HomeMy WebLinkAboutSDP201100011 Correspondence 2022-02-18Cameron Langille
From: Cameron Langille
Sent: Friday, February 18, 2022 2:06 PM
To: Scott Clark
Subject: RE: SP-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club
Yes, I agree. Thank you for reaching out to them, Scott.
I'm still waiting on VDH's response, but we've almost gotten this figured out!
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangille@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
From: Scott Clark <Sclark@albemarle.org>
Sent: Friday, February 18, 2022 11:52 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: SP-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club
Hi —
So, if VDOT had no objections to the existing entrance, and the manual requirements only apply to new work, it sounds
like the entrance wouldn't need to be shown on the LOR plan. Would you agree?
Thanks!
--Scott
From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov>
Sent: Friday, February 18, 2022 8:25 AM
To: Scott Clark <5clark@albemarle.org>
Cc: Cameron Langille <blangille@albemarle.org>
Subject: Re: 5P-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hello Scott,
This is fine, that verbiage is for any new proposed work to the entrance if needed.
Thanks,
Willis Bedsaul
Land Dev. Engr.-Land Use
Charlottesville Residency
Virginia Department of Transportation
540-219-5492
willis. bedsaul(a2VDOT. Virg inia.goy
On Thu, Feb 17, 2022 at 3:31 PM Scott Clark <Sclark@albemarle.org> wrote:
Hi, Willis —
We recently received a Letter of Revision application for the previous site plan for this use, rather than a new site plan
application. During the recent special use permit review, VDOT's comments (attached) found the proposal (two small
buildings, operating -season changes) "generally acceptable, " but said that "the final site plan/plat must shown
conformance with the VDOT Road Design Manual Appendices B(1) and F, " etc.
If we're not reviewing a full site plan, but just a letter of revision, could the conformity of the entrance be established
with a site check? I don't believe the applicant is proposing to change anything about the entrance, so I'm not sure if
we need to require a drawing unless standards have changed and the site no longer meets VDOT requirements.
I've pasted in the page showing the entrance on the 2011 site plan. Please let me know if anything new is needed to
show conformity with the design -manual standards, or if a VDOT site visit could confirm acceptability.
Thanks!
--Scott
From: Bedsaul, Willis <willis.bedsaul@vdot.virginia.gov>
Sent: Wednesday, January 29, 2020 9:39 AM
To: Scott Clark <Sclark@albemarle.org>
Cc: Adam Moore <Adam.Moore@vdot.virginia.gov>
Subject: SP-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Scott,
Attached you'll find the review letter on the above subject, if you have any questions please let me know.
Regards,
Willis C. Bedsaul
Land Development Engineer
Virginia Department of Transportation
Land Use-Albemarle/Green/Madison
70I VDOT Way
Charlottesville Residency
Ph# 434-422-9866
Cell# 540-2I9-5492