HomeMy WebLinkAboutSUB201900058 Correspondence 2022-04-04® COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
( 434.293.3719 PH 434.293.2813 FX
www.colf ns-engineeringxom
March 25, 2022
Emily Cox, PE
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Pleasant Green Connector Road Plan (SUB 201900058)
Thank you for the comments dated March 10, 2021 and the various departments' previous approvals (GIS, ARB, Fire Rescue, ACSA
and Transportation) on the above referenced project. Below are detailed responses to the remaining comments. In addition to the
minor changes noted below, the applicant would like to bring to the reviewers' attention that the previously proposed concrete box
culverts is now a proposed precast concrete Conspan structure. The applicant kindly requests you review this information and
forward this letter and the plans for final approval.
Engineering (Emily Cox)
1. This comment is acknowledged. WPO 201900027 plan approval is required prior to this plan's approval.
3. This comment is acknowledged. All permits required for work in the floodplain will be provided prior to this plan's approval.
The FDP and CLOMR have been submitted for review and approval.
11. The DBIZ has been approved, hereby addressing this comment.
Planning (Megan Nedostup)
1. The DBIZ has been approved, hereby addressing this comment.
VDOT (Max Greene)
1. This comment is acknowledged. All permits required for work in the floodplain will be obtained prior to this plan's
approval. The CLOMR and FDP have been submitted for review and approval, and the DBIZ has already been approved.
2. Notes and details for the construction of the head and end walls have been added to the plans on sheets 5 and 5A.
3. A geotechnical report was provided to VDOT. The report was subsequently approved on May 21, 2021 in an e-mail
correspondence from Mr. Brad Chapman of VDOT to Matt DuBois and Clyde Simmons of F&R, Graham Murray and Scott
Collins of CE and Max Greene of VDOT in the Charlottesville residency. Please note, an updated geotechnical report has
been submitted with this plan corresponding to the revised precast concrete Conspan structure noted above, which
replaces the previously submitted box culverts.
Should you have any questions during your review and approval of this plan, please feel free to contact Scott Collins at
scottCa)collins-engineering.com or Graham Murray at grahamPcollins-engineerine.com.
Sincerely,
Scott Collins, PE