Loading...
HomeMy WebLinkAboutSUB201500124 Bond 2022-04-02internd rsc Only Dote Received: _ Fee id:_ Received by. Intake: Forevrd ro Progra.Ad ohon&Wor BOND INSPECTION REQUEST APPROVED PLAN #: sus 2015-00124 PROJECT NAME (including Phase #): stonefield - Sleek D2 (Phase 1 and 2) (As listed on the approved plan) This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please check the appropriate boa below for the requested inspection(s). Fees includes 4% Technology Fee. Inspections for the purposes of bond reduction or release will require a separate fee for each bond. ❑ VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207 & 17-208 $294.32 c Reduction T Release ® Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 S307.84 c Reduction Release ❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $307.84 - Reduction c Release ❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $344.24 Reduction (site work only) --Release TOTAL FEES $307.84 Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esints, certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request, this application shall be deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will be required. Applications may be withdrawn for a full refimd within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: steck@christophercompanies.com OR REGULAR MAIL ADDRESS: Signature of Print Name a u Date Revised 7152014, 7;202015, 11:72015, 81412017, 1,,2al2020, 7/12021