IN A PROPOSED SWIM FACILITY. SEE THIS SHEET FOR //� A DEPICTION OF THE ROOF AND YARD DRAINS SURROUNDING THE SINGLE FAMILY ATTACHED LOTS, AND �// \� I Oo / THE FINAL SITE PLAN FOR THE CONSTRUCTION OF THESE STRUCTURES. / C' ) _ T i a/ � CD ZZ SUBAREA B / �J M C Z' (FINAL BUILDOUT) CY) a , , —� l l I I �' l y/ / / o psi ///��J� /� -- 20 08 ac N APPROVED �° o / /' Tc-0.17 hrs.a POND #4 � � � � � _ l •� = /. �v �i Q / 446CD z 3 _ oCA � / �-- � as � � I rv, _ I � /� _ _ O)N W LU OF OVERLAND FLOW w/ A ELEV.=T, / / ��/� �� / / \ v OF CONC. FLOW w/ A ELEV.-9' �F-550' OF CHANNEL FLOW A, / //�� \ V > c LU U- ,I �- a�NATURAL BUFFER ALONG V \/ _ Post -Development Impervious Area Summary L9 � T__ 7�r�� PROPERTY's PERIMETER �\ �A )�� / \ Subarea A Blocks 16 & 17- Proposed Roads & Sidewalks 69,175 sf Q Z z�Blocks 16 & 17 73470 sf Buildings, Walkways &Patios Decks ^ // Blocks 16 & 17- Driveways 17,725 sf U O Block 18- Future Roads &Sidewalks 15,975 sf I a Block 18- Future Buildings Patios/ Decks 20,775 sf W O Block 18- Future Driveways 5,650 sf Y MONTGOMERY RIDGE W 202,770 sf z SUBDIVISION H Subarea B W Blocks 16 & 17- Proposed Roads & Sidewalks 158,075 sf t / � / — >) >>w v pUl� �// Blocks 16 & 17- Buildings, Walkways & Patios / Decks 103,220 sf I� a c � // /�� / �/ /// j Blocks 16 & 17- Driveways 27,875 sf � O /� // w Z Roads &Sidewalks 74,400 sf Buildings Patios / Decks 106,450 sf 1 \ I \ \ ✓et/� POINT OFANALYSIS 'B' o l /// a / / //" / / / / / / //// ���% / // / �� Blockl8-FutureDrivewa s 38475 sf O > AT CONCENTRATED OUTFALL) ' I / / /// / // / / / /(( /� // Y w ( I I �Jf� / / / / \ / / / / // I� / / Factor of Safet for Other Potential Imp. Areas 10,000 sf in �� �� ✓ /V� A / / o / /�//// / / / / // /� �/ // /j 518,495 sf i /x/�i�� I - 1� ��///// �/ / / / /� /// ��� ��/SubareaC M o �/ _ , �ii it /,// / // — J LU ... �, / / / / / ���//�/ / � //� /� ��/ Blocks 16 & 17- Proposed Roads &Sidewalks 18,475 sf " o 20' OF OVERLAND FLOW w A ELEV.=6' /" / / & 450' OF CHANNEL FLOW /�/ / Existing Polo Grounds Road 25,775 sf a c /' /� Q �Q 44,250 sf FF�E�E_C REF L FED BUFFER WATERSHED SUMMARY FOR SUBAREA C� ALONG POLO6UNDS ROAD o A /� �/ /� ��� //�/�/ /��� _ /� \ / / / �� i ) / �� / ���� //� / / / // // CN Aace, 1-Ye cfs low, 2-ye cfs low, 10-YecfsFlow, - 'a �W � _�� �� O • , / / /.:: :� � �� �� ��� �� �� //�� / // // /// /// ////// DAA (Post Dev.) 82 7.75 0.13 2.14 24.35 a J80 - ---- -_ �. �, 8 _ — — �� �� (� i�� �� �/ /�� / / // /' WATERSHED SUMMARY FOR SUBAREA B3 Lu E ma's iJ�\ / / i) ISTI.N IU4 t�k\\1 \\\ \\ \ �\ �� �) I ` /J/�(I l( CN Area, 1-year Flow, 2-year Flow, 10-year Flow, z OO S aC. cfs cfs cfs JOB NO. a 2 -- � A � � � �_�_ �A\V �\ ������/ � � � � � � � � � � � � � DA B (Post Dev.) 82 12.16 0.18 0.21 9.14 182150 c t yl \\� �/ v (RtPRAP-LfP1E-0 STR�AMBED-BELOW _ , ., - ---- `\V��_ V \VAA i/�"- ( ( DAB (Final Buildout) 83 20.08 0.27 7.75 75.32 SCALE C PROPUSED-CONCENTRATED-OUTFALL). '; - may _ ��Z�C�� \\ V /// t ESTRIA A _\�\V�V� _� � �N►gTERSHEDSUMMARYFORSUBAREAC 1°=100' c T NEL I\�` SUBAREA C \ ���A� CONCENTRATED OUTFALL A\� �V/ / 1�� '��_ �� �� ��� ���� ����\���� CN SHEET NO. C - _ Area, 1-year Flow, 2-year Flow, 10-year Flow, S \1.87 ac., CN=8 Tc=0.10 hrs. \ \\ / ��\� \\\\\\�\ \\\\ \\ _ _15 1 \ ����` \`��/\\✓/� 1 �� \\ \ \\\\\��� ac. cfs cfs cfs a \ \�\\ \ \\\\ \\ \\������� DAC(Post-Dev.) 81 1.87 3.70 5.12 9.91 F PRE -DEVELOPMENT STORMWATER QUALITY PLAN: SCALE 111=100' POST -DEVELOPMENT STORMWATER SCALE 111=100' LITY PLAN: II �/Z / Oo d ;; ;; // llllVll�/i�//�- � -- / //� llll�///��� � ,: -•_ (� I II I� I III I /� I I "/ i-� v 00 � ry / �/ �= = =� co �///// 00 A/z \ W\\� 11 7� —/ /� // '� may/ �71 71 \ \ \ \ \ \ \ bus-- � �j — / ` 1' : �,r 1 I /// //��j ROPOSED LIMIT/S �� \��\ \ / / PROP65/1Eb ANCE ®j \OF DISTURBANCE= //ENCOMPASSES ALL PROPOSED WORK 26._ \ \ \ \ tZ5 ACRES/ ) 1 1 I \ J /ASSOCIATED WITH THIS PLAN. THE LIMITS / // OF DISTURBANCE DOES NOT ENCROACH INTO \ THE SWM FOREST & OPEN SPACE EASEMENT, NOR DOES IT ENCROACH INTO THE SWM ;CON RV D OPEN SPACCEA SEM NT, //// 1�W / / o Ai �'k m /// \x _= 1 SWM FOREST AND OPEN SPACE EASEMENT NOTE: THE SWM FOREST AND OPEN SPACE EASEMENT IS SUBJECT TO THE GUIDANCE SET FORTH BY THE DEQ IN THE VIRGINIA STORMWATER MANAGEMENT PROGRAM. THE AREAS WILL REMAIN UNDISTURBED IN A x p\ \ \\ / \ NATURAL, VEGETATED STATE, EXCEPT FOR ACTIVITIES AS APPROVED BY THE LOCAL PROGRAM AUTHORITY, J 1 SUCH AS FOREST MANAGEMENT, CONTROL OF INVASIVE SPECIES, REPLANTING AND REVEGETATING, PASSIVE RECREATION (E.G., TRAILS), AND LIMITED BUSH HOGGING TO MAINTAIN DESIRED VEGETATIVE COMMUNITY (BUT NO MORE THAN FOUR TIMES A YEAR). o� 0 o PROPOSED DISTURBANCES TO r. GREENWAY ARE LIMITED TO A / UTILITY CONNECTION, A ROAD CONNECTION, TWO STORM SEWER OUTFACES & A TRA14WAY a 0 o /Cl a — c ®f` \ a i \ OP6E6 /� / P CIMI�TS OF DIS UI ENCOMPASSES ALL PROPOSED WORK i s � ASSOCIATED WITH THIS PLAN. THE LIMITS /\ OF DISTURBANCE DOES NOT ENCROACH INTO �\ THE SWM FOREST & OPEN SPACE EASEMENT, / /NOR DOES IT ENCROACH INTO THE SWM SPA/CE��E7NT, RBA�VCESj 5� GREENWAY ARE LIMITED TO A ) I ///UTILITY CONNECTION, A ROAD STORM EVyEE OUT A/SL & A TRAIL AY,�17 Drainage�eDevelopment Managed opo Managed Turf 2.69 ac. Impervious Area .68 ac. 6.37 ac. Full Buildout Impervious Area 4.65 ac. 7.75 Post -Development Impervious Area Summary %I \ \ (For Proposed Water Quality- ESC LOD Boundary = VRRM Boundary) I/ I I I \ \ V� Blocks 16 & 17- Proposed Roads & Sidewalks 245,725 sf I I \ \ \ Blocks 16 & 17- Buildings, Walkways & Patios / Decks 176,690 sf sf 468,015 sf Total Phosphorous Removal Required for Blocks 16-17 (without any preserved areas) 19.58 Ibs/yr Phosphorous Removal Achieved from the Level Spreader A's Sheetf low to Conservation Area, A/B Soils 6.89 Ibs/yr Phosphorous Removal Achieved from a new Nutrient Credit Purchase BMP 6.02 Ibs/yr a < Phosphorous Removal Credits from the Brookhill Development Applied to this Project 4.81 Ibs/yr Phosphorous Removal Achieved from the BMP of the SWM Forest & Open Space Easements 1.86 Ibs/yr s 19.58 Ibs/yr SCOTT/R. CD'LLINSZ Lic. No. 035791,E p 2/4/22 r to rq z w w �0 0 z O it:� u J a 0 (� O � O C r/ U) U Z o W C O C 0 a W� F m z u �,�In W ¢ ° V/ C a Lu H CO PIN L W J ° (n W w a c U � u CD ti Z ^ O N LU 2 a M =_ z � a N cy") 3 zz Q` rn J W N z W LJJ cn w C Ld J Q s v z� U t _ w < 0 w a O I..1— 3 Q \Q C z U Y � a c W ' O O C i C Y J � r c J H £ Ul U) J J L ~ Q C ° w zw z _ U O w z a J 0° JOB NO. 182150 SCALE 1"=100' SHEET NO. 16A DRY DETENTION BASIN'A' & 'B' CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER, SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED. 2. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AT ALLTIMES TO THE RISER STRUCTURE. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREATTHAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 5. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF COLLINS ENGINEERING PRIOR TO THE CORRESPONDING CONSTRUCTION ACTIVITY. 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASH INGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY AT 1-800-552-7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENTTO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOTSTOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90°%CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE CONTRACTOR's CONTROL. FACILITY CONSTRUCTION 1. DETENTION BASINS MAY SERVE AS SEDIMENT BASINS AND/OR TRAPS DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED TO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. MODIFICATIONS SHALL BE MADE TO THE RISER, ORIFICES AND BARRELS AS REQUIRED SO THAT THEY ARE CONSISTENT WITH THE FINAL CONSTRUCTION SPECIFICATIONS. 3. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. 4. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TO THE DESIRED SUB -GRADE. 5. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 7. CONTRACTOR SHALL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) WITH PERMANENT COLLARS DURING THE ESC PHASE. CONTRACTOR SHALL ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 8. THE CONTRACTOR SHALL CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8-TO 12-INCH LIFTS, COMPACTION SHALL BE COMPLETED IN LIFTS WITH APPROPRIATE EQUIPMENT. THE CONTRACTOR SHALL ALSO ADHERE TO THE CLAY LINER SPECIFICATIONS OUTLINED IN TABLE 14.4 BELOW: Table 14.4. Clay Liner Specmcarions Property Test Method Unit swwrAdon Permeability ASTM D-2434 Cmtsec 1 x 1 Plasticity Index of Clay ASTM D-4231424 % Not less than 15 Liquid Limit of Clay ASTM D-2216 % Not less than 30 Clay ParlI Pass" ASTM D422 % Not less than 30 Clay Compaction ASTM 0-2216 % 95%(9 standard pfotAordens Source: Virginia Stormxaler Management Handbook (1999) 9. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 10. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP PROTECTION IF APPLICABLE. 12. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 13. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS, IF APPLICABLE. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUB THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECTTHE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERI 4. INSPECFTHE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDE THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DI 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SP 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHB OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATIO 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICALTO ENSURE THE BASIN s ARE PROPERLY CO CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSP SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING T 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONT 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND TH 4. DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) 5. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DI 6. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) 375 375 EXISTIN GRADE � a 370 30' 370 P OPOSED RADE P R S FI 365 365 c 362 362 Lu Lu J J N 0 O 0 O W W V' n M h ^ M M M M u- W W 0+50 PROPOSED io' WIDE TOP OF DAM ELEVATION=373.0' ROPOSED 30' WIDE VE PRAP LINED EMERGE �ILLWAY W/4:1 SIDE S LTER FABRIC UNDERL TONE DEPTH=22" ). SF REST ELEV.=372.67'. BASIN A SPILLWAY SEE RETAINING WALL DESIGN, BY OTHERS, FOR CONSTRUCTION DETAILS, TYPICAL. 405 405 PROPOSED RETAINING WALL, TYP. 400 I TYP. 1 I 400 EXISTIN FOUNDATION, TYP. 395 X I 395 1 1 395 1 FGcRAoEl ti/I 1395 390 390 390 390 ED ROPO GRAD 385 385 385 385 1. 5' MIN. COVER A 1.5' MIN COVER N N 380 38o 38o �) 38o (' PROPOSED 0120" I. CONTECH PERFORATED -----_ PIPE SURROUND IN STONE & WRAPPED IN 375 375 A FILTER FABRIC, TYP. 375 375 0120" INV.-372.35' ) � 0120" INV. 372.09' 370 370 F"LUUJ 370 370 W W w w w rUi V1 M ri U5 °M M �t rn o M s l0 M N n ni m m M V1 of m 00 M co r, m 0+50 0+75 0+50 0+75 UGD A- X-SEC #1 1"Kvr=5) UGD A- X-SEC #2 1 50' (H) S OF NSTRUCTED. ECTOR ROLS) PROPOSEDACCESS MH W/ S IRS FOR PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE INSPECTION & MA NTENAN E, TYP. AL DAMAGE, EROSION OR UNDERCUTTING. PROPOS D 022o" PERFORATED CMP NCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION NDERG OUND DETENTION SYSTEM Qa o.5o9% SPLACEMENT, WOODY GROWTH, etc. TR. Al 390 ALONG, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 60" H w/ LI OARD RISERS AS APPLICABLE FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR RI =384.0 PR POSED II =371.4 GRADE N, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. TR. A14 1.5' 60" M W/ LID MIN. 385 BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE PROPOS D BASIN s FLOOR HALL B SLOPED II= 1.00 (030" A15) I PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE TO RAIN TO HE RISE (o.S %M N.) WITH XISTIN II=374. 5 (030" BYPASS) L HE FOLLOWING STAGES OF THE DETENTION BASIN'S CONSTRUCTION PROCESS: POSITIVE LOPESTHROUGHOUT. BAST FLOOR GRADE II=377. 0 030" BYPASS TO B LINED ITH VDO CL. AI S ONE (i8" I =370.90 DEPTH) FILTER ABRICU DERLAY ENT TO /I/I RED 11 THE RISK 10EOFC CLOGGING. SIR. Al2 III 380 E OUTLET STRUCTURE(s). STR A8 TO E ERVE AS A RISER RIM= 78.05 RECTING IF APPLICABLE) STRUCTURE SEE DE AILS ON II= 70.17 ELEVA ED 030" HDP ENCY BYDASS SHEET 19B. RISER TO NCLUDE I0= 67.17 EMER A E 0" INNER DIAME1 ER WITH PIPES, INV.=37 .50 All OPEN TOP&T SHRACK TOP OF WEIR RIN =370.75 80.17' 375 PLATE= 10= 362.86 ( k9 015") TO I IREVENT FLOTATION THE RISER BAS4 SHALL BE FIRMLY IO 364.55 ( 7 03011) E BEDDED 6" INTO N 36" THICK REINFORCED CONCRETE o X20 , STIR. A6 M 370 RI =369 20 IN 370 RIFICELOW-17 I =359.89 NEIR PLATE=372. 0' I =359.79 STIR. A4 PR POSED E LEVATEE STIR. A7 OUTFALL ST p OF 036 STIR. A 5 30" INV. OUT=371.97' 6U" MH CARRYII 4G LARGER STORIv EVENTS HOPE 22.05 LF O 036" RIM 363.70 (60.40 F OF 03 " HOPE 8.50% DPE @ 1 700% 365 II 359.09 ROPOSE D LOWE 030" HD E 365 IO 358.99 INV.= RIMARY OUTFALL 366.00 STIR. A111 3. 2 LF a, 23. o ) 60" MH CON F-RA-CfOF SHALL INSTAL 16.116 LF OF 36" RIM_358.71 ]EMBANKMENT N ACC w/ TH F 0 H PE @ 4. 0% I�p,°(° y.�Q-� POSED DOT I =358. UU-yr 10-yr PEAK HEAK WSE- WS PR NO �@I OT CL. At STD. E -1 STR Ja 5 btN =371.4 JCY 36o V.= 35 STR. 3 14 LF F 030" 2-yr PEAK WS -370.81 360 .25' ST . Al .00 1- r P AK WSE 370.6 _OPES & AYMENT 71.92 LF OF 030' 0.50% HOPE @ .50° /o PROPOSED 06" HOPE STUB PIPE @ 0.50% WITH VDOT STD. EW-12 HEADWALL. ILLWAY HOPE CONTRACTOR TO INSTALL A MANUFACTURED STEEL WEIR PLATE WITH A LOW -FLOW o PROF OSED ST . Aq, LOWER OUT ALL (q&E o CUT-OUT IN LIEU OF THE SPECIFIED TYPICAL FLATTENED 'EXPANDED STEEL MESH'. - EW-12 HEADWALL OPENING TO BE COVERED WITH A LANE ENTERPRISES TRASHRACK, N LF F025" DPE o. o9b)CAR CARRYING E TREATM NT VOL ME FLO TO LEV L OR EQUIVALENT. SEE SHEET 19B FOR EW-12 HEADWALL & TRASHRACK DETAIL. 355 APPROX. LOCA ION OF . X. 021" SPRE DER W. 1=362.80' 10=362.4 ) 355 L INV 354.74 . A MIN. SEPARATION OF 1.5' IS REQ'D W Lu ci O It Ln n V1 0O 0ntlD 01 N OM' � N M 010 J W W O ci N O It 6 O ltC6 pp N Ll1W N M w M W 'oM l0M M rn rn 0) M^ W u- f 0+50 1+00 1.+50 PROPOSED FLAT VDOT CLASS Al, EC-1 RIPRAP OUTLET PROTECTION W/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT. FABRIC TO BE KEYED INTO EX. GROUND 9" MIN. AT ENDS & ALONG PERIMETER. FABRIC TO OVERLAP A MIN. OF 9" (OP L=64', W1=9', W2=16', D=18") 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+oo UGD SYSTEM A AND BASIN A PROFILE SCALES 1"=5' (V) 1"=50'(H) 6+5o 7+00 NOTE: 0120" WEIR PLATE DETAIL WEIR PLATE TO BE SECURELY BOLTED, OR SIMILARLY FASTENED, (UNDERGROUND DETENTION SYSTEM' A') TO THE DETENTION SYSTEM. SCALE:1"=5' OVERFLOW WEIR IS HYDRAULICALLY 7.73' ELEV.=382.00' EQUIVALENTTO AN ORIFICE WITH AN (TOP OF PIPE) APPROX. DIAMETER OF 022.24" INSTALL TRASH RACKS ON ALL - ORIFICES, TYP. SEE SHEET ig6 FOR THE WEIR PLATE'S TRASHRACK ON THE LOW -FLOW ORIFICE, OR EQUIVALENT. MANUFACTURE / INSTALL ONE (1) 03" LOW -FLOW - ORIFICE IN THE STEEL WEIR PLATE AT THE LOW POINT C THE DETENTION SYSTEM (INVERT ELEVATION 372.00') UNDERGROUND DETENTION SYSTEM 'A' STORAGE TABLE NFORCED 12 GA. STEEL PLATE OF (E) (F) (G) Facility Elevations Area of 120" UGD System Void Space of Area of Stone Storage Area in Total UGD System (ft) Perforated CMP (sf) Footprint (sf) Stone (%) (Sf) Stone (cf) Storage Area (sf) 371.50 0 3,321 40% 3,321 1,328 1,328 372.00 0 3,321 40% 3,321 1,328 1,328 372.50 1,500 3,321 40% 1,821 728 2,228 373.00 2,000 3,321 40% 1,321 528 2,528 373.50 2,291 3,321 40% 1,030 412 2,703 374.00 2,449 3,321 40% 872 349 2,798 374.50 2,500 3,321 40% 821 328 2,828 375.00 2,449 3,321 40% 872 349 2,798 375.50 2,291 3,321 40% 1,030 412 2,703 376.00 2,000 3,321 40% 1,321 528 2,528 376.50 1,500 3,321 40% 1,821 728 2,228 377.00 0 3,321 40% 3,321 1,328 1,328 377.50 0 3,321 40% 3,321 1,328 1,328 378.00 0 3,321 40% 3,321 1,328 1,328 378.50 0 3,321 40% 3,321 1,328 1,328 379.00 0 3,321 40% 3,321 1,328 1,328 DRY BASIN 'A' STORAGE TABLE (H) (I) Facility Elevations Area of Contours (ft) (Sf) 363.0 88 363.5 197 364.0 371 364.5 578 365.0 815 365.5 1,081 366.0 1,368 366.5 1,675 367.0 1,995 367.5 2,220 368.0 2,426 368.5 2,672 369.0 2,924 369.5 3,189 370.0 3,518 370.5 3,816 371.0 4,117 371.5 4,437 372.0 4,762 372.5 5,099 373.0 5,448 I&A SCOTT/R. CD'LLINSZ ti Lic. No. 035791 D p 2/4/22 � N z w ' Lu F w ¢ ; � p I O F z LU U w Z F- Q ,,AA UU Yl U U I Z W p to J Q Z 0 0 0 Q J W Z W w Q H a m W Q Lu < W w 0- c \ \CD Ul J J 0 Cn M Cn N (� r C] N N Q w J J U) LU - 0 Q U r w w LU U) LU NH LL Q C) C) N a V / Tr W Y U 0 W J ill 2 0 0 0� W JOB NO. 182150 SCALE AS SHOWN SHEET NO. 168 r UNDERGROUND DETENTION SYSTEM (UGD)'A' &'B' REQUIREMENTS CONTRACTOR REQUIREMENTS: i. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 3. REFER TOTH E APPROVED FINALS ITE PLAN FOR ANY DETAILED SITE INFORMATION. 4. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 5 MINOR FIELD ADJUSTMENTS MAYBE NECESSARY DUE TO SITE CONDITIONS. MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. GENERAL CONSTRUCTION SEQUENCE NARRATIVE i. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. 2. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TOTH E DESIRED SUB -GRADE. 3. CONTRACTOR SHALL EXCAVATE THE TRENCH. 4. THE TRENCH FOR THE UGD SYSTEM SHALL EXTEND 3' BEYOND THE PIPES' SPRINGLINES. 5. CONTRACTOR SHALL WRAP THE EXCAVATED TRENCH WITH A 6 OUNCE FILTER FABRIC CLOTH. A SUITABLE FOUNDATIONS SHALL BE BENEATH THE TRENCH's FILTER CLOTHS. 6. TRENCH TO INCLUDE A 6"#57 STONE BED AT 95% COMPACTION BENEATH THE STORM PIPES. 7 CONTRACTOR SHALL INSTALL THE UGD DETENTION SYSTEM, INCLUSIVE OF THE OUTFALLS AND ALL OF THE ASSOCIATED STRUCTURES. 8. TRENCH SHALL BE BACKFILLED WITH COMPACTED #57 STONE IN 8" LIFTS AND SHALL EXTEND 6" VERTICALLY ABOVE THE CROWNS OF THE PIPES. THE TOP OF THE # STONE SHALL BE COVERED WITH A 6 OUNCE FILTER FABRIC CLOTH OVERLAPPING THE PREVIOUSLY INSTALLED CLOTH THAT 9 57 , SURROUNDS THE BOTTOM AND SIDES OF THE TRENCH. io. SUITABLE FILL REACHING THE FINISHED GRADE SHALL BE APPLIED ABOVE THE TOP LAYER'S FILTER CLOTHES, MEETING MINIMUM PIPE MANUFACTURER'S REQUIREMENTS TO PREVENT FLOATATION AND ENSURING PIPE INTEGRITY IS MAINTAINED. 11. A MINIMUM COVER OF 28" IS REQUIRED ABOVE THE CROWN OF THE DETENTION SYSTEM's PIPES. THE MINIMUM 6"OF#57 STONE ABOVE THE CROWN OF THE PIPES CAN BE PART OF THE MINIMUM 18" OF COVER. 12. SEETHE MANUFACTURER'S SPECIFICATIONS FOR ADDITIONAL UNDERGROUND DETENTION SYSTEM REQUIREMENTS. INSPECTIONS DURING CONSTRUCTION: CONSTRUCTION INSPECTIONS ARE CRITICAL TO ENSURE THE UNDERGROUND DETENTION SYSTEM IS PROPERLY BUILT. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER COUNTY INSPECTOR AND CONTECH REPRESENTATIVE PRIOR TO INSTALLATION. CONTECH,OR AN EQUIVALENT PIPE MANUFACTURER SHALL BE CONTACTED WELL AHEAD OF THE CONSTRUCTION START DATE TO ENSURE ADEQUATE LEAD TIME FOR MATERIALS AND DELIVERY. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER, COUNTY INSPECTOR & PIPE MANUFACTURER, DURING THE FOLLOWING STAGES OF THE UNDERGROUND DETENTION SYSTEM CONSTRUCTION PROCESS: i. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING(E.G., INTERIM/FINAL ELEVATIONS). 4. WHEN THE DETENTION PIPE SUBGRADE IS READY FOR PIPE CONSTRUCTION, BUT BEFORE STONE BEDDING IS INSTALLED. 5. AFTER STONE BEDDING IS PLACED AND COMPACTED, BUT PRIOR TO PIPE INSTALLATION. 6. ATTHE TIME OF THE PIPE INSTALLATION. 7. AFTER PIPE INSTALLATION, BUT PRIOR TO PLACING BACKFILL & FILL OVER THE SYSTEM. 8. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) PLEASE ALSO SEE BELOW, UNDER FACILITY MAINTENANCE, FOR REQUIRED INSPECTIONS AFTER INSTALLATION IS COMPLETE. INSPECTIONS & MAINTENANCE AFTER CONSTRUCTION: THE FOLLOWING MAINTENANCE TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRSTYEAR FOLLOWING THE INSTALLATION OF THE UNDERGROUND DETENTION SYSTEM. i. FOR THE FIRSTYEAR FOLLOWING CONSTRUCTION, THE SITE SHALL BE INSPECTED BY THE CONTRACTOR QUARTERLY AND AFTER STORM EVENTS THAT EXCEED 21NCH OF RAINFALL. 2. THE CONTRACTOR SHALL LOOK FOR BARE OR ERODING AREAS IN THE CONTRIBUTING DRAINAGE AREA AND AROUND THE UNDERGROUND DETENTION SYSTEM AND MAKE SURE THEY ARE IMMEDIATELY STABILIZED. CONTRACTOR SHALL SPOT RESEED AS NECESSARY AND ENSURE ADEQUATE SITE COVERAGE IS PROVIDED WITHIN THE FIRSTYEAR. ATTHE QUARTERLY INSPECTIONS, AND AFTER EACH RAINFALL EVENT IN EXCESS OFF', THE CONTRACTOR SHALL PERFORM THE ANNUAL MAINTENANCE TASKS DESCRIBED BELOW IN #3. AFTER THE FIRSTYEAR THE OWNER SHALL PERFORM FOLLOW-UP INSPECTIONS ANNUALLY, AND AFTER EACH SIGNIFICANT RAINFALL EVENT: 3. A SPRING MAINTENANCE INSPECTION AND CLEANUP SHALL BE CONDUCTED ANNUALLY. THE MAINTENANCE PROGRAM FOR THE UNDERGROUND DETENTION SYSTEM SHALL INCLUDE CLEANING IT ANNUALLY OF TRASH, DEBRIS & SEDIMENT AND ENSURING THE INTEGRITY OF THE TRASH RACKS AND OUTFALL & INFLOW PIPES. THE OWNER SHALL ENSURE THE SYSTEM IS OPERATING AS INTENDED AND IS NOT CLOGGED OR DAMAGED. THE OWNER SHALL IMMEDIATELY CLEAN & REPAIR THE FACILITY AS NECESSARY AND SHALL PAY SPECIAL ATTENTION TO THE INLET AND OUTLET LOCATIONS. THE ACCESS MANHOLES SHALL BE USED FOR INSPECTION AND MAINTENANCE. GENERAL SWM NOTES: i. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. SEE DETAILS IN THIS PLAN SET, OR EQUIVALENT, FOR DESIGN. 2. CONCRETE FOUNDATIONS SHALL BE INSTALLED ON ALL RISER STRUCTURES MEETING MINIMUM VESCH .1 SPECIFICATIONS. 3 4 3. CONTRACTOR SHALL HIRE ATHIRD PARTY GEOTECHNICAL ENGINEER TO ENSURE THE EMBANKMENTS ARE STRUCTURALLY SOUND. THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFFTRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PLAN SET. ALL EXISTING AND PROPOSED FILL MATERIAL AND PROPOSED CONSTRUCTION SHALL BE APPROVED BYAN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS AND PRESENT DURING THE CORE SAMPLING. . THE DOWNSTREAM EMBANKMENT SIDE SLOPES OF ALL PERMANENT FACILITIES SHALL HAVE A MAXIMUM :1 SLOPE. 4 3 . THE GENERAL CONTRACTOR RD PARTY GEOTECHNICAL ENGINEER AND STRUCTURAL ENGINEER DESIGNING THE RETAINING 5 3 WALLS SHALL WORK TOGETHER TO ENSURE THE SWM FACILITIES AND RETAINING WALLS DO NOT UNDERMINE EACH OTHER. THESE PARTIES SHALL ENSURE THE STRUCTURAL INTEGRITY OF THE WALLS AND SWM FACILITIES ARE MAINTAINED. 0120" WEIR PLATE DETAIL UNDERGROUND DETENTION SYSTEM 'B' NOTE: WEIR PLATE TO BE SECURELY SCALE:i"=5' BOLTED, OR SIMILARLY FASTENED, TO THE DETENTION SYSTEM. 7.73' ELEV.=382.00' (TOP OF PIPE; OVERFLOW WEIR IS HYDRAULICALLY ELEV.=380.17' EQUIVALENTTO AN ORIFICE WITH AN APPROX. DIAMETER OF 021.24" INSTALLTRASH RACKS ON ALL - ORIFICES, TYP. SEE SHEET i9B FOR THE WEIR PLATE's TRASHRACK ON THE LOW -FLOW ORIFICE, OR EQUIVALENT. NFORCED 12 GA. STEEL PLATE ELEV.=372.00' (BOTTOM OF F MANUFACTURE / INSTALL ONE (i) 0io" LOW -FLOW ORIFICE IN THE STEEL WEIR PLATE ATTHE LOW POINT OF THE DETENTION SYSTEM (INVERT ELEVATION 372.00) 390 390 NOTE: PROPC SED ACC SS MH STAIRS ANY DFU1NAGE S TRUCTU E WITH k DROP IN EXCES 3 OF 4'V ERTICAL Y SHALL HAVE FOR IN PECTIO & MAINI ENANCE A 1" THI K STEEL PLATE A T THE BOTTOM 01 THE ST kUCTURE, TYPICA . 385 385 till 60"1312 MH RI 387.50 I =371.8 I =371.3 ELEVATE) 030" DS/ EMERGE EMERGENCY BYP 38o S R. BB10 III 380 �� PIPES, I_. 0' RIBU- =387.22 I -368. 14 I =366.64 STR. BE TOP OF WEIR PLATE= 80.17' io6.8i'C F 036" 375 1HDPE @ 3.0% 375 STIR. BEI TO SERVE AS A RISER STRUCTURE. SEE DETAILS ON RECESSED SHE 19B. R SER TO INCLUDE RADE A 60" NER DI METER WITH A OPEN T DP & TRASHRACK TR. BB8 RIM-361.33 66" MH 010" LOW -FLOW 370 II=349. 5 (06" RIFICE) RI =366.5 NV. IN 370 ORIFICE I0=3 6.50 (BIBS 36 II 360.79 WEIR PL 3E=372 00' IO 357.04 030" IN .OUT=3 1.9T 10 -yr PEAK WSE 362.56 1 -yr PEAK WSE 361.64 365 ROPOS 50' WID VDOT . Al RIPR P LINED EMERGENCY - PEAK WSE 359.57 STIR. BB1 , PROPO ED LOW R 365 SPIL AY w 1 SIDE S OPES & FILTER FABRIC -� 030" HD E PRIMA Y OUTF LL UND RLAYME T(STONE DEPTH a").SPILLWAY C EST / 10.0 1.0 LEV.=362 33'. (io' IDE TOP F DAM LEV.=364 00') ',/-/,I/ PROPOSED S VDOT D. EW-1 ^ PROPOS D 0i2o" ERFORA ED CMP CONTRACTOR SHALL INSTALL /� -STR.El YNDERGR OUND OF TENTION SYSTEM @o.5o% EMBAN<MENTII w/ THE 51-54' 0 036" ACCORDANCE DI SIGN S OWN ON THESE PLANS. HDPE @11.40% 36o TR. BB4 360 RI -357.33 (MH2-11 I.A). A I =345.40 MIN. SE ARATIO I =344.65 OF 1.0' S REDID APPROX. LOCA ION OF EX. 021" STR.BB7 DIPS IL (INV= 50.42t . A MIN. r? 20.00' O 036" 355 SEPARATION OF 1.0' IS REQ'D ' HDPE Qa .50% 355 INV. OU =356.14' XISTING STR. BBz RADE 60" MH CONTRA OR SH NILL REPLACE STE L WEIR PLATE ATTACHED TO THE RISER WIT A STEEL RIM=348.0o E IN =343 66 STABILIZED, OR HEN TIE ESC INSPECTO DIRECT THE OWNER (W ICHEVE INV O T=34316 COMES IRST). P OPOSE WE P ATE BELOW IS SIZED FORBLOCKS 16 & 17 NEW 350 WEIR P EISSZEDFORBLOCKE 16&171ANDTHRPORTIO\IOFFUIUREBLCCK18 1 350 SHOWN ON THESE PLANS. NEW WE IR PLATE TO INC UDE A 1 U" LOW FLOW ORIFICE PROPOSED VDOT (INVERT 350.00 , OR A 1 a" x 1-a" SQUARE OPENIN WITH N INVER OF 350 00. D. ES-1 s INV. OU 343.00' SLOPED ODRAI TOTHE ISER(o.5 MIN.) 1345 345 WITH PO ITIVESL PESTH OUGHO T. CONTRA OR SH LL INST NILL A 12 x12" MA 14UFACTL RED STEEL WEIR 82.8o'61 036..' PLATE O ER THE ISER's 6" LOW FLOW ORIFICE OPENING. WEIR PLATE VSTR. STR. BB HDPE La11.30% TO INCLUDE A 1 3" a LOW-F OW ORI ICE IN ( ERT=35 .00 O ), A 1-9i is 1-9i ie 49-05TM 3 RE OPENING WITH A IN 350.00. TE's OPENHV HDPE Cal 2.1o% WILL DIRECT RUNOFF INTO THE R SER's 0 " ORIFICE. A LAN ENTERPRISE 7.85' OF 036" TRASHIRU ICK, OR EQUIVALENT, SHIA ILL BE IN TALLED OVER TH E WEIR I LATE 340 HDPE 2.0% & AFFIXE D TO THE RISER. SEE LAN = ENTER RISE TR NSHRACPDETAIL ON 340 TO F REVENT FLOTATIC N THE RISER BASE SHALL BE FIRMLY SHEET 1 B. NOTE, TO REE LICE THE RISK OF CLOGGI IIG THE ONTRA OR EIV BEDDED "INTO 36"THI K REINF RCED C NCRETE SHALL I STALL A 10'Lx10' x12"D L. AI RIPRAP LINED STONEPIT WI ­H A FOU DATION HAT IS 1 'x1o', AN BURIED BELOW ROUND. FILTER F NBRIC Ul IDERILAYMENT AT THE RIS R's LOW FLOW O RIFICE PROPOSE DFLAT VDOT CLASS ET PROTECTION (T0 ki, EC-1 RI RAP OUT LOW-FLC W Cl WHE14 DIRECI LY BELOW THE L W-FLO ORIFICE & ELEV: 34 .00')w/G OTEXTILE ILTER FA RIC LINDE LAYMENT FABRICTO TRASH CK. 335 BE KEYED NTO EX. GROUND 9" MIN. AT IDS & AL NG PERIM TER. 335 FABRICTC OVERLAPA MIN. OF9" OPL= 30' W1=9 W2=17' =18" LU LU O Ol O Ol N N N 0 Ol 0 �'F M N V) L9 N n M W J J W w N M d lD lD . H rl n O n O d ON ul l0 c^i o6 n M O �p M W pl 1p N It It .t d XI \D l0 Ln l0 Ln l0 ID l0 ^ lD W n 1\ n 00 L7 M M M M M M „� M M rm M M M M M M M m M m w w 0+50 1+00 1+50 2+00 PROFILE SCALES 1"=5' (V) 1"=50'(H) 2+50 3+00 3+So 4+00 4+50 5+00 UGD SYSTEM B AND BASIN B ' � wWWWWII " IJWWWW \ I W I\ I\W II �IF` ■I wWWI I I NIIAISII � I (JI ) I ■I I I I s I I I ( . ) / � s/ / 7I \ �1 0120" INV. ' UNDERGROUND DETENTION SYSTEMV PROPOSED ACCESS w/STAIRS FOR & DRY DETENTION BASINBDETAIL: INSPECTION &MAINTENANCE, TYP. SCALE 1"=30' 0120" INV. 37259' . 0120" INV. 372.53' CONTRACTOR SHALL CALL THE COUNTY INSPECTOR & ENGINEERING DEPARTMENT 2 -HOURS BEFORE ANY 0120" NV. 3746' ANTICIPATED CONSTRUCTION ACTIVITIES FOR THE BMPs. THIS IS INCLUSIVE OFWHEN THE UNDERGROUND DETENTION SYSTEM SUBGRADE I READY FOR PIPECONSTRUCTION, B T BEFORE STONE BEDDING ISINSTALLED. 0120"INV. 01 01 0120" INV. 372.20 0120" INV37214 22.00' OF 0120" CMPQ 0.50%, TYP. DEPROPOSELEVATED 030" HDPEL EMERGENCY OUTFALL (14.75 LF, 11=379 5010-379.00) PROPOSED YLMERGENCOUFAL (12. oLF 11=37 50, 10=374 PROPOSED 06o"MH WITH STEEL PLATE, RIM=386.0o- PROPOSED 036" HOPE EMERGENCY OUTFALL (485 LF, 11=372.00, 10=372.87) ST. BEI EXISTING WETLANDS TO E° R EBVEQSTEERREMAIN UNDISTURBED, TYPSLOPES TYPIf I ST B8 4 All PROPOSED'WIDETOP ) iI .�1-•`�' .i . 1 r a mn � r , . i 0 ♦ 1 r • i ti 1 II � } X / 1 L -7 r �� YI r 1 v 0120" INV. 372.03' ' LOWER Ow ' iL OUTFALL ID • IINN I I r 38 \ 4 \ 1 \ 382 / s sIS s s 5- / I T$- I I=mI L1i==1l 1l_�lI I I W- -# \\ DD(11 10 PROPOSED OF DAM ELEVATION=364.0PROPOSED VDOT SWM STD. EW-1 GREENWAY, TYP. PROPOSED VARIABLE \ 'WIDTHSWM"& I I ( 1 W ACCESS ESMT// I I III- II \ \ PROPOSED FLAT VDOT CLASS Al, EC-1 `.., _ / / / I _ C� / RIPRAP OUTLET PROTECTION (TOP \ \ \ ELEV. 343.00')w/GEOTEXFILTER FABRIC UNDERLAYMENT. FABRIC TO BE \ \\ I KEYED INTO EX. GROUND 9 MIN. AT III III ENDS&ALONG PERIMETER. FABRICTO i R'eB STIR. B2 ' IIL= - \ . OVERLAP A MIN. OF 9" (OP L=130, I +00 III \ , , IL11_0- D_,Q,,, -III 2x00 I �f/ � 3 STIR. BB4 I I I s i SEE THIS SHEET FOR PROPOSED VDOT SCALED PROFILES OF ISTD. ES-1 \ THE ALIGNMENTS (TYP.) ( � V III \ PRO RIPRAP LINED VDOT IP SPILLWAY w/ 4:1 SID SLOPES & 1 FILTER FABRIC UNDERLAYMENT+] \ / (STONE EPTi2").SPILLW Y R T E♦\EV� 62.3 '. I /SIrR. BB6 V. S \` IED 66'x6o" ULVERTIH SEPARATE SE LANS) 10' WIDE GRADED, GRASS LINED ACCESS ROAD �I FOR POTENTIAL MAINTENANCE. ACCESS 35 �_ v ROAD ENCASED IN VAR. WIDTH SWM & = ACCESS EASEMENT. ROAD TO EXTEND FROM -34 . PUBLIC RIGHT-OF-WAY TO THE SYSTEM.`s / 35z \ \ PROPOSED So'WIDE VDOT CL. Al RIPRAP LINED EMERGENCY SPILLWAY & FILTER FABRIC UNDERLAYMENT (STONE DEPTH=12"). SPILLWAY 365 CREST ELEV.=362.33'. 365 Q ^ � v' 36o 36o 50' ROPOS D EXISTNG GRADE GRA E 355 355 0) MM O MNM E,L� N D M PROPOSED id WIDE TOP OF DAM ELEVATION=364.0' 5+50 6+oo 6+50 7+00 7+25 0+50 0+75 BASIN B SPILLWAY UNDERGROUND DETENTION SYSTEM 'B'STORAGE TABLE 10 r I T u I � 360 PROPOSED BASIN s FLOOR. SHALL BE SLOPED TO DRAIN TO J� THE RISER (o.5% MIN.) WITH 1 POSITIVE SLOPES THROUGHOUT. in 3/ x. II PROPOSED STIR. BB6 TO SERVE AS THE / RISER STRUCTURE. RISER TO INCLUDE A TOP TRASHRACK AND A LOW -FLOW ORIFICE THAT CONTAINS A STEEL WEIR PLATE & TRASHRACK. SEE THE PROFILE ON THIS j EESHEET �F,yO�R A//DDDITIONAL INFORMATION. //,-X // 1. //r TO PREVENT FLOTATION THE RISER / BASE SHALL BE FIRMLY EMBEDDED 6 INTO A 36" THICK REINFORCED CONCRETE FOUNDATION THAT IS l io'x10', AND BURIED BELOW GROUND. it ems:. (E) (F) (G) (A) (B) (C) (D) C-B DxE B+F FacilityElevations Area of 120" UGD System Y Void Space of P Area of Stone Storage Area in g Total UGD System Y (ft) Perforated CMP (sf) Footprint (sf) Stone (%) (Sf) Stone (cf) Storage Area (sf) 371.50 0 3,960 40% 3,960 1,584 1,584 372.00 0 3,960 40% 3,960 1,584 1,584 373.00 1,842 3,960 40% 2,118 847 2,689 374.00 2,456 3,960 40% 1,504 602 3,058 375.00 2,814 3,960 40% 1,146 459 3,272 376.00 3,008 3,960 40% 952 381 3,389 377.00 3,070 3,960 40% 890 356 3,426 378.00 3,008 3,960 40% 952 381 3,389 379.00 2,814 3,960 40% 1,146 459 3,272 380.00 2,456 3,960 40% 1,504 602 3,058 381.00 1,842 3,960 40% 2,118 847 2,689 382.00 0 3,960 40% 3,960 1,584 1,584 383.00 0 3,960 40% 3,960 1,584 1,584 \ ) C/ DRY BASIN 'B' STORAGE TABLE (H) (1) Facility Elevations Area of Contours (ft) (Sf) 350 2,672 352 3,816 354 5,127 356 6,609 358 8,268 360 10,105 362 12,089 364 14,178 ►I SCOTT R. CD'LLINS'Z Lic. No. 035791,E 4' 2422 p �J C to rq Z w C w u 0 U) u Z U z F O it:Lu u J Q Z 2 (� 0 O r/ V Z o N�z_� ` O a 0 W _a Z a V/ w Lu a o 2 a H m C,J w 0 (n D ` W w 0- c c > 'u N N W N N N N CD CD 2 LU T_ 2 ICY)z ICY) > a M =_ a NIT V C7 S 3 1 z a a E a o J ` WN V) a W 2 Q a L \Ljjc / 0 J U) �� z w F- 66 LU L9 O � W c a 3 � � Z c z z U Y Q C G WL O a a Y J2 LLl LU c Q c UlF: U) H� I L L 0 ZLU W H z O z - U) O v z LU I. a C `a J c Q i c OF a 0 N x a S c 1- J P JOB NO. 182150 SCALE AS SHOWN SHEET NO. 17 / FAoo APPROVED rvP, " \ \ \ / 3 SUBAREA Cis OUTFALL PATH DETAIL: //a. i j�//�� / / i "� / f = = / \/ Lu w 11/ SCALE 1"=30' Izz 63 - -jam /( Z: Ln / - � � 5 •�� � � _, \ \ I I I 1 ` I r ` \ \ e ._. � / _ _ � . � � ... \ ,z I / .\ " I r \ 1 �� �,�► - / W 562 S . w. W\_w ��h \ . .w \ .. " 382 q. OPO/ %.. � .... I I /ARGREE-AY. i �LIMITTOF STRIEX I I \ 1\ \ \ \ \ _/ �. ; ... \ ... /... CO Y DEFWF� I 1 \ \ ",= -- 1 / LIMITS OF WE�LAP�OPO�ED DRY I w-w p w , /` / P � BLOCK LIMITS, TY I I I I� I� 1 \\ I I \1 DEEP TENTION I I I I I \ A \ 1 LIMITS OF - / I -°• �� /� -.� /-.--. / V / -�!:. / �� ��� /// / / / // / a I \ I / " -III ♦ / / z / / / / / / I \ 1 TYP I I STREAM, / I _ , U I W I I�� ♦ 7 / \ I -�AR AS, TYP. " If �4IF IIII. �EEI_liIIIIII'FIIe =1 \ II -III �IIII iIII I II II 3�� _ / , P TYET/ELI/FN�YTS, ��/Y/ P/ mill- 4 ROPOSED STORM SEWER, TYPICA, 3o'OPDF�NAT RALB/UFRALONG/ RUNOFF BEFORE IT ENTERS POLO GROUNDS ROAD. O R MINOR PROPOSED RUNOFF IS DIRECTED INTO THE POLO GROUNDS ROAD MANMADE STORM SEWER SYSTEM,NETNATHL - /WHICH DISCHARGES TO THE CULVERTS'OUTLET I l I I I I / I I I _ - PROTECTION LOCATED IN THE STREAM's BED. SEE THE UND RD. �i / ,,YY""YY��``' \\KK \ IIIE 111 Mill ATTACHED SWM CALCULATIONS PACKET FOR THE `REFORESTED/ I�I II -I -III -// :1 I - - ANALYSIS OF THE STORM SEWER SYSTEM s HGL Nl \ �- -. \ ,� �. � COMPUTATIONS SHOWING THE io YEAR DESIGN STORM UNDSRD III III Ilr II II III IT • . - ,p . ' - IS CONTAINED WITHIN THE SYSTEM. ALSO NOTE, THE I AR DESIG N STORM IS NON EROSIVE ON THE PIPES � I � ;r , � / ` / \ 5 N 34 - w - / Z= \/ \ -34 4- - 3 ♦ r` s \`STM BB s a �/ .W.W.W.W.W `. J�/ v U = So 354 35 i ♦ \ \ -- -� w \ 54 5 W _o . . I _ TM-134 -_ \ s ml ♦ _-� - -- T - - - - J - i � �,� - � �e ♦il . STM-Bi.o 4 .� 41 in 4r# _ 34� �6 STM-B3 - - - - . J U ♦♦ \ \ �\ / 5 -5 \ MANMADE STORM SYSTEM (UNRER SE LA ASEWER T \ f ff \\ \ \ \ \ \ \ \ W OF PLANS UTOALLTH PROPpSEDS O WER =` �o' Structure Area (Acres i t� Min 4B 0.23 0.60 5.0 4 0.29 0.50 6.0 B10 0.53 0.80 6.0 B9 0.25 0.60 6.0 B8 0.22 0.50 6.0 B7 0.14 0.81 5.0 B6 0.20 0.69 5.0 B5 0.16 0.68 5.0 B4 0.29 0.76 6.0 B3 0.00 0.90 5.0 B2 0.00 0.90 5 SEV 350 STORM SEWER SYSTEM CONVEYS RUNOFF TO THE \ V \ \ •'. ' ` " ��� \ \ \\ \� \ \ RIPRAP LINED OUTLET PROTECTION LOCATED IN THE 'z \ \ • \ \ __ \ \\� STREAM's BED, WHERE SUBAREA C IS ihOF THE \ \ \ \ \ I I \ \, �,� j- \ 66 \\\ \ \ \\\ \ \\ \\OONTRIBUTING WATERSHED. FA 's RUNOFFIS NOT EROSIVE IN THE RIPRAP AND CsN�\ V \\ 1 DURING THE 2-YEAR STORM EVENT, AND DOES NOT OVERTOP POLO GROUNDS RD. & THE INLETS DURINGTHE -YEAR DESIGN STORM. � 1 / � � `� I J� s (` � I\ � � � � �� \ \ \ •�\\\.... NOTE: THE CONSTRUCTION OF THE PHASE II POLO GROUNDS ROAD IMPROVEMENTS (PROVIDED UNDER A SEPARATE PLAN) IS REQUIRED PRIOR TO THE ISSUANCE OF CERTIFICATES OF OCCUPANCIES FOR BLOCKS 16 & 17 OF BROOKHILL. THE POLO GROUNDS ROAD PHASE II IMPROVEMENTS ARE SHOWN ON THESE PLANS AND PROVIDE ACCESS TO BLOCKS 16 & 17 AND OUTFALL SUBAREA'C'. III Si CD,LLINS'Z Lic. No. 035791,l p 2/4/22 c4i f to rq Z W w 0 u 0 z O LLI ` u J a 0 (� k o 1 O C r/ U Z O O � Q W C Ln F m _ Z Q u '� 'L Q In V/ a H m W J 0 ><I LU w 0- c U � u CR 0 M N z a W N � Ul Q J_ W � Q -1 0 J_ > Tl Z ® LU LU F- 0 2 0 0 1 '�wr�77 T� V zQ 0 Y W U Y 0 LU F- � LI.I M I..I.J UlJ W O ZOO � O LU om JQ 0 0 N U r JOB NO. 182150 SCALE 1 "=30' SHEET NO. 18 HUGGER SINGLE BAR, BAND FLAT GASKET BOLT AND STRAP (SBBS) liiiliiilii FLAT GASKET CONNECTION DETAIL (SBBS) 2 2/3"xl/2" RE -ROLLED END HEL-COR PIPE GENERAL NOTES: 1. JOINT IS TO BE ASSEMBLED PER AASHTO BRIDGE CONSTRUCTION SPECIFICATION SEC 26.4.2.4. 2, BAND MATERIALS AND/OR COATING CAN VARY BY LOCATION. CONTACT YOUR CONTECH REPRESENTATIVE FOR AVAILABILITY. 3. BANDS ARE SHAPED TO MATCH THE PIPE -ARCH WHEN APPLICABLE. 4. BANDS ARE NORMALLY FURNISHED AS FOLLOWS: • 12" THRU 48" 1-PIECE • 54" THRU 96" 2-PIECES • 102" THRU 144" 3-PIECES 5. BAND FASTENERS ARE ATTACHED WITH SPOT WELDS, RIVETS OR HAND WELDS. 8. ALL CMP IS REROLLED TO HAVE ANNULAR END CORRUGATIONS OF 2 2/3"x1/2" 7. DIMENSIONS ARE SUBJECT TO MANUFACTURING TOLERANCES. 8. ORDER SHALL DESIGNATE GASKET OPTION, IF REQUIRED (SEE DETAILS ABOVE). H-12 HUGGER BAND DETAIL NOT TO SCALE 20 MIL PE IMPERMEABLE LINER OVER TOP OF PIPE LIMITS OF (IF REQUIRED) REQUIRED BACKFILL 41270TYP. 36" TYP. 36" SEE TYPICAL BACKFILL DETAIL NOTES TYPICAL SECTION VIEW NOT TO SCALE NOTE: IF SALTING AGENTS FOR SNOW AND ICE REMOVAL ARE USED ON OR NEAR THE PROJECT, A GEOMEMBRANE BARRIER IS RECOMMENDED WITH THE SYSTEM. THE GEOMEMBRANE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM A CHANGE IN THE SURROUNDING ENVIRONMENT OVER PERIOD OF TIME. PLEASE REFER TO THE BACKFILL REQUIREMENTS FOLLOW THE GUIDELINES OF AASHTO LRFD BRIDGE DESIGN (SEC 12)AND CONSTRUCTION (SEC 26) 1 MINIMUM TRENCH WIDTH MUST ALLOW ROOM FOR PROPER COMPACTION OF HAUNCH MATERIALS UNDER THE PIPE. THE MINIMUM TRENCH WIDTH (12.6.6.1): PIPEs 12": D + 16" PIPE > 12": 1.51D + 12" 1a MINIMUM EMBANKMENT WIDTH (IN FEET) FOR INITIAL FILL ENVELOPE (12.6.6.2): PIPE < 24•: 3.0D PIPE 24"-144 D+4'0" PIPE > 144": D + 10'0" 2 THE FOUNDATION UNDER THE PIPE AND SIDE BACKFILL SHALL BE ADEQUATE TO SUPPORT THE LOADS ACTING UPON IT (26.5.2). 3 BEDDING MATERIAL SHALL BE A RELATIVELY LOOSE MATERIAL THAT IS ROUGHLY SHAPED TO FIT THE BOTTOM OF THE PIPE, AND A MINIMUM OF TWICE THE CORRUGATION DEPTH IN THICKNESS, WITH THE MAXIMUM PARTICLE SIZE OF ONE-HALF OF THE CORRUGATION DEPTH (26.3.8.1, 26.5.3). 4 CORRUGATED STEEL PIPE (CSP / HEL-COR). 5 HAUNCH ZONE MATERIAL SHALL BE HAND SHOVELED OR SHOVEL SLICED INTO PLACE TO ALLOW FOR PROPER COMPACTION (26.5.4). 5a INITIAL BACKFILL FOR PIPE EMBEDMENT TO MEET AASHTO A-1, A-2 OR A-3 CLASSIFICATION, OR APPROVED EQUAL, COMPACTED TO 90% STANDARD PROCTOR (T 99). MAXIMUM PARTICLE SIZE NOT TO EXCEED 3" (12.4.1.2). ALL LIFTS PLACED IN A CONTROLLED MANNER. IT IS RECOMMENDED THAT LIFTS NOT EXCEED AN 8" UNCOMPACTED LIFT HEIGHT TO PREVENT UNEVEN LOADING, AND THE LESSER OF 1/3 THE DIAMETER OR 24" AS THE MAXIMUM DIFFERENTIAL SIDE -TO -SIDE (26.5.4). 6 INITIAL BACKFILL ABOVE PIPE MAY INCLUDE ROAD BASE MATERIAL (AND RIGID PAVEMENT IF APPLICABLE). SEE TABLE ABOVE. 6a TOTAL HEIGHT OF COMPACTED COVER FOR CONVENTIONAL HIGHWAY LOADS IS MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TOP OF RIGID PAVEMENT (12.6.6.3). 7 FINAL BACKFILL MATERIAL SELECTION AND COMPACTION REQUIREMENTS SHALL FOLLOW THE PROJECT PLANS AND SPECIFICATIONS PER THE ENGINEER OF RECORD (26.5.4.1). NOTES: • GEOTEXTILE SHOULD BE CONSIDERED FOR USE TO PREVENT SOIL MIGRATION INTO VARYING SOIL TYPES (PROJECT ENGINEER). • FOR MULTIPLE BARREL INSTALLATIONS THE RECOMMENDED STANDARD SPACING BETWEEN PARALLEL PIPE RUNS SHALL BE PIPE DIAJ2 BUT NO LESS THAN 12", OR 36" FOR PIPE DIAMETERS 72" AND LARGER. • CONTACT YOUR CONTECH REPRESENTATIVE FOR NONSTANDARD SPACING (TABLE C12.6.7-1). TYPICAL BACKFILL DETAIL NOT TO SCALE TEMPORARY COVER FOR CONSTRUCTION LOADS HEIGHT OF COVER CONSTRUCTION LOADS FINISHED GRADE FOR TEMPORARY CONSTRUCTION VEHICLE LOADS, AN EXTRA AMOUNT OF COMPACTED COVER MAY BE REQUIRED OVER THE TOP OF THE PIPE. THE HEIGHT -OF -COVER SHALL MEET THE MINIMUM REQUIREMENTS SHOWN IN THE TABLE BELOW. THE USE OF HEAVY CONSTRUCTION EQUIPMENT NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED GRADE COVER MINIMUMS FOR NORMAL HIGHWAY TRAFFIC. AXLE LOADS PIPE SPAN, INCHES (WPs) 18-50 1 50-75 1 75-110 1 110-150 MINIMUM COVER (FT) 2.0 2.5 3.0 3.0 12-42 48-72 3.0 3.0 3.5 4.0 78A20 3.0 3.5 4.0 4.0 126-144 3.5 4.0 4.5 4.5 *MINIMUM COVER MAY VARY, DEPENDING ON LOCAL CONDITIONS. THE CONTRACTOR MUST PROVIDE THE ADDITIONAL COVER REQUIRED TO AVOID DAMAGE TO THE PIPE. MINIMUM COVER IS MEASURED FROM THE TOP OF THE PIPE TO THE TOP OF THE MAINTAINED CONSTRUCTION ROADWAY SURFACE. CONSTRUCTION LOADING DIAGRAM NOT TO SCALE 36"0 MAX AHS-25 ACCESS CASTING TH Qr., WITH GRA DE RINGS AS REQUIRED, TO REINFORCING TABLE' �� BE PROVIDED AND INSTALLED BY "BEARING CONTRACTOR. MAYBE TOP MOUNTED CMP (AS SHOWN) OR RECESSED, w O CMP A B 0 REINFORCING PRESSURE SCOTT R. LLINSZ PROTECTION RIM/FINISHED o a RISER (PSF) SLAB --- - U Lic. No. 035791,a GRADE _ __-- __� VARIES Lt a ---- -- iv 24" 4'0 26" #5 @ 10.00EW 2,540 4'x4' #5 @ 10- OCEW 1,900 *�,Ao 2 4 �ZZ ;74•-6"0 #5@ 10"OCEW 2,260 `S`SIONAL 30" 4'-0" x W-6" 32* #5 @ 9" OCEW 1,670 5'0 #5 @ 9" OCEW 2,060 GASKET MATERIAL 0 CMP RISER ¢ 36* 5' x 5' 38* #5 @ 8" OCEW 1,500 SUFFICIENT TO PREVENT a -- SLAB FROM BEARING ON p 42" 5'-5-6 5'-6" #5 @ 8" OCEW 1,490 RISER TO BE PROVIDED BY a N 37 CONTRACTOR. 0B 11" TYP. g�0 #5 @ 7" OCEW 1,210 ,..i N N SECTION VIEW 48" 6'x& S0* #5@7"OCEW 1,270 N N ACCESS CASTING NOT SUPPLIED BY CONTECH c P A #4 DIAGONAL TRIM _'7 1, BAR (TYP. 4 PLACES), I SEE NOTE 7. t= �/tiOL�Q r- ­-_H4 OPENING IN I___ PROTECTION ^_-- _ - � } _ _-A-_-� SLAB FOR i C -/ ll,� � I I ACCESS INTERRUPTED BAR SPECIFICATION FOR CORRUGATED STEEL PIPE -ALUMINIZED TYPE 2 STEEL REPLACEMENT, SEE SCOPE HANDLING AND ASSEMBLY NOTE 6. THIS SPECIFICATION COVERS THE MANUFACTURE AND SHALL BE IN ACCORDANCE WITH RECOMMENDATIONS OF THE INSTALLATION OF THE CORRUGATED STEEL PIPE (CSP) DETAILED IN NATIONAL CORRUGATED STEEL PIPE ASSOCIATION (NCSPA) THE PROJECT PLANS. UNDERGROUND DETENTION SYSTEM NOTES: INSTALLATION 1. TRASHRACKS SHALL BE INSTALLED ON ALL ORIFICES, MATERIAL INCLUDING THOSE LOCATED AT THE DUTFALL STRUCTURES SHALL BE IN ACCORDANCE WITH AASHTO STANDARD WITHIN THE UNDERGROUND DETENTION SYSTEM. THE ALUMINIZED TYPE 2 STEEL COILS SHALL CONFORM TO THE SPECIFICATIONS FOR HIGHWAY BRIDGES, SECTION 26, DIVISION II 2. ANY RETAINING WALLS AND FOUNDATIONS CONSTRUCTED IN APPLICABLE REQUIREMENTS OF AASHTO M274 OR ASTM A929. OR ASTM A798 AND IN CONFORMANCE WITH THE PROJECT PLANS THE VICINITY OF THE UNDERGROUND DETENTION SYSTEM AND SPECIFICATIONS. IF THERE ARE ANY INCONSISTENCIES OR SHALL BE REVIEWED AND APPROVED BY THE STRUCTURAL PIPE CONFLICTS THE CONTRACTOR SHOULD DISCUSS AND RESOLVE ENGINEER AND A GEOTECHNICAL ENGINEER. WITH THE SITE ENGINEER. 3. THE ADJACENT PUBLIC ROADS & THE GRADED ACCESSES THE CSP SHALL BE MANUFACTURED IN ACCORDANCE WITH THE WILL SERVE AS ACCESS TO THE UNDERGROUND DETENTION APPLICABLE REQUIREMENTS OF AASHTO M36 OR ASTM A760. THE IT IS ALWAYS THE RESPONSIBILITY OF THE CONTRACTOR TO SYSTEMS. 4. CONTACT COLLINS ENGINEERING (434.293.3719) REGARDING PIPE SIZES, GAGES AND CORRUGATIONS SHALL BE AS SHOWN ON FOLLOW OSHA GUIDELINES FOR SAFE PRACTICES. ANY QUESTIONS CONCERNING THE UNDERGROUND DETENTION THE PROJECT PLANS. SYSTEM. 5. ALL FILL EMBANKMENT MATERIAL SHALL CONSIST ALL FABRICATION OF THE PRODUCT SHALL OCCUR WITHIN THE PREDOMINANTLY OF SOIL AND BE PLACED IN SUCCESSIVE UNITED STATES. UNIFORM LAYERS NOT MORE THAN 8 INCHES IN THICKNESS BEFORE COMPACTION OVER THE ENTIRE AREA IN ACCORDANCE NTH THE CURRENT VDOT ROAD AND BRIDGE MATERIAL SPECIFICATION SPECIFICATIONS. 6. VDOT STD. IS-1 & ST-1 ARE REQUIRED ON THE NOT TO SCALE UNDERGROUND DETENTION SYSTEM STRUCTURES, INCLUSIVE OF THE OUTFALL STRUCTURES. 7. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL TEST -DIG AT THE EXISTING INLETS & OUTFALLS TO CONFIRM THE INVERTS AND TO ENSURE THE PROPOSED 11'-a" 2Yz" GRADES CAN BE ACHIEVED. CONTRACTOR SHALL CONTACT COLLINS ENGINEERING OF ANY DISCREPANCIES IN THE � HORIZONTAL OR VERTICAL ALIGNMENT PRIOR TO ORDERING AND CONSTRUCTION. ALL STEEL PER 8. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION 3/4 (#6) REBAR CAN BE CUT FLUSH - a ASTM A36 MUST COMPLY WITH OSHA STANDARDS FOR CONSTRUCTION TO OUTSIDE OF RAIL INDUSTRY (29 CFR PART 1926). (BAR LENGTH = 16%q) OR BAR CAN 4 > 9. CONTRACTOR SHALL PROVIDE ADEQUATE STONE BACKFILL EXTEND BEYOND RAILY2"t ~ FABRICATION TOLERANCE: ±y4" FOR THE UNDERGROUND DETENTION SYSTEM PIPES IN _ , FLAT BAR AND REBAR: MILL ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS. 3/8" TOLERANCE APPLIES T'P ���r lM 811 Z-6" PIPE 0 PLAN FRONT 48"0 to 90"0 FITTING REINFORCEMENT MAY BE REQUIRED BASED ON HEIGHT OF COVER AND LIVE LOAD CONDITION TYPICAL MANWAY DETAIL NOT TO SCALE CENTEI Rl 3/" HOLE w/ Y4" REBAR RUNG, WELD REBAR TO RUNG ON OUTSIDE OF STEEL RAIL 0 2Y2" x %" FLAT BAR SIDE RAIL PLAN SIDE NOTES: 1. LADDERS CAN BE MADE IN 20'-0" STANDARD LENGTHS AND CUT TO FIT 2. ALL MATERIAL TO MEET ASTM A36 3. LADDER TO BE HOT DIPPED GALVANIZED PER ASTM A-123 AFTER FABRICATION IS COMPLETE STANDARD LADDER DETAIL NOT TO SCALE PART NO. HALAGVL16 PROVIDE MINIMUM OF 4 ATTACHMENT ANGLES (2 ON EITHER SIDE OF LADDER RAIL) TO CONNECT LADDER TO RISER EXTENSION RISER w/ LADDER AND STEPS IF EXTENSION IS REQUIRED RISER w/ LADDER AND STEPS MAINLINE CMP 2yxY2,5x1,3x1,ETC. NOTE: THIS DRAWING IS INTENDED TO APPLY TO LADDERS INSTALLED IN RISERS HAVING A DIAMETER OF 30" OR LARGER. DUE TO SPACE CONSTRAINTS AND LIMITED ACCESSIBILITY, THE PRACTICALITY AND SUITABILITY OF UTILIZING RISERS SMALLER THAN 30" DIAMETER AND/OR INCORPORATING LADDERS IN THESE SMALLER DIAMETER RISERS SHOULD BE ADDRESSED BY THE OWNER AND PROJECT ENGINEER V-6" MAX. #4 DIAGONAL TRIM BAR (TYP. 4 PLACES), - SEE NOTE 7. 2" COVER (TYP) �l I OPENING IN PROTECTION SLAB FOR ACESS STANDARD STANDARD REINFORCING, REINFORCING, SEE TABLE SEE TABLE ROUND OPTION PLAN VIEW NOTES: 1. DESIGN IN ACCORDANCE WITH AASHTO, 17th EDITION AND ACI 350. 2. DESIGN LOAD HS25. 3. EARTH COVER = V MAX. 4. CONCRETE STRENGTH = 4,000 psi 5. REINFORCING STEEL = ASTM A615, GRADE 60. 6. PROVIDE ADDITIONAL REINFORCING AROUND OPENINGS EQUAL TO THE BARS INTERRUPTED, HALF EACH SIDE. ADDITIONAL BARS TO BE IN THE SAME PLANE. *NOTE: WHEN RISER EXTENSIONS ARE USED, THE PLANT SHOULD CUT 3" FROM THE SIDE RAILS AS SHOWN *3" FROM BOTTOM OF LADDER 10 RAIL TO RISER JOINT *3" FROM TOP OF LADDER RAIL TO RISER JOINT FO LADDER RAILS AND RUNGS (2)Y4" FILLET WELDS 1" LONG ATTACHMENT ANC L5" x 3" xy" x 16" LONG AT V-0" MINIMUM OF 4 ANGLES P SPACING. LONG LEG TO LADDER SECTION, (2 EACH SIDE PROJECT OUT. WELD TOP LADDER) 6' MAX. SPACI AND BOTTOM OF 3" LEG TO EACH VERTICAL CORRUGATION CREST (THESE ANGLES SHOULD BE USED FOR LARGER DIAMETER MAINLINES WHERE ADDITIONAL STEPS ARE NEEDED) 6" FROM RUNG TO RISER JOINT 6" FROM RUNG TO RISER JOINT SECTION A -A RISER LADDER DETAIL NOT TO SCALE RISER NORMALLY CMP WITH 22/3' x )2" CORRUGATIONS (4)Y6" FILLET WELDS FROM EACH ANGLE TO CORRUGATION CREST (2 WELD EACH SIDE) L3"x3"xi6" 5Y" LONG A INTERRUPTED E REPLACEMENT, SEE NOTE 6. SQUARE OPTION PLAN VIEW 7. TRIM OPENING WITH DIAGONAL #4 BARS, EXTEND BARS A MINIMUM OF 12" BEYOND OPENING, BEND BARS AS REQUIRED TO MAINTAIN BAR COVER. 8. PROTECTION SLAB AND ALL MATERIALS TO BE PROVIDED AND INSTALLED BY CONTRACTOR. 9. DETAIL DESIGN BY DELTA ENGINEERS, ARCHITECTS AND LAND SURVEYORS, ENDWELL, NY. MANHOLE CAP DETAIL NOT TO SCALE (4));6" FILLET WELDS FROM EACH ANGLE CORRUGATION CREST (2 WELDS EACH SIDE) (4) L3" x 3" x 3/16" 5Y2" LONG (2)Y4" FILLET WELDS 1" LONG FROM EACH ANGLE TO LADDER RAIL LADDER RAILS AND RUNGS WAd►1 -_ _-A (4)Y6" FILLET WELDS FROM EACH ANGLE TO CORRUGATION CREST (2 WELDS EACH SIDE) L3" x 3" x Vj6" Sy" LONG 411IIIIAT/rlrel\ LADDER AND RUI r Z I w f O , z O 0 a O V co Lu c Z o ul J O O ¢ w �. CO i j z Q t w � • d i L w Lu �W/ li i W N N N N C) ao � o cli M M N M U7 z I -I Q Lu NO Q C) �I� N o6 W la- Lu Lf) O LU > z ZJ TI Q L Q ri O u Q z U Y Lu � U W c! Y w 'Q' O z v J = w Lu Lu O o U) C) z w LL � J m Q J w r V M O z O ® � N U JOB NO. 182150 SCALE i SHOWN SHEET NO. 19A ALL EW-12 A L 1 SLOT DETAIL WITTED FOR EASY REMOVAL) WEIR PLATE TO INCLUDE A 01-}"-� LOW -FLOW ORIFICE OPENING A DIRECTING RUNOFF INTO THE 06" STUB PIPE. ALTERNATIVELY, A IJ"xj" SQUARE LOW -FLOW ORIFICE CAN BE CUT INTO THE WEIR PLATE. AT THE TIME OF THE FULL BUILDOUT, THE PROPOSED WEIR PLATE SHALL BE REMOVED AND REPLACED WITH A NEW ONE CONTAINING A 01-%6" LOW -FLOW ORIFICE (OR A tit"xttg" SQUARE LOW -FLOW ORIFICE). ISOMETRIC PLAN ORUMINUM RIVETS BOLT4" X 8" ALUMINUM PANEL, c PIPE COUPLER TO BE CAST INTO ENDWALL. 0.080 OR 0.10 THICK I FD COIRLER MVST BE FLUSH WITH OUTER SURFACE OF UEW-,z AND PROVIDE A POSITIVE CONNECTION FORD THE OUTLET PIPE 14" OR 6111. H _ b - GALVANIZED U-TYPE '^ 2" BLACK LETTERS PLACED `T 4 MN. R ROLLED RAIL STEEL VERTICALLY ON MARKER POST AT 1.33 LBS./FT. PLATE WITH WHITE BACKGROUND UO" FOR UNDERDRAINS 1' a" "CD" FOR CROSSDRNNS UNDERDRAIN OUTLET SECTION A A MARKER DETAIL NOTES: 1. TYPICAL ENDWALL TO BE PLACED AT THE EPICS OF ALL UNDERDRAIN OUTLETS,BARRNG LOCATIONS WHERE UNDERDRAIN IS TIED INTO OTHER DRAINAGE STRUCTURES. ENDWALL TO BE INSTALLED PERPENDICULAR TO ROADWAY MD FLUSH WITH THE SLOPE. 2 OUTLET PIPES SHALL BE RIGID NONPEFFORATED SMOOTH -BORE PIPE MEETING THE EOUREMENTS PIPE I.D. SLOPE DMEN"Ves CLASS AS CONCRETE CUBIC YARDS OF 70 PSITESTEO ACCORDING TO ASTM 2412. 3. EXPANDED STEEL MESH (FLATTENED) SHALL HAVE OPENINGS OF APPROX. /i' X 1" AND WEIGH APPROX. 0.82 LBS. PER 50. FT. MESH SHALL BE CALVAAHZEO IN ACCORDANCE WITH ASTM A-123. THE MESH SHALL EXTEND A MINIMUM OF I" ABOVE THE O.D. OF THE PPE. AND IS A BARRIER FOR RODENTS, ETC. THE SLOT FOR THE STEEL MESH IS TO BE CONSTRUCTED SO THAT THE MESH CAN BE REMOVED FOR CLEANOUT PURPOSES. q THIS ITEM MAY BE PRECAST OR CAST IN PLACE, CAST IN RACE CONCRETE IS TO BE CLASS A3 13000 PS MIN.). PRECAST CONCRETE IS TO BE CLASS A4 (4000 PSI MIN.), 5. STEEL POSTS SHALL BE GALVANIZED N ACCORDANCE WITH THE ROM AND BRIDGE SPECIFICATIONS. ALWNUM MARKER RATES SHAH BE ASTM 6209 ALLOY 6061-T6 OR 505241381F. SI-CETING FOR L H 4' 2:1 2'-5 I -2 .' 0.19 4" 3:1 3' 51/" 1 -1 0.25 4' 4:1 4 -5' 7 -P ' 0.30 6' 2:1 2-W' ' 1 51/" 0.20 6' 3:1 4'- I-41 i' 0.30 8 411 5 -3 1'-3 4 0.38 WIN IL BM:KGHUUJU AND BLACK LLI IERS SHALL UUNUNM IV SLLI RAN 7UI UH NHL ROM AND BRIDGE SPECIFICATIONS. 6. MARKER SHALL BE PLACED AT ALL EW-12 INSTALLATIONS WITH z INCH LETTERS PLACED VERTICALLY DESIGNATING UNCERDIRANS WITH "LID" AND CROSSDRAINS WITH "CO". 7. MARKER WILL BE PAID FOR IN ACCORDANCE WITH SECTION 501 OF THE ROAD AND BRIDGE SPECIFICATIONS. NVDOT A COPY OF THE ORIGINAL SEALED AND SIGNED DRAWING IS ON FILE IN THE CENTRAL OFFICE. SPECIFICATION ROAD AND BRIDGE STANDARDS STANDARD ENDWALL FOR PIPE UNDERDRAIN VRGINIA DEPARTMENT OF TRANSPORTATION REFERENCE 105 70' 233 302 501 SHEET 1 OF 1 REVISION DATE 04/20 1p1.S2 TRASHRACK DETAIL FOR THE STUB PIPE's HEADWALL IN DRY BASIN 'A': DIMENSIONS A: Y-9/16" FLAT PUTS: TBD by Lanc &Gantmttor a'p' BAR STOCK: Tso WLane&contract. C• 2-1/8' HOLE SIZE: TBDby Lana6Gontrector Cilia COATING: Yea Ey a2/8" HINGED: Yes F: TBO by Lane & Contractor G• TBD bYLane &Contmctor H i8Dby Lane&Contractor D, LAME TRASH RACK o LANE MODEL #126 A0126 a I 12/15/00 MAINTENANCE INSPECTIONS: ANNUAL INSPECTIONS SHALL BE CONDUCTED IN THE NON -GROWING SEASON DURING THE FALL AND WINTER MONTHS. INSPECTIONS SHALL TRIGGER MAINTENANCE OPERATIONS AS REQUIRED. MAINTENANCE OPERATIONS MAY INCLUDE BUT IS NOT LIMITED TO, SEDIMENT REMOVAL, PERIODIC MOWING, REPAIR OF THE LEVEL SPREADER AND ENSURING A DENSE HEALTHY VEGETATED GROUNDCOVER. MOWING SHALL BE COMPLETED AT LEASTTWICE A YEAR TO PREVENT FURTHER WOODY GROWTH AND SPOT RE -VEGETATION OFTHE CONSERVATION AREA BUT SHALL NOT EXCEED 4 TIMES A YEAR. THIS MOWING IS REQUIRED IN ORDER TO MAINTAIN A go%MINIMUM COVERAGE RATE. THE CONTRACTOR SHALL CONDUCT THE INSPECTIONS FOLLOWING THE FIRST YEAR THE PROJECT IS COMPLETED AND THE OWNER SHALL CONDUCT THE INSPECTIONS THEREAFTER. INSPECTIONS SHALL INCLUDE THE FOLLOWING AT MINIMUM: 1. ENSURE FLOW PATHS ARE NOT SHORT-CIRCUITED IN THE LEVEL SPREADER AND THROUGH THE SWM CONSERVED OPEN SPACE EASEMENT. 2. ENSURE DEBRIS AND SEDIMENT HAS NOT ACCUMULATED. 3. CHECK FOR SCOUR AND EROSION WITHIN THE LEVEL SPREADER SYSTEM AND CONSERVATION AREA. 4. CHECK FOR FOOT OR VEHICULAR TRAFFIC DAMAGE IN THE STONE. 5. ENSURE VEGETATIVE DENSITY MEETS OR EXCEEDS go%OF THE SWM CONSERVED OPEN SPACE EASEMENT. IN THE EVENT MAINTENANCE IS REQUIRED DURING THE ABOVE NOTED INSPECTIONS, CORRECTIVE MEASURES SHALL BE COMPLETED IMMEDIATELY. VAUCP DECLSTORMWATER DESIGN SPECIFICATION NO.2 SHEET FLOW TO FILTER OR OPEN SPACE KEY LEVEL SPREADER INTO E)OSMNG GRADE RIPRAP PLLRJOE POOL RIPRAP APRON Y6rXIJrTREATED -t TIMBERS OR BETE LIP r �L LENGTH OF LEVEL SPREADER - .-- ) A 00% LIP TORE BASED ON DESIGN FLOW r_ AND ALLOWABLE VEI_OCFTY �. TOP OF SHALL.-BELEV�SPREADER rlr v � I} 1-3 IN. COURSE AGGREGATE OR OTHER LINING AAS DESIGNED FOR STABILITY PLAN VIEW DIMENSION BASED ON urolerLARBEo ExIBrrRO CIFUME 5%(20:1)ORLEB& IFV2Gf`FATGD DESIGN DISCHARGE FLTFA STRIP OR CON519RVEU OPFN SPARE. FRET t0 FEET LF9S TrwN 74 3 MIN W2* TaMIN �I � 3MIN 1 1 t2 ' ' =I 1-11 1 I_ MIN. DEPTH BASED O III ' REQUIRED STONE SIZE -I I 11-TI_ I I 'Tt I�I�-III�I=IILI�IL�,�,I�_ILI,II ,I I I ' SECTION A -A Figure 14: Level Spreader: Pipe or Cluarnnel Flow to Filter Strip or Rieoseri:r.rConserved Open Space StormRaxn ROUND SERIES TRASH RACK CONCRETE MANHOLE STANDARD BO INCH RACK SHOWN DIMENSIONS IN INCHES (OR EQUIVALENT) PLAN SIDE VIEW StormRaxTM Round Series for Concrete Manhole Plat No. DMkU54 WS BDWC min MDIOD Rs24 17414% 28 . 24 3D W36 21 14 40 36 43 RS-4t 27 . 46 57 0.560 27 %1B % 66'S 60 70 *1 Plastic Solutions. Inc. CU570NER PO Bur 4". W7rch5ta, VA U6011 d ZW lWaahee, M W nchesler. VA Z2603 81 PNOIK: I'fIOECT: (54O 7Z2.2219 tax K hHp,//www.Plastic-roW6m.mn X pvF emucTuwLLPWRGaY PLl9TR:9QUNP19, M4 w L 0 IF Aw ISOMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE OPTIONS CROSS BRACING FOR OVERHANG HDPE ANTI -VORTEX PLATE 'A' SEDIMENT BASINW DRY BASIN'B'& SEDIMENT BASIN' B' DATE OPMP. AMID Er DETAIL A 1/2" K1.. pealed ...k attached with 3;-8' fastener ® ®® ®ID (N 2-1/8' die. fides A ®® ISarriet r10 1/4' HDPE plot. (optional) PyPe Avert :eS x- HDPE alruclural plaalic witF 0 2-1/8- hales and I/4" plate manufactured by Plaatie OO o Solutlona Inc. r equal 000 DODO 6 shown with optional Plate n HTPF aL,.rtural plaelir with holes and 1/4- plate cctlorl manufactured by Plastic Solutions Inc. or equal R- di.. holy p 0 o O o 00 0 0 "ogle BMP Flevation 4f\ PLASTIC T)TRRTS CAGE SOLUTIONS P.o. Blow 4386 XinrANMr VA U601 INC. b7T-B•n-STZT rn.plMlfe-WWXAMN SWM CONSERVED OPEN SPACE EASEMENT LANDSCAPING REQUIREMENTS: IN ACCORDANCE WITH VA DEQ SPECIFICATION #2, NO GRADING OR CLEARING OF NATIVE VEGETATION IS ALLOWED WITHIN THE SWM CONSERVED OPEN SPACE EASEMENT. THE CONTRACTOR IS HOWEVER REQUIRED TO REFORESTTHE EASEMENT'SAREA WITH NATIVE TREES AND SHRUBS WHERE VEGETATION 15 SPARSE. THE LANDSCAPER SHALL INITIALLY REMOVE ANY INVASIVE SPECIES WITHIN THE SWM CONSERVED OPEN SPACE EASEMENT. FOLLOWING THISTHE CONTRACTOR SHALL PLANTTREES 1o' ON -CENTER OUTSIDE OFTHE SANITARY SEWER EASEMENT AND SHRUBS 5' ON -CENTER WITHIN THE SANITARY SEWER EASEMENT WHERE NATIVE SPECIES ARE NOT ALREADY PRESENT. THIS OVER -PLANTING WILL ASSIST IN THE AREA's FAST ESTABLISHMENT AND WILL ACCOUNT FOR MORTALITY. TREES AND SHRUBS WITH DEEP ROOTING CAPABILITIES ARE REQUIRED FOR PLANTING TO MAXIMIZE SOIL INFILTRATION CAPACITY. THE TREES SHALL BEA COMBINATION OFz1„ CAL. ROTUNDILOBA AMERICAN SWEETGUMS (LIQUIDAMBAR STYRACIFLUA'ROTUNDILOBA') AND 2;" CAL. PINCETON ELMS (ULMUS AMERICANA'PRINCETON'). THE SHRUBS SHALL BE A COMBINATION OF 2;" CAL. BUFORD MOLLIES (ILLEX CORNUTA 'BURFORDII') AND 2"' CAL. NELLIE R. STEVENS HOLLIES ILLEX X'NELLIE R. STEVENS). AT THE COMPLETION OF THE TREE AND SHRUB PLANTINGS, THE CONTRACTOR SHALL APPLY A NATIVE SLOPE MIX TO THE GROUNDCOVER WITH AN ANNUAL RYEGRASS BY ERNST CONSERVATION SEEDS AT A RATE OF 6o LBS. PER ACRE, OR 1 I.B. PER 1,000sf, UNLESS OTHERWISE SPECIFIED. THIS GROUNDCOVER WILL HELP TO ENSURE RAPID VEGETATIVE COVER OF THE SWM CONSERVED OPEN SPACE EASEMENT. EW1, I IPC L SEE DETAIL A I.FaN 9•d - A7 Fo �xF 319R FRONT ELEVATION A-..J 4 BARS a 6" C-C EACH WAY. EACH FACE. - NOTESI 1. CONCRETE TO BE 4000 PSI MNEAM COMPRESSIVE STRENGTH 2. IF PIPE B TO BE SKEWED THE OPENING WILL BE ADJUSTED TO ACCOMMODATE ANGLES UP TO 45'. 3. REINFORCING STEEL N ACCORDANCE WITH ASTM A-615 (REINFORCING BARS). 4. PIPE OPENINGS IN PRECAST DRAINAGE OUTS SHALL NOT EXCEED 4 INCHES AT MY GIVEN POINT BETWEEN THE PPE AND THE PRECAST UNIT. 5. DIMENSIONS SHOWN ARE MNNLN. ACTUAL MEASUREMENTS MAY VARY WITH MNRFALTURER'S TOLERANCE. 6. IN NO CASE SHALL TOP OF ENDWALL PROJECT MOVE FILL SLOPE. OITCH SLOPE. OR SHOULDER. 7- HEADWALL TO BE BEVELED IN ALL AREAS EXCEPT WHERE A CONFLICT WITH INVERT OR WNGWN OCCUR. 8. BEVEL EDGE IS REQUIRED ON THE HEADWALL AT THE INLET END OF THE CULVERT. SHAPE T( HEADWALL AT OUTLET END MAY BE EITIER SQUARE EDGE OR BEVELED. BEVELED MORTM 9. YYi' CHAAfER MAY BE PROVIDED ON ALL EDGES AT MMUFACTUERS OPTION. EW-PC ENOWALL FOR CIRCULAR PIPE DIAMETER OF PIPE CULVERT 1 12" 1 15" 1 1 21" OR 24• 27" OR 30" W. 33" 2'-0"2'-3"2'8" -2" '-10H A. L 0 to,- 4" 0._l;.4" 0._2.. O'-2%z' 1 O'-V/i' o•-3�i' b I 0'-T' 1 O'-V/4" 0'-1/:" 1 9-2" 1 0'-21/2" 01 BIAS a l2" C-( EACH WAY EACH FI FLOW A ; I SEE DETAIL B SECTION A -A 0 DO HOT BEVEL INVERT A 1,- DETAIL A DETAIL B EW'-1MC ENOWALL FOR ELLIPTICAL PIPE SIZE OF ELLIPTICAL PIPE CULVERT (SPAN x RISEI S x D 1 23' x 14" 2W" 1P' 34" x 22" M" x 24" 42" A 27" 45" x 29" 49' x 32" H T-D„ 2.x 2'-7.. 2,_2,� 3,_1. 3,_3. 3,_6„ L 5._5. 7._2. 6'_g'. 9'-2" O'-2" q'-1T• 12_1. 12_ry. a 0'-2%z' I O'-V/i' 1 V-3%i" 0�_4". 0._4%i' 1 V-4fi• 1 0'_5.' W-51/ ' b 1-2•' 1 0'-21," 1 V-274" 1 U-3" 1 0•-3%e' 1 a-3N" 1 0'-4" 0'-4,/s• ROM AND RvIIDDG❑E STANDARDS PRECAST ENDWALL FOR PIPE CULVERTS SPECIFICATION REFERENCE SHEET 1 OF , REVISION DATE 1211 - 36" CIRCULAR AND 23" x 1411 - 5311 x 34" ELLIPTICAL PIPES 105 101.02 VIRGINA DEPARTMENT OF TRANSPORTATION 302 2016 ROAD & BRIDGE STANDARDS SWM-OR 2016 ROAD & BRIDGE STANDARDS SWV-' NOTES L COST OF TRASH RACK AND DEBRIS RACK ARE TO BE INCLUDED N THE PRICE BID FOR THE STORMWATER MANAGEMENT DRAINAGE STRUCTURE. 2. STRUCTURE MAY BE PRECAST OR CAST IN PLACE. SEE SHEET 1OF 3 FOR DETAILS ON CAST IN PLACE STRUCTURE, 3. WEEP HOLES SHALL NOT BE PROVIDED. MY LIFT HOLES SHALL BE PLUGGED. 4, STEPS ME TO BE PROVIDED WHEN HEIGHT OF STRUCTURE 15 4'-C" OR GREATER MOVE INVERT OF OUTLET PIPE. FOR STEP DETAILS SEE STANDARD ST-I. 5. SEE STANDARD SWM•DR FOR DETAILS ON PLATE. DEBRIS RACK AND TRASH RACK. 6. MARK WIGHT OF STRUCTURE, IN BLACK, WITH 4" HIGH NUMERALS AND 1" WIDE HORIZONTAL STRIPES AT 1-INTERVALS FROM INVERT OF WATER QUALITY ORIFICE (ALL VISIBLE SIDES). ( 7. THE PERMANENT STORMWATER MANAGEMENT DRAINAGE STRUCTURE, - - STANDARD SWM-I MAY BE MODIFIED WHERE THE S70RMWATER MANAGEMENT BASH IS TO BE USED AS A TEMPORARY SEDIMENT HAI'FR DURING FOR TEMPORARY MODFICATD DETAILSCONSTRUCTION. SEE 7ANDMD SWM-OR, SHEET 'F B. THE SIZE OF THE WATER QUALITY ORIFICE SHALL BE SPECIFIED Ox THE PLAN VIEW PLANS. ADDITIONAL OKNINGS IN THE STORMWATER MANAGEMENT DRAINAGE STRUCTURE TO BE PROVIDED WIEN SPECIFIED ON THE PLANS. TRASH RACK ' -3; CAP 'NFNT I N 6 METAL I SEE NOTE 6 " PLATE V2 I -•�= DEBRIS li I R�K TYPICAL ROUND OR -� BOTTOM OF STORMWATER cl WATER QUALITY CUM. VERi _ SOUME 12" MAX.- �-- i MANAGEMENT BASIN ^ ORIFICE SEE NOTE F OR B' MIN OPENNG I �:ROWH. {E WALL ___ F _ L 1 P I I •,..,:, u CUSS M3 CONCRETE TO BE FRONT VIEW b" 5--0" 0 V. USED .. FILL SWM DRAINAGE SIDE VIEW STRUCTURE TO INVERT OF (DEBRIS RACK NOT SHOWN) DJTLET PIPE. SWM DRAINAGE STRUCTURE PRECAST STORMWATER MANAGEMENT DRAINAGE SREF REFERENCE ROAD AN`9 (DOS HOARDS STRUCTURE 105n4.02 SHEET 2 OF 2 REVISION GATE OB/10 VRGINIA DEPARTMENT OF TRANSPORTATION 302 SWM-OR 1 (STANDARD PPE HANGER OR x 2" METAL CLAMPS WITH HOLES fxl I/i Ol l x l TS M NUTl 5� 2016 ROAD & BRIDGE STANDARDS P 3" MIN. DIAMETER TEMP. ONFK:E STIAOUT. SCHEDULE 40 STEEL STUB, 1 FOOT. MN. LENGTH. 1 I 6" POLYETHELENE CAP WATERTIGHT FLEXIBLE COL W FOR a" DIA ELE U POLYETHELENE TUBING `8" DIA SOLID POLYETHELENE DRAINAGE TUBING WATERTIGHT FLEXIBLE GOIRINC FOR 3" MN, DIX STEEL PPE TO 6" DIAPOLYETHELENE TUBING DRAINAGE TUBING SHALL COMPLY WITH TEMPORARY DEWATERNG DEVICE I � I I " TEMPORARY WATER GUALITY ORIFICE " C COVER PLATE PERMANENT WATER OPENING ORIFICE I I SIDE VIEW ASTM F667 OR AASHTO M294. FRONT VIEW STORMWATER MANAGEMENT DRAINAGE STRUCTURE (TYPICAL DETAILS) (TYPICAL DETAILS) (STD. SWM-1 TYPICAL) NOTES: 1. THESE DETAILS ME TO BE USED TO MODIFY THE PERMANENT STORMWATER MANAGEMENT DRAINAGE STRUCTURE WHERE THE STORMWATER MANAGEMENT BASIN IS TO BE USED FOR A TEMPORARY SEDIMENT BASIN DURING PROJECT CONSTRUCTION. 2. GRADE STORMWATER MANAGEMENT BASIN AS SHOWN IN PLANS. 3. ALL OPENINGS (IF ANY) IN SIDE OF STRUCTURE (OTHER THAN PERMANENT WATER QUALITY ORIFICEI ARE TO BE COVERED WITH SOLID METAL PLATES WHILE THE BASIN 15 BEING USED FOR SEDIMENT CONTROL. 4. DEWATERNG DEVICE MO COMPONENTS AND TEMPORARY METAL PLATES IF Mn, AS SHOWN IN THE DETAL,ARE TO BE REMOVED AND PERMANENT STEEL PLATE W17H WATER DUALITY ORIFICE IS TO BE INSTALLED WHEN BASIN IS NO LONGER NEEDED FOR SEDIMENT CONTROL. S. SMILAR DEVICE MAY ALSO BE USED ON OTHER STORMWATER MANAGEMENT DRAINAGE STRUCTURES. a. COST OF TEMPORARY DEWATERING DEVICE AND TEMPORARY METAL PLATES (IF MY) SHALL BE INCLUDED IN THE BID PRICE FOR STORMWATER MANAGEMENT DRAINAGE STRUCTURE. 7. THE TEMPORARY B' DNA. POLYETHELENE DRAINAGE TUBING IS TO BE SOLID FOR THE LENGTH BELOW WET STORAGE ELEVATION AND IS TO BE PERFORATED MOVE THE WET STORAGE ELEVATION. THE COWLING IS TO BE WATERTIGHT. 1V�F svrDFK:, ROAD AND BRIDGE STANDARDS STORMWATER MANAGEMENT (SWM) DETAILS REFERD SHEET 1 OF 5 EWSION DATE 302 VIER (NIA DEPARTMENT F TRANSPORTATION 11{.0! G DE E O SWM DAM METAL PLATE DETAIL (NOT GAVANZEU) 1CONC.SWM DAM i 2016 ROAD 8 BRIDGE STANDARDS *X1/12 D D D* CONCRETE CRADLE PPE SIZE INCHES CRADLE BOTTOM WIDTH (INCHES( CRADLE HEIGHT ONCH I SI CRADLE TOP WIDTH (INCHES) INCREMENT, N CUBIC YARDS, PER LNEM FOOT OF PPE 12 34 14 32 0.093 15 38 15.75 35.5 O.li 18 42 17.5 39 0.129 24 50 21 46 0.168 SO 56 26 53 0.233 36 66 31 60 O.SD7 42 ]1 36 67 0.3B0 o t o 1-� -T CONCRETE SHALL BE CLASS M X BUT NOT LESS THAN 6" 91 9 BOTTOM X lK IF THE PIPE 6 LAD IN AN EXCAVATED TRENCH, THEN OF THE SIDE WALLS MAY COHFOWN TO THE TRENCH SHAPE J (E THE TRENCH MAY BECOME THE CRADLE FORM). DE AIL FOR METAL PLATE AND SIDE VIEW OF SWM CONCRETE CRADLE IS TO BE INSTALLED IANOER THE ENTIRE WATER QUALITY ORIFICE DAD( WITH DEBRIS LENGTH OF CULVERT AT EACH STORMWATER MANAGEMENT BASK. CONCRETE CRADLE IS TO BE PAD FOR AS MISCELLANEOUS TYPICAL SWAN DAM CONCRETE AND SUMMARIZED N CUBIC YARDS FOR EACH PIPE LOCATION METAL PLATE MUST BE CARVED TO FIT CRCOLM ROUND OR SQUARE CONC. SWM RISER UNITS WHERE APPLICABLE. 12' MAX. 5" MW. ORANAGES� OPENING THROUGH WALL STRUCTURE DEBRIS V 2'X• I(I" RACK (4) iex4"ADWSIVIE W.I/n IBOLTS.ELFWATER FKING LATS• BOTTOMOF 1 l 4• QUALITY WASHERS _ _ _ 5 / ORIFICE A l a _' a l 1 r II~METAL FOR SIZE) PLATE I --L - - -< .JJ _ L L- _ -JJ f4) 3'i' OA HOLES DETAIL FOR METAL PLATE AND SIDE VIEW WITH DEBRIS RACK METAL PLATE DETAIL WATER QUALITY ORIFICE (NOT GALVANZEO TYPICAL SWM DRAINAGE STRUCTURE ROAD MNvooSTAND MOS STORMWATER MANAGEMENT (SWM) DETAILS SPECIFICATION' DEBRIS RACK, METAL PLATE, WATER QUALITY ORIFICE, CONCRETE CRADLE sHEEr 3 a s aEvlslox DATE (FOR SWM DRAINAGE STRUCTURES SWM RISER PIPES AND SWM DAMS) wz 11L-OBI VIROINA DEPARTH•ENt OF TRANSPORTATION Splash Block Instructions Before instal rain diverting around the house. There 10 feet from ame SPLASH BLOCK NOTES: i. SPLASH BLOCKS SHALL BE INSTALLED AT THE OUTLETS OF THE DOWNSPOUTS LOCATED ALONG THE REAR PORTIONS OF THE HOMES LOCATED ON LOTS 7-22, 43-45, 117, 118 & 125-13S. 2. THE AREA DOWNSTREAM FROM THE SPLASH BLOCKS SHALL BE STABILIZED PRIOR TO THE INSTALLATION OF THE DOWNSPOUTS AND SPLASH BLOCKS. SECTION A-0: TYPICAL GRAPHICAL DETAILS Homogeneous fill r- - - ------- I i� /� 4' min �� - Cut off trench-4' below suitable material Soil a rock L - - - - - - - - - - - J TYPICAL HOMOGENEOUS EMBANKMENT Perforated a FOUNDATION DRAIN 305 Transition fill __ROCk or gravel \Blanket drain BLANKET DRAIN / aaR Sane, grnrtl a gat � Gain oleki Rock or gravel Tura toe drain 38.+v 4Trunsillon 611er `Transition filter CHIMNEY DRAIN TOE DRAIN Figm-e A -la. Homogeneous Ernbaliklnelai I% Seepage Controls EMBANKMENT NOTES: A SUMMARY OF THE EMBANKMENT DESIGN REQUIREMENTS ARE LISTED BELOW MANDATING THE CONTRACTOR MEET THESE REQUIREMENTS Q Q ATAMINIMUM: THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN ON IN THIS PLAN. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ME, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE MINIMUM OF 95%OF MAXIMUM DRY DENSITY AND 2%OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. TRASHRACK DETAIL FOR DRY BASIN B's LOW -FLOW ORIFICE: Providc [fir Locksb)e I Access i A za" MT PLATE: 24" MT ANGLE: C: z-L7B• BAR STOCK: D: z-ye" HOLE SIZE £:TBD by Lane & COATING: Yes Contractor HINGED' Yes SCOTT/R. CTTLLINSZI H Lic. No. 035791,a A 2/4/22 url E z F W � L O H z O u � z a V� U v LU Z W J o (n Gc e z < C O O ¢ C ~H W Co U z Q C W Lu `u d LU 0 w < N C .H W N N N N o r-I L9 T_ JOB NO. 182150 SCALE i SHOWN SHEET NO. 198 Brookhill Stormwater Quality Summary Table Section Block Common Name SWM Facility ID Type of Facility Phosphorus Removal achieved w/proposed plan (lb/yr) Plan # Amount of Offsite Credits Created (lb/yr) Amount of Offsite Credits Purchased (Ib/yr) Percent of Total Development Offsite Credits (%) 1 4A Apartments Pond 11 Wet Pond 4.01 WP0201800051 0 1.27 3.7% 1 4A Apartments DP-4A Detention Pond w/ Underground Storage - WP0201800051 1 4A Apartments CDS-4A CDs Unit (Manufactured Device) 1.60 WP0201800051 1 4A Apartments LS-11 Sheetflow to open space REMOVED - WP0201800051 1 4B Apartments Pond 11 Wet Pond 0.18 WP0201800051 1 4B Apartments LID-4B Isolator Row (Manufactured Device) 3.38 WP0201800051 1 4B Apartments Pond 4B Extended Detention Pond 0.79 WP0201800051 1 4B Apartments LS-413 Sheet flow to open space 0.74 WP0201800051 1 - ROW Pond 11 Wet Pond 0.18 WP0201800013 0 1.09 3.2% 1 - ROW LS-11 Sheetflow to open space REMOVED - WP0201800013 1 - ROW LS-11 Sheetflow to open space REMOVED - WP0201800013 1 8B ROW and Block 8B Pond 10 Wet Pond 5.91 WPO201800080 0.68 1.53 2.5% 1 - ROW LS-10 LS-10 REMOVED - WPO201800080 1 - ROW LS-10 LS-10 REMOVED - WP0201800080 1 3 Section 1 Mass Grading Pond 4 Wet Pond 20.56 WP0201700037 (Amendment#2) 0.46 0 1.4% 1 3 Section 1 Mass Grading LS-4.1 Sheet flow to open space 5.14 WP0201700037 (Amendment #2) 1 3 Section 1 Mass Grading Wet Pond B Wet Pond 8.53 WP0201700037 (Amendment #2) 0 0 0.0% 1 3 Ice Rink ROW Pond 11 Wet Pond 0.38 WP0201800050 0.08 0 0.2% 1 3 Ice Rink ROW LS-11 Sheetflow to open space REMOVED - WP0201800050 1 3 Ice Rink ROW Pond 4 Wet Pond 0.89 WP0201800050 0.68 0 2.0% 1 3 Ice Rink ROW LS-4.1 Sheet flow to open space 0.67 WP0201800050 1 3 Ice Rink Pond 4 Wet Pond 2.20 WP0201800050 1 3 Ice Rink LS-4.1 Sheet flow to open space 1.79 WP0201800050 1 8A Senior Living Facility Pond 11 Wet Pond 3.70 WP0201900004 0.01 0 0.0% 1 8A Senior Living Facility LS-11 Sheetflow to open space REMOVED - WP0201900004 Section 1 Master Plan Comparison Section SWM Facility ID Phosphorus Removal proposed w/master plan (Ib/yr) Phosphorus Removal achieved w/proposed plan ( Ib/yr) Anticipated Amount of Offsite Credits Purchased Ib/yr) ( Anticipated Percent of Total Development Offsite ( Credits %) Amount of Offsite Credits Purchased ( Ib/yr) Percent of Total Development Offsite Credits ( ) 1 Pond 4 Treatment Total 6.77 23.65 1 Pond 7 Treatment Total 8.11 TBD 1 Pond 10 Treatment Total 6.94 5.91 1 Pond 11 Treatment Total 9.68 8.45 1 Pond 4B Treatment TDtal - 0.79 1 Manufactured Devices Treatment Total 2.62 4.98 1 Infiltration Treatment Total 21.71 0 1 Wet Pond B - 8.53 1 Sheet Flow to Open Space Treatment Total 9.74 8.34 Section 1 BMP Treatment Total 65.57 60.65 Section 1 Offsite Nutrient Credits Totall 6.8 1 20.0% 1 1 1 3.89 1 11% Section Block Common Name SWM Facility ID Type of Facility Phosphorus Removal achieved w/proposed plan (lb/yr) Plan # Amount of Offsite Credits Purchased (lb/yr) Percent of Total Development Offsite Credits (%) 2 9 Townhouses Blk 9 Wet Pond Level II Wet Pond 5.87 WP0201800086 2.10 6.2% 2 10 Townhouses Blk 10- UGD Underground Detention (No Water Quality) - WP0201800086 2 11 Townhouses _ FYI: A 2.08 Ibs/yr credit is appied to the Blks 9-11 WPO 20200004 plan from the immediately adjacent Wet Pond B in WP0201700037 Amendment #2, This credit is accounted for above in Section 1's Wet Pond B's 8.53 Ibs/yr removal rate and is therefore not shown in Section 2's removal rate summary. _ WP0201800086 Section 2 Master Plan Comparison Section SWM Facility ID Phosphorus Removal proposed w/master plan (Ib/yr) Phosphorus Removal achieved w/proposed plan ( Ib/yr) Anticipated Amount of Offsite Credits Purchased Ib/yr) ( Anticipated Percent of Total Development Offsite ( Credits %) Amount of Offsite Credits Purchased ( Ib/yr) Percent of Total Development ( Offsite Credits %) 2 Pond 12 Treatment Total 8.06 - 2 Sheet Flow to Open Space Treatment Total 1.67 - 2 Blk 9 Wet Pond - 5.87 2 Blk 10- UGD - - 2 Credit Applied from WP0201700037 Amendment#2 - - Section 2 Treatment Totall 9.73 1 5.87 Section 2 Nutrient Credits Total 6.8 1 20.0% 2.10 1 6.2% Section Block Common Name SWM Facility ID Type of Facility Phosphorus Removal achieved w/proposed plan (lb/yr) Plan # Amount of Offsite Credits Purchased (lb/yr) Percent of Total Development Offsite Credits I%) 3 13 TBD TBD TBD TBD TBD TBD TBD 3 13 TBD TBD TBD TBD TBD TBD TBD 3 12 TBD TBD TBD TBD TBD TBD TBD Section 3 Master Plan Comparison Section SWM Facility ID Phosphorus Removal proposed w/master plan (Ib/yr) Phosphorus Removal achieved w/proposed plan Ib r ( /y) Anticipated Amount of Offsite Credits Purchased Ib r ( /y) Anticipated Percent of Total Development Offsite Credits % ( ) Amount of Offsite Credits Purchased Ib r ( /Y) Percent of Total Development Offsite Credits ( ) 3 Pond 13A Treatment Total 9.13 TBD 3 Sheet Flow to Open Space Treatment Total 5.95 TBD Section 3 Treatment Total 15.08 TBD Section 3 Nutrient Credits Total 6.8 20.0% TBD TBD Section Block Common Name SWM Facility ID Type of Facility Phosphorus Removal achieved w/proposed plan (lb/yr) Plan # Amount of Offsite Credits Purchased (lb/yr) Percent of Total Development Offsite Credits I%) 4 14 TBD TBD TBD TBD TBD TBD TBD 4 14 TBD TBD TBD TBD TBD TBD TBD 4 14 TBD TBD TBD TBD TBD TBD TBD Section 4 Master Plan Comparison Section SWM Facility ID Phosphorus Removal proposed w/master plan (Ib/yr) Phosphorus Removal achieved w/proposed plan (lb/yr) Anticipated Amount of Offsite Credits Purchased (lb/yr) Anticipated Percent of Total Development Offsite Credits (%) Amount of Off site Credits Purchased (Ib/yr) Percent of Total Development Offsite Credits I%) 4 Pond 13A Treatment Total 14.05 TBD 4 Sheet Flow to Open Space Treatment Total 0.04 TBD Section 4 Treatment Total 14.09 TBD Section 4 Nutrient Credits Total 6.8 20.0% TBD TBD Required Phosphorous Removal Rate (Ibs/yr) 14.17 1.12 6.74 29.94 1. To date the total required phosphorous removal rate is 85.42 Ibs r and the total phosphorous removal rate achieved through onsite SWM facilities is 73.41 Ibs r. In accordance with stormwater regulations, the overall Brookhill Development is allowed to use offsite . Q P P /Y P P g /Y g P 5.68 BMPs (e.g. nutrient credit purchases) totalling a maximum of 25% of the overall required required phosphorous removal rate. 2. Actual purchased nutrient credits assoicated with the approved plans to date is 5.99 lb/yr. 3. Actual nutrient credits proposed to be purchaed that are assoicated with this plan (WPO 20210007) to date is 6.02lb/yr. Required Phosphorous Removal Rate (Ibs/vr) IDIOM Required Phosphorous Removal Rate (Ibs/vr) TBD Required Phosphorous Removal Rate (Ibs/vr) TBD Section Block Common Name SWM Facility ID Type of Facility Phosphorus Removal achieved w/proposed plan (lb/yr) Plan # Amount of Offsite Credits Purchased (lb/yr) Percent of Total Development Offsite Credits (%) 5 16 Single Family Housing Level Spreader'A' Sheetflow to Conservation Area with A/B soils 6.89 WPO 20210007 0 0.D% 5 17 Single Family Housing UGD'B' Underground Detention (No Water Quality) WPO 20210007 10.83 31.9% 5 18 Single Family Housing TBD TBD TBD TBD TBD TBD Section 5 Master Plan Comparison Section SWM Facility ID Phosphorus Removal proposed w/master plan (Ib/yr) Phosphorus Removal achieved w/proposed plan (lb/yr) Anticipated Amount of Off site Credits Purchased (lb/yr) Anticipated Percent of Total Development Offsite Credits (%) Amount of Offsite Credits Purchased (lb/yr) Percent of Total Development Offsite Credits (%) 5 Pond 14A Treatment Total 4.81 TBD 5 Pond 14B Treatment Total 6.42 TBD 5 Pond 15A Treatment Total 5.16 TBD 5 Pond 15B Treatment Total 5.14 TBD 5 Pond 16 Treatment Total 11.75 TBD 5 Grass Channel Treatment Total 2.1 TBD 5 Sheet Flow to Open Space Treatment Total 1.43 6.89 5 Blocks 16-17 Wet Pond - 0 Section 5 Treatment Total 36.81 6.89 Section 5 Nutrient Credits Total 6.8 20.0% 10.83 1 31.9% Overall Treatment Total 141.28 1 73.41 Overall Nutrient Credits Purchased 34 100.0% 16.82 1 49.5% Anticipated Treatment Total With SWM Master Plani 175.56 Notes: STORMWATER QUALITY SUMMARY NOTE. - AS SUMMARIZED ABOVE IN NOTES #1-3, THE TOTAL PHOSPHOROUS REMOVAL RATE REQUIRED TO DATE IS 85.42 Ibs/yr FOR THE OVERALL BROOKHILL DEVELOPMENT. ADDITIONALLY, THE TOTAL PHOSPHOROUS REMOVAL RATE PROVIDED ONSITE IS 73.41 Ibs/yr FOR THE OVERALL BROOKHILL DEVELOPMENT. A MINIMUM OF 75% OF THE REQUIRED PHOSPHOROUS REMOVAL RATE SHALL BE PROVIDED ONSITE, AND TO DATE 85.9% IS PROVIDED ONSITE. COUNTY OF ALRF.MARLE Department of Comm u nit y Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following; I. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvertlpipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material lavers - biofilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Riofilter media must be an approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. Required Phosphorous Removal Rate (Ibs/vr) 17.72 Total Required Phosphorous Removal Rate (Ibs/yr) to Date 85.42 Total ONSITE Phosphorous Removal Rate Provided (Ibs/yr) 73.41 Lic. No. 035791 as 2/4/22 \ M N N IN N \ \ r' 00 U) to w O V O z z F Q f g /A r- Z�' V� O O O U 2:U V U V W=w Zz�� O U,< z z z J O O VO U O J J W W z cc Q of .. a w w W f p m CID Q J co J to � ¢ a LY wawa � O o a w O w ci�W > cc w ti w N \ N M CD N 0 r M z "' N NT I Qz; 0 J WCY) Cl- N N W J J � � rl F- C6 L9 _J T__l O 11.-D U W o Y J W co F_ Ul 1.-: U) J 1-­t � 0 z U) O F_ COI'� _ W �< V O 06 V) LLI - 0 Q z LLI CW GLLI Q Q 0 w J W 0 O d 3013 NO. 182150 SCALE NONE SHEET NO. 20 FF I I ! f \ \�493 3B5 . PROPOSED 8' HDPE ROOF DRAIN SYSTE POSED M w . / o TH ) / �' �•• / PROPUBLICS � � 1 x° � / ' - io' PRIVATE DRAINAGE EASEMENT �o j DRAINAGE EASEMENT 9 i ` 310 ^'� 45- 4oa33 F 48 / s y -- / I N 5 ET 2 END o \ F i LOT / / / // J SC R. C�LLINS'Z, / s fl / O / / / / / % :, IW W y\ STAAz JS \ i ✓ t1x i 4oa.67 FF 47 / / / / U Lic. No. 035791 l FUTURE PUBLIC GREENWAYTO BE 2�4�22 l / / o\ \ oo \ / / "Ai DEDICATED TO ALBEMARLE COUNTY 374 W u 3 \9\/ 34� hoO \ \\\ P OPOSED DRAINAGE SYSTE ROPOSED GUARDRAIL AT TIME OF FINAL SUBDIVISION PLAT, I 374BG 29 f ✓ 40 / S FZMAzoi8000li= / n.67Bw i \ \\ �y j y�*°° 4 NOT : NO PROPOSED GRADES SHALL EXCEED za SLOPE IONAi PER PROFFER #z O 3 \� // � W / 374 Y'W � � ��✓" s. � \ \\\.. 8 '. /. / -:._ ". ,'l i f / / � / �y a '- � PROPOSED 12 HDPE YARD DRAIN SYSTE� f � 96 6w / A A y YD-1 /374 � � � • '° � x .� �` • • � w/ 10' PRIVATE DRAINAGE EASEMENT. � I �I W� OPEN � � � � � as v �. � w 368 67��x°° ',SPACE �' 374 \ - \ A 9 h y OTE: SLOPES GREATER THAN 1 SHALLBE PLANTED ITHA IVE / — v � Ao ��F s° DRAINAGE EASEMENT 4 STEEP SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST CONSERVATION i a PROPERTY BOUNDARY(TYP.) 368BG O 9/8\...../G� -.•/ /_yx o �.. �. /SEEDS AT A RATE OF 6o LBS. PER ACRE OR 74BG 3 3Q867 BSy1 L B. PER 1,00o SF. w\ PROPOSEDUUNb DETENTION SY TEMPROPERTYBOUNDAR�TY) o riri •�.96 / /./ ..�. � /.� /.. ... / / // / / � J PROPOSED W \ ( /I ALL P1 I s \\ /. L 3956 E\ /^ �.Zox� \ \*°o. /,/ �� / // / ����'�� O i (MAX. HEIGHT=6') I M I 32 \ \ \ \ / /. 96. 3 SMT \ fo 3g4 / /EXIi TING PRESERVED!/ uVi m w o E � / STEEP SLOPES YP.) O z g c EXISTING too -YEAR FLOODPLAIN (TYP.) I I I 1 i \\ \ s �� \ / 394.0o GAS \ �. J9 % _fir // / �H/� Ln CO L z i 4.67FFE ¢ �% > �a o / w w mM I / ROPOSED DRAINAGE SYSTEM I , \ P9 \ / / /� 384. B T 1 I I 1'0% / En \ PROPOSED WALL \ \ / / \39 w GEO-GRID SYSTEM ... I �. s / /.. \ LOT.. W r PROPOSED VAR. WIDTH SWIM // 93.67GA \�\\\ / FACI I 94.33 F3- r 384.33 BSMT- • U L Off / zo n V� 4 / / YD-6A T i \ � 300. ' ' / > 393.07 UAR v � - / - / ✓/ /�' / 38� - / � .. / I / / / / / / I N r1 N W 366BW / �- — 12�� G� i 9433 FF \ \ /P OPOSED DRAINAGE STEM , ? �. // w N r4 N z.6 GAR / \ \ / / l / 39 7CD CN 393-33 FFE I— 3 433 EXISTING PRESERVED W / / 383.33 BSMT 3y l I \ LOT \fin \ // �/ / x�o STEEP SLOPES (TYP.) W ` W \ PROPOSED WA 1 i / T -3 33 GAR \ \ n0 \ / / yv p' �0 W .. MAINTENANCEEASEMIN / J WALL 3 4.0o FFE T A I � � 3 4.00 5MT �I\3 LCITPROPOSEDI2 HDPE YARD DRAIN SYSTEM/ PROPOSED WALL 366BW 6BG l // 6 w/ io'PRIVATE DRAINAGE EASEMENT 1 I I I GEO-GRID SYSTEM 368 BG / 366BW 3 CA I ) y y 6 - / W AAL WA 3 / / / (Y) STA. 366BW — — 2 / / / / / / o \ --PROPOSED PUBLIC l /l l l l / M DRAINAGE EASEMENT � /� / / / / / / / � / 1 PROPOSED vAK. WIDTH SWM o / \ \ W . . W.W w\ • I� I • \ V A I �I / � PROPOSEDVAR.WIDTH SWM ACILITY& MAINTENANCE EASEMENT � FACILITY & MAINTENANCE EASEMENT 7, NCD CN Q ��) I ITlilli� Fd_ III I XISTING STREAM (TYP.) \• I .� y /�� Z PROPOSED DRY // 7 �ROPOSEDSWMFOREST&� / / / / J Q I I / BASIN'B' , / _ nDETENTION OPEN SPACE EASEMENT > / / Ja W N I / 11 �� I I J,-� `` , I �,, , ,. f ��.• - .,. 1��o /�/ jl / // . // i/,�'/ /. // /// //l// / l // l /// l/ / / / /� // // / / / / / / / // o�D 36 r o NOt VD az < _' 4 ' / ✓EASEMENTS TO THE EXTENT NECESSARY TO PROTECT / / / / / I = (n 0 THE ROADWAY FROM FLOODING OR DAMAGE. U FUTURE PUBLIC GREENWAY TO BE 06 DEDICATED ED TO ALBEMARLE COUNTY N.\T� Y AT TIME OF FINAL SUBDIVISION PLAT, ,I PROPOSED DRAINAGE SYSTE PER PROFFER #z OF ZMA2o3.800011 M xo a � —' .� a ...• / � ////. /// // /.�/ / j ,: yW I I I I I Lu OI� Q OPEN 356 + PROPOSED VAR. WIDTH SWM SPACE czrD FACILITY &MAINTENANCE EASEMENT co -r \. _����, � 1 °(�` �" /�,/' � i � � I.�. .�. /.�. ;.// •J/ W W `�W`�WWW WW WW W � � lII I I II I I Il, / lI / lIC�j l Wl' W�I �I I I � I � � \ w 4w PcoPROJECT BOUNDARY TYP.Q = '441 \ I I w —352 30 POLO GROUNDS — _ Ex -BB' 0 \ 1 / W I I I I I I .ROAD BUFFER,Q \ I ✓ � /�:� I� A�� � N a �s ti W W I' W \ I 1 I I o I \ GF�A �IC \SC�L 10 Lu J,�� _ '— '---ETIE-INTO STORM STRUCTURE INSTALLED WITH v. � . � 3 � � � I \ � !- ~ PHASE z POLO GROUNDS ROAD PLAN, 3 �/ / I I I I \ \ ( ) \ \ \ \ \ \ \ SUB-201 -11 — — \ FEET SEE PHASE 2 POLO GROUNDS ROAD PLAN �J/ 7 Z 4 / / J I —\—\ \ _\ 1 inch 0 -- OR DRAINAGE IMPROVEMENTS, �.` SEE PHASE 2 POLO GROUNDS ROAD PLAN L SUB-2o17 117 �`� \ \ OR DRAINAGE IMPROVEMENTS, — I— —� —\ 1—� s \ \ \ \ I I \ \ I \ \ \ \ f \ �h G SUB 2017 117 34 SEE PHASE 2 POLO GROUNDS ROAD PLAN 3cZ \ \ 44� /[ FOR PROPOSED POLO GROUNDS ROAD �\ \ \ \ \ \ \ \ \ \� / / C \ \ \ \ ( — EXPANSION & ENTRANCE DETAILS, _ Ql 1 4 a % �I _ SUB-2017-117 Drainage Easement Chart Pipe No. Size (inches) Max Depth (feet) Easement Width Required (feet) Easement Width Prodded (feet) 6A 36 1 12.5 1 30.0 1 30 13 30 9.3 23.0 23 29 24 1 14.8 33.5 34 JOB NO. 182150 SCALE 1"=30' SHEET NO. 21 / I EXISTING PRESERVED / I STEEP SLOPES (TYPJ / l II XI STIN loo-YEAR FLOODPLAIN (TYP.) / / PROPOSED SW OPEN SPACE E, OPEN I o` SPACE / I I o 2 3.a.,rc / LOT \ 29. FFE / \\ \ \ / / i \ 6. G R \ ^ M 4 9.0o j / / / \ \ \ 4 42 4 0o F�E 446 / 48l00 / j/ zoo / 43167FFE \ / , z n LOT 3w zp z0 23 z w T \ m m En 1 1 /o / p J x w z 42g.o 444 / 74 % i 434 a z m f x 35 f / / - `- / / oO GA PROPOSED$'' HDPE ROOF DRAIN SYSTEM w/ / ° /A c 0 O �o O / 5 s PROPOSED 12" HDPE YARD DRAIN SYSTEMI / s� ` I �/' U U U j s N PRIVATE DRAINAGE EASEMENT g 4y OT j io' PRIVATE DRAINAGE EASEMENT /3 / M w j J z 54 / 73 / v / PROPOSED WALL o m z z LOT 6 G 44 �� a z O 4 7 // GEO-GRID SYSTEM p a U O 3 ... !{,1 4 F -. - /- END bF m J J w / 3� F \ � " • � : o. GAR.71p I � < ,• ' � � . O r_ m w U O o 43i.otl FFE / / o. L WALL a > ? a xh ROPOSED 8"HDPE ROOF DRAIN SYSTEM w/ xh q / os YD-il x 4 5 w 1 I io' PRIVATE DRAINAGE EASEMENT 3 / /7z ,,. .. -�._y�Oj 54..ISTA. i 8. m w f / PROPOSED WALL PROJECT BOUNDARY (TYP.) MAINTENANCE EASEMENT PROPOSED SWM FOREST & FUTURE PUBLIC GREENWAY TO BE PROPOSED WALLS HT. 6') s / OPEN SPACE EASEMENT / DEDICATED TO ALBEMARLE COUNTY ATTIME OF FINAL SUBDIVISION PLAT, /v (MAX. w w Drainage Easement Chart Pipe No. Size (inches) Max Depth (feet) Easement Width Required (feet) Easement Width ProNded (feet) 56A 24 17.0 38.0 38 57 24 12.8 29.5 30 58A 24 10.1 24.2 25 59 24 8.3 20.5 21 63 24 7.8 19.5 20 65 24 6.2 16.3 1 20 - FUTURE PUBLIC GREENWAY TO BE DEDICATED TO ALBEMARLE COUNTY- I PROPOSED WALL 420 TW418.o � (MAX. HT. = 4') BG pz AT TIME OF FINAL SUBDIVISION PLAT, PER PROFFER #2 OF ZMA201800021 wy16.67ew -- / OF / _- 422 TW END WALL -� 418.0 BG 416.67BW STA. 1+6z PROPOSED SWM FOREST&2 �30 / / OPEN SPACE EASEMENT 422 418 BG 412/ ' y18 T BG / y16.67 BW � 41 _ 418 16.67 BW -A PER PROFFER #2OFZMA2oi800022 �/. �.r .v .�; w ��1). 1g -' w ./w/'.' w �. �.I,._.,._ w _.,. �;,. w -'_.. �.�;� �,_... �, .. �, may,.- �, 414 \ m u, w .. . PROPOSED WALL �, ,`�... .w/ �,.-� �,�, .�;. /�, w �,// ,� w --.-\J' �. �, START OF GIky661 B�� T 4� p \ / / END OF GEO-GRID SYSTEM / / WALL w - WALL F,, "� / / // 11" \41 _�` �... .� / 'l„9� .. �, �, . w/. �, �, .. � -� �... w "w STA. °+oOmyG \, w STA. 3+ya - 8o TWw. �"'/./v. _ 39� .. .wi9z TWw w w .. �J'0. v. w/. wy . w /.w. / w y, - w. „ / \ - / \ ,.� Ck mZ 1 .38o BG - 86 BG 386 BG /`...394TW ! / /.. /_ �.. _ 4�9 �r.. G PROPOSED WALL... .Ir _W 38a TVJ/. vr...3788W /f _ -g84 BWw 3646W 88 BG /�g8 TV,7 vi...- ,,-.pv� BENDOF 'EXISTING PRESERVED -/d vr. �I, 41gB�... WALL E / ,✓ \ ha' � GEO-GRID.SYSTEM -� �..,..3746G w /.....%39oTw ,I, ;,�,. -ooTVJ - 3868W/�;- 392 BG //..� / STA.5+3z-`!/-STEEPSLOPES(TYP.) �i /27.67BW / j .. 37z BW .384 BG 394 BG 98TW 39 oo"IW / / / % �•y2 i y20 418 BG \ LOT \ �� `( \\ `!'. `�'.:.. w. w.. w _w - 82 BW w 4 w .... w� ,✓ �L y.. /w �- pig 418E 39z BW - gB BGi. 394 BG� /. /. �.. z y16.6 6w� \ \ PROPOSEDWALL \ /' $ / 388 TW - 416.676 �� \ 1 1 SCOTT/R. 051LINSZ Lic. No. 035791 � P 2/4/22 392 BW �, 4o4TW �,... �, / �� \ 35 442.67 38o BW y02 � .. 400 BG \ \\ MAINTENANCE EASEMENT 443:3 FFER _ _ 398 T�'V 96 BG w - 398 BW ;yozTW.- ��_ / '.' \\ \ / LO l L _ J� / W < \ \ 396 B 396 TW 94 BW oo BW / \\ 1 1.00 GAR 4 "3 $ \ 5 Z F / 394Bw 39oBG 4 / V / LVT 34 44 67FFE \ \ 44z \ w --_ -- LV , .I, A �, v11 �� gz BG V ,E 388BW-� - o \ V. /..._ V - .. 9°g ✓ - -- _, �ra,u _ 4 V ��� A A\ \ o GAR V A\ 4?7BS �s '•� + f A \ 0 WALL D w I 6T \ / STA. 4*631 I -� -- A /'.'.'.\\ i.'.'. g \\ 333 3733 f \ _ :. i 00� �" u v v \ 39oBG A LOT/ A / I _ _- -- / 1 A A 4 Ff l / �. . y6+ -j � o0!39 0 V I { V A V LO A 4 :oa69fC1 1 A w a Z` 388 Bw \ 12 T I I _ - / \ V AV A s� A zAh /, .. _ \ 7 I -- 0 -1 /* \ \ 132 2.67 R A o -o m \ PROPOSED SWM FACILITY & ^ I o6 - - - I I -A 15+5 - �u I PROPOSED 20 PUBLIC u � 1 w \ w / PROPOSED WALLS 4 Ik , I I I A LOT \ 4 33 FFE % `� o DRAINAGE EASEMENT w \ MAINTENANCE EASEMENT m �° m A �4 7 FFE - _ I � / ,// / / o � (MAX. HT. = 6') - 41 o GA� I V A� / w ¢ _ \ t19 . jE5 -231 427.00 GAR \ - - +oo �� / Z g c 4a�6zF E 42 I ALO 15 ✓✓.� 1 b / 7zB o 388TW \V I 40 6MT L LOT I 1 0 \ 4z7.67 BSE / G -. 4 z e a . �. 73'- / F�1 \ 382 BG ro / L 413.67 GAR \ ( I - _ - A i, o . / \ \ 74 Lu '" 414.33FFE V �n - 42 �9 1 1.00 R N 14+5 .W .� %- Vl ILL v w \ \v w 38oTw mm // LOT 404.33 BSNI \ i s% GAR I I % 4 i. j FFE 1/ %' 0 1 `� w / 74A / H o -�� . \ 3748G // 126 /. // v �I I 4i7.3 FF I ti _ - ,� �6 6g 14+off. - YD 46 YD 4C / E < 372Bw / / z%// - I L� A /� -- - - / .. c YD_ 4A 0 4� / ILL! C - �,r�� �.-I � � '.-ice"' • ... 1,3+50 �- �Wi N Lu " CONTIGUOUS 390BG \ f Q w WETLAND vx w s' 388Bw �' m 3 YD-4 LOT \11 W ° w \ � � ' / . , . 26 .: ° ' •. 4, . n 13 • ROPOSED DRAINAGE SY TS EM GA PROPOSED WALLS \ z 6G f 1 / / 39 33 h W W W 7 , w w 3 (MAX. HT. - 6') \ \ /3/o BW � 4 �:0o G RI / l �, ry 1z+5° � �-�i � - T • .. 67k \ 9% 40.0o FF I PROPOSED i2"HDPE YARD DRAIN SYSTEM w w w v 386 fwl 6 E I a / 1 76B 7 3 \I I w/ io' PRIVATE DRAINAGE EASEMENT s6f L 4 3� 7 1 1� /. 1 + 6 A / . cyo 0 1�+00 T 76 LDT X 403.67 WSrk 20+00 / io o ii+Qo ii+ o .r S 78 BW - ! / - - 5 / o \ \ ' l I 6o �L� I / - o PUB 68 439 33 G%i 97 1 / '}( +. w O \ C I� i V of ' L I w w w W w - PROP \ 3 18% 40.0o FF PROPOSED 8 HDPE ROOF DRAIN SYSTEM w/ w wl w \ w 3886G 125 _ s / o \ \ io' PRIVATE DRAINAGE EASEMENT N' / / • +; 38o TW 386^BW. .'.'.I ..1 I , - - H \ � . - .. LOT.... � 1 II / G'rw 437 7 � � 1 Tw z 6w 39 N ` I LOT 438 33 FFE ',, �° I N y \ 6 - w I 373 3 \ 39oBG ,I ! - -- �.' _,, 63 .' 65:: 66- _ I. 110 -'3'. ':' y14o.00G W I II \ €x -I _ - - - 5o BSMT 1- 1 W w I m �7� asaw �\ °. � 62 7r?.9-o r YD- z8. ' 8% �,o.67FF J r�l �: �r 5 4 1 rr t I w w 1�ww I tN " PROPOSEDDRAINAGESYSTEM / r I I ra \ \ PROPOSED SWM CONSERVEDIw \ 388TW r o r - I I 1 «, L 1 EN�OF -..-III 38zBG " �" �.... -PROPOSED PUBLIC... /I I I I I LOT 1 I �- - I I LOT ; OPEN SPACE EASEMENT I Iw wAL G I I 40: J. g- 3aoaw r DRAINAGE EASEMENT 1 3 \ i I a �"F... , n STA. 1+� ! I_L II \ � �.'.' , '.1 O ' ; �' '.'. u= _ \� ✓ ; •: / � - :° L -1111 11 1 Q� - 439F6F R � 1 - 40.67 G R 9�_ _ \ . YD-4D \ 1 .; I • ; / p o 4z3 I / I I 41 I \' 0 is FF - . { 64 PROPOSED PBLIC 1 L 439% 1 7/0 4- 33 \ o w Tw o \ OT 423 F \ 39 / I / d DRAINAGE EASEMENT - - 10 z B M o> 373TW 373TW pp,. .. L T ) I - a 1 I 9 4 9 83 S T W 32B \ 367BG oBG 6D /(}��' .I.. .. 420.00 GAR I.� 1 S _J 1 I s.. fJ..._ „ \ 1\... 1 .. N. .I....... 36`�-- 36aew 24 3 \ \ I I / o zo.6 FFE PROPOSED 8 HDPE ROOF DRAIN SYSTEM w/ 1rw \ 1 T - ..f. I g/o 7 I o 11 I u_u-1 \ 373rW STn roF �! 4, 1 -. .6 GA I. , I io PRIVATE DRAINAGE EASEMENT .375 BG WALL '4 I. y '.'.. / 4 9 � �; •y ,. \ 73 BW o. FFE 8/0 373 B ( Bw 373 STA. i - 4 33 ° A = _ - GARI I N I 1 alo z.00 FF 11 \ 1 68 \ 37 ✓ 8% I I I L -- 43 7 1 I ,=t 389 �o I y e \ \ I I LOT a 33 FFE I 4 \ 1 { 3 S56we \ 9e3eG z ROPOSEDDRAINAGESYSTEM i 1 L LOT a1Bw - �4 :zsoGAR'- I I PROPOSED PUBLIC _ _ � - - - � - -108- - 430. o BSMt •; /' 1\ 4z. 1 - ` 367 a 9 \ RAIN, &SWM 64D £ 64C / YD-SA / / \ 4z:oo G R 93 2 ill g ma's \ / START 5.67 FFE / - 6 B / / I II \_ I \ �i WALL I ACCESS EASEMENT 4 I LOT 1 44 \ a 42.67 FF ST . o+oo / 05,67 BSMT [c10 g y _ o I oo GAR ' \ 3e1rW 9 1 LOT - / _ - _ o l z 3 �44 ' YD-4E s d 376 BG. / - �. ci. 112 PR P ED SWIM FA ILITY 1 \ aw a rw 12 / I : / I I / �I 44 67 FF E : 1 - 4333 G%� LOT II I I< O OS S C & - -IF 37a 3 9 /. �J 3 I 5gA I S I f 4 i 8 BSMT', I ✓ MAINTENANCE EASEMENT--1i1 \ 3s6eG I / 8B 1/ I ' LO f�l / L1 L0 3 3 \ �% 44. 92 II �p /..'. 5 I- I 14 .00C�A 1! I I 10. I /o I .I. _II 1.. / LI I `.� N LLP 39iBG iS 3wrw '7 L - I / I I 12 I Y I I - 7 I I + 3 PROPOSED DRAINAGE SYSTEM w w - z.FE 1 I I I 1 m / 'll III_' gi BG �.,\. 9978� ICE DOF... / I I 422:0 GAR I ° : ' €. / ' I I I I 1 1 I. n �9 aw 399s wALLcr / / / / \' 4zz.6�7 FFE 8 /o, - - J I I I N 8A - - - - - - 1 � J ; PROPOSED SWM FACILITY & T / - I I / - I I - I I > r MAINTENANCE EASEMENT, \ w ` srn z\zJ, PROPOSED PUBLIC 4Y2. / RAINAG E & SWM O \ a o 58 ACCESS EASEMENT 1 , w wl`\ ;�.;?,f s -; - __ / co BW- £ND OF/. \� \ ' L -.,-.- _-.-{-. - �. I '• L I V1 � I. _,11 WALL CI / _ o L I � � I I ROPOSED i2" HDPE YARD DRAIN SYSTEM.', I 7 B• LOT - I I _. I I II Q3a •+ y Y _ r I a 4z ' I + I a4.00 AR I w/ io PRIVATE DRAINAGE EASEMENT ' • I 3Q / � I /0 4433 G%� 0 .2 0 . I �: /II I If Il j 91 I 10I-o a1oTw L z4.67 FE I O L_ 45.00fF + 1 4io BG 4z4.67 GA \ > \ \ / ,' L� I I/ LOT TTT XISTING ioo-YR FLOODPLAIN (TYP.), o g G 4 a w / / 408 BW LOT \ I I m .67 GAR I0.Z.� : „ I I'.''• I h ,y 4 �Q a7 W d9 1oTw\ 425.33FF ' / to I L I I 423. 106 I 3 -` w \w \ aoaT w 4 420 4i5. B / \ �� ' /9I 1 LOT 16 BG 43 :So BS T 5 Q.a % 45 67 GA m 1 PROPIED DRY w \ / / 3 6Bw ^o / / yo46W 113 I I I } I 0 PROPOSED 8 HDPE ROOF DRAIN SYSTEM w/ l \ \ ✓ O/ I I 5 p o 46.33 FF DETENTION 1\ ARrok y 4 oTW yo \ / / ✓ �� _ _ _ - = I I YD- B io' PRIVATE DRAINAGE EASEMENT I Q 1.� . A ( N \ \ w - yls . o.o / yo4 Bw �y / % 29/o v ' - - - LOT 447 67 G I Q Q L LOT I 1 1: 1 �(, BQ51 \ A \ ALL �5 -� - N s n `Qil llil j // \\ <4 0 - , - 10j 44 33 Fy8 0� tr .00 GA 1 I EXISTING MANAGED- w / =1 : a ti Vy o I I - yo4 w / / \ �, _... ... .. O. fix.... /.' I T. I ...... .67 FF -II PROPOSED 8"HDPE ROOF DRAIN SYSTEM w/ / ` STEEP SLOPES (TYP.) \ 8ir 40o BG � ti f S / l LOT I I I I I } L o� 13 / I / � : ' � I d "', •, � I I i io' PRIVATE DRAINAGE EASEMENT • . I - EXISTING STREAM (TYP.)� 7 Bw 98 BW f LO / w 8 LOT \ h / 1 FUTURE PUBLIC GREENWAY TO BE I 11 / III } I I LOT 44 I I I + 8:33 I 1 Y o L 6 oo FFE 8$ I } � L .a. l z GA I I I I 44 :bo FFE I -/ DEDICATED TO ALBEMARLE COUNTY .W PROPOSED SWM ACCESS PATH m / 4z I _ 4 5 7 i BS TI N. 3. „ 1 h 10 AT TIME OF FINAL SUBDIVISION PLAT, / 4 4 ° 7° I' 426. 3 FFE I L I 4 43 7 I �I I PROPOSED iz HDPE YARD DRAIN SYSTEM I z .o0 FFE I I I w/1o' PRIVATE DRAINAGE EASEMENT PER PROFFER #z OF ZMAzo38000u �` �` \\ \ PROPOSED WALL / I / / i6 0o B Iv�T � f � ° � - I I I I 3/0 I GEO-GRID SYSTEM o N _ f I I LOT . W I 4 S I p1oTW -4/0l ' - ---__- I I I I 49:ooGA II I 1.1�3. 404 6 I 406 BG %�. \ I - I I 449. 400 B I I o4 BW - � j N' t • -'.7` . 39 (-- - F, ^ 1I - , �J LOT` f 14o I 4 of / I/ II 4?S 0 I 440 5o BS T t o PROPOSED SWM FOREST & 4o4TW o o _ - N - 1 I' I 103 I I + I_ / / OPEN SPACE EASEMENT 3986G ° - - I 13. L of GAR LOT n. / �. f \ 1.' - - - / 26.6 GAR -' / 0 33 v l l / i \ 9 6 BW I \. \ e 7 0, o Sao Yp_ G I I I I of a I 1.0o FFE 86 N \ 33 l ROJECT BOUNDARY TYP. 4z6.00 GAR \ - a \ u / l j l _ - - . <. . ° I I � ' ' (TYP.) PROPOSED UNDERGROUND / PROPO 4z6.67 FIFE / / < / 5 _ L I I 6 DETENTION SYSTEM'A, PROPOSEDWALL z�j \ L T ' /� -/ 16.6 BSMQ _ _ - �5_ I 4 .6 FF LOT 1 5 ' (MAX. HT. = 6') \ 4 7 \ : \ / / / / J / L �/ \ o o \ ✓ \ / \ n PROPOSED 12HDPE YARD DRAIN SYSTEM LOT PROPOSED PUBLIC DRAINAGE I\ y1oT 1 / w/ 1o' PRIVATE DRAINAGE EASEMENT s \ _ SWIM ACCESS EASEMENT \ \ 4o66G \ \ 7 \ 102 45 BW ia% - y 8%4 \ \\I \ \ / 4 / PROPERTY BOUNDARY (TYP.) \\yo8TW \✓ \ 6 0 A \ / \ \ \ / / / 4 R3 BSI�1T 1 / / h I r o 4o46G °g 2 FFE \ N \ \ \ ✓ ( / 4 / 1 4 - yo4 TW 4oz BW. 4oz BG � I s \. �7. a. R LOT \ �.\ \ ° \ ooBW i :6 BSMT 1 r 1 16 > T` 4z7.67 F \ // LOT 451: GA 398 BG`06 TW 451.67 FF 84 39 BW v `°�o � � LOT , � 4?4 (/ ]f, � -/ / / I � 1101 ` 45?�33 FFH' I I •; / y/ w 11 40o BG / \ 1 /o / 398BW \ ...,. 11 \. zo \ \ '.'.'..\.� / / '.. - 44�506�!'1 I °° �.' -.- .. 'b% 52.67GA 9 4 26. / /. ✓ � � 3gs 6 11 � , > \ I � /i / l l \ � 2.33 FF LOT .- 7 8 - -f PROPOSEDWALL \ 400TW \. 4o8 G 3 / .PROPOSED 8"HDPE ROOF DRAIN SYSTEM w 0 1. GA / 08 BG \ w/ _ _ \ - 4 \ /i / LOT 45 7 \\ / 6 / 0 OPEN - (MAX. HT. 6') 3986G �05.676 \ /i / 4 .33 F O 1 �o "Sz. 7 FF1o' PRIVATE DRAINAGE EASEMENT e p / � SPACE ��96 Bw \ _ 0 \ / YD-5D io0 44 5 S I 1 ° 1 0 49 33 LOT' / I 00000 wnu cz 398 6 s nRroF \ / ' i o PROPOSED 8" HDPE ROOF DRAIN SYSTEM N _ 82 45 r H O w ST +oo - .100 EXISTING PRESERVED 396.67 ew � ° CwALL c1 / io' PRIVATE DRAINAGE EASEMENT / p / �- • I - Y /4% 51.67 GA STEEP SLOPES (TYP.) �, / 1 LOT o GAR yob TW STA. o+oo LOT Y OI gs460ew 408 8G �� 67 FFE / /. 408 TW y1z TW 4o6.67 BW 99 44 .83 BS T/ 1 $1 / I oB 6G ,. ppAA ,�...3 1�/ 4srtai7 GA _ / '. ° 3 GRAPHIC SCALE / :. 4o2 BG yob BG l" is u 1 / oo.67BW-r4oy.67 BW 410 TW � /.. j.. .. 1 0 PROPOSED WALL y �- � / 41oTW o6.67BW PEN G. j.. 2.33FF 1 MAINTENANCE EASEMENT 04BG f: L8� 3� 5 3o bo j 402.67BW SPACE o+ r 6, S { NOTE: NO PROPOSED GRADES SHALL EXCEED 2:1 SLO E. / / �. rsJ, \ 3 I i/4 51.00 GA 1 z6A ; 6 ( IN FE T) / f / T / j 1.67 FF LOT 1 I 1\inch =0 ft. / NOTE: SLOPES GREATER THAN 3:1 SHALL BE P AN ED WITH NATIVE - STEEP SLOPE MIX WITH ANNUAL RYEGRASS BY ERNST CONSERVATIONI179 WED SEEDS AT A RATE OF 6o LBS. PER ACRE, OR 1 LB. PER l,000 SF. \ - fYP.> , �: MATCHLINE - SEE SHEET 22 /zL non GAR I N rn I N N N Lu N v\i r4 M CD \O f^ O N ti co M (n N M LE N Q CD J N N 121- > 2: LU > z J Q J > 11. LLI LLl O 111 z a Q v U 06 O z ~ < ult--t LLI YLLJ � � O O J w m J< 0 O O N Lu r. F- JOB NO. 182150 SCALE 1"=30' SHEET NO. 23