Loading...
HomeMy WebLinkAboutSDP201100011 Correspondence 2022-02-18Cameron Langille From: Cameron Langille Sent: Friday, February 18, 2022 2:06 PM To: Scott Clark Subject: RE: SP-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club Yes, I agree. Thank you for reaching out to them, Scott. I'm still waiting on VDH's response, but we've almost gotten this figured out! Cameron Langille (pronounced "LAN-JILL") Principal Planner Albemarle County blangille@albemarle.org 434-296-5832 x3432 401 McIntire Road, Charlottesville, VA 22902 From: Scott Clark <Sclark@albemarle.org> Sent: Friday, February 18, 2022 11:52 AM To: Cameron Langille <blangille@albemarle.org> Subject: FW: SP-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club Hi — So, if VDOT had no objections to the existing entrance, and the manual requirements only apply to new work, it sounds like the entrance wouldn't need to be shown on the LOR plan. Would you agree? Thanks! --Scott From: Bedsaul, Willis<willis.bedsaul@vdot.virginia.gov> Sent: Friday, February 18, 2022 8:25 AM To: Scott Clark <5clark@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: Re: 5P-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hello Scott, This is fine, that verbiage is for any new proposed work to the entrance if needed. Thanks, Willis Bedsaul Land Dev. Engr.-Land Use Charlottesville Residency Virginia Department of Transportation 540-219-5492 willis. bedsaul(a2VDOT. Virg inia.goy On Thu, Feb 17, 2022 at 3:31 PM Scott Clark <Sclark@albemarle.org> wrote: Hi, Willis — We recently received a Letter of Revision application for the previous site plan for this use, rather than a new site plan application. During the recent special use permit review, VDOT's comments (attached) found the proposal (two small buildings, operating -season changes) "generally acceptable, " but said that "the final site plan/plat must shown conformance with the VDOT Road Design Manual Appendices B(1) and F, " etc. If we're not reviewing a full site plan, but just a letter of revision, could the conformity of the entrance be established with a site check? I don't believe the applicant is proposing to change anything about the entrance, so I'm not sure if we need to require a drawing unless standards have changed and the site no longer meets VDOT requirements. I've pasted in the page showing the entrance on the 2011 site plan. Please let me know if anything new is needed to show conformity with the design -manual standards, or if a VDOT site visit could confirm acceptability. Thanks! --Scott From: Bedsaul, Willis <willis.bedsaul@vdot.virginia.gov> Sent: Wednesday, January 29, 2020 9:39 AM To: Scott Clark <Sclark@albemarle.org> Cc: Adam Moore <Adam.Moore@vdot.virginia.gov> Subject: SP-2019-00014 & SP-2019-00015-Blue Ridge Field Camp & Swim Club CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Scott, Attached you'll find the review letter on the above subject, if you have any questions please let me know. Regards, Willis C. Bedsaul Land Development Engineer Virginia Department of Transportation Land Use-Albemarle/Green/Madison 70I VDOT Way Charlottesville Residency Ph# 434-422-9866 Cell# 540-2I9-5492