Loading...
HomeMy WebLinkAboutWPO202100066 Review Comments Appeal to BOS 2022-03-31�q oe nt 401 McIntire Road, North Wing Charlottesville,VA22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG VESCP Permit Plan Review Project title: 1225 AppleTree Lane Layout, Grading ESC Plan - VESCP Project file number: WPO-2021-00066 Plan preparer: William Moore [wmoore@belzer.cc] Owner or rep.: Earl and Suzanne Grossman [earlgrossman@gmail.com] Plan received date: November 17t , 2021 February 141h, 2022 Date of comments: December 161h, 2021 March 8'h , 2022 March 23'd, 2022 Reviewer: Geoff Elsie County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VESCP permit by issuing a project approval or denial. This project is Approved. The rationale is given in the comments below. The VESCP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. • Not required for this application C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is Approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. • Not required for this application D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is Approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. • Tree protection is needed within the Limits of Disturbance for any tree that is to remain. - Addressed Rev. 1 • Construction Entrance must drain to a sediment trapping device, as shown partially drains to silt fence. - Addressed Rev • Remove Trench Drain and note from Erosion and Sediment Control Plan, if it were to remain it would need to have a defined terminus with proper protection, since this is a Engineering Review Comments Page 2 of 2 Stormwater item and plan being reviewed is an Erosion and Sediment Plan, remove mention from plan. - Addressed Rev. 1 • Provide Retaining Wall details, as shown on plan appears that they may need grading easement to construct - Addressed Rev. 1 • Easement for offsite grading on neighboring property must be provided. -Addressed Rev. 2 • Show final grades for home and neighboring properties, home seems to be very close to property lines and may need to tie final grading over property lines. - Addressed Rev. 1 • Extend silt fence containment to capture English Garden area. - Addressed Rev. 1 The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals, please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. After Bond is issued, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/commu nity-development/apply-for/engineering-applications